Sie sind auf Seite 1von 6

NOTES

DRAWING NOTES

STANDBY GENERATOR - FOUNDATION PLAN - NEW WORK DETAIL

KEY PLAN

PROJECT TRUE
NORTH NORTH

STANDBY GENERATOR - FOUNDATION SECTION - NEW WORK STANDBY GENERATOR - FOUNDATION SECTION - NEW WORK

NOVEMBER 14, 2012


DF1201
AS NOTED
RC ST03.001
KRS DMG
STANDBY GENERATOR 1 of 1
LWC
DRH
FOUNDATION PLAN AND SECTIONS -
FDH
NEW WORK 13 of 27
File name:..\ST03.001.dwg
NOTES

OPENING
0"

DRAWING NOTES

SECTION - CONCRETE
SECTION - NEW WORK FOOTING AT STAIR BASE
SECTION THRU WALKWAY SLAB - NEW WORK (TYP. OF 2)

7" 2-1/2" PROJECTION

3"

15"

1-1/2"

1-1/2"

6"

3"

DETAIL - DUCT BANK SECTION WITH DETAIL


DETAIL
REINFORCING STEEL

NOVEMBER 14, 2012


DF1201
NOT TO SCALE
RC ST03.003
KRS DMG
STANDBY GENERATOR 1 of 1
LWC
DRH
FOUNDATION DETAILS -
FDH
NEW WORK 15 of 27
File name:..\ST03.003.dwg
NOTES:

DRAWING NOTES

NORTH SUBSTATION & TRANSFORMER YARD - POWER PLAN - NEW WORK

KEY PLAN

PROJECT TRUE
NORTH NORTH

NOVEMBER 14, 2012


DF1201
1/8" = 1'-0"
MJ EL04.001
KRS DMG
NORTH SUBSTATION 1 of 1
LWC
DRH
AND TRANSFORMER YARD
FDH
POWER PLAN - NEW WORK 18 of 27
File name:..\EL04.001.dwg
SECTION
SECTION SECTION

C
EL07.002 B
A EL07.002
EL07.002

PRECAST ELECTRICAL MANHOLE DETAIL PRECAST COMMUNICATION HANDHOLE DETAIL

NOVEMBER 14, 2012


DF1201
NOT TO SCALE
MJ EL07.002
KRS DMG
LWC 1 of 1
DRH
DETAILS
23 of 27
FDH
File name:..\EL07.002.dwg
NOTES

DRAWING NOTES

PARTIAL RISER DIAGRAM

NOVEMBER 14, 2012


DF1201
NOT TO SCALE
MJ EL09.002
KRS DMG
LWC 1 of 1
DRH
RISER DIAGRAM - NEW WORK
26 of 27
FDH
File name:..\EL09.002.dwg
NOTES DRAWING NOTES

NOVEMBER 14, 2012


DF1201
NOT TO SCALE
HU EL10.001
KRS DMG
LWC 1 of 1
DRH
AUTHORITY MONITORING SYSTEM
FDH
CONNECTIONS 27 of 27
File name:..\EL10.001.dwg

Das könnte Ihnen auch gefallen