Sie sind auf Seite 1von 213

 

 
谨以此书献给辛苦哺育的老婆
和努力成长的林依依。

小林于上海

2012.04.02
 

目录 
 
 

一 复习事记 P1

二 复习资料 P2~6
2.1 References of LEED GA P2

2.2 本书参考资料 P3

2.3 LEED GA 考试主要内容及例题 P4

三 考场经验 P7~13

3.1 某老外的LEED GA考试心得 P7

3.2 一起走过的考友 P9

3.3 网友考场经验分享 P10

3.4 上海考点实拍 P11


 
3.5 成绩单实拍 P12

3.6 证书电子版 P13

四 备考笔记 P14~27

4.1 LEED 2009 NC 学习问答 P14

4.2 LEED GA Study Guide 学习问答 P17

4.3 LEED Acronyms P20

4.4 Thoughts to remember P24

五 仿真模拟 P28~206

 
 

 
 
序号  事项 
1  熟悉 LEED Green Associate Candidate Handbook(Valid for February 2011).pdf 
2  收集  References of LEED Green Associate 
3  模拟题测试学习错误!超链接引用无效。 
4  网站注册账号:http://gbci.cyzap.net/certloginonline/ 
5  某老外 GA 考试经验汉化 http://bbs.ehvacr.com/thread‐39088‐1‐1.html 
6  GA 考试内容及例题 
7  LEED 2009 for New Construction and Major Renovations Rating System 
8  LEED 2009 Minimum Program Requirements 
LEED 2009 MPR Supplemental Guidance 
9  LEED Green Associate Study Guide(Studio4­2010.02) 
10  LEED Acronyms:http://bbs.ehvacr.com/thread‐45749‐1‐1.html 
11  LEED Green Associate Study Guide(USGBC) 
12  LEED Green Associate Exam Advice 
13  LEED Green Associate Exam Prep­101 Q&A(Studio4) 
14  LEED 项目受邀 
15  Cost of Green Revisited 
Sustainable Building Technical Manual:Part II 
The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
Guidance on Innovation and Design (ID) Credits 
Credit Interpretation Rulings 
Guide to Purchasing Green Power 
16  考试报名,上传证明,交注册费$50,报名信息确认: http://www.gbci.org/homepage.aspx 
17  Quiz ‐ Set A‐B‐C:http://bbs.ehvacr.com/thread‐46161‐1‐1.html 
18  LEED for Existing Buildings:Operations and Maintenance Reference Guide,Introduction 
19  LEED for Homes Rating System 
20  LEED GA Exam Simulator 
21  Flash Cards_LEED Green Associate   
22  LEED 2009 for New Construction and Major Renovations 
23  LEED Green Associate Study Guide(Studio4­2010.02) 
24  Guide to the LEED Green Associate Exam 
25  Green Building and LEED Core Concepts Guide 
26  Qize & Test:http://bbs.ehvacr.com/thread‐46334‐1‐1.html 
27  Sechdule,交考试费$200: prometric.com/gbci. 
28  LEED 2009 for New Construction and Major Renovations 
29  LEED Green Associate Exam 
30  下载电子版证书,预定纸版证书: http://www.gbci.org/homepage.aspx 
更多详细安排可参考:http://bbs.ehvacr.com/thread‐39764‐1‐1.html 
 

 
1/206
 

References of LEED Green Associate 
序号 参考资料 备注
Green Building & LEED Core Concepts Guide, 1st
1 USGBC, 2009
Edition
Green Office Guide: Integrating LEED Into Your Leasing
2 USGBC, 2009, 17Pages
Process, Section 2.4
LEED 2009 for New Construction and Major
3 USGBC, 2009, 108Pages
Renovations Rating System
LEED for Existing Buildings: Operations & Maintenance
4 USGBC, 2008, 11Pages
Reference Guide, Introduction
LEED for Existing Buildings: Operations & Maintenance
5 USGBC, 2008, 20Pages
Reference Guide, Glossary

6 LEED for Homes Rating System USGBC, 2008, 114Pages

by Davis Langdon (2007) ,


7 Cost of Green Revisited
25Pages
by Anthony Bernheim and
8 Sustainable Building Technical Manual: Part II William Reed (1996) ,
11Pages
LEED Technical and
The Treatment by LEED® of the Environmental Impact Scientific
9
of HVAC Refrigerants Advisory Committee, 2004,
24Pages

