Beruflich Dokumente
Kultur Dokumente
com/ifjwa84
Andryaas Mamuaya
Project Manager Participated in GE's
PT PROFAB Indonesia Nuovo Pignone fo Total
Tunu 7 Project
PT PROFAB
http://www.profab.co.id
Indonesia:
PT PAL Indonesia: http://www.pal.co.id
http://www.yourwebcv.com/
See My Online CV:
cv.php?user=amamuaya
Summary
2002
I consider myself to be a self-motivated, hard working, punctual, and conscientious individual, capable As a Production Engineer participant in
of working to high standards and under pressure either as part of a team or on own initiative. As a Nuovo Pignone- Italy. PT PAL
team member, I enjoy an excellent working relationship with colleagues of all ages and personalities. I awarded EPC Contract by Total
am also able to write creatively and critically, and successfully meet deadline Indonesie, Tunu VIII & IX Gas
Compression Modules
Work History
Stator Frame for Gas
PT PROFAB INDONESIA Turbine Power Plant
Batam, Indonesia Feb 2010 - Present 600MW
Project Manager
The Profab group of companies provides a one stop solution for the oil & gas and related Industries
from field development to production to refining, Profab can design and manufacture all size and
material Pressure Vessels, Air Cooled Heat Exchangers, Shell & Tube Heat Exchangers. We
manufacture Process Modules and Well Head Platforms up to 2000t. Additionally we provide Valve
refurbishment and design, supply and operate onshore or offshore Drilling Derricks.
PT PAL Indonesia
Surabaya, Other, Indonesia Jan 1992 - Jan 2010
Project Manager
PAL INDONESIA lives up to its reputation as a primary force for national maritime-industry
development. As part of its effort to support the foundation of a solid maritime industry, we strive to
deliver knowledge, skills and technology for wider use in the national maritime industry community.
This effort has become even more relevant as it holds the key for an enhanced national maritime
industry.
Page 1 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84
2008-2010 : Project Manager in PT PAL Indonesia for Alstom, ElTebbin, CSA Spain Project
2007 : Project Manager in PT PAL Indonesia for Metering Skid PGN Project (Perusahaan
Gas Negara)
2006-2007 : Project Engineer in PT PAL Indonesia for Engineering, Procurement, Fabrication, General Electric Stator
Precommisioning of KE 32, Topside and Monopod Jacket for KODECO Energy Project Frame
Detail work
1. Daily project engineer the project of Offshore EPCI (Engineering, Procurement, Construction &
Installation) Services for KODECO Energy Oil Co., Indonesia.
2. Lead the project team to perform engineering, procurement, installation and pre-commissioning of
the following development projects;
(a) Tripod Central Poleng Processing Platform (PPP)
(b) KE32 Wellhead Platform and 7 km of 12” Pipeline (from KE32 to Tee-junction along KE38-PPP)
(c) Tie-in of the KE-30 pipeline to the preinstalled KE-30 pipeline riser on PPP after PPP installation
(d) Gas Expansion Phase II Pipeline (70 km of 16” pipelines from PPP to ORF) General Electric award in total 80
(e) 2 km of 16” Horizontal directional drilling (HDD) pipelines Units of Stator Frame since 1998
3. Provided supervision and management to all Sub Contractors and Vendors responsible for any to 2002. Range of 300MW to
design, procurement, fabrication and installation aspects of the project, to ensure that all parties are 700MW
working to the planning.
2005-2006 : Project Engineer in PT PAL Indonesia for Engineering, Procurement, Fabrication, Alstom project delivered
Precommisioning of Zelda F, Topside and Monopod Jacket for Sumatra SES CNOOC Project to El Tebbin
Detail work
1. Daily project engineer the project of Offshore EPCI (Engineering, Procurement, Construction &
Installation) Services for CNOOC, Indonesia.
2. Lead the project team to perform engineering, procurement, installation and pre-commissioning of
the following development projects;
(a) Tripod Central Poleng Processing Platform (PPP)
(b) Wellhead Platform and 7 km of 12” Pipeline (from WHP to Tee-junction along )
3. Provided supervision and management to all Sub Contractors and Vendors responsible for any
design, procurement, fabrication and installation aspects of the project, to ensure that all parties are
working to the planning.
