This document discusses the design of a combined footing to support two columns. It provides the loads on the columns, soil properties, dimensions of the footing, and calculations for the length, width, bending moment, shear force, reinforcement, and design checks. It also discusses the design of a strap beam to transfer the load from the footing to the soil, including calculations for moments, reinforcement, shear, and design checks.
This document discusses the design of a combined footing to support two columns. It provides the loads on the columns, soil properties, dimensions of the footing, and calculations for the length, width, bending moment, shear force, reinforcement, and design checks. It also discusses the design of a strap beam to transfer the load from the footing to the soil, including calculations for moments, reinforcement, shear, and design checks.
This document discusses the design of a combined footing to support two columns. It provides the loads on the columns, soil properties, dimensions of the footing, and calculations for the length, width, bending moment, shear force, reinforcement, and design checks. It also discusses the design of a strap beam to transfer the load from the footing to the soil, including calculations for moments, reinforcement, shear, and design checks.
Factored Load on column A= 122.5 KN Factored Load on column B= 322.45 KN Centre to centre distance between columns = 1.52 m Now, Property line is at the edge of column A i.e 0.15 m from centre of column A i) Length and width of column centre of gravity of loads from property line x= 1.25 m Therefore, length of footing = 2.51 m Adopt length of footing = 2.52 m Assume weight of footing and earth above it as 5% of total weight Total load on earth = 467.1975 KN Footing width = 1.03 m Adopt 8'3" x 3'4" of footing
ii) Longitudinal bending moment and shear
Net upward soil pressure= 171.43 KN/m2 < 180 KN/m2 Net upward soil pressure per unit length = 176.57 KN/m maximum shear force at centre line of column A V1 = -26.5 KN V2 = 96.0 KN maximum shear force at centre line of column B V1 = 149.31 KN V2= -173.14 KN Point of zero shear force from centre of column A x= 0.54 m Maximum bending moment from right side = -145.771 KN-m M = 0.36fckbxm(d-0.42xm) d= 230.7 mm Adopt d= 350 mm D= 400 mm BM = 0.87fyAst(d-(fyAst/(fckb)) Ast = 1031.186 mm2 Adopt 12 dia bars @ 100 mm c/c Ast provided = 1164.286 mm2 iv) Shear one way action (column B) Vu = 84.86 KN Nominal shear stress τv = 0.24 N/mm2 Percent tension steel p = 0.32 % The shear strength of M20 concrete (τc) = 0.38 N/mm2 OK v) Shear two way action (column B) Shear strength of concrete τc' = ksτc Ks = (βc + 0.5) βc = 1 Ks= 1.5 > 1 So adopt Ks = 1 τc = 0.25(fck)^0.5 = 1.12 N/mm2 Shear strength of concrete τc' = 1.118034 N/mm2 Shear force Vu = 159.5929 KN Nominal shear stress τv = 0.175377 N/mm2 OK
Design of strap beam
The intensity of base pressure acting will be 176.57 KN/m From empirical relations Hogging moment = wl2/8= 51.28767 KN-m Sagging moment = wl /10= 2 41.03014 KN-m Let width of beam = 300 mm therefore, d= 253.52 mm Adopt d= 400 mm D= 450 mm Steel on top bar = 315.45 mm2 Steel on bottom bar = 248.67 mm2 Provide 2-16 mm dia bar at top and 2-16 mm bar at bottom. Shear reinforcement Maximum shear force = 396.93 KN τv = 3.31 N/mm2 percentage of steel p = 0.33 % Thus, τc = 0.38 N/mm2 Vus = 337.65 KN Provide 8 mm bar 2L vertical stirrup at spacing 128.9322 c/c Adopt spacing = 150 mm c/c Design of strap beam The intensity of base pressure acting will be = From empirical relations Hogging moment = wl2/10 240.121 Sagging moment = wl2/12 200.101 Let width of beam = 300 therefore, d= 466.37 mm Adopt d= 470 mm D = 500 mm Steel on top bar = 1179.4 Steel on bottom bar = 982.14 Provide 6-20 mm dia bar at top and 5-20 mm bar at bottom. Shear reinforcement Maximum shear force = 552.835 τv = 3.95 N/mm2 percentage of steel p = 0.90 Thus, τc = 0.4992 N/mm2 Vus = 482.991095433 KN Provide 8 mm bar 2L vertical stirrup at spacing 130.314 Adopt spacing = 125 mm c/c 127.28 KN/m 250.64 299.83 KN-m KN-m mm 2.514 6.321