NEW ENQUIRY FEASIBILITY REVIEW

CUSTOMER :
( New / Existing )
ENQUIRY NO: DATE :
PART NAME : PART/DRG NO. : Rev.

Sr. REMARKS
REVIEW POINTS YES NO
No.
A Technical Requirement Review
1. Status of Supply(Raw/Semi-finish/Finish)
2. Supplementary Requirements
a. Conventional / Specific Shot Blasting If specific Details
b. Conventional / Specific Fettling If specific Details
c. Gauging / Geometrical Profile If specific Details
d. Heat Treatment
(SR/Ferritizing/annealing/Normalizing/Tempering/ If Yes Details

Other)
e. Oiling / Priming / Painting If Yes Details
f. Pressure Testing If Yes Details
g. Millipore Testing If Yes Details
h. Raw Casting Finish/Finished Casting Finish
If others specify
(50RA by default / other) (15RA by default/other)
i. Minimum Casting Wall Thickness
Not acceptable below 6mm
(6mm by default / other)
j Other Requirements( not covered in a to i)
3 Volume/Requirement & Batch size - present
- for further three years
Bashko - Production Run (MPR)
i) Raw casting
Lead Time required for one MPR
ii) Semi Finish
(Raw casting / Semi Finish / Finish)
iii) Finish
Is Traceability Requirement specified? If No as per BEPL WI by default
4 If yes details
(Heat No./Product Marking/Company Logo)
Development Time / Delivery Time specified
5 (Pattern Equipment, Jig-Fixture-Gauges/Samples,
and First Pilot) Whether acceptable?
Scope of Supply( Pattern Equipment, Jig-Fixture-
6
Gauges)
Scope of Reimbursement of Samples/Trails from
7
fourth Samples/Trails (BEPL/Customer)
8 Packing & Labelling Requirement If Yes Details
If yes details

i) Oil Sand
Estimated Core Weight - Oil Sand/Shell Sand/Cold
9 ii) Shell Sand
Box/No- Bake
iii) Cold Box

iv) No- Bake


NW :
10 Estimated Net weight/ Gross weight/Yield GW:
YD:
Match Plate Size / No of Cavities ( Patterns / Core
11
Boxes)
12 Requirement of Sub-Contract for any process If yes Specify
Additional Product & Process Specification of
13 engineering required to be monitored other than
BEPL’s SOP & WI’s & Procedures
B System Requirement Review
Latest Specifications/Standards/references Number of Parameters –

1 mentioned in drawing – Whether available and Available –

clear? Required -
Whether Casting Material/Grade requirement is Required Grade –
2 Equivalent IS Grade –
clear?
Manufacturing Facilities – whether adequate?
3 i) Moulding Capacity
ii) Melting Capacity
a. Review of Inspection/Testing/Quality i) Statutory / Mandatory Tests
required
Documents Submission/Tests Piece Submission
ii) Tests & Reports demanded
Requirement (Chemical / Spectro, Hardness,
4 iii) Tests Piece submission
Tensile, Elongation, Micro-Tensile, Impact,
demanded
RT/UT/DPT/CpCpk-Mould Hardness, Casting
iv) Facilities not available
Hardness, Sand Temperature, Metal Temperature) (In-house or outside)
Available: (Y/N)
b. Review of System Requirement/Quality Plan Clear: (Y/N)
(Auto/ Partially Auto / Non Auto)
Required:

Specified(Y/N)

Conventional / non-conventional
c. Review of Submission of Record specified?
If non conventional –

C Commercial Requirement Review


1 Change in Terms & Conditions of Payment If yes Specify
2 Change in Metal Surcharge Correction System If yes Specify
3 Change in Currency Surcharge Correction System If yes Specify
4 Change in VAT No. If yes Specify
5 Change in ECC No. If yes Specify
If yes modify Risk Assessment
6 Change in Risk Assessment Rating form

IS ENQUIRY FEASBILE : YES NO

REMARKS :

REVIEW BY :
MD
BEPL/F/MKT-03f .Page -3