PRODUCTIVITY RATIOS

AVERAGE
DESCRIPTION MANHOUR/UNIT UNIT QTY. HOUR

1.STRUCTURAL EXCAVATION
Common excavation
Hand 6 MH/M3 1 6.00
Machine 0.5 MH/M3 1 0.50
Rock excavation 8 MH/M3 1 8.00
Hauling of spoils 1 MH/M3 1 1.00

2.STRUCTURAL BACKFILL
By hand 5 MH/M3 1 5.00
By machine 2 MH/M3 1 2.00
3.TRENCHING
By hand 6 MH/M3 1 6.00
By machine 0.5 MH/M3 1 0.50
EXCAVATION- MANUAL
Common earth 8 MH/M3 1 8.00
Loam of sand 1.31 MH/M3 1 1.31
Clay or heavy soil 1.64 MH/M3 1 1.64
Rock 2.63 MH/M3 1 2.63

EXCAVATION- MECHANICAL
Common earth 6.67 MH/M3 1 6.67
Rock with jack hammer 16.67 MH/M3 1 16.67
BACKFILLING
Common manual 0.82 MH/M3 1 0.82
Gravel fill manual 5 MH/M3 1 5.00

TRENCHING & BACFILLING OF UNDERGROUND PIPING USING


EXCAVATION MATLS MANUAL FROM:

0 – 2m Depth 1.25 MH/LM 1 1.25


2 – 3m Depth 1.67 MH/LM 1 1.67
3 – 4m Depth 2.5 MH/LM 1 2.50
4 – 5m Depth 3.33 MH/LM 1 3.33
Placing binder gravel 0.11 MH/M3 1 0.11
Escombro backfilling 0.21 MH/M3 1 0.21
Spreading,tamping & grading 0.48 MH/M2 1 0.48
Mechanical compaction, plate
0.06 MH/M3
compaction 1 0.06
MANUAL CLEARING & GRUBBING

Clearing under growth & trees – 12″ 0.05 MH/M2


1 0.05
Clearing under growth & shrubs 0.03 MH/M2 1 0.03
Disposal of soil 1.69 MH/M3 1 1.69
Hauling of soil 1 MH/M3 1 1.00
Gravel fill 2.07 MH/M3 1 2.07

EXCAVATION – CRANE & CLAMPSHELL


With 8 men & 2 carpenters 1.07 MH/M3 1 1.07
5.ROOFING AND SIDING
Roofing
Metallic 0.97 MH/m2 1 0.97
Non-Metallic 1.51 MH/m2 1 1.51
Siding
Metallic 1.29 MH/m2 1 1.29
Non-Metallic 1.51 MH/m2 1 1.51
CONCRETE WORKS
4.CONCRETE WORKS
Grade members
Formworks 2.54 MH/M2 1 2.54
Concreting 8.54 MH/M3 1 8.54
Rebar 0.07 MH/kg 1 0.07
Finishing 0.4 MH/M2 1 0.40
Suspended members
Formworks 3.28 MH/M2 1 3.28
Concreting 16.7 MH/M3 1 16.70
Rebar 0.08 MH/kg 1 0.08
Finishing 0.8 MH/M2 1 0.80
Embeded metal 0.27 MH/kg 1 0.27
Water proofing 1.82 MH/M2 1 1.82
Joint filler 0.3 MH/lLm 1 0.30
PLACING CONCRETE
Slab on Fill 5 MH/M3 1 5.00
Slip Form 25 MH/M3 1 25.00
Floor Finish Unhardened 1 MH/M3 1 1.00
Concrete finished hardened 1.43 MH/M3 1 1.43
REBAR WORKS
Ground floor installation 0.07 MH/M3 1 0.07
Upper floor installation 0.08 MH/M3 1 0.08
Fabrication 0.1 MH/M3 1 0.10
Mixing manual 16 MH/M3 1 16.00
Mixing machine 1.8 MH/M3 1 1.80
MORE THAN 1.8 M3 POUR
Chute from truck 7 MH/M3 1 7.00
Crane & bucket 14 MH/M3 1 14.00
Wheeling 27 MH/M3 1 27.00
Finishing 2.8 MH/M3 1 2.80
FORMWORKS & CARPENTRY WORKS
FORM WORKS INSTALLATION
Wall on ground 2 MH/M2 1 2.00
Wall above ground 2.35 MH/M2 1 2.35
Beams 3.08 MH/M2 1 3.08
Columns 2.35 MH/M2 1 2.35
Suspended slab
Suspended slab 0 – 18″ 1.67 MH/M2 1 1.67
Suspended slab 10 – 36″ up 3.33 MH/M2 1 3.33

Elevated & shored slab forming


Forming only 8.6 MH/M2 1 8.60
Forming & Shoring 11 MH/M2 1 11.00
Wood wall & Partition 0.5 MH/M2 1 0.50

