Sie sind auf Seite 1von 4

ITEM MOVIMIENTO DE TIERRAS

1 EXCAVACION MANUAL PARA VEREDAS e=0.10mt.


2 EXCAVACION DE SARDINEL DE VEREDAS (a1=0.15, h=0.25)
3 EXCAVACION DE SARDINEL SUMERGIDO DE VEREDAS (a=0.15, h=0.45)
4 EXCAVACION DE SARDINEL PERALTADO (a=0.15, h=0.60)
5 EXCAVACION PARA MUROS DE CONTENCION
6 EXCAVACION A NIVEL DE SUB RASANTE C/EQUIPO
7 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO
8 ELIMINACION DE MATERIAL EXCEDENTE. CARG. 125HP VOLQ 10m3, Dp= 10 KM

ITEM VEREDAS Y SARDINELES

1 CONFORMACION DE SUBRASANTE (NIV. Y COMPACT.) PARA VEREDAS


2 BASE GRANULAR PARA VEREDAS MANUAL E=0.10M
3 VEREDA Co.F´C=175 kg/cm2 TIPO V, E=0.10M PREMEZCLADO TIPO V, ACAB. Mo C:A SEMIP./BRUÑAS
4 CONCRETO PREMEZC. F 'c=175 kg/cm2. EN SARDINEL DE VEREDA, TIPO V, (a=0.15, h=0.25mt.)
5 ENCOFRADO Y DESENCOFRADO DE SARDINEL DE VEREDA
6 ACERO DE REFUERZO FY=4200 KG/CM2
7 CONCRETO PREMEZCLADO F´C=175 kg/cm2. TIPO V, EN ESCALERAS, ACAB. Mo C:A
8 ENCOFRADO Y DESENCOFRADO DE ESCALERA
9 CONCRETO PREMEZC. F´C=175 kg/cm2. TIPO V, EN SARDINEL SUMERGIDO (a=0.15, h=0.45mt.)
10 ENCOFRADO Y DESENCOFRADO DE SARDINEL SUMERGIDO (a=0.15, h=0.45mt)
11 CONCRETO PREMEZC. F´C=175 kg/cm2.TIPO V, EN SARDINEL PERALTADO (a=0.15, h=0.60mt.)
12 ENCOFRADO Y DESENCOFRADO DE SARDINEL PERALTADO
13 ACERO DE REFUERZO FY=4200 KG/CM2
14 CONCRETO PREMEZC. F´C=175 kg/cm2. TIPO V EN RAMPAS
15 ENCOFRADO Y DESENCOFRADO DE JUNTAS DE 3/4"
16 JUNTAS DE DILATACION C/ ASFALTO E=3/4"

ITEM PAVIMENTOS

1 CONFORMACION Y COMPACTACION DE LA SUBRASANTE MEJORADA C/EQUIPO (mat. prestamo e=0.10m.)


2 SUB BASE AFIRMADO C/EQUIPO E=0.20mt.
3 BASE GRANULAR C/EQUIPO E=0.20 m
4 IMPRIMACION ASFALTICA
5 CARPETA ASFALTICA EN CALIENTE E= 0.05M
ITEM MUROS DE CONTENCION

1 CONCRETO F´C=210 kg/cm2. MURO DE CONTENCION PREMEZC., TIPO V


2 ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCION CARAVISTA
3 ACERO DE REFUERZO FY=4200 KG/CM2
4 SOLADO PARA ZAPATAS MEZCLA 1:12 C:H, E=0.05M.

ITEM SEÑALIZACION

1 PINTURA LINEAL CONTINUA E=0.10 M


2 PINTURA LINEAL DISCONTINUA E=0.10 M
3 PINTURA DE SIMBOLOS, LETRAS Y ZONAL
4 PINTURA EN POSTES COLOR VERDE Y BLANCO
5 SEÑALIZACION VERTICAL
6 PINTURA DE SARDINELES

ITEM VARIOS

1 CURADO DE LOSA CON ADITIVO TIPO MEMBRANA


2 NIVELACION DE TAPAS DE AGUA
3 NIVELACION DE TAPAS DE DESAGUE
4 NIVELACION DE TAPAS DE BUZON
5 SEMBRADO DE GRASS AMERICANO
6 REUBICACION DE POSTES
7 NIVELACION DE TAPAS DE CAMARAS REDUCTORAS DE PRESION
METRADO EXP. METRADO REAL COSTO EXP. COSTO REAL DIFERENCIA
UND P.U
TECNICO EJECUTADO TECNICO EJECUTADO COSTO
m3 31.67 2,140.41 7,055.18 S/67,786.78 S/223,437.55 S/155,650.77
m3 35.63 389.15 588.03 S/13,865.41 S/20,951.52 S/7,086.11
m3 40.72 828.09 690.32 S/33,719.82 S/28,109.97 S/5,609.86
m3 40.72 28.44 76.66 S/1,158.08 S/3,121.60 S/1,963.52
m3 40.72 3,540.40 S/144,165.09 S/0.00 S/144,165.09
m3 8.85 60,798.08 49,070.80 S/538,063.01 S/434,276.58 S/103,786.43
m3 17.24 3,325.15 0.00 S/57,325.59 S/0.00 S/57,325.59
m3 26.40 85,910.44 71,851.24 S/2,268,035.62 S/1,896,872.80 S/371,162.82

