Process Flow Diagram

LP Fuel Users
- Flare Purges & Pilots
Power Plant - Back - up Heaters
GAS 8 x SGT-800 - Accommodation Area
376 MW
FUEL GAS
HYDROCARBON LIQUID
WATER METHANOL
Future

BOG
Booster CO2 Rejected Compressors
Compressors Unit 034
from Feed Gas Flare Losses
Unit 007

Wells & Gas Driers LPG Liquefaction LNG


Inlet line Separation
Gathering Slug Catchers AGRU
Hg-Guard Extraction 2 x GE Frame7 4 x 160 000 m3
Manifold Unit 103/203
Unit 104/204
Unit x11
Network Unit 003 2 x 4 sep Unit x12 Unit x13 Unit x14 Unit 034
LNG
170 000 m3
3100-G-003-PR-PFD-00101 3100-G-103-PR-PFD-00201 111-PR-PFD-00001 – 112-PR-PFD-00001 – 113-PR-PFD-00001 – 114-PR-PFD-00001 – 034-PR-PFD-00001 –
– Inlet Line Manifold – Slug Catcher Acid Gas Absorption Dehydration and LPG Extraction Liquefaction Feed – Gas LNG Storage and Loading
Gas Heating 111-PR-PFD-00002 – Mercury Removal Pre-Cooling 034-PR-PFD-00002 –
Unit 008 Solvent Regeneration 114-PR-PFD-00002 – LNG BOG Handling
2 heaters 111-PR-PFD-00003 – Cryogenic Exchanger 034-PR-PFD-00003 –
Methanol Regeneration 114-PR-PFD-00003 – BOG Flare Package
Unit Liquefaction Propane
3100-G-000-PR-PFD-00502 Compressor and Drum
– Separation Unit 114-PR-PFD-00004 –
Liquefaction Propane
Ethane
3 trains Refrigeration
2 x 500 m3
Unit 031
Fractionation Propane
2 х 66% 2 x 1 000 m3
Unit 615/715 Unit 031

Stabilization Gas 031-PR-PFD-00001 –


615-PR-PFD-00001 –
Compression Fractionation Deethaniser
Ethane Storage
031-PR-PFD-00002 –
Unit 006 and Depropaniser
Propane Storage
3 str 615-PR-PFD-00002 –
Fractionation Debutaniser

3100-G-006-PR-PFD-01102 –
Stabilization Gas Compression
Unit

Condensate
Stabilization 3 x 50 000 m3
Unit 105/205
Unit 035
Condensate
035-PR-PFD-00001 –
57 000 m3
3100-G-105-PR-PFD-01202 –
Condensate Stabilization Unit Condensate Storage
and Loading

Methanol Methanol
Recovery Day Tanks
(4 Units) 4 x 100 m3
Unit x21 Unit 020

3100-G-021-PR-PFD-00802 – 3100-G-020-PR-PFD-03150 –
Methanol Regeneration Unit Methanol Day Tanks with Pump House

Methanol
Storage
3 x 5 000 m3 Methanol
5 000 m3
Inlet Facilities

Gas

Inlet Valve
Station
Unit 003 Gas/Liquid Condensate Stabilization Gas Heating Compressors
Separation & Heating Unit 105 Unit 008 (2 + 1)
Unit 104 Unit 006

Slug Catchers
Unit 103/203

Gas/Liquid Condensate Stabilization


Separation & Heating Unit 205
Unit 204

Gas

Gas Condensate

Water Methanol
Regeneration Condensate
Methanol Unit x21
х4
Water/Methanol
Water

Methanol Methanol
Day Tank Day Tank
Methanol Methanol
to Wells from Trains

Methanol Methanol
Day Tank Day Tank
Unit 020
Inlet Facilities
Inlet Valve Station
Unit 003
Methanol dosing System

C
LGHA case

Temperature, ⁰C

C Pressure, kPa abs


Mass flowrate, kg/h

C
Methanol from methanol Day Tanks

C Reservoir Gas
Reservoir Gas from well pad 7 to Slug Catcher
3

Reservoir Gas from well pad 35 7.1

7 300

Reservoir Gas from well pad 1 1 223 920

Reservoir Gas from well pad 44

Methanol dosing System

C
Methanol from methanol Day Tanks

Reservoir Gas from well pad 47

Reservoir Gas from well pad 2

Reservoir Gas from well pad 45

Reservoir Gas from well pad 39

Methanol dosing System

C
Methanol from methanol Day Tanks

C
Reservoir Gas from well pad 46

Reservoir Gas from well pad 25 7.1

7 300

1 223 920 Reservoir Gas


Reservoir Gas from well pad 30
to Slug Catcher
Slug Catcher
Unit 103
Temperature, ⁰C
String 1
Pressure, kPa abs
-103- -5.0 ÷ 10.1
Mass flowrate, kg/h
1 900 ÷ 7 270

