LAPORAN MSMA

Hydraulic Design Calculation for Internal Drainage

PERMOHONAN PELAN KERJA TANAH, JALAN DAN PERPARITAN BAGI CADANGAN


PEMBANGUNAN KILANG YANG MENGANDUNGI:
1) 1 BLOK BANGUNAN PENTADBIRAN BESERTA MAKMAL R&D DAN QC 3 - TINGKAT
2) 1 BLOK BANGUNAN KANTIN BESERTA "VISITOR GALLERY" 2 - TINGKAT
3) 1 BLOK BANGUNAN ENGINEERING 1 -TINGKAT
4) 2 BLOK BANGUNAN KILANG 3 - TINGKAT
5) 1 BLOK GUDANG "FINISHED GOODS" 1 1/2 - TINGKAT
6) 1 UNIT KAWASAN REKREASI BERBUMBUNG
7) 1 UNIT TEMPAT LETAK MOTORSIKAL BERBUMBUNG
8) 1 UNIT TEMPAT LETAK KERETA BERBUMBUNG
9) 1 UNIT KEBUK SAMPAH
10) 1 UNIT RUMAH PAM SPRINKLER
11) 1 UNIT "SCRAP YARD" BERBUMBUNG
12) 1 UNIT "QUARANTINE YARD" BERBUMBUNG
13) 1 UNIT RUMAH PAM BESERTA 3 UNIT TANGKI AIR
14) 1 UNIT STESEN METER "NATURAL GAS”(NG)
15) 1 UNIT "WASTE WATER TREATMENT PLANT" (WWTP)
16) 1 UNIT STESEN SUIS UTAMA (SSU)
17) 1 UNIT PEJABAT PENGAWAL
18) 3 UNIT PONDOK PENGAWAL
DI ATAS PT 1402 (DAHULUNYA PT 1163, PT 1164, PT 1165, PT 1166 DAN SEBAHAGIAN
TANAH KERAJAAN), KAWASAN PERINDUSTRIAN TAMAN TEKNOLOGI 2 (TECHPARK 2),
BANDAR ENSTEK, DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.
UNTUK TETUAN AJINOMOTO (MALAYSIA) BERHAD

Owner:
AJINOMOTO (MALAYSIA) BERHAD
(No. Syarikat : 4295-W)
Lot 5710 Jalan Kuchai Lama,
58200 Kuala Lumpur
Tel : 03-7890 6958
Fax : 03-7981 7010
E-mail: sato@ajikl.com.my

Consulting Engineers:
KESHMEN CONSULT SDN. BHD.
12A-3 (3rd Floor), Jalan PJS 11/28,
Bandar Sunway,
46150 Petaling Jaya,
Selangor Darul Ehsan.
Tel: 03-5632 3750
Fax: 03-5634 0356
E-mail: info@keshmen.com

December 2019
Contents

1.0 Introduction and Project Description

2.0 Land Information and Site Description

3.0 Drainage System Concept

4.0 Rainfall Intensity and Design Formula

5.0 Internal Drainage Design

6.0 On-site Detention (OSD)

Appendix A – Drawings

Appendix B – Rainfall Intensity Calculation

Appendix C – Catchment Layout Plan

Appendix D – OSD Calculations

Appendix E – Internal Drainage Hydraulic Design Calculations


1.0 INTRODUCTION AND PROJECT DESCRIPTION

1.1 The objective of this report is to present the drainage design concept for the
proposed development.

1.2 The proposal is a new Factory for Ajinomoto Malaysia Berhad.

1.3 The site is located at PT1402 of Kawasan Perindustrian Taman Teknologi 2


(Techpark 2), Bandar Enstek, Daerah Seremban, Negeri Sembilan Darul
Khusus.

2.0 LAND INFORMATION AND SITE DESCRIPTION

2.1 The total land cover by the proposed site is 46.6 acre (18.9 ha).

2.2 The site is generally flat, undeveloped land, with existing ground level
completed by previous earthworks to a platform level of 55.00 O.D.L.
Vegetation is non-existent at the time of writing of this report.

2.3 The access to the proposed site is via existing roads within the Techpark 2
development.

2.4 The Key Plan and Location Plan are as shown in Figure 1 and Figure 2.

3.0 DRAINAGE SYSTEM CONCEPT

3.1 In the existing condition, the site is drained by temporary earth drains which
discharge to the existing sediment basin and subsequently to the existing
roadside drains.

