Beruflich Dokumente
Kultur Dokumente
with paved shoulder in the State of Andhra Pradesh under NHDP-IV on EPC Basis
Ambient
Relative Concrete Mix Wind Velocity Rate Of
S.No Time Temperature Remarks
Humidity (%) Temperature o
C (Km / Hr) Evaporation (%)
o
c
1
Between 24 hours
and 7 Days after the
2
construction of the
slab 0.75 to 1.25
3
4
Not later than 6
5 Weeks before the
road is opened to
traffic 0.65 To 1.25
Average Texture Depth (mm)
Remarks :