1 083 826 ÷ 1 124 819


Reservoir Gas
to Separation Unit

-20.0 ÷ 10.0

1 900 ÷ 7 270

887 298 ÷ 1 162 474


Reservoir Gas
from ILM

-5.0 ÷ 10.1

1 900 ÷ 7 270
Slug Catcher
103-V-001 20 202 ÷ 80 566
Condensate
to Stabilization Unit

Liquid
mesh filter
A,B
Semisubmersible Pump 103-S-001 A/B
103-P-001
Return drains
to Stabilization Unit

Drain
Vessel -5.0 ÷ 10.1
103-V-002
1 900 ÷ 7 270

1 083 826 ÷ 1 124 819


Reservoir Gas
to Separation Unit
String 2
-20.0 ÷ 10.0 -203- -5.0 ÷ 10.1
1 900 ÷ 7 270
1 900 ÷ 7 270
887 298 ÷ 1 162 474
Reservoir Gas 20 202 ÷ 80 566
Condensate
from ILM
to Stabilization Unit
Separation units 104/204
Heating unit 008

Unit 104 Gas to


7.3 LNG Plant
7 300

394 641
7.3 7.3

7 300 7 300
Separator Separator Separator Separator
1 183 920 2 367 840 Booster
7.3
Compession
7 300

1 209 7.3
Station
395 850 395 850 395 850 0
7 300 6 x 25 MW
3 627

Condensate to
Gas from
7.3
Stabilization
7 300
Existing
Slug Catchers 1 187 550

Future

7.1

7 300

2 366 720

Unit 204 Unit 008


7.3

7 300

Gas from 394 641


7.3

Stabilization Gas Separator Separator Separator Separator


7 300

1 183 920
Compressors 7.3 HTF (Hot oil)
7 300

1 209
60.0 7.3

7 300 395 850 395 850 395 850 0 7 300

8 380 3 627

Condensate to
7.3
Stabilization HTF (Hot oil)
7 300

1 187 550

2 x 50%
2 х 6,9 MW

Temperature, ⁰C
Gas
Pressure, kPa abs

Unstable condensate Mass flowrate, kg/h

Heating applies only in case of Feed gas temperature below minus 3⁰


Condensate Stabilization. Units 105/205

Unit 105
39.7
Stabilization gas
39.7 1 950 to 2nd stage
1 950 5 640 of compression

3- phase Stabilization gas


45.0
Separator 650 to 1st stage
2 794 of compression
10.0
40.0 45.0
2 020
650
Unstable condensate 3.2 HTF (Hot oil) 2 000
2 820 1 397
from Slug Catchers 2 100
29 715
& Separation Unit
Degasser T

7.1
Heat Exchangers 40.0 38.4
44 182 2 000 710
7 250 26 895 13 448
88 364 40.0
2 020
Water / Methanol 61.3 29 715 40.0
3- phase
to Methanol 780 2 000 Separator
113.6
Regeneration 3- phase
26 895
790 Stabilization
Separator Column
8.3 14 492
150 38.8 105.0
28 984 850 800
13 448

Heat
Exchanger 149.8
800
25 498 HTF (Hot oil)
40.0 40.0
730 730 Stable Condensate
Air Cooler 25 498 50 996
to Storage
NNF

Emergency Unstable
Drain Drum Condensate Drum

3 х 100 m3

Unit 205

Unstable condensate
Temperature, ⁰C Stable condensate
Pressure, kPa abs Water/Methanol
Mass flowrate, kg/h Gas
Stabilization Gas Compression. Unit 006

Compression unit 1

Gas from 1st stage


Condensate 45.0 45.0 Separator Air Cooler
650 650
Stabilization
2 794 1 397
Column 118.4
45.0
2 000
650
Gas from 39.7 39.7 60.0 1 397