10 Guidance on Innovation & Design (ID) Credits USGBC, 2004, 1 Page

11 Credit Interpretation Rulings www.gbci.org, 2 Pages

12 Guide to Purchasing Green Power U.S. EPA, 2004, 50Pages

LEED 2009 for Operations & Maintenance Rating


13 USGBC, 2009, 112Pages
System

14 LEED 2009 Minimum Program Requirements USGBC, 2009, 6Pages

15 LEED 2009 MPR Supplemental Guidance v1 USGBC, 2009, 34Pages

来自:LEED Green Associate Candidate Handbook(Valid for February 2011).pdf 
官方下载地址:http://www.gbci.org/main‐nav/professional‐credentials/candidate‐handbooks.aspx 
 
2/206
 

本书参考资料 
序号  参考资料  来源或分享 
1  LEED Green Associate Candidate Handbook(2011.02)  GBCI 下载 
2  LEED Green Associate Exam Advice  Kittytea 分享 
3  Green Building and LEED Core Concepts Guide  Darlene 分享 
4  Green Office Guide:Integrating LEED Into Your Leasing Process Section 2.4  GBCI 下载 
5  LEED 2009 for New Construction and Major Renovations  GBCI 下载 
6  LEED 2009 for New Construction and Major Renovations(中文版)  yy0318 分享 
7  LEED  for  Existing  Buildings : Operations  and  Maintenance  Reference  GBCI 下载 
Guide,Introduction 
8  LEED for Existing Buildings:Operations and Maintenance Reference Guide,  GBCI 下载 
Glossary 
9  LEED for Homes Rating System  GBCI 下载 
10  Cost of Green Revisited  GBCI 下载 
11  Sustainable Building Technical Manual:Part II  GBCI 下载 
12  The  Treatment  by  LEED®  of  the  Environmental  Impact  of  HVAC  GBCI 下载 
Refrigerants 
13  Guidance on Innovation and Design (ID) Credits  GBCI 下载 
14  Credit Interpretation Rulings  GBCI 下载 
15  Guide to Purchasing Green Power  GBCI 下载 
16  LEED 2009 for Existing Buildings:Operations and Maintenance  GBCI 下载 
17  LEED 2009 Minimum Program Requirements  GBCI 下载 
17  LEED 2009 MPR Supplemental Guidance v1  GBCI 下载 
19  LEED Green Associate Study Guide(GBES‐2011.11)  珍珍分享 
20  LEED Green Associate Study Guide(Studio4‐2010.02)  Ericlin830109 分享 
21  LEED Green Associate Study Guide(USGBC)  利齿小花分享 
22  Flash Cards_LEED Green Associate  cvml 分享 
23  Guide to the LEED Green Associate Exam  Ymg 分享 
24  Green Building Basics and LEED Glossary  多多分享 
25  LEED Green Associate Exam Prep‐101 Q&A(Studio4)  Jill8128 分享 
26  LEED GA Exam Simulator  多多分享 
27  Quiz ‐ Set A‐B‐C  多多分享 
28  test1~ test7  Togimoon 分享 
29  Pool F~ Pool G  小司分享 
30  GA‐Practice‐Exam‐with‐answers  cvml 分享 
31  LEED 考试真题(2012.1.18)  Tambourmajor 分享
注:1、官方下载地址:http://www.gbci.org/ 
2、网友分享下载:http://bbs.ehvacr.com/forum‐143‐1.html   
3、蓝色加粗为小林推荐必看资料 

 
3/206
 

LEED GA 考试主要内容及例题 
摘自:LEED Green Associate Candidate Handbook(Valid for February 2011) 