3.2 The permanent drainage system of the proposed development will discharge
directly to the existing external roadside drains, and subsequently to an
existing Kolam Takungan Awam (KTA) centralized retention pond adjacent to
the Techpark 2 development, which caters for the catchment area of our site.

3.3 Please refer to Appendix C for the Catchment Layout Plan and flow direction
plan to the main drains and KTA.

3.4 To provide additional redundancy for the KTA, our drainage system proposal
includes additional OSD capacity.

3.5 The permanent drainage system of the proposed development will flow
through primary and secondary outlets at each discharge point to provide
OSD capacity to control the rate of discharge to the existing external roadside
drains.

3.6 OSD volume is provided by calculating the volume of the drains.


4.0 RAINFALL INTENSITY AND DESIGN FORMULA
4.1 Rainfall intensity is based on empirical equation as follows :-
I = λTK
(d + θ)η
Where,
I = Average rainfall intensity (mm/hr);
T = Average Recurrent Interval – ARI (0.5<T<12 month and
2<T<100 year);
d = Storm Duration (hours), 0.0833<d<72; and
λ, K, θ & η = Fitting constant dependent on the rain gauge location
(Table 2.B1 in Appendix 2.B, MSMA 2nd Edition)
4.2 The formula used to calculate runoff peak discharge is the Rational Method
as follows: -
Q = CIA
360
Where,
Q = Peak Flow (m3/s) ;
C = Runoff Coefficient (Table 2.5, MSMA 2nd Edition);
I = Average Rainfall Intensity (mm/hr); and
A = Drainage Area (ha).
4.3 The formula use to calculate drainage structure capacity is Manning’s formula
as follows: -
Q = (1/n) x A x (R)2/3 x (S)1/2
Where,
Q = Flow, m3/s
n = Manning’s roughness coefficient
R = Hydraulic radius, m
S = Slope (m/m)

5.0 INTERNAL DRAINAGE DESIGN

Reference is made to Manual Saliran Mesra Alam Malaysia 2012, (MSMA 2nd.
Edition), Urban Stormwater Management Manual for Malaysia published by
Department of Irrigation and Drainage Malaysia.

The following main criteria are adopted in the design of Internal Drainage:

5.1 The minimum and maximum average flow velocity for open drain is 0.8 m/s
and 4.0 m/s respectively for lined channel drain.

5.2 The discharge for internal drain is designed for minor system based on
average recurrence interval (ARI) of 10 years and the major system is
checked to a 100-year ARI.

5.3 The total catchment shall be sub divided into sub catchments. Please refer to
the respective appendices for catchment layout plan and internal drainage
hydraulic design calculations.

5.4 Appendix A shows the proposed drainage system alignment on the Road and
Drainage Layout drawing. Appendix C shows the Catchment Layout Plan.
6.0 ON SITE DETENTION (OSD)

Reference is made to Manual Saliran Mesra Alam Malaysia, (MSMA 1st Edition),
Urban Stormwater Management Manual for wMalaysia published by Department of
Irrigation and Drainage Malaysia.

The following criteria are adopted in the design of the OSD systems.

6.1 The primary and secondary outlets are designed for an average recurrence
interval (ARI) of 10 years and 100-year ARI respectively.

6.2 Each catchment area shall be diverted to their respective OSD systems.

6.3 Appendix A shows the proposed drainage system alignment, including the
location of OSD systems, on the Road and Drainage Layout drawing.

6.4 OSD Design Criteria


Pre-Development Condition
Impervious Area : 0%
Pervious Area : 100 %
Post-Development Condition
Impervious Area : 80 %
Pervious Area : 20 %

6.5 Catchment areas for each catchment are shown graphically in Appendix C on
the Catchment Layout Plan.

OSD Site Storage Volume calculation for each catchment is calculated in the
OSD design calculations in Appendix D.

Provided detention volume (drain volume) is calculated in the internal


drainage hydraulic design calculations in Appendix E.

Summary of OSD design:

Catchment Catchment 100% OSD Provided Drain OSD Volume


Area Volume Storage Volume Provided
A1* 57447 m2* 974 m3 470 m3 48%
A2 25011 m2 410 m3 118 m3 29%
B 43308 m2 739 m3 199 m3 27%
C 64309 m2* 1054 m3 333 m3 32%
Total 190075 m2* 3177 m3 1120 m3 35%
* Catchment includes future development area
APPENDIX A

Drawings
APPENDIX B

Rainfall Intensity Calculations


APPENDIX C

Catchment Layout Plan


APPENDIX D

OSD Calculations
APPENDIX E

Internal Drainage Hydraulic Design Calculations