Balance of Plant such as Main
Condenser, LP Heater was
2005-2007 : Project Manager for Fabrication & Machining Stator Frame 300MW & 600MW for
delivered to ElTebbin Egypt
China. Our client Harbin Electric Company- China awarded USD 3.000.000 for Engineering,
Procurement, Fabrication, and Machining of Stator Frame 300MW (10 units) and Stator Frame
600MW (10 units). All units will be shipped to China within 1.5 year. Project team involved are 1 WHP AHESS
Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production
Engineer, 4 Shops manager ( 4 shops for welding and machining), 15 Fitter and 20 Welders.
PLATFORM "A"
Project Manager jobs are: Review Contract, Manage Kick Off Meeting, Project Plan (Manpower
plan, schedule, engineering, procurement & subcontractor), Project Execution, Project Controlling,
Reporting Status & Progress to Upper management & Client, Evaluation
2004-2005 : Project Manager for UOP Recovery Plus Project –Module Refinery Plant Pertamina
Balongan. Our client UOP LLC –USA awarded USD 700.000 for Engineering, Procurement,
Fabrication, and Installation of UOP Recovery Plus Module for Pertamina Balongan. Project team
involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer,
WELLHEAD PLATFORM “A”
2 Production Engineer, 4 Shops manager ( 4 shops for welding and machining), 20 Fitter and 16
UJUNG PANGKAH
Welders. Project Manager jobs are: Review Contract, Manage Kick Off Meeting, Project Plan
DEVELOPMENT PROJECT
(Manpower plan, schedule, engineering, procurement & subcontractor), Project Execution, Project (AMERADA HESS)
Controlling, Reporting Status & Progress to Upper management & Client, Evaluation JACKET 160 TON
PILES 480 TON
2003-2004 : PT PAL’s Project Manager for Pressure Vessels for TUNU 9 Field Defelopment DECK 450 TON
Project Our client was PT Astinaputera Ekaperkasa awarded USD 600.000 for Engineering, TOTAL 1090 TON
Procurement, Fabrication, and Machining of Pressure Vessels for TUNU 9 Field. Project team
involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer,
2 Production Engineer, 2 Shops manager ( 2 shops for welding and machining), 10 Fitter and 15
Welders. Project Manager Jobs are: Review Contract, Manage Kick Off Meeting, Project Plan
Page 2 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84
(Manpower plan, schedule, engineering, procurement & subcontractor), Project Execution, Project
Controlling, Reporting Status & Progress to Upper management & Client, Evaluation Zelda F Monopod WHP
CNOOC
2002 : Project Manager for LPG Storage Vessels for Cemara LPG Plant. Our client PT
Wahana Insannugraha awarded USD 400.000 for Engineering, Procurement, Fabrication, and
Installation of LPG Storage Tank and scrubber to Cirebon. Project team involved are 1 Project
Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer,
4 Shops manager ( 4 shops for welding and machining), 15 Fitter and 20 Welders. Project Manager
jobs are: Review Contract, Manage Kick Off Meeting , Project Plan (Manpower plan, schedule,
engineering, procurement & subcontractor), Project Execution, Project Controlling, Updating &
Reporting Status & Progress to Upper management & Client, Evaluation
2002 : PT PAL’s Project Manager for Duri Steam Flood Area 11 EPC. Our client PT.
