Sie sind auf Seite 1von 4

INVESTIGATE FORM

Project: Upgrade STP system for Mobifone


Job:
 Investigation the current status of Mobifone’s Danang site infrastructure
 Investigation of devices requirements

GENERAL INFORMATION

I. Objective and Scope of Investigate


1. Objective
Investigate telecommunication infrastructure at Mobifone's Danang site in preparation
for upgrading STP system.
2. Scope
Investigate to get information about:

 Current status of infrastructure in Mobifone's Danang site.


 Additional requirements for STP system deployment and upgrade plan
 Create forms and reports to prepare for deployment.
II. Methods of implementation
 Direct investigation.
 Discuss and receive information from Mobifone.
CONTENT OF THE INVESTIGATION

1. Device Location

Unit Number
Network Elements Site Location Rack Number
(from-to)

MSTPDN1S

MSTPDN2S

MSTPDNIMF1A

MSTPDNIMF1B

2. Power Distribution Unit

PDU 1 PDU 2
Network Elements Number Max Number Max
Socket Power Socket Power

MSTPDN1S

MSTPDN2S

MSTPDNIMF1A

MSTPDNIMF1B

Trang 3
3. Time Reference

Network Elements Method of time reference Conection

MSTPDN1S

MSTPDN2S

4. IP Connection

Network Elements Port Subnet Switch Port VLAN ID

MCH1.BP2
MCH2.BP2

MCH1.P4

MCH2.P4
MSTPDN1S
MCH1.FP3
MCH2.FP3

MCH1.FP4
MCH2.FP4

MCH1.BP2

MCH2.BP2

MCH1.P4

MCH2.P4
MSTPDN2S
MCH1.FP3
MCH2.FP3

MCH1.FP4

MCH2.FP4
Eth01
MSTPDNIMF1A
Eth02

Trang 4
Network Elements Port Subnet Switch Port VLAN ID

Eth01
MSTPDNIMF1B
Eth02

5. Signaling Connection to other Network Element

Link Quantity Link


Ref Element Name PCN Connection
MSTPDN1S MSTPDN2S Type

Trang 5

Das könnte Ihnen auch gefallen