Sie sind auf Seite 1von 7

View My VisualCV Online: http://www.visualcv.

com/ifjwa84

Andryaas Mamuaya
Project Manager Participated in GE's
PT PROFAB Indonesia Nuovo Pignone fo Total
Tunu 7 Project
PT PROFAB
http://www.profab.co.id
Indonesia:
PT PAL Indonesia: http://www.pal.co.id
http://www.yourwebcv.com/
See My Online CV:
cv.php?user=amamuaya

Summary
2002
I consider myself to be a self-motivated, hard working, punctual, and conscientious individual, capable As a Production Engineer participant in
of working to high standards and under pressure either as part of a team or on own initiative. As a Nuovo Pignone- Italy. PT PAL
team member, I enjoy an excellent working relationship with colleagues of all ages and personalities. I awarded EPC Contract by Total
am also able to write creatively and critically, and successfully meet deadline Indonesie, Tunu VIII & IX Gas
Compression Modules

Work History
Stator Frame for Gas
PT PROFAB INDONESIA Turbine Power Plant
Batam, Indonesia Feb 2010 - Present 600MW
Project Manager
The Profab group of companies provides a one stop solution for the oil & gas and related Industries
from field development to production to refining, Profab can design and manufacture all size and
material Pressure Vessels, Air Cooled Heat Exchangers, Shell & Tube Heat Exchangers. We
manufacture Process Modules and Well Head Platforms up to 2000t. Additionally we provide Valve
refurbishment and design, supply and operate onshore or offshore Drilling Derricks.

2010- Present: PT PROFAB‘s Project Manager 2005


20 Unit of Stator Frame 600MW
2010 : Project Manager in PT PROFAB Indonesia for Chevron- Anchor Pile Project was made in 2 years for Harbin
2010 : Project Manager for Skid Module for Siemens - DGF Vessel for EMAS Project Electric Corporation during 2005
2010 : Project Manager for Drilling Template for FMC - PT PAN -Pertamina Project to 2007. Scope of work comprise
2010 : Project Manager for Thickeners Mechanism for Siemens - Hyundai-Hanwa-Arzew of Material procurement,
Refinery Fabrication, Welding and
2010 : Project Manager for Fuel Gas Skid for Boustead- Cristal Project Machinery. Total weight of one
2010 : Project Manager for Fuel Gas Skid for Boustead- Petrobas-BIH Project Frame is 100MT.

Brace Monopod Platform


Kodeco KE32

PT PAL Indonesia
Surabaya, Other, Indonesia Jan 1992 - Jan 2010
Project Manager
PAL INDONESIA lives up to its reputation as a primary force for national maritime-industry
development. As part of its effort to support the foundation of a solid maritime industry, we strive to
deliver knowledge, skills and technology for wider use in the national maritime industry community.
This effort has become even more relevant as it holds the key for an enhanced national maritime
industry.

Page 1 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84

2001-2009 : PT PAL‘s Project Manager


2006
1998-2001 : PT PAL’s Project Coordinator
Awarded Contract by Kodeco Energy
1995-1998 : PT PAL’s Production Engineer Ltd. for KE-32 Braced Monopod
1992-1995 : PT PAL’s Supervisor Platform

2008-2010 : Project Manager in PT PAL Indonesia for Alstom, ElTebbin, CSA Spain Project

2007 : Project Manager in PT PAL Indonesia for Metering Skid PGN Project (Perusahaan
Gas Negara)

2006-2007 : Project Engineer in PT PAL Indonesia for Engineering, Procurement, Fabrication, General Electric Stator
Precommisioning of KE 32, Topside and Monopod Jacket for KODECO Energy Project Frame
Detail work
1. Daily project engineer the project of Offshore EPCI (Engineering, Procurement, Construction &
Installation) Services for KODECO Energy Oil Co., Indonesia.
2. Lead the project team to perform engineering, procurement, installation and pre-commissioning of
the following development projects;
(a) Tripod Central Poleng Processing Platform (PPP)
(b) KE32 Wellhead Platform and 7 km of 12” Pipeline (from KE32 to Tee-junction along KE38-PPP)
(c) Tie-in of the KE-30 pipeline to the preinstalled KE-30 pipeline riser on PPP after PPP installation
(d) Gas Expansion Phase II Pipeline (70 km of 16” pipelines from PPP to ORF) General Electric award in total 80
(e) 2 km of 16” Horizontal directional drilling (HDD) pipelines Units of Stator Frame since 1998
3. Provided supervision and management to all Sub Contractors and Vendors responsible for any to 2002. Range of 300MW to
design, procurement, fabrication and installation aspects of the project, to ensure that all parties are 700MW
working to the planning.