Condensate 1 950 1 950 1 950


5 640 2 820
Degasser
45.2 Compressor
4 217
45.2
nd
2 stage 1 950
Separator 4 189
60.0 Gas
7300
to Inlet
Air Cooler 8 380
Separators

155.6
7 350

Compression unit 2

Temperature, ⁰C
Pressure, kPa abs Compression unit 3
Mass flowrate, kg/h
Methanol Regeneration Unit x21

Gas to
Gas to
LP Flare Header
LP Flare Header

Water/Methanol
mixture
-5.0
from Condensate 151
Stabilization 19 335
45.0 Reflux
120
Drum
75.0
140
3-phase 15 984
separator 45.0
120
-5.0 45.2 15 984
151 -4.9 8 791 500
9 151 210 50.0
19 324 167
19 325 Methanol
Bottoms water to 20.0
Distillation Reflux to Day Tanks
water treatment 565 7 193
12 179 615 20.0 Column pump (96.5% mass.)
facilities 150

119.8
200
HC liquid to Heat exchanger 12 179
Condensate 1.4 MW
Stabilizer
NNF
HTF (hot oil)

Water/Methanol
Max MeOH case Water
Temperature, ⁰C Methanol
Pressure, kPa abs HC Liquid
Mass flowrate, kg/h Gas
Methanol Day Tanks
Unit 020

Methanol from Methanol


Regeneration Unit

Methanol
from Upper Storage

Methanol drains from equipment

Methanol
from LNG Plant

Semisubmersible
Pump М

Q=20 m3/hr
Methanol Drain
Tank
From tank truck
PC

Nitrogen

Proportioning Kerosene
Methanol Day Tank Pump Tank
100 m3

Methanol Day Tank Methanol


100 m3 to ILM and
PC
to Wells

Methanol Day Tank


100 m3 Methanol Pump
Block

Temperature, ⁰C
Pressure, kPa abs Methanol
Methanol Day Tank Nitrogen
Mass flowrate, kg/h
100 m3
Unit x11- Acid Gas Removal

Treated Gas
Acid Gas
40.0 N2 -CO2 96%
6 640 -H2O 2%
852 352 22.0 -Methanol 1,5%
22.0
45.0 130
130
6 640 98.5 6 988
Regeneration Gas 140 539 433
150 13 543

from Dehydration Overhead


vapor Reflux
AGR AGR 32.0
Drum
150
Absorber 46.3 Regenerator
to Flare 320 6 046
Water/Methanol
168 647

Feed Gas
35.0
6 660 35.3
to Methanol
from Inlet
900 Distillation
119

Facilities
46.5
Flash Gas to 140 108.2
Distilled Water
14.5
6 883
34.7
6 833
859 020 900
Condensate
793 959 Stabilization
35.3
6 660 Flash 118.3
HC liquid to 146 914
Vessel 170 HTF (Hot oil)
Condensate 140 539
NNF

Stabilization
Rich Solvent 35.3 Lean Solvent
31.1 900
Water from 900 148 037
1 858 Water/Methanol
Dehydration
LGHA case Water
Temperature, ⁰C Rich Solvent

Pressure, kPa abs Lean Solvent

Mass flowrate, kg/h Gas


Acid gas removal unit - Methanol recovery

-42% CO2
LGHA case -40% N2
30.0 -15% Methanol
Temperature, ⁰C Water/Methanol 130
15
Pressure, kPa abs Water N2
Mass flowrate, kg/h Methanol
71.5
130 30.0 Reflux
1 986 130
Drum

Air cooler

30.0
130
1 471
Water/Methanol N2
22.0
mixture 180
From AGR 6 556
91.4 30.0
130
Reflux 351
pump 500

Distilled Water 32.0 Distillation


150
Column Methanol to storage
6 046
( 92% mass.)

103.2
525

HTF (Hot oil)


Dehydration & Mercury Removal. Unit x12

Regeneration
Gas to AGRU

Dehydrators 290.0
30.0 47.5
5 696 6 833
(2 Adsorption + 1 Regeneration) 5 756

65 783
30.0
5 706
65 062
M
850 745

31.0
40.0
6 640 30.0
900 Water
5 696 721
852 352 M 6 496
to AGRU

Feed from AGRU


Mercury 29.2
Guard Bed 6 151
Fuel
42 000
Gas
31.2
900

1 137 29.2
29.8 6 151
6 301
743 014
785 014
Water to AGRU
Treated Gas
30.0
6 351
65 000
to LPG Extraction
850 014

