Beruflich Dokumente
Kultur Dokumente
Expert
Designation
Super!
DMODE
(Score -1)
DMODV
(Score -1)
Approach
DMAIC
A company wants to develop a new process. Which Six Sigma methodology the company would
(Score -1)
be implementing?
DMADV
(Score 1)
Score
-1/1
Obtained/Total
0.0034
(Score -1)
0.34
(Score -1)
DPMO 3.4
Six Sigma processes produce less than _________ Defects per Million Opportunities. (Score 1)
340,000
(Score -1)
Score
1/1
Obtained/Total
To increase variation
(Score 1)
To reduce defects
(Score -1)
Score
1/1
Obtained/Total
Define
(Score -1)
Measure
(Score -1)
Analyze
(Score -1)
Solution Generation
Which stage of the DMAIC process is most associated with solutions generation?
Improve
(Score 1)
Control
(Score -1)
Score
1/1
Obtained/Total
Inputs
(Score -1)
Identify
(Score -1)
DMAIC - I Implement
In DMAIC, the letter "I" stands for: (Score -1)
Improve
(Score 1)
Score
1/1
Obtained/Total
DMADV - D Do
In DMADV, the second "D" (which is the 4th letter) stands for: (Score -1)
Design
(Score 1)
Duplicate
(Score -1)
Dedicate
(Score -1)
Score
1/1
Obtained/Total
Define
(Correct Position: 1,
Score: 1)
Measure
(Correct Position: 2,
Score: 1)
Analyze
(Correct Position: 3,
Approach for improving an exisiting process Score: 1)
Arrange these elements for improving an exisiting process. Keep "Define" as the top element.
Base Score: 0
Improve
(Correct Position: 4,
Score: 1)
Control
(Correct Position: 5,
Score: 1)
Score 5/
Obtained/Total 5
Measure
(Correct Position: 2,
Score: 1)
Analyze
(Correct Position: 3,
Score: 1)
Design
(Correct Position: 4,
Score: 1)
Verify
(Correct Position: 5,
Score: 1)
Score 5/
Obtained/Total 5