2005-2006 : Project Engineer in PT PAL Indonesia for Engineering, Procurement, Fabrication, Alstom project delivered
Precommisioning of Zelda F, Topside and Monopod Jacket for Sumatra SES CNOOC Project to El Tebbin
Detail work
1. Daily project engineer the project of Offshore EPCI (Engineering, Procurement, Construction &
Installation) Services for CNOOC, Indonesia.
2. Lead the project team to perform engineering, procurement, installation and pre-commissioning of
the following development projects;
(a) Tripod Central Poleng Processing Platform (PPP)
(b) Wellhead Platform and 7 km of 12” Pipeline (from WHP to Tee-junction along )
3. Provided supervision and management to all Sub Contractors and Vendors responsible for any
design, procurement, fabrication and installation aspects of the project, to ensure that all parties are
working to the planning.
Balance of Plant such as Main
Condenser, LP Heater was
2005-2007 : Project Manager for Fabrication & Machining Stator Frame 300MW & 600MW for
delivered to ElTebbin Egypt
China. Our client Harbin Electric Company- China awarded USD 3.000.000 for Engineering,
Procurement, Fabrication, and Machining of Stator Frame 300MW (10 units) and Stator Frame
600MW (10 units). All units will be shipped to China within 1.5 year. Project team involved are 1 WHP AHESS
Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production
Engineer, 4 Shops manager ( 4 shops for welding and machining), 15 Fitter and 20 Welders.
PLATFORM "A"
Project Manager jobs are: Review Contract, Manage Kick Off Meeting, Project Plan (Manpower
plan, schedule, engineering, procurement & subcontractor), Project Execution, Project Controlling,
Reporting Status & Progress to Upper management & Client, Evaluation

2004-2005 : Project Manager for UOP Recovery Plus Project –Module Refinery Plant Pertamina
Balongan. Our client UOP LLC –USA awarded USD 700.000 for Engineering, Procurement,
Fabrication, and Installation of UOP Recovery Plus Module for Pertamina Balongan. Project team
involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer,
WELLHEAD PLATFORM “A”
2 Production Engineer, 4 Shops manager ( 4 shops for welding and machining), 20 Fitter and 16
UJUNG PANGKAH
Welders. Project Manager jobs are: Review Contract, Manage Kick Off Meeting, Project Plan
DEVELOPMENT PROJECT
(Manpower plan, schedule, engineering, procurement & subcontractor), Project Execution, Project (AMERADA HESS)
Controlling, Reporting Status & Progress to Upper management & Client, Evaluation JACKET 160 TON
PILES 480 TON
2003-2004 : PT PAL’s Project Manager for Pressure Vessels for TUNU 9 Field Defelopment DECK 450 TON
Project Our client was PT Astinaputera Ekaperkasa awarded USD 600.000 for Engineering, TOTAL 1090 TON
Procurement, Fabrication, and Machining of Pressure Vessels for TUNU 9 Field. Project team
involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer,
2 Production Engineer, 2 Shops manager ( 2 shops for welding and machining), 10 Fitter and 15
Welders. Project Manager Jobs are: Review Contract, Manage Kick Off Meeting, Project Plan

Page 2 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84

(Manpower plan, schedule, engineering, procurement & subcontractor), Project Execution, Project
Controlling, Reporting Status & Progress to Upper management & Client, Evaluation Zelda F Monopod WHP
CNOOC
2002 : Project Manager for LPG Storage Vessels for Cemara LPG Plant. Our client PT
Wahana Insannugraha awarded USD 400.000 for Engineering, Procurement, Fabrication, and
Installation of LPG Storage Tank and scrubber to Cirebon. Project team involved are 1 Project
Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer,
4 Shops manager ( 4 shops for welding and machining), 15 Fitter and 20 Welders. Project Manager
jobs are: Review Contract, Manage Kick Off Meeting , Project Plan (Manpower plan, schedule,
engineering, procurement & subcontractor), Project Execution, Project Controlling, Updating &
Reporting Status & Progress to Upper management & Client, Evaluation

