Beruflich Dokumente
Kultur Dokumente
AVERAGE
DESCRIPTION MANHOUR/UNIT UNIT QTY. HOUR
1.STRUCTURAL EXCAVATION
Common excavation
Hand 6 MH/M3 1 6.00
Machine 0.5 MH/M3 1 0.50
Rock excavation 8 MH/M3 1 8.00
Hauling of spoils 1 MH/M3 1 1.00
2.STRUCTURAL BACKFILL
By hand 5 MH/M3 1 5.00
By machine 2 MH/M3 1 2.00
3.TRENCHING
By hand 6 MH/M3 1 6.00
By machine 0.5 MH/M3 1 0.50
EXCAVATION- MANUAL
Common earth 8 MH/M3 1 8.00
Loam of sand 1.31 MH/M3 1 1.31
Clay or heavy soil 1.64 MH/M3 1 1.64
Rock 2.63 MH/M3 1 2.63
EXCAVATION- MECHANICAL
Common earth 6.67 MH/M3 1 6.67
Rock with jack hammer 16.67 MH/M3 1 16.67
BACKFILLING
Common manual 0.82 MH/M3 1 0.82
Gravel fill manual 5 MH/M3 1 5.00
ARCHITECTURAL SPECIALTIES
Doors
Wooden 2.37 MH/M2 1 2.37
Steel 7.64 MH/M2 1 7.64
Aluminum 8.07 MH/M2 1 8.07
Cyclone wire 7.64 MH/M2 1 7.64
WINDOWS
Glass 3.23 MH/M2 1 3.23
Louver 4.63 MH/M2 1 4.63
Steel 32.29 MH/M2 1 32.29
PARTITIONS
single wall 2.48 MH/M2 1 2.48
Wooden wall 3.44 MH/M2 1 3.44
Wooden Louver 3.44 MH/M2 1 3.44
cyclone Louver 5.38 MH/M2 1 5.38
PAINTING ( 3 coats )
Equipment 0.24 MH/f2 1 0.24
Pipes 0.3 MH/f2 1 0.30
Miscillaneous 0.24 MH/f2 1 0.24
0.75
0.06
1.00
0.13
0.63
0.25
0.75
0.06
1.00
0.16
0.21
0.33
0.83
2.08
0.10
0.63
0.16
0.21
0.31
0.42
0.01
0.03
0.06
0.01
0.01
0.00
0.21
0.13
0.26
0.13
0.12
0.19
0.16
0.19
0.32
1.07
0.01
0.05
0.41
2.09
0.01
0.10
0.03
0.23
0.04
0.63
3.13
0.13
0.18
0.01
0.01
0.01
2.00
0.23
0.88
1.75
3.38
0.35
0.25
0.29
0.39
0.29
0.21
0.42
1.08
1.38
0.06
0.13
0.03
0.16
0.13
0.11
0.10
0.14
0.44
0.35
0.13
0.02
0.05
0.03
0.12
0.05
0.04
0.10
0.03
0.02
0.03
0.06
0.13
0.05
0.30
0.96
1.01
0.96
0.40
0.58
4.04
0.31
0.43
0.43
0.67
0.03
0.04
0.03
13.75
7.50
8.75
5.00
5.00
6.25
12.50
0.38
0.50
3.75
7.50
31.25
25.00
1.00
1.38
1.00
0.88
1.38
1.00
0.75
1.38
1.00