FORM WORKS FABRICATION


Form works fabrication 1 MH/M2 1 1.00
STRIPPING OF FORMS
Wall on ground 0.25 MH/M2 1 0.25
Wall above 10″ 1.29 MH/M2 1 1.29
Beams 1.03 MH/M2 1 1.03
Columns 0.85 MH/M2 1 0.85
Suspended slab
Suspended slab 0 – 18″ 0.83 MH/M2 1 0.83
Suspended slab 10 – 36″ up 1.08 MH/M2 1 1.08
Elevated & shored slab forming – strip
3.5 MH/M2
of forms 1 3.50
Floor slab at grade – strip of forms 2.8 MH/M2 1 2.80
INSTALLATION OF CARPENTRY WORKS
Plywood partition 1 MH/PC 1 1.00
T & G Flooring and Siding 0.14 MH/B.F. 1 0.14
Ceiling & frame work 0.36 MH/B.F. 1 0.36
Siding frame work 0.27 MH/B.F. 1 0.27
Flooring framing 0.97 MH/B.F. 1 0.97
Wooden post errection 0.43 MH/B.F. 1 0.43
Truss Fabrication 0.35 MH/B.F. 1 0.35
Truss Installation 0.8 MH/B.F. 1 0.80
Girt Installation 0.21 MH/B.F. 1 0.21
Plates Installation 0.13 MH/B.F. 1 0.13
Purlins Installation 0.27 MH/B.F. 1 0.27
Fascia board Installation 0.46 MH/B.F. 1 0.46
1/4″ or 3/4″ thk. plywood
Cutting by manual 1 MH/PC 1 1.00
Assembly 0.42 MH/M2 1 0.42

ARCHITECTURAL SPECIALTIES
Doors
Wooden 2.37 MH/M2 1 2.37
Steel 7.64 MH/M2 1 7.64
Aluminum 8.07 MH/M2 1 8.07
Cyclone wire 7.64 MH/M2 1 7.64
WINDOWS
Glass 3.23 MH/M2 1 3.23
Louver 4.63 MH/M2 1 4.63
Steel 32.29 MH/M2 1 32.29
PARTITIONS
single wall 2.48 MH/M2 1 2.48
Wooden wall 3.44 MH/M2 1 3.44
Wooden Louver 3.44 MH/M2 1 3.44
cyclone Louver 5.38 MH/M2 1 5.38
PAINTING ( 3 coats )
Equipment 0.24 MH/f2 1 0.24
Pipes 0.3 MH/f2 1 0.30
Miscillaneous 0.24 MH/f2 1 0.24

STRUCTURAL STEEL WORKS


7. STRUCTURAL STEEL
Fabrication
Light 110 MH/MT 1 110.00
Heavy 60 MH/MT 1 60.00
Errection
Light 70 MH/MT 1 70.00
Heavy 40 MH/MT 1 40.00

WELDING ( one pass only )

1- Welder and 1- Helper ( 16 total mh ) 40 Lf/day


1 40.00

G.1 STRUCTURAL STEEL


Fabrication
Heavy weight 50 MH/MT 1 50.00
Light weight 100 MH/MT 1 100.00
Grating 1 1/4″ x 3/16″ 3 MH/SF 1 3.00
Star threat grating 4 MH/SF 1 4.00
Errection
Heavy Structural teel 30 MH/MT 1 30.00
Light Structural steel 60 MH/MT 1 60.00
Stacks ( Inc. full welding ) 250 MH/MT 1 250.00
Tanks ( Inc. full welding ) 200 MH/MT 1 200.00

FINISHING AND MASONRY WORKS


H. CHB
4” CHB
Laying 8 m2/day 1 8.00
Tooling 11 m2/day 1 11.00
Plastering 8 m2/day 1 8.00
6” CHB
Laying 7 m2/day 1 7.00
Tooling 11 m2/day 1 11.00
Plastering 8 m2/day 1 8.00
8” CHB
Laying 6 m2/day 1 6.00
Tooling 11 m2/day 1 11.00
Plastering 8 m2/day 1 8.00
AVE. DAYS (8HRS
WORKING HRS)

0.75
0.06
1.00
0.13

0.63
0.25

0.75
0.06

1.00
0.16
0.21
0.33

0.83
2.08

0.10
0.63

0.16
0.21
0.31
0.42
0.01
0.03

0.06
0.01

0.01

0.00
0.21
0.13
0.26

0.13

0.12
0.19

0.16
0.19

0.32
1.07
0.01
0.05

0.41
2.09
0.01
0.10
0.03
0.23
0.04

0.63
3.13

0.13
0.18
0.01
0.01
0.01
2.00
0.23

0.88
1.75
3.38
0.35

0.25
0.29
0.39
0.29

0.21
0.42

1.08
1.38
0.06

0.13

0.03
0.16
0.13
0.11

0.10
0.14

0.44
0.35

0.13
0.02
0.05
0.03
0.12
0.05
0.04
0.10
0.03
0.02
0.03
0.06

0.13
0.05

0.30
0.96
1.01
0.96

0.40
0.58
4.04

0.31
0.43
0.43
0.67

0.03
0.04
0.03

13.75
7.50
8.75
5.00

5.00

6.25
12.50
0.38
0.50

3.75
7.50
31.25
25.00

1.00
1.38
1.00

0.88
1.38
1.00

0.75
1.38
1.00