P N M L K J H G F E D C B A

1600x1000 1600x1000 1600x1000 1600x1000 1600x1000 1600x1000 1600x1000 1600x1000 1600x1000


CABLE TRAY
1LAYER FOR LV CABLES & CABLE TRAY
1 LAYER FOR IT CABLES FOR LV CABLES

BBT-5 BBT-3
BBT-4 BBT-2

BBT-1
BBT-6

CRANE [1TON (2 nos)]


CRANE LONGITUDINAL CRANE [1TON (2 nos)]
[1TON (2 nos)] MOVEMENT LONGITUDINAL
+608.40M LONGITUDINAL MOVEMENT TERRACE
TS LEVEL. MOVEMENT FLOOR LVL.

FACTORY
AREA
OFFICE AREA FACTORY
603.25M
FACTORY FACTORY FLOOR LVL.
8.0M WIDE ROAD 603.4M 603.4M
FINISH TO
603.0M 602.8M SHADED PATH
603.4M
AREA AREA 603.4M
DETAIL
LANDSCAPE
EARTH FILLING EARTH FILLING EARTH FILLING
FILLING TO FILLING TO FILLING TO
EARTH FILLING
DETAIL DETAIL DETAIL
FILLING TO
DETAIL

1 SECTION - 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
40
1
40 The gutter is designed as per GUTTER WITH
1 the maximum rainfall under the
15 SIPHONIC SYSTEM
past 100 years
GUTTER INSULATED ROOF
CABLE TRAY
1LAYER FOR LV CABLES &
1
1 LAYER FOR IT CABLES

INSULATED ROOF
INSULATED ROOF LOUVERS
GUTTER
40
CABLE TRAY
1LAYER FOR LV CABLES & BBT-
1
1 LAYER FOR IT CABLES

CRANE [5TON]
INSULATED WALL
CRANE TERRACE
CRANE FLOOR LVL.
[1TON (2 nos)] [1TON (2 nos)]
RAIN WATER RAIN WATER INSRS RAIN WATER
DOWN TAKE DOWN TAKE
ST1 DOWN TAKE
PIPE PIPE
FACTORY PIPE
FLOOR LVL. INSULATED
FACTORY
WALL
VDF FLOORING FLOOR LVL.
UTILITIES SPECIAL PROCESS 1300 SQM PHASE - WORK SHOP 6T/MSQ VDF FLOORING 6T/MSQ BALANCING TURNING WASHING PLASMA

2 SECTION - 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
40
1
40 The gutter is designed as per
1 the maximum rainfall under the
15
past 100 years
GUTTER INSULATED ROOF
CABLE TRAY
1LAYER FOR LV CABLES &
1
1 LAYER FOR IT CABLES

INSULATED ROOF LOUVERS


GUTTER

CABLE TRAY
1LAYER FOR LV CABLES & BBT-
1 LAYER FOR IT CABLES

CRANE [5TON]
INSULATED WALL
CRANE
[1TON (2 nos)]
RAIN WATER RAIN WATER
DOWN TAKE DOWN TAKE
PIPE PIPE ST1
FACTORY
FLOOR LVL.
VDF FLOORING
UTILITIES SPECIAL PROCESS 1300 SQM PHASE - WORK SHOP 6T/MSQ

3 SECTION - 2 [PART-A] GRAPHIC SCALE:

CLIENT:

15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
PROJECT MANAGEMENT

GUTTER WITH
SIPHONIC SYSTEM

PROJECT:
INSULATED ROOF

40
1
DRAWING TITLE:

REV
TERRACE
CRANE FLOOR LVL.
[1TON (2 nos)]
INSRS DRAWING NO:
RAIN WATER
ST1 DOWN TAKE
PIPE
INSULATED
WALL FACTORY
FLOOR LVL. design | interiors | engineering | construction management
VDF FLOORING 6T/MSQ BALANCING TURNING WASHING PLASMA
C.R.Narayana Rao ( Consultants ) Private Limited

No. 10, Karpagambal Nagar,


Mylapore, Chennai-600 004.
India.
4 SECTION - 2 [PART-B] www.crn.co.in