I. Synergistic Opportunities and LEED Application Process


A、 Project Requirements (e.g., site; program; budget; schedule)
B、 Costs (e.g., hard costs; soft costs; life-cycle)
C、 Green Resources (e.g., USGBC; Environmental Building News)
D、 Standards that support LEED Credit (e.g., American Society of Heating, Refrigeration and
Air-conditioning
Engineers [ASHRAE]; Sheet Metal and Air Conditioning Contractors National Association [SMACNA]
guidelines; Green Seal)
E、 Credit Interactions (e.g., energy and IEQ; waste management)
F、 Credit Interpretation Rulings/Requests and precedents that lead to exemplary performance credits
G. Components of LEED Online and Project Registration
H. Components of LEED Score Card
I. Components of Letter Templates (e.g., project calculations; supplementary documentation)
J. Strategies to Achieve Credit
K. Project Boundary; LEED Boundary; Property Boundary
L. Prerequisites and/or Minimum Program Requirements for LEED Certification
M. Preliminary Rating (target certification level)
N. Multiple Certifications for Same Building (e.g., Operations & Maintenance for certified building new
construction; core and shell and commercial interior; certified building in neighborhood development)
O. Occupancy Requirements (e.g., existing building--building must be fully occupied for 12 continuous
months as described in minimum program requirements)
P. USGBC Policies (e.g., trademark usage; logo usage)
Q. Requirements to Earn LEED AP Credit
1: What Carpet and Rug Institute (CRI) program
set standards for low-emitting carpets, adhesives,
and pads?
A、 Green Seal
B、 Green Guard
C、 Green-e Certified
D、 Green Label Plus

II. Project Site Factors


A、 Community Connectivity

 
4/206
 

1. Transportation (e.g., public transportation; bike storage; fuel efficient vehicle parking; parking capacity;
car pool parking; car share membership [e.g. Zipcar™]; shuttles; carts)
2. Pedestrian Access (e.g., circulation and accessibility such as cross walks; ramps; and trails)
B、 Zoning Requirements (e.g., density components such as calculations -site area and floor area ratio;
construction limits; open space; building footprint; development footprint; specific landscaping restrictions)
C、 Development
1. Heat Islands (e.g., non-roof; roof; Solar Reflectance Index [SRI]; emissivity; albedo; heat island effect;
green roofs)
2: Why should a green project be located in an
existing community?
A、 Adequate parking is available on sitE、
B、 The zoning approval for the project is easier.
C、 Native plantings can be used for erosion control.
D、 The connection to basic community resources is present.

III. Water Management


A、 Types and Quality of Water (e.g., potable; graywater; blackwater; stormwater)
B、 Water Management (e.g., water use reduction through fixtures such as water closets; urinals; sinks;
lavatory
faucets; showers; harvesting; baseline water demand; calculations of Full Time Equivalent; irrigation)
3: Graywater is most often used for:
A、 drinking.
B、 irrigation.
C、 dishwashers.
D、 swimming pools.

IV. Project Systems and Energy Impacts


A、 Environmental Concerns (e.g., chlorofluorocarbon [CFC] reduction, no refrigerant option, ozone
depletion,
fire suppressions without halons or CFC’s, phase-out plan, Hydrochlorofluorocarbons [HCFC])
B、 Green Power (e.g., off-site generated, renewable energy certificates, Green-e providers)
4: What refrigerant contributes the most to
global warming potential (GWP)?
A、 HFC-23
B、 CFC-12
C、 Propane
D、 HCFC-123
 
5/206
 

V. Acquisition, Installation, and Management of Project Materials


A、 Recycled Materials (eg., pre-consumer, post-consumer, collection requirements, commingled)
B、 Locally (regionally) Harvested and Manufactured Materials
C、 Construction Waste Management (e.g., written plan; accounted by weight or volume; reduction
strategies;
polychlorinated biphenyl (PCB) removal and Asbestos-containing materials (ACM) management)
5: A general contractor (GC) attempts a credit in
Local or Regional Materials and discovers that
the specified product has only a portion of the
material manufactured within the required
radius. What should the GC do?
A、 Not list the product
B、 Not use the product
C、 List the entire product
D、 List only the portion within the required radius

VI. Stakeholder Involvement in Innovation


A、 Integrated Project Team Criteria (architect, heating-ventilation-air-conditioning [HVAC] engineer,
landscape
architect, civil engineer, contractor, Facility Manager)
B、 Durability Planning and Management (e.g., material lifecycle, building re-use)
C、 Innovative and Regional Design (regional green design and construction measures as appropriate and
established requirements)

VII. Project Surroundings and Public Outreach


A、 Codes (e.g., building, plumbing, electrical, mechanical, fire protection)
6: What is the legal instrument that regulates
current land use?
A、 Zoning
B、 Licensing
C、 Abatement
D、 Commissioning

