UPTO PL
1 Cement Bags upto PL (SRC) 790.0
2 Steel (tons) 3.98
3 Binding Wire (Kgs) 31.84
4 Gravel (cft) 11906.4
GROUND FLOOR
1 Cement Bags 891.0
2 Blocks 6" 5125.0
3 Blocks 5" 0.0
4 Blocks 4" 0.0
5 Steel Tons 9.3
6 Binding wire (Kg) 74.5
7 Wall Plaster (sqft) 8099.0
8 Ceiling Plaster (sqft) 3161.0
9 Putty/Filling (Sqft) 10868.0
10 Primer (sqft) 10868.0
11 Paint (sqft) 32604.0
12 Floor Tiles ( Sqm) 171.2
13 Bathroom Tiles (Sqm) 85.1
14 Kitchen Tiles (sqm) 7.3
15 Skirting (rft) 629.5
17 Wood works ( Doors ) sqft 225.5
18 Door Frmes (rft) 160.8
19 Aluminium Doors (rft) 134.6
20 Aluminium Frames (sqft) 404.3
21 Wallpaer (roll) 72.0
TYPICAL FLOOR
1 Cement Bags 1295.0
2 Blocks 6" 0.0
3 Blocks 5" 0
4 Blocks 4" 7240.0
5 Steel Tons 11.4
6 Binding wire (Kg) 91.1
7 Wall Plaster (sqft) 10704.0
8 Ceiling Plaster (sqft) 3307.3
9 Putty/Filling (Sqft) 13680.0
10 Primer (sqft) 13680.0
11 Paint (sqft) 41040.0
12 Floor Tiles ( Sqm) 278.7
13 Bathroom Tiles (Sqm) 143.0
14 Kitchen Tiles (sqm) 12.5
15 Skirting (rft) 900.0
17 Wood works ( Doors ) sqft 375.9
18 Door Frmes (rft) 263.7
19 Aluminium Doors (rft) 235.5
20 Aluminium Frames (sqft) 670.6
21 Wallpaer (roll) 120.0
P 221