LGHA case FY

Temperature, ⁰C Gas
290.0
Pressure, kPa abs Water 5 771

Mass flowrate, kg/h Fuel Gas

Regeneration Gas
LPG Extraction. Unit x13

LGHA case Feed Gas


Temperature, ⁰C Gas 4 000 to Methanol synthesis
Pressure, kPa abs LPG, C2/C3
24.2
Mass flowrate, kg/h Future 4 378
13.9 17.0
3 900 24.3 70.1 7 200 16.0 Feed Gas
710 498 4 398 7 270 706 498 719 360 to Liquefaction
Suction
Expander Drum

Recompressor Booster
537 383
compressor
-64.6
4 000
29.2
Treated Gas 6 151 20.0
29.0
from Dehydration 743 148 6 101 Cold Box -61.6 4 010

179 128

6 001

716 511 -60.3 4 010


Demethaniser

-38.0 -44.5
6 051 4 020
22.0
26 637
3 970 C2+ to
46 078 Fractionation
LT Separator
91.3 120.0
13 429 7 770
C2/C3 Recycle from Fractionation 28.7 129 894 4 020

13 076 41.8 7 400


LPG from Fractionation
Liquefaction. Unit x14
-154.9 -155.4
LNG
5 706 800 to Tank Feed Gas from LPG Extraction
LGHA case

Temperature, ⁰C
15.9
Pressure, kPa abs
G -36.9 Return to Compressors 7 200

126 -20.0 -4.0


719 358 Mass flowrate, kg/h
LNG Expander 112 512 244 419

109 024 132 620 Propane Propane


-33.9
-17.0 -1.0
Vaporisers Mixed Refrigerant
7 050

Feed/LP Feed/MP Dry Feed/HP Natural Gas


112 512 221 536 354 156 38 446

to Frac
-36.9 Return to Compressors
126 -20.0 -4.0
343 822 244 419

434 991
HP MR -33.9
428 212 602 988 Propane
Separator 5 670 -17.0 -1.0 Vaporisers
HP MR/LP HP MR/MP HP MR/LP

343 822 772 033 1 375 021


-33.9

Main Cryogenic 7 050

719 358
Heat Exchanger 1 127 531

17.0
5 820
-38.3
-38.6 1 562 660
442
417 16.8
1 562 660
781 721 2 545 17.0 2 480

14.0

79.4 1 033
Propane 1 767 623

LP HP
-37.2 31.0
-20.8
111
219 -4.6
494 780
LP 394
55.6 39.1
32.0
247 832 126 -36.6
1 133
from Frac 1 223
MP 1 767 623
Return 537 236 268 218 244 -20.0
884 254

from HP
Kettles 367 804 419 -4.0

735 608

Compressor/ Driver String B


Condensate & “LPG” flows on Layout

C2+ from PRODUCTION LNG TRAIN №3


LPG
extraction
Unit

PRODUCTION LNG TRAIN №2 LPG to LPG


Extraction Unit

Condensate to
Condensate GAS CONDENSATE
Storage STORAGE AREA

INLET FACILITIES
PRODUCTION LNG TRAIN №1 Condensate to
Condensate
Storage

STORAGE BULLETS

Propane to
Refrigerant
Storage Unit
FRACTIONATION AREA

Ethane to
Ethane Refrigerant
Propane
Butane Storage Unit
Condensate
Fractionation. Units 615/715

LPG Recycle
to LPG Extraction Unit

-11.7 Ethane 36.0 30.0 Propane 16.8 28.7


7 870 to Refrigerant 7 870 1 520 to Refrigerant 7 870 7 770
6 595 Storage Unit 10 387 1 566 Storage Unit 4 337 20 145

-11.9 7 500

2 745

Propane 485
Refrigerant 48.8
7 870 LPG
22 774 to Liquefaction Unit

41.7
7 870

19 610

22.7 93.3 104.5

C2+ from LPG 1 650 1 631 1 160

extraction Unit 69 117 62 038 50 085

C2+ LGHA case


Deethaniser Depropaniser Debutaniser
Ethane
Temperature, ⁰C
Propane
Pressure, kPa abs
Butane
Condensate Mass flowrate, kg/h