 
6/206
 

某老外的 LEED GA 考试心得 


 
原文来自:http://www.areforum.org/forums/showthread.php?t=174301 
I passed the LEED GA exam today with a 186. I figured I would describe my experience, because about two weeks ago, I 
really wish someone had made something like this available to the board. My percentage breakdown is as follows. 
Synergistic Opportunities and LEED Application Process ‐ 82% 
Project Site Factors ‐ 100% 
Water Management ‐ 77% 
Project Systems and Energy Impacts ‐ 94% 
Acquisition, Installation, and Management of Project Materials ‐ 100% 
Stakeholder Involvement in Innovation ‐ 89% 
Project Surroundings and Public Outreach ‐ 75% 
 
Okay some things that helped me.   
1. Far and away, the GEP packet. Buy it so you don't flunk and have to drop $150 to take it again. I'd say buy the USGBC 
one as well because it's good to know the exact phrasing and terminology that the USGBC prefers. 
2. The extra supplemental readings/pdfs listed on GBCI 
3. I was lucky to have studied a lot of the issues the LEED credits are intended to address in school, so I already knew a 
lot of the terminology, whereas for the NC exam, I knew nothing about the calculations for light and air flow etc.   
4. Enjoying the material. USGBC use some very unreliable statistical measures for supporting LEED. But what matters 
is that this is the first incremental step towards making sure buildings address our current environmental problems. If 
you like what you're reading, it'll stick harder. Don't think of this activity as a chore.   
My exam asked a lot about the following. 
‐Refridgerants, ozone depletion rates, global warming potential, etc 
‐water run‐off, so many questions it was bizarre 
‐heat island, green roofs, SRI etc 
‐LEED Online, Score Cards, registration process 
 
I didn't have to make any calculations, it didn't reference any credit requirements specifically, and I finished it in 1:05. It 
was easier than NC for me. 
My top 3 pieces of advice for taking this exam. 
1. Buy both the USGBC and GEP packets and know them well, and at the very least, skim all the other recommended 
readings from GBCI I mentioned earlier. 
2. Take an actual GBCI exam first. If you haven't taken one, just sign up tomorrow and take the GA exam if only to get a 
feel  for  the  questions,  the  test  taking  process,  how  GBCI  will  try  to  test/trick  you  on  the  details.  All  this  stuff  is 
statistically proven to help your score. You don't need a 198, you need a 170. 
3. Throw out (or recycle) all your old NC or other pre LEEDv3 materials because too much has changed and studying 
them is a waste of time.   
 
If you have any questions, ask away. 
 
7/206
 

 
网友汉化版:我今天以 186 分的成绩通过了 LEED GA 的考试。我希望能介绍下我的经验,因为两周
前,我真的希望能有人能介绍下。我的得分比例分类如下: 
合作机会与 LEED 申请过程‐ 82% 
项目选址因素‐ 100% 
用水管理  ‐ 77% 
项目系统与能源影响‐ 94% 
采购,安装与项目材料管理‐ 100% 
股东参与创新‐ 89% 
项目周边与公共外扩  ‐ 75% 
 
下面是一些对我有用的: 
1、首先,GEP 资料集,购买了能帮助你及格,免得再交 150 美元重考。同时,也要买 USGBC 的资
料,因为这些资料上的词汇和术语是 UAGBC 官方的。 
2、GBCI 所列的补充参考资料文档。 
3、我很幸运在学校里我曾经接触过不少与 LEED 得分点相关的论文资料,所以我已经了解了不少相
关术语。但对于 NC 考试,我对采光和气流组织计算一窍不通。 
4、享受这些资料。虽然 USGBC 使用了一些不可靠的统计方法来支持 LEED 体系,但重要的是这些方
法是解决我们现在建筑环境问题的首要步骤。如果你喜欢你所阅读的资料,不把这件事当成家务琐
事,那么你就会坚持的更久。 
 
我的考试涉及到比较多的是以下几个方面: 
‐制冷剂、臭氧损耗率、全球变暖威胁等 
‐雨水径流等奇怪的问题 
‐热岛效应、屋顶绿化、太阳反射指数等 
‐LEED 在线、评分卡、注册程序 
 