METRADO EXP. METRADO REAL COSTO EXP. COSTO REAL DIFERENCIA


UND P.U
TECNICO EJECUTADO TECNICO EJECUTADO COSTO

m2 12.56 21,404.07 18,104.98 S/268,835.12 S/227,398.54 S/41,436.58


m2 23.38 21,404.07 18,104.98 S/500,427.16 S/423,294.42 S/77,132.74
m2 37.91 20,334.23 18,104.98 S/770,870.66 S/686,359.77 S/84,510.89
m3 335.25 466.60 746.09 S/156,427.65 S/250,128.18 S/93,700.53
m2 32.69 3,732.16 4,147.35 S/122,004.31 S/135,576.97 S/13,572.66
Kg 4.10 2,250.96 0.00 S/9,228.94 S/0.00 S/9,228.94
m3 339.69 81.00 154.15 S/27,514.89 S/52,363.21 S/24,848.32
m2 48.08 845.93 597.78 S/40,672.31 S/28,741.26 S/11,931.05
m3 335.25 816.97 776.61 S/273,889.19 S/260,359.78 S/13,529.41
m2 37.10 10,892.88 10,354.85 S/404,125.85 S/384,164.97 S/19,960.88
m3 335.25 28.44 114.99 S/9,534.51 S/38,550.45 S/29,015.94
m2 43.18 379.17 S/16,372.56 S/0.00 S/16,372.56
kg 4.10 1,398.80 0.00 S/5,735.08 S/0.00 S/5,735.08
m2 41.57 377.20 289.80 S/15,680.20 S/12,046.99 S/3,633.22
m 3.71 3,910.40 3,158.14 S/14,507.58 S/11,716.70 S/2,790.89
m 4.04 3,910.40 3,158.14 S/15,798.02 S/12,758.88 S/3,039.13

METRADO EXP. METRADO REAL COSTO EXP. COSTO REAL


UND P.U DIFERENCIA
TECNICO EJECUTADO TECNICO EJECUTADO

m2 8.55 55,973.72 52,051.46 S/478,575.31 S/445,039.99 S/33,535.32


m2 14.11 55,973.72 52,051.46 S/789,789.19 S/734,446.10 S/55,343.09
m2 17.95 55,973.72 52,051.46 S/1,004,728.27 S/934,323.71 S/70,404.56
m2 2.84 55,973.72 52,051.46 S/158,965.36 S/147,826.15 S/11,139.22
m2 27.93 55,973.72 52,051.46 S/1,563,346.00 S/1,453,797.28 S/109,548.71
S/3,715,433.23 S/279,970.90
METRADO EXP. METRADO REAL COSTO EXP. COSTO REAL
UND P.U DIFERENCIA
TECNICO EJECUTADO TECNICO EJECUTADO

m3 332.44 507.13 833.69 S/168,590.30 S/277,151.90 S/108,561.61


m2 78.80 4,313.83 5,069.81 S/339,929.80 S/399,501.03 S/59,571.22
kg 4.10 48,986.13 68,049.72 S/200,843.13 S/279,003.85 S/78,160.72
m2 16.53 1,088.76 1,413.68 S/17,997.20 S/23,368.13 S/5,370.93
S/727,360.44 S/979,024.91 S/251,664.48

METRADO EXP. METRADO REAL COSTO EXP. COSTO REAL


UND P.U DIFERENCIA
TECNICO EJECUTADO TECNICO EJECUTADO

m 10.47 6,233.83 6,233.83 S/65,268.20 S/65,268.20 S/0.00


m 12.86 684.00 684.00 S/8,796.24 S/8,796.24 S/0.00
m2 21.36 1,759.62 1,759.62 S/37,585.48 S/37,585.48 S/0.00
und 17.53 499.00 499.00 S/8,747.47 S/8,747.47 S/0.00
und 354.98 194.00 194.00 S/68,866.12 S/68,866.12 S/0.00
m2 10.72 4,930.43 4,930.43 S/52,854.21 S/52,854.21 S/0.00

METRADO EXP. METRADO REAL COSTO EXP. COSTO REAL


UND P.U DIFERENCIA
TECNICO EJECUTADO TECNICO EJECUTADO

m2 1.36 21,404.07 18,104.98 S/29,109.54 S/24,622.77 S/4,486.76


und 101.69 927.00 927.00 S/94,266.63 S/94,266.63 S/0.00
und 99.44 1,047.00 1,047.00 S/104,113.68 S/104,113.68 S/0.00
und 327.40 56.00 56.00 S/18,334.40 S/18,334.40 S/0.00
m2 14.64 10,335.00 9,969.45 S/151,304.40 S/145,952.75 S/5,351.65
und 138.48 10.00 24.00 S/1,384.80 S/3,323.52 S/1,938.72
und 101.69 2.00 2.00 S/203.38 S/203.38 S/0.00

Das könnte Ihnen auch gefallen