126.0
581 Condensate
27 310 22.0 to Condensate
Storage
Ethane Storage

Ethane from/to Ethane Filling


Fractionation to Liquefaction
NNF

Ethane Vapour Ethane Vapour


from Fractionation to Liquefaction

PC

NNF
CD

PC

NNF

PC

NNF
CD

-13.0

2 745

PC 988

Ethane Ethane
Storage Bullet Storage Bullet
500 m3 500 m3

LGHA case
7 450
5.0 Temperature, ⁰C
12 986
FC 2 745 Pressure, kPa abs
Mass flowrate, kg/h
Propane Storage
Propane Propane make-up
from Fractionation to Liquefaction

NNF NNF
CD CD

551

FC 3 132

N2 N2

PC PC

PC PC

Propane Storage Bullet Propane Storage Bullet


1 000 m3 1 000 m3
LGHA case 1 850
5.0
Temperature, ⁰C 551
65 254

Pressure, kPa abs


Mass flowrate, kg/h
LNG Storage and Loading

Ship BOG to BOG


Compressors/Flare
-121.9

106

39 765
M

PC -157.0

106
-153.0 107.0 60.0
163 144 BOG Compressor
-155.9 102 3 970 3 920
Aftercooler
413 м 54 381

719 358
LNG Storage Tank
160 000 m3 BOG Compressor

BOG Compressor
Suction Drum M

PC

-153.0 107.0 60.0


BOG Compressor
102 3 970 3 920
-155.9 Aftercooler
To/From Fuel Gas
413
м 54 381
System
719 358
LNG Storage Tank BOG Compressor
LNG from Liquefaction 160 000 m3 LNG Loading Arms 60.0

BOG Compressor 3 894


Suction Drum
M 163 144
2 158 074

PC

-153.0 107.0 60.0

102 3 970
BOG Compressor
3 920
-155.9 Aftercooler
м 54 381
413

719 358
LNG Storage Tank BOG Compressor
160 000 m3
BOG Compressor
Suction Drum M

PC

BOG Compressor LNG


-161.1 Aftercooler
708 м BOG

6 202 700
BOG Compressor
LNG Storage Tank LGHA case, loading
160 000 m3 Temperature, ⁰C
BOG Compressor
Suction Drum Pressure, kPa abs
Mass flowrate, kg/h
Condensate Storage and Loading

Condensate from
Condensate
89 982
Stabilization

25.0

301

Condensate from
Fractionation

Condensate
Storage Tank
54 622
-10.0 Stabilised
50 000 m3
Condensate
502
Loading Arms
2 996 000

Stabilised
condensate
Fiscal metering
Package

PC
Condensate
Storage Tank
50 000 m3
-10,0

1 238

5 992 000

LGHA case

Temperature, ⁰C
Condensate
Storage Tank Pressure, kPa abs
50 000 m3 Mass flowrate, kg/h
HOT OIL heating loop

046-V-001 A/B
COMMON HTF
HOT OIL
EXPANSION DRUMS

to COMMON
HTF WATER/
GLYCOL
046-E-006 A/B
046-E-150 COMMON
COMMON HTF HVAC HEATERS
046-S-001 HOT OIL
COMMON HTF from COMMON
TRIM COOLER
HOT OIL HTF WATER/GLYCOL
SLIP STREAM FILTER
050-E-002 050-E-004 1/239-И-1 1/2/331-И-1 615-E-003 615-E-005 615-E-007 715-E-003 715-E-005 715-E-007
SECONDARY PRIMARY STABILIZER METHANOL DEETHANISER DEPROPANISER DEBUTANISER DEETHANISER DEPROPANISER DEBUTANISER
046-P-002 A/B/C COMMON HP COMMON HP REBOILER REGENERATION REBOILER REBOILER REBOILER REBOILER REBOILER REBOILER
COMMON HTF HOT OIL FG HEATER FG HEATER REBOILER
COMMON CIRCULATION PUMP
WASTE HEAT -WATER/GLYCOL LOOP
RECOVERY UNIT
COMMON HP & LP FUEL GAS INLET FACILITIES FRACTIONATION TRAIN 1 FRACTIONATION TRAIN 2

POWER
GENERATION

046-P-001 A/B/С
EXHAUST
COMMON HTF
from GTG TRAIN 3
HOT OIL
A/B/C/D
CIRCULATION PUMP

TRAIN 2

TRAIN 1
046-S-002
COMMON HTF
HOT OIL
PUMP OUT FILTER 046-P-004
046-T-001 COMMON HTF HOT OIL
COMMON HTF HOT OIL PUMP OUT PUMP
STORAGE TANK
146-V-001
046-P-003 LNG TRAIN
COMMON HTF 046-H-010 A/B
HTF HOT OIL
HOT OIL COMMON HTF HOT OIL
EXPANSION DRUM
TRANSFER PUMP STORAGE HEATERS