我没有遇到任何相关计算,它并没有涉及到任何具体得分点要求,我在 1:05 完成了考试,对我来说
这比 NC 容易。 
 
对于这个考试,我总结了三条最重要的建议: 
1、购买 USGBC 和 GEP 资料集并且好好掌握。对于我前面提高的 GBCI 推荐的其他参考书,至少要能
全部浏览一遍。 
2、首先,参与一次 GBCI 的考试。如果还没有参加过,明天就去申请并参加 GA 的考试,感受考题、
考试过程、GBCI 如何在细节上使你迷惑。所有的这些东西都是用来帮助你得分的,不需要得 198 分,
170 就够了。 
3.把旧版本的 NC 和 LEEDv3 版本以前的资料都扔掉或者处理掉,因为内容改动的太多以至于仍旧用
老材料会浪费时间。 
 
如果有问题的话,尽管问。 

 
8/206
 

一起走过的考友 
 
序号  考友  考试日期  GA 成绩 AP 成绩 相关贴 

1 2011.4.26 188 http://bbs.ehvacr.com/thread-40108-1-2.html


马大姐
2 2011.9.16 186 http://bbs.ehvacr.com/thread-44359-1-2.html

3 利齿小花 2011.9 http://bbs.ehvacr.com/thread-46312-1-2.html

4 boilingsea 2011.12.9 170 http://bbs.ehvacr.com/thread-46108-1-2.html

5 cvml 2012.12.27 183 187 http://bbs.ehvacr.com/thread-46344-1-2.html

6 お邪流ゃ 2012.1.6 173 http://bbs.ehvacr.com/thread-46577-1-2.html

7 Darlene 2012.1.11 175 http://bbs.ehvacr.com/thread-46721-1-2.html

8 小司 2012.1.11 172 http://bbs.ehvacr.com/thread-46664-1-2.html

9 林林 2012.1.17 191 171 http://bbs.ehvacr.com/thread-46706-1-1.html

10 tambourmajor 2012.1.18 184 http://bbs.ehvacr.com/thread-46715-1-2.html

11 Miss Punk 2012.3.15 184 http://bbs.ehvacr.com/thread-47718-1-1.html

12 Ericlin830109 2012.3.15 186 http://bbs.ehvacr.com/thread-47721-1-1.html

13 南方的天空 2012.3.19 184 http://bbs.ehvacr.com/thread-47790-1-1.html

 
9/206
 

网友考场经验分享 
 
boilingsea
说实话,准备的很糟糕,能过真是运气。
细节一塌糊涂,很多东西都没记住,一些考试题目的内容似乎从来就没见过。
一些不熟悉的领域还有不少生词
感觉的做的还行的就一点,理解了每个 credit 都是干什么的,不少题目其实都可以从常识和背景知
识中推出来。
标准和相关技术的题目有一些,稍微多花点时间,这部分的分数应该能拿到的。

Tambourmajor:
托你们大家的福,本来考了一半已经想战略性放弃了,因为第一遍下去近三十道题属于不确定的疑
题,比模拟卷难,我想如果近三十道题蒙不到一半,就算了,把三十道题过第二遍的时候,已经无
比烦躁疲惫,最后以至于用满了考试时间,提示我必须交卷了,结果不确定疑题的三分之二都被我
蒙对了,以三井寿身高厘米数的份数通过考试,感谢所有力挺我的人!

Ericlin830109:
考题比大家想象的难的多,但得分比大家想象的容易,关键考的是心态,所以一定要坚持一题一题
做完,时间肯定是够的,该 mark 的 mark,不管有多少题拿不准,关键是一定要坚持做完,熬到最
后。做完一遍 review 再把 marked 的题过一遍。最后 comment,再调整下呼吸,做完那些调查题,
尽量都给好评,然后 end,你会发现分数比你想象的高,哈哈。

 
MISS PUNK:
从考试的内容来看,还是有没复习到的地方。个别没见过的题只能靠直觉去猜。考试的系统有个缺
点,就是点击下一题时新题跳出来有点慢,所以时间不够时一定要注意这一点。多少留点时间给自
己做检查,因为 LEED 题有些题有欺骗性,回头复看时可能会发觉。一定要做完,特别是多选题,
总是能选对一部分。祝大家好运

 
10/206
 

上海考点实拍 
 

 
 
Shanghai,CHINA L1 
Prometric Test Center: # 8516   
SHANGHAI,CHINA L1 
Flat1,Bldg.16, 
Universal Software Park, 
No 879 ZhongJiang Rd 
SHANGHAI 200333 
中江路 879 号(近金沙江路)天地软件园 16 幢 1 层 
 

 
11/206
 

成绩单实拍 
 

SAMPLE

 
12/206
 

证书电子版 
 

SAMPLE

 
13/206
 

LEED 2009‐NC  学习问答 
详:http://bbs.ehvacr.com/thread-39835-1-1.html

NC-1:How many prerequisites does NC have?


