EDUCATIONAL BACKGROUND
WORK EXPERIENCE
Modules Site E & I Inspection – Electrical & Instrument Inspection Works for the ICHTHYS LNG
Modularization Project for Darwin, Australia. Performed Quality/Assurance/Control Inspection for
Electrical & Instrument completion activities and confirmed/approved Inspection Test Record (ITR),
where applicable prepare punch list and attached to the ITR and submit the same to
Project/construction management. Record (ITR), where applicable prepare punch list and attached to the
ITR and submit the same to Project / construction management, Coordinate with the construction
Electrical & Instrument completion, safety and other concerned departments for QA/QC inspection
activities. Witnessed insulation resistance, continuity and hi potential cable testing, cold loop checking,
earth continuity resistance test, low ohm test for bus bars, bench & field calibration, leak testing,
instrument function test and installation. Performed pro-active E & I - QA/QC inspection to the ongoing
construction activities to align & comply all construction output to the specific project procedures,
standards, specifications and ensure that it follows all relevant approve construction drawings. Make a
record or report on hard and soft copy of the ITR done each day for the QA/QC department ITR tracking.
Prepared necessary drawings like; Instrument Layout Drawing (ILD), Piping & Instrument Diagram (P&ID),
LOOP Diagram, (FGD) Fire and Gas Layout Drawing, (TLD) Telecom Layout Drawing, (BLD) Block Logic
Diagram, Cable Schedule, Instrument/Cable Indexes, and other pertinent drawings needed for
inspection. assembly including provision of temporary facilities, pre-commissioning of testing and
inspection works.
2. Position : QA/QC – Engineer
Company : ETA – Emirates Trading Agency , L.L.C
Dubai, United Arab Emirates
Project : 1). CCAD – Cleveland Clinic Abu Dhabi
(5 Star Clinic/ Hospital Special Project)
2). C3-AX-134 Dubai International Airport
(Prestigious Airport Project)
3). DuRL – Dubai Rapid Link Metro Rail Project
(Prestigious Rail project).
Duration : December 28, 2009 – February 10, 2014
TRAININGS/SEMINARS ATTENDED
Quality Assurance Inspection System VCC 120 Scanner for Operating and Maintenance
Dr. Schenk GmbH Industrienesstechnik Dr. Schenk GmbH Industrienesstechnik, Munich, Germany
January 27, 1997 – January 28, 1997
Singulus Machine Metalizer and Plastic Injection Molding Machines for Operating and Maintenance
Singulus Technologies GmbH Singulus Technologies GmbH, Alzenau, Germany
January 13, 1997 – March 5, 1997
Additional Info
LICENSES/CERTIFICATIONS
License/Certification License / Certification No. Date
Philippine Regulation Commission PRC-REE No. 15402 Feb 15, 1999