146-E-140
LNG TRAIN HTF HOT OIL
LT TRIM COOLER

to TRAIN
146-S-001 HTF WATER/GLYCOL
LNG TRAIN HTF
HOT OIL 146-E-003
SLIP STREAM FILTER LNG TRAIN
HVAC HEATER
111-E-008 111-E-005 150-E-001 111-E-003 A/B 113-E-003
from TRAIN METHANOL INLET LNG TRAIN AGR REGEN DEMETHANISER
HTF WATER/GLYCOL DISTILLATION GAS HEATER HP FG HEATER REBOILER REBOILER
REBOILER

146-E-001 A
HTF HEAT
RECOVERY COIL
146-P-001 A/B/С
LNG TRAIN EXHAUST FROM 146-E-120
HTF HOT OIL 114-CGT-010 A LNG TRAIN HTF HOT OIL
CIRCULATION PUMP TRIM COOLER

146-E-001 B
HTF HEAT
RECOVERY COIL
EXHAUST FROM
114-CGT-010 B
HTF Water/Glycol heating loop

CENTRAL CONTROL
BUILDING

POWER HTF
SUBSTATION
GENERATION HOT WATER
110 kV
BUILDING MODULE

047-V-001 A/B
COMMON HTF LNG TRAIN 3
WATER/GLYCOL
EXPANSION DRUMS

AGR MAKE-UP
PUMPS MODULE
AND COMMON HOT
SUBSTATION MAIN
OIL SUBSTATION
UTILITIES

to COMMON
HTF HOT OIL 047-F-110 LNG TRAIN 2
047-S-001 HVAC BACK-UP
COMMON HTF HEATER
WATER/GLYCOL LNG STORAGE AND
046-E-006 A/B
SLIP STREAM FILTER BOG AREA
COMMON
HVAC HEATERS

from COMMON N2
HTF HOT OIL
FUEL GAS
DEMINERALISED GAS CONDENSATE
CHEMICAL STORAGE HVAC HEATING COMMON HTFS AND LNG TRAIN 1
WATER AIR AND METERING SKID
WAREHOUSE AREA MODULE HTF STORAGE AREA
NITROGEN AREA

TRAIN 1
to TRAIN
HTF HOT OIL
146-E-003 FRACTIONATION CONDENSATE
INLET FACILITIES TRAIN 1 AND 2 STORAGE AREA
LNG TRAIN E-36
047-V-002 HVAC HEATER
COMMON HTF from TRAIN
WATER/GLYCOL 047-P-001 A/B/С HTF HOT OIL
SUMP DRUM COMMON HTF
WATER/GLYCOL REFRIGERANT
CIRCULATION PUMP STORAGE AREA
047-T-002
047-S-002 HVAC BACK-UP TRAIN 2
COMMON HTF HEATER DIESEL
WATER/GLYCOL BUFFER TANK HP FLARE FACILITIES
047-P-003 DRAIN FILTER
COMMON HTF
WATER/GLYCOL TRAIN 3
DRAIN PUMP

047-S-003
047-T-001 HVAC BACK-UP
COMMON HTF HEATER DIESEL
WATER/GLYCOL 047-P-004 A/B FILTER
STORAGE TANK HVAC BACK-UP
HEATER DIESEL
BOOSTER PUMPS
047-H-001 A/B
COMMON HTF
047-P-002
WATER/GLYCOL DIESEL
COMMON HTF WATER/GLYCOL
STORAGE HEATERS
TRANSFER PUMP
HTF Hot Water heating loop

to
Atmosphere

N2

048-V-001
COMMON HTF
HOT WATER
EXPANSION DRUM

CENTRAL SECURITY
ADMINISTRATION
BUILDING &
AREA
MAINGATE HOUSE

048-S-001
COMMON HTF
HOT WATER INFRASTRUCTURE/
SLIP STREAM FILTER ACCOMADATION
AREA

to HTF
WATER-GLYCOL

from HTF
WATER-GLYCOL
048-E-001
COMMON HTF
HOT WATER
HEATER
048-P-001 A/B
COMMON HTF
HOT WATER
CIRCULATION PUMP
Service and Instrument Air System