答:8 项。
SS Prerequisite 1: Construction Activity Pollution Prevention
WE Prerequisite 1: Water Use Reduction
EA Prerequisite 1: Fundamental Commissioning of Building Energy Systems
EA Prerequisite 2: Minimum Energy Performance
EA Prerequisite 3: Fundamental Refrigerant Management
MR Prerequisite 1: Storage and Collection of Recyclables
IEQ Prerequisite 1: Minimum Indoor Air Quality Performance
IEQ Prerequisite 2: Environmental Tobacco Smoke (ETS) Control

NC-2:How many prerequisites and credits does NC have?


答:57 项=8 项 Prerequisites+49 项 Credits。

NC-3:Define NC rating system。


答:The LEED 2009 Green Building Rating System for New Construction and Major Renovations is a set
of performance standards for certifying the design and construction of commercial or institutional
buildings and high-rise residential buildings of all sizes, both public and privatE、 The intent is to
promote healthful, durable, affordable, and environmentally sound practices in building design and
construction.

NC-4:How many stories do high-rise residential buildings have in NC?


答:High-rise residential buildings means residential buildings of 4 or more habitable stories,四层以下的
适用于 LEED-Homes。
NC-5:How many categories are NC strategies divided into?
答:Sustainable Sites (SS)
Water Efficiency (WE)
Energy and Atmosphere (EA)
Materials and Resources (MR)
Indoor Environmental Quality (IEQ)
Innovation in Design (ID)
Regional Priority (RP)

NC-6:What do“Construction Activity Pollution Prevention”of SS P1 mainly control to reduce


construction pollution.
答:Soil erosion, waterway sedimentation and airborne dust generation.

 
14/206
 

NC-7:List more than 8 “basic community services”in SS C2。


答:Bank,Place of Worship,Convenience Grocery,Day Care Center,Cleaners,Fire Station,Beauty
Salon,Hardware,Laundry,Library,Medical or Dental Office,Senior Care Facility,Park,Pharmacy,
Post Office,Restaurant,School,Supermarket,Theater,Community Center,Fitness Center,Museum.

NC-8:Define“FTE”.
答:Full Time Equivalent (FTE) occupant(s).

NC-9:Assuming that one shared vehicle can carry 6 persons, for buildings with fewer than 400
FTE occupants, at least how many low emitting or fuel-efficient vehicles must be provided?
答:As one low-emitting or fuel-efficient vehicle must be provided per 3% of FTE occupants, at least 2 low
emitting or fuel-efficient vehicles must be provided for 400 FTE occupants.

NC-10:“low flow showers”can impacted which two of the 7 categories?


答:WE,EA

NC-11:How many FTEs must NC have for LEED?


答:The LEED project must serve 1 or more Full Time Equivalent (FTE) occupant(s).

NC-12:List the fixtures and fixture fittings of EPAct standards?


答:Water closets, urinals, lavatory faucets, showers, kitchen sink faucets and pre-rinse spray valves.

NC-13:What energy related systems must be completed in building commissioning process?


答:Heating, ventilating, air conditioning and refrigeration (HVAC&R) systems (mechanical and passive)
and associated controls;Lighting and daylighting controls;Domestic hot water systems;Renewable energy
systems.

NC-14:List more than three items of “process energy”and“Regulated energy”.


答:process energy is considered to include, but is not limited to, office and general miscellaneous
equipment, computers, elevators and escalators, kitchen cooking and refrigeration, laundry washing and
drying, lighting exempt from the lighting power allowance and other.  Regulated (non-process) energy
includes lighting heating, ventilating, and air conditioning (HVAC), and service water heating for domestic
or space heating purposes.

NC-15:Define:ODP、GWP、Lr、Mr、Rc.
答:ODP:Ozone Depletion Potential;GWP:Global Warming Potential;Lr:Refrigerant Leakage Rate;
Mr:End-of-life Refrigerant Loss;Rc:Refrigerant Charge。

NC-16:Where is green power derived from?


答:Green power is derived from solar, wind, geothermal, biomass or low-impact hydro sources.

NC-17:List the credits of Low-Emitting Materials.