2002 : PT PAL’s Project Manager for Duri Steam Flood Area 11 EPC. Our client PT.
As Project Engineer in EPC Project
Tripatra awarded USD 400.000 for Engineering, Procurement, Fabrication, and Machining of
ZELDA F MONOPOD
Pressure Vessel for Caltex Pacific Indonesia. Project team involved are 1 Project Sponsor, 1 Project
WELLHEAD PLATFORM
Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer, 4 Shops manager
CNOOC SES, Ltd
( 4 shops for welding and machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review MEZZ & MAIN DECK 184 TON
Contract, Manage Kick Off Meeting , Project Plan (Manpower plan, schedule, engineering, CELLAR DECK 114 TON
procurement & subcontractor), Project Execution, Project Controlling, Reporting Status & Progress CAISSON & BOAT LAND 212 TON
to Upper management & Client, Evaluation PILES 175 TON
TOTAL 685 TON
2001 : PT PAL’s Project Manager for Stator Frame 7FH2 Project (Mitsubishi Electric
Company -MELCO ) Our client Mitsubishi Electric Company-JAPAN awarded total USD 950.000
for Engineering, Procurement, Fabrication, and Machining of Stator Frame 400MW (10 units) All
units shipped to JAPAN. Project team involved are 1 Project Sponsor, 1 Project Manager, 1
Condenser Module for
Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer, 4 Shops manager ( 4 shops Alstom
for welding and machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review Contract,
Manage Kick Off Meeting , Project Plan (Manpower plan, schedule, engineering, procurement &
subcontractor), Project Execution, Project Controlling, Reporting Status & Progress to Upper
management & Client, Evaluation

2001 : PT PAL’s Project Manager for Stator Frame 7FH2 Project (General Electric )
Our client General Electric Power System USA awarded total USD 10.000.000 for Engineering,
Procurement, Fabrication, and Machining of Stator Frame 400MW (85 units) All units shipped to
USA. Project team involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1
Procurement Officer, 4 Production Engineer, 4 Shops manager ( 4 shops for welding and Alstom Power is one of the long
machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review Contract, Manage Kick term customer and award several
Off Meeting , Project Plan (Manpower plan, schedule, engineering, procurement & subcontractor), BOP Project for Europe and Far
Project Execution, Project Controlling, Reporting Status & Progress to Upper management & Client, East Power Plant.
Evaluation

2000 : PT PAL’s Production Engineer for Produced Fluid Heat Exchanger, CGS Area 10 Drilling Template -FMC
Project (Caltex Project) Our client IKPT awarded USD 900.000 for Engineering, Procurement, for PT PAN
Fabrication, and Machining of Heat Exchanger for Caltex Pacific Indonesia. Production Engineer job
are: Detail Scheduling, Monitor and Update Status, Reporting to Project Manager.

1999 : PT PAL’s Production Engineer for Air Cooled H/E Project (VICO)
Our client VICO Indonesia awarded USD 700.000 for Engineering, Procurement,
Fabrication, and Testing of Air Colled H/E. Production Engineer job are: Detail Scheduling, Monitor
and Update Status, Reporting to Project Manager.

1995 – 1998 : PT PAL’s Production Engineer for Barge Mounted Power Plant Project (PLN-IHI Four leg Drilling Template
Project). Our client PT PLN awarded USD 13.000.000 for Engineering, Procurement, Fabrication, designed by FMC for PT
Installation and Testing of BMPP. Production Engineer job are: Detail Scheduling, Monitor and Partalahan start fabrication by
Update Status, Reporting to Project Manager. early August 2010 and complete
by end of September 2010
1992 – 1995 : PT PAL’s Supervisor for PLTU Gresik, PLTU Paiton Project, PLTUG Suralaya
Project

Page 3 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84

Education
University of Dr. Soetomo
Surabaya, Indonesia Jun 1996 - Jan 2000
Bachelor Degree, English
http://fs.unitomo.ac.id/

Load Out to Supply Vessel


PT PAL Education Centre
Surabaya, Other, Indonesia Jan 1989 - Jan 1992
Shipbuilding Technical High School

Template on board

Suction Pile for Chevron

In progress

Page 4 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84

As Mechanic in Installation UOP Kodeco KE32


Mitsubishi -Kobe Module at Topside
Balongan for Blue
Sky Project
Pertamina

It was invited by Melco- Do you ever see WHP/


Mitsubishi Electric Topside Platform
Company for Inspection fabricated inside of
of Stator Frame that was The Module was workshop? The building
ordered for 15 Unit of fabricated in PT PAL and must be tall enough and
300MW Stator Frame to deliver to Balongan for the goodness was very
PT PAL installation and quick and no obstacles
commisioning like bad weathers.

