Beruflich Dokumente
Kultur Dokumente
B C D E F G H J K L M
21412-1
5. PROVIDE ADEQUATE MAINTENANCE ACCESSIBILITY FOR
FE
H 62.22 Kg/cm2G AT LOADING AND UNLOADING OF BED MATERIALS.
21401-1B 6. THESE FLOW ORIFICES MUST BE CLEARLY LABELED WITH
8 FIC FT PERMANENT TAGS TO ENSURE THE OPERATOR WILL ROUTE 8
-14A INTEGRAL
ICA THE PROCESS FLOWS THROUGH THE CORRECT FO. IMPROPER
21412-1 A1L 21412-1
TO FY-21421-10 AP ROUTING WILL RESULT IN INADEQUATE BED REGENERATION.
SA2L -14A
21401-1B 7. PROVIDE A TEMPORARY START-UP STRAINER TO PREVENT
10 S TO C-21406 DEBRIS FROM DAMAGING THE PUMP. SEE PPM-11B IN
TP-113-ICA-021 21419-2 "SUPPLEMENT TO PROCESS PARTS", VOLUME 2, SECTION I.
23
B2 8. PROVIDE A SPOOL PIECE TO FACILITATE TOP HEAD REMOVAL
H 62.22 Kg/cm2G 1" 1 1/2" FOR LOADING BED MATERIALS.
ICA
PG PG 1 1/2"-ICA-214B06-6E21-N-(II)
-40A 9. MAKE THE VALVES READILY ACCESSIBLE NEAR TO THE
TO FLARE 21404 21403
26 REGENERATION AND DEPRESSURIZATION FLOW ORIFICES.
ERI-034 -93A
S TO REACTOR 10. PROVIDE A PERMANENT VALVE TAG STATING: "KEEP VALVE
21419-1 4 1 4 1 113-010
B2 OPEN TO AVOID DEAD-HEADING PUMP, WHICH CAN CAUSE
SA2L
M
MIN. MIN. PUMP DAMAGE."
PP
PP
1500mm 1500mm
TP-113-FLG-002 TP-190-FLG-001-C 11. NOT USED.
I
H 62.22 Kg/cm2G P 3.96 Kg/cm2G 12. SWAGE ICA DRYER INLET AND OUTLET LINES UP AND DOWN
RESPECTIVELY TO ACCOMMODATE REGENERATION NITROGEN
190-010
7 FLOW AND ICA FLOW. SEE LINE LIST FOR LINE SIZES. 7
22
TO FLARE
3/4"-FLG-214B02-1E21-N-(VII) 3/4"-FLG-214B11-1C15-N-(VII) 13. NOT USED.
-93A
(II) (VII)
TP-190-FLG-001-D 14. NOT USED.
3/4"-FLG-214B20-1E21-N-(VII) 1 1/2"-ICA-214B13-6E3-HC(R-150)-(II) 15. NOT USED.
TO FLARE P 3.96 Kg/cm2G
1 1/2" PI 17 1 1/2" 16. LOCAL LEVEL INDICATOR FROM INSTRUMENTS LI-21419-10B
(II) (VII) 17 PI
21419-9B 14-2 21420-9B -93A AND LI-21420-10B MUST BE CLEARLY VISIBLE FROM THE
14-2 GLOBE VALVE (USED TO DRAIN THE VESSEL) LOCATED
PI S1H
TP-190-FLG-001-C UPSTREAM OF THE DEPRESSURIZATION ORIFICE (FO-21419-3)
PI S1H
PT 1 1/2"-ICA-214B15-6E3-HC(R-150)-(II) PT TO FLARE SO THAT THE OPERATOR CAN READILY SEE THE LIQUID LEVEL
21419-9 21420-9 21420-9 P 3.96 Kg/cm2G WHEN EMPTYING THE VESSEL PRIOR TO REGENERATION.
116-010 TP-116-RGN-002 21419-9 -93A
REGENERATION H 67.05 Kg/cm2G 17. LOCAL PI INDICATION FROM INSTRUMENTS PI-21419-9B AND
3"x1 1/2" PI-21420-9B MUST BE CLEARLY VISIBLE FROM THE GLOBE
NITROGEN 29 12
3"-RGN-221G08-1E3-HC(R-150)-(VII) VALVE LOCATED UPSTREAM OF DEPRESSURIZATION ORIFICE
-21G API SEAL PLAN 13+52
3
TO FLARE FO-21419-3.
3/4"-FLG-214B15-1C15-N-(VII)
FROM E-22114 29 3"x1 1/2" 4 -93A 18. NOT USED.
14-3-1 600#
1/2"-ICA-214B25-6E21-N-(II) XA 12 "C-21420 (VII) (II) 19. LOCATE THIS VALVE AS CLOSE TO THE ICA DRYER INLET
14-1 XA
CSO
6 PRESSURE/ B.V 6
21419-10 14-1 190-010 NOZZLE REDUCER AS PRACTICAL.
4 21420-10 LEVEL
"C-21419 HIGH" 20. NOT USED.
4"-FLG-214B13-1C15-N-(VII)
4"-FLG-214B14-1C15-N-(VII)
21-8 PRESSURE/
(VII) (II)
21-8 SA1H PG 21. THE ITEMS REFERRED TO IN NOTES 4,5,9 AND 16 ABOVE
LEVEL 3"-RGN-214B01-1E3-HC(R-150)-(VII) LI
LI 21405 FO SHOULD BE LOCATED TOGETHER IN THE SAME GENERAL
HIGH"
21412-6 B.V
1/2"-ICA-214B24-6E21-N-(II)
3/4"
LI 16 B.V 21412-3 BY ONE PERSON WITHOUT HAVING TO CLIMB UP AND DOWN
21412-3
LI STRUCTURE. THE VALVE AND PIPING SHOULD ALSO BE
H 62.22 Kg/cm2G
21419-10B
CONSTRUCTED SO THAT THERE IS NO LIQUID HOLD-UP IN
TP-113-ICA-020
3/4"-FLG-214B19-1E21-N-(VII)
1 1/2"-ICA-214B01-6E21-N-(II)
3/4"-FLG-214B18-1E21-N-(VII)
3"-ICA-214B05-6E57-HC(R-150)-(II)
3"-ICA-214B12-6E57-HC(R-150)-(II)
4"x2" FB 1 TO ATM 25. NOT USED.