As Project Engineer in EPC Project
Tripatra awarded USD 400.000 for Engineering, Procurement, Fabrication, and Machining of
ZELDA F MONOPOD
Pressure Vessel for Caltex Pacific Indonesia. Project team involved are 1 Project Sponsor, 1 Project
WELLHEAD PLATFORM
Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer, 4 Shops manager
CNOOC SES, Ltd
( 4 shops for welding and machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review MEZZ & MAIN DECK 184 TON
Contract, Manage Kick Off Meeting , Project Plan (Manpower plan, schedule, engineering, CELLAR DECK 114 TON
procurement & subcontractor), Project Execution, Project Controlling, Reporting Status & Progress CAISSON & BOAT LAND 212 TON
to Upper management & Client, Evaluation PILES 175 TON
TOTAL 685 TON
2001 : PT PAL’s Project Manager for Stator Frame 7FH2 Project (Mitsubishi Electric
Company -MELCO ) Our client Mitsubishi Electric Company-JAPAN awarded total USD 950.000
for Engineering, Procurement, Fabrication, and Machining of Stator Frame 400MW (10 units) All
units shipped to JAPAN. Project team involved are 1 Project Sponsor, 1 Project Manager, 1
Condenser Module for
Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer, 4 Shops manager ( 4 shops Alstom
for welding and machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review Contract,
Manage Kick Off Meeting , Project Plan (Manpower plan, schedule, engineering, procurement &
subcontractor), Project Execution, Project Controlling, Reporting Status & Progress to Upper
management & Client, Evaluation
2001 : PT PAL’s Project Manager for Stator Frame 7FH2 Project (General Electric )
Our client General Electric Power System USA awarded total USD 10.000.000 for Engineering,
Procurement, Fabrication, and Machining of Stator Frame 400MW (85 units) All units shipped to
USA. Project team involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1
Procurement Officer, 4 Production Engineer, 4 Shops manager ( 4 shops for welding and Alstom Power is one of the long
machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review Contract, Manage Kick term customer and award several
Off Meeting , Project Plan (Manpower plan, schedule, engineering, procurement & subcontractor), BOP Project for Europe and Far
Project Execution, Project Controlling, Reporting Status & Progress to Upper management & Client, East Power Plant.
Evaluation
2000 : PT PAL’s Production Engineer for Produced Fluid Heat Exchanger, CGS Area 10 Drilling Template -FMC
Project (Caltex Project) Our client IKPT awarded USD 900.000 for Engineering, Procurement, for PT PAN
Fabrication, and Machining of Heat Exchanger for Caltex Pacific Indonesia. Production Engineer job
are: Detail Scheduling, Monitor and Update Status, Reporting to Project Manager.
1999 : PT PAL’s Production Engineer for Air Cooled H/E Project (VICO)
Our client VICO Indonesia awarded USD 700.000 for Engineering, Procurement,
Fabrication, and Testing of Air Colled H/E. Production Engineer job are: Detail Scheduling, Monitor
and Update Status, Reporting to Project Manager.
1995 – 1998 : PT PAL’s Production Engineer for Barge Mounted Power Plant Project (PLN-IHI Four leg Drilling Template
Project). Our client PT PLN awarded USD 13.000.000 for Engineering, Procurement, Fabrication, designed by FMC for PT
Installation and Testing of BMPP. Production Engineer job are: Detail Scheduling, Monitor and Partalahan start fabrication by
Update Status, Reporting to Project Manager. early August 2010 and complete
by end of September 2010
1992 – 1995 : PT PAL’s Supervisor for PLTU Gresik, PLTU Paiton Project, PLTUG Suralaya
Project
Page 3 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84
Education
University of Dr. Soetomo
Surabaya, Indonesia Jun 1996 - Jan 2000
Bachelor Degree, English
http://fs.unitomo.ac.id/
Template on board
In progress
Page 4 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84
This Jacket for Kodeco More than 150 units Alstom BOP for Egypt
KE32 was also MRS Skid was fabricated ready to Sail Out.....good
fabricated inside of for PGN Project funded bye my baby
workshop and load out by World Bank
was in the twilight to
catch the high tide of the
seawater...
Page 5 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84
Lunch
@Sampoerna
Cafe
Skills
Technical Standard, Improvement and Project Management
(Advanced)10+ Years Experience, (Currently in use)
Excellent understanding of Material specifications, standardized by ASTM, ASME and BS, DNV,
MIGAS regulation, piping oil and gas platforms.
Professional Training
Page 6 of 7
View My VisualCV Online: http://www.visualcv.com/ifjwa84
Interests
My interest in opportunities of Oil and Gas, Power Plant Project in Project Management field
Page 7 of 7