The Twilight of MRS Skid Balance of Plant


Jacket

This Jacket for Kodeco More than 150 units Alstom BOP for Egypt
KE32 was also MRS Skid was fabricated ready to Sail Out.....good
fabricated inside of for PGN Project funded bye my baby
workshop and load out by World Bank
was in the twilight to
catch the high tide of the
seawater...

Page 5 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84

With PT PAL Hang out in Cafe My Real Project


colleagues and Sampoerna for
Client farewell party

They are my real


The background was All my friend since 1989
work.........
Container Vessel and were in school...good
taken in the evening with luck
friends and my client
from Harbin-China

Lunch
@Sampoerna
Cafe

UOP team in lunch time

Skills
Technical Standard, Improvement and Project Management
(Advanced)10+ Years Experience, (Currently in use)
Excellent understanding of Material specifications, standardized by ASTM, ASME and BS, DNV,
MIGAS regulation, piping oil and gas platforms.

Wide experiences on technical clarifications, material inspections and testings


Understanding in application of Six Sigma, TQM, Kaizen, FMEA, Earn Value Analisys, RCA in
industrial and project management.

Project Management & Skill Up Training


(Advanced)10+ Years Experience, (Currently in use)

Professional Training

2005 : ESQ Leadership Training (Certificate)


2005 : FINON (Financial for Non Finance Manager) (Certificate)

Page 6 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84

2003 : Project Management Institute Training PMBOK (Certificate)


2001 : GE Supplier Project Manager Training, Port Blair, India
2000 : ASME Sec. VIII Div.I (Certificate)
1999 : Package Assembly & Testing of Gas Turbine and Centrifugal Compressor, Florence, Italy
1996 : The Pre-Advanced English Course (Conversation Level 6) (Certificate)
1997 : Peluang dan Tantangan Implementasi ISO 14000 di Industri dalam Era Pasar Bebas
(Certificate)
1997 : Indonesian Quality Convention 1997 (Certificate)

POWER PLANT PROJECT EXPERIENCE


(Advanced)
10+ Years Experience, (Last Used 10+ years ago)

Contribution in Power Plant Project:


Supply of Balance Of Plant for several Power Plant Components Provider (General Electric Power System,
Mitsubishi Heavy Industries, Alstom Power Systems, Siemens, etc)
EPCI Barge Mounted Power Plant (1 x 30 MW) – PT. PLN
Supply of Balance Of Plant for Gunung Salak Geothermal Power Plant (1x65 MW) – ANSALDO, Italy
Rehabilitation Works of Power Plant for PLTU Priok unit #3 & #4 (2 x 50 MW) – PT. PLN
EPCI 2 x 20 MW Gas Turbine Power Plant Teluk Lembu, Lampung – PT. PLN
EPCI 1 x 20 MW Gas Turbine Power Plant PIM-2, Aceh – PT. PLN
EPCI 2 x 2.5 MW Geothermal Power Plant Ulumbu, NTT – PT. PLN (Under Construction)

OIL & GAS PROJECT EXPERIENCE


(Advanced)
10+ Years Experience, (Last Used 10+ years ago)
Process Components for several oil & gas exploration & production (Caltex Pacific Indonesia, Vico
Indonesia, Total Indonesie)
Process Components for several oil & gas contractors (IKPT, Sempec, TPEC, Rekayasa Industri)
Skid Mounted for Sempec, TPEC and Punj Lloyd
Modules Packages (< 300 tons) for ARII, Total Indonesie and UOP (USA)
Sub-structure monopod for ARII
Floating Structure for UNOCAL Indonesia
Wellhead Platform, Topside, Jacket & Pipeline Installation (Amerada HESS Indonesia, Kodeco Energy,
CNOOC)

Interests
My interest in opportunities of Oil and Gas, Power Plant Project in Project Management field

This next-generation resume was created using VisualCV

Page 7 of 7

Das könnte Ihnen auch gefallen