SEAL OIL B.V AT SAFE LOCATION
RESERVOIR CWR
CSO SET : 41.48 kg/cm2g 2"x1" 2"-CWR-214B01- 26. CHECK VALVE SHALL BE DISSIMILAR TYPE WITH DOWNSTREAM
SSG
2"x1" -91A CHECK VALVE.
5 "G-21413 "G-21412
PSV -N-(VII) 5
21420-60 500 CWS 27. NO POCKET AND MECHANICAL CAVITY BYPASS LINE BACK TO PUMP
SHUTDOWN" SHUTDOWN"
4"x2" FB 1 2"-CWS-214B01-1B2-N-(VII) SUCTION AT LEAST MIN. 5m FROM PUMP SUCTION NOZZLE.
CSO
AUTO
FB
AUTO -91A
HS XL HS XL 28. MINIMUM 3 DIAMETER STRAIGHT LENGTH TO BE APPLIED
14-3-2 14-3-1 CSO 2"x1"
STOP 21413-2 21413-2 STOP 21412-2 21412-2 2"x1" 113-010 DOWNSTREAM OF REDUCER.
2"-ICA-214B21-6E57-HC(R-150)-(II) 2"-ICA-214B22-6E57-HC(R-150)-(II) 3/4" DETAIL "A" 29. USE RECOMMENDED HIGH - TEMPERATURE VALVE
G-21412 SEAL SYSTEM BA-1968, BA-1969 OR BF-2864
ESD ESD
JI JI
CSO
FB
14-3-2 14-3-1 I I
21413-5 SA1L 21412-5 SA1L
3"-ICA-214B05-6E57-HC(R-150)-(II) 3"-ICA-214B12-6E57-HC(R-150)-(II) API SEAL PLAN 13+52
3
TO FLARE
3/4"-FLG-214B16-1C15-N-(VII)
HS
START
HS
START -93A
AUTO AUTO 14-3-2 600#
21413-2B STOP 2"x1 1/2" 21412-2B STOP 2"x1 1/2" 190-010
B.V
TP-190-FLG-001-C
CSO
600#
B.V 600# 1/2" 600#
B.V 600# 1/2" 5 8 5 8 LEGEND :
FO FO P 3.96 Kg/cm2G
21413-50 B.V B.V 21412-50 B.V B.V 600# SA1H PG
LI
FO M B M B 21406 FO
FO S2H
4 S2H 21413-6 TP-121-PEG-001 TEST BLOCK NO. 4
3/4"-FLG-214B01-1E21-N-(VII)
3/4"
21419-1A 21419-1A 21419-1A 21420-1A B.V 21413-3 21413-3
14-3-2 H 0.0525 Kg/cm2G TEST PRESSURE IN Kg/cm2G
G-21413 G-21412
SEE DETAIL "B" 600# 28 600# 3/4"x1/2" SEE DETAIL "A" 600# 28 600# 3/4"x1/2" TO/FROM
3"x2" 3"x2" C-21419 C-21420 PUMP SEAL TP-193-CWR-002-B
3/4"-FLG-214B08-6E57-PP-(II)
7 "C-21419 "C-21420
G-21413
LT PSV SET : 8.50 kg/cm2g TEST FLUID H = HYDROSTATIC TEST
7 H 12.75 Kg/cm2G
3/4"-FLG-214B06-6E57-PP-(II)
TP-113-TR-003 STM TP-113-TR-003 STM H TEMPERATURE/ H TEMPERATURE/
21413 21412 PRESSURE PRESSURE 21413-6 21413-60 P = PNEUMATIC TEST
V - V - HIGH" HIGH"
193-010 S = IN SERVICE TEST
A1H A1H TO ATM
TA TA SEAL OIL
14-2 14-2
RESERVOIR
B.V AT SAFE LOCATION CWR V = VISUAL TEST
21419-1 21420-1 2"x1" 2"-CWR-214B02-
4 (II) (VII) 4 (II) (VII) SSG
-91A
5 S2H 5 S2H
2" S1H A2H S1H A2H
1B2-N-(VII)
TE TT TIR TA 2" TE TT TIR TA CWS
B.F. H T2 14-1 B.F. H
T2 14-1 2"-CWS-214B02-1B2-N-(VII)
21419-1B 21419-1B 21419-1B 21419-1 21420-1B 21420-1B 21420-1B 21420-1 -91A
2"x1"
113-010
2"-ICA-214B19-1E21-N-(II)
3 3
3/4" DETAIL"B"
TP-113-ICA-019 G-21413 SEAL SYSTEM
H 62.22 Kg/cm2G
2"-ICA-214B07-1E21-N-(II)
1"
H 14.235 Kg/cm2G 190-010 IN PART EXCEPT AS AUTHORIZED IN THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF TOYO ENGINEERING CORPORATION.
THIS DRAWING OR THE MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED
DEPRESSURIZATION WRITING BY UNIVATION TECHNOLOGIES. IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR
21
FO 6 TP-190-FLG-003 DRWIN BY ENGINEER DATE
WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY TOYO ENGINEERING CORPORATION.