答:Adhesives and Sealants、Paints and Coatings、Flooring Systems、Composite Wood and Agrifiber
Products.

NC-18:Which credit are residential projects not eligible for?


 
15/206
 

答:IE Q Credit 7.2: Thermal Comfort—Verification, which is in addition to IE Q credit 7.1.

NC-19:List the four options that can achieve daylight credit.


答:Simulation、Prescriptive、Measurement、Combination.

NC-20:How can exemplary performance points be earned?


答:An exemplary performance point may be earned for achieving double the credit requirements and/or
achieving the next incremental percentage threshold of an existing credit in LEED.

 
16/206
 

LEED GA Study Guide  学习问答 
详:http://bbs.ehvacr.com/thread‐39110‐1‐1.html 

SG-1:What are the three general reasons why building owners should seek Certification?
答:commitment、legitimacy、marketability.

SG-2:Define “sustainability”
答:Sustainability is the ability of the current generation to meet its own needs without compromising the
ability of future generations to meet their needs.

SG-3:What building expenses can be calculated in the life cycle cost analysis?
答:Initial costs、operating costs、maintenance, repair and replacement costs、salvage value.

SG-4:What are the three design phases?


答:Schematic Design(SD)、Design Development (DD)、Construction Documents (CD).

SG-5:What are the three costs elements of LEED projects?


答:Hard costs、soft costs and life cycle costs.

SG-6:How many percents higher levels of occupant satisfaction can green building performance?
答:27%.

SG-7:How many percents do green buildings cost approximately more than conventional buildings?
答:2%.

SG-8:What are the Triple Bottom Line components of LEED?


答:Economic Prosperity、Social Responsibility、Environmental Stewardship. Another way: People、
Planet、Profit.

SG-9:How much you should pay for the CIR fees for each application?
答:$220.

SG-10:What’s the minimum floor area requirements of LEED NC and LEED CI?
答:1000 square feet and 250 square feet.

SG-11:What’s the difference among “LEED certification”、”LEED certified” and ”LEED Certified”?
答:‘LEED certification’ with lowercase ‘c’ describes the certification process. ‘LEED certified’ with
lowercase ‘c’ is used to describe a project that has been certified. ‘LEED Certified’ with capital ‘C’ is
used to describe a project that has been certified to the base level: Certified.

SG-12:How many points do each LEED rating system requires at least for certification?
答:A minimum of 40 pionts.

SG-13:How many degrees does LEED define heat islands as temperatures greater than those of
surrounding urban areas?
答:10 fahrenhite degrees.

 
17/206
 

SG-14:How many percents does transportation accounts for the nation’s greenhouse gas emissions and
vehicle technology?
答:32%.

SG-15:How many energy and electricity of building used each year in US?
答:39%、74%。

SG-16:What pieces of information required to be consistent when applied to each applicable credit?
答:LEED project boundary information and full time equivalent data.

SG-17:What are the same strategies to reduce indoor water use and outdoor water use and process water
use?
答:Use nonpotable water and install submeters.

SG-18:List more than four natural refrigerants.


答:Carbon Dioxide, Water, Ammonia, Hydrocarbons, Air.

SG-19:List more than four renewable energy.


答:Photovoltaic, wind energy, solar thermal, biofuels, geothermal heating, low impact hydroelectric, wave
and tidal.

SG-20:What’s the energy related systems that must be commissioned?


答:HVAC&R, Lighting and daylighting controls, Domestic hot water systems, Renewable energy
systems.

SG-21:How much possible points can we get from “Building reuse: maintain existing walls, floors and
roof” for NC, schools and CS?
答:3 points for NC, 2 points for schools and 5 points for CS.

SG-22:What’s the difference between pre-consumer recycled materials and post-consumer recycled
materials?
答:Pre-consumer content is material that might have come from excess or damaged items generated
during manufacturing processes that are not reused for the same purposE、 Post-consumer content is a
material that has served its intended use and instead of being set alongside the curb to be picked up and
disposed of, it is being recycled and reused in a different product.

SG-23:What are the three basic contaminants that should be reduced or eliminated in managing indoor
pollutants?
答:Environmental tobacco smoke, carbon dioxide, particulate matter.

SG-24:What are the variables that can affect thermal comfort of building occupants?
答:Activity, clothing, air temperature, radiant temperature, humidity and air speed.