Unit 46/47/48 Unit 50


LNG TRAIN 3
HEATING MEDIUM FUEL GAS

to Plant Nitrogen
Package
Load Sharing
Regeneration Gas
System PC to Service Air
to Atmosphere Unit 40
Headers in Plant
POWER GENERATION LNG TRAIN 2
to Dry Compressed
Air Distribution
м PC to Instrument Unit 11
Air Distribution SOLVENT STORAGE LNG TRAIN 1

Unit 71
NITROGEN SYSTEM Unit 33/34
Glycol Water LNG STORAGE AND
Closed Loop Unit 112
Unit 111/150 Unit 113 LOADING
070-S-003/4 DEHYDRATION &
PC 070-S-001/2 AGR & FUEL GAS LPG EXTRACTION
PC Instrument Air MERCURY REMOVAL
Wet Air Receiver
E-18 E-15 E-17 E-13 Receiver
Silencer
Silencer

Unit 70 Unit 78
м AIR SYSTEM DEMINERALIZED WATER Unit 160
070-V-002 FLARE
070-V-001 A/B Unit 146 Unit 114
A/B 070-U-202 A/B INSTRUMENT HOT OIL LIQUEFACTION Unit 35
WET AIR INSTRUMENT AIR AIR CONDENSATE STORAGE
RECEIVERS DRYERS RECEIVERS AND LOADING
AIR COMPRESSORS INLET FACILITIES
070-K-110/120/130

AIR COMPRESSORS E-14 E-16


070-K-140/150/160

Unit 31
Unit 60 REFRIGERANT STORAGE
to Oil Contaminated FLARE Unit 715 Unit 615
System FRACTIONATION TRAIN 2 FRACTIONATION TRAIN 1
Nitrogen System

071-U-130

071-U-131

LIQUID N2 LIQUID N2
STORAGE TANK PRESSURE STORAGE TANK PRESSURE
071-T-132 BUILD UP 071-T-131 BUILD UP
VAPORISER VAPORISER
TRIM HEATER 071-E-134 071-E-133
LIQUID NITROGEN
071-H-132 A
VAPORIZER
071-E-131 A/B/C

В КОЛЛЕКТОР

LIQUID NITROGEN
TRIM HEATER VAPORIZER
071-H-132 B 071-E-135 A/B/C

071-U-110

CONDENSER/
WASTE N2 PURE N2 EVAPORATOR DRAIN
VENT SILENCER VENT SILENCER VESSEL VAPORISER
071-ES-114 071-ES-113 071-V-114 071-E-119/129 Unit 46/47/48
HEATING MEDIUM
*
CONDENSER/ LNG TRAIN 3
EVAPORATOR
EXCHANGER
REGENERATION GAS 071-E-114
VENT SILENCER
071-ES-111
Unit 40
POWER GENERATION
MAIN HEAT
EXCHANGER LNG TRAIN 2
071-E-113

REGENERATION Unit 11
HEATER SOLVENT STORAGE
071-E-111 LNG TRAIN 1
Unit 33/34
LNG STORAGE AND
LOADING
Unit 112
Unit 111 Unit 113
ADSORBER DEHYDRATION &
DISTILLATION AGR LPG EXTRACTION
VESSEL MERCURY REMOVAL
COLUMN
071-V-111 B 071-C-111
DUST FILTER AIR FAN
071-S-113 A AFTERCOOLER
Unit 78
071-E-118
DEMINERALIZED WATER
ADSORBER
VESSEL Unit 35
Unit 146 Unit 114
071-V-111 A CONDENSATE STORAGE
HOT OIL LIQUEFACTION
AIR FAN WATER
M M AND LOADING
From Unit 60
070-V-001 A/B PRECOOLER SEPARATOR INLET FACILITIES
071-E-017 071-V-113
DUST FILTER
071-S-113 B 071-V-115/125

071-S-144 A/B
M M
Unit 31
REFRIGERANT STORAGE
To drain Sewer EXPANSION TURBINE
071-ET-112
071-E-116
071-P-111 A/B

M M E-18 E-16

071-E-115 071-T-111

WET AIR
DRY AIR
071-U-120
DRAIN WATER
KETTLE LIQUID (О2 and other components)
LIQUID NITROGEN
DRY NITROGEN
WASTE NITROGEN

Das könnte Ihnen auch gefallen