QUOTATION FOR ELECTRICAL WORK LABOUR RATE ONLY

Estimate Date: 22-Dec-19


ESTIMATE FOR: Estimate No: 0001236
Name : Mr. George Mikhael
Company : Convert Electromechanical Contracting and Trading PROJECT : V02 GYM
Address : Al Muiather, Furusiya Street, P.O Box: 45267
City, State ZIP : Doha – Qatar
Phone : 974 40385706 FAX : 974 44604119

JOB SCOPE: VILLAGIO MALL, GROUND FLOOR BACKGROUND MUSIC SYSTEM LAYOUT,
GROUND GLOOR DATA LAYOUT, CCTV, Fire Alarm Layout, Emergency Lighting Layout,
ONLY INSTALLATION COST
S/L Description UNIT Cost
1 GROUND FLOOR BACKGROUND MUSIC SYSTEM LAYOUT
a 25mm G.I Conduit @ HL With Contaiment Installation
b Speaker audio Cable Pulling
c G.I Junction box Instaillation
1 QAR 29,400.00
d G.I COPEX Pipe Installation
e Audio Speker ( 1.5mm Suspension Wire) Insatallation
f SCS Installation & Connection
2 GROUND GLOOR DATA LAYOUT
a 25mm G.I Conduit @ HL With Contaiment Installation
b G.I Cable Trunking 200 X 200 @ HL
c G.I Cable Trunking 300 X 300 @ HL
d Wireless access point
1 QAR 27,800.00
e Data Outlet / Telephone Outlet/ Data point CCTV/ Data Point For TV
f 25 mm P.V.C Conduit ( Under Screed) With Containment Installation
g Cat 6 Cable Pulling
h Outlet Conecting By Cable
3 CCTV
a 25mm G.I Conduit @ HL With Contaiment Installation
b G.I Cable Trunking 200 X 200 @ HL
c G.I Cable Trunking 300 X 300 @ HL
1 QAR 24,300.00
d Data point RJ-45 Connection and installation
e Cable Pulling (cat6A cable)
f CCTV camera Installation
4 Fire Alarm Layout
a 25mm G.I Conduit @ HL With Contaiment Installation
b Smoke Detector / Remote Indicator installation
c Pull station installation
d Sounder Horn & Strobe Light Installation
1 QAR 25,200.00
e MCM Installation
f FAC Panel Installation and Termination
g Fire Rated Cable Pulling
h Exit / Emergency
5 Emergency Lighting Layout
a 25mm G.I Conduit @ HL With Contaiment Installation
b Emergency Light Installation
c exit Light installation
d Power Socket Layout and Installation
1 QAR 23,000.00
e Switch Installation
f Isolator Installation
g MDB & MSDB Installation and Termination
h Fire Rated Cable Pulling
Total Amount of LABOR Cost QAR 129,700.00
Amount in Word:One Hundred Twenty Nine Thousand Seven Hudred QAR Only
TERMS AND CONDITIONS
1. Invoice for 15 days consecutively while working and pay within 7 days after invoice
2. All types of civil works shall have Main Contractor scope
3. After the quotation is approved, we will start the job after subcontractor agreement and Issue LPO.
4. The main contractor will provide full scaffolding when needed to operate at a high level.
5.While working, the main contractor will provide the drawing of all lay-out plans
6. The Maine Contractor is responsible for delivering all types of raw materials to the workplace

Customer Acceptance (sign below): For


x ___________________________________________ M/S- MEGAWATT CONTRACTING AND ELECTRICITY CO.

Print Name:

If you have any questions about this price quote, please contact
[ENG. RAKIBUL ISLAM Z, Phone #+974 50008751, E-mail: megawattelectricity.company@gmail.com]
Thank You For Your Business!

Das könnte Ihnen auch gefallen