JOB SAFETY ANALYSIS Date: 17 March 2018
Rev. 0
Work Description :
BLIND LIFTING OPERATIONS USING SPECIAL MINI CONTAINER FROM LAY DOWN AREA INTO 1ST DECK/ 2ND DECK DOUBLE BOTTOM HULL V.V. USING STARBOARD SIDE CRANE
Prepared By: Fahriza, Fahriza Reviewed By: Didik Karyono/ Akbar Rahmansyah Approved By: Ari Suseno/ Jonathan Takaria Date of Review: 17/03/2018
This JSA is prepared for the (Circle One): a. New JSA of work as per work description
Prevention/ Mitigation
Prevention/ Mitigation
Residual Probability
Residual Severity
Initial Probability
Adjusted RISK
Initial Severity
Other risk reduction measures
Status
RISK
Hazardous End Existing Barrier including: Isolate / Engineering / Action by
No. Job Step/ Description Activity Type Hazard (Completed/ On
Event Consequence(s) & Control Procedure / Training / Detection / whom
Progress)
Protection, PPE
Incorrect, wrong,
Miscommunication, Prepare all document and
missing minimum Lifting
mal administratif, Injury and property attachment related with Ensure all document completed and
1 PTW preparation Blind Lifting Area requirement of
not proper damage PTW, JSA, PJSM, and Hot
2 A L
reviewed by authorized personnel only
2 A L Operations
document and Team
references Work Certificate
authorization
Pedestal crane
Ensure all personnel wearing the proper
boom movemnets Wearing proper & standard
Performing engine pedestal crane boom & standard PPE, aware of his
Crane operations, uncontrollable, PPE (helmet, hand gloves, Lifting
Fatality, Injury and surrounding and hook up safety harness
7 testing movements - refer to Blind Lifting Area Mechanical, electrical, swing speed rate
property damages
safety glasses, ear plug, 2 A L
all the time.
2 A L Operations
manufacturer recommendations instrumentation failures not smooth, and safety shoes), hand Team
Ensure brake and ESD point already
lowering speed rails and safety harness
notice