SG-25:Besides of LEED AP, what are the two strategies to receive points with the Innovation in Design?
答:Exemplary performance, innovative performance.

 
18/206
 

LEED Acronyms 
详:http://bbs.ehvacr.com/thread-45749-1-1.html

ACCA Air Conditioning Contractors of America 美国空调承包商


ACEEE American Council for an Energy Efficient Economy 美国能源效率经济委员会
ACM Asbestos-Containing Materials 含石棉材料
AFUE Annual Fuel Utilization Efficiency 年燃料利用效率
AHU Air Handling Units 空气处理机组
AIA American Institute of Architects 美国建筑师学会
AFV Alternative Fueled Vehicle 替代燃料交通工具
ALP Advanced Lighting Package 先进灯具
ANSI American National Standards Institute 美国国家标准协会
AP Accredited Professional 认证专家
ASHRAE American Society of Heating, Refrigerating and 美国采暖、制冷与空调工程师学
Air-Conditioning Engineers 会
ASME American Society of Mechanical Engineers 美国机械工程师协会
ASTM American Society of Testing and Materials 美国测试与材料协会
BAS Building Automation System 楼宇自控系统
BD&C Building Design & Construction 建筑设计和施工
BIPV Building Integrated Photovoltaics 楼宇光电综合
Biological Oxygen Demand 生物氧份需求
BOD
Basis Of Design 设计基础
Btu British thermal units (英国)热量单位
CAA Clean Air Act 清洁空气法案
CAE Combined Annual Efficiency 综合年效率
CDVR Corrected Design Ventilation Rate 修正设计通风率
CFA Conditioned Floor Area 空调面积
CFC ChloroFluoroCarbon 氟氯烃
CFL Compact Fluorescent Light 紧凑型荧光灯
CFM Cubic Feet per Minute 立方英尺每分钟
CFR U.S. Code of Federal Regulations 美国联邦规则代码
CGP Construction General Permit 建造许可证
CHP Combined Heat and Power 热电联产
CIBSE Chartered Institution of BuildingServices Engineers (英国)注册建筑设备工程师学

CIR USGBC Credit Interpretation Request 得分释疑请求
CIWMB California Integrated Waste Management Board 加州废弃物综合管理部
CO Carbon Monoxide 一氧化碳
CO2 Carbon Dioxide 二氧化碳
COC Chain of Custody 产品收发消耗监管链
COP Coefficient Of Performance 性能系数
CRI Carpet and Rug Institute (美国)地毯协会
CS Core & Shell 商业核心与外壳

 
19/206
 

CWA Clean Water Act (美国)清水法案


Cx Commissioning 调试
CxA Commissioning Authority 调试机构
CZ Climate Zone 气候区
DHW Domestic Hot Water 室内热水
DOE U.S. Department Of Energy 美国能源部
DU Distribution Uniform 均匀送风
EA Energy and Atmosphere 能源与大气
ECB Energy Cost Budget 能源成本预算
ECM Energy Conservation Measure 节能措施
EEM Energy Efficient Measure 能源有效利用措施
EER Energy Efficient Rating 能效比
EERE U.S. Office of Energy Efficiency and Renewable 美国能效与可再生能源办公室
Energy
EF Energy Factor 能源系数
EPA Environmental Protect Agency (美国)环保局
FSC Forest Stewardship Council 森林管理委员会
ET Evapotranspiration Rate 蒸腾率
ETS Environmental Tobacco Smoke 环境烟草烟气
ETV Environmental Technology Verification 环境技术认证
FEMA U.S. Federal Emergency Management Agency 美国联邦紧急事务管理署
FSC Forest Stewardship Council 森林管理委员会
FTE Full Time Equivalent 全时工作设备
GBCI The Green Building Certification Institute (美国)绿色建筑认证协会
GPF Gallons Per Flush 加仑/冲
GPM Gallons Per Minute 加仑/分钟
GWP Global Warming Potential 全球变暖趋势
HCFC HydroChloroFluoroCarbons 含氢氯氟烃
HEPA High-Efficiency Particle Absorbing 高效过滤器
HERS Home Efficiency Rating Standards 住宅能源等级标准
HET High-Efficiency Toilet 高效卫生间
HOA Homeowner’s Association (美国)屋主协会
HSPF Heating Season Performance Factor 供热季节性能因子
HVAC Heating, Ventilation and Air-conditioning 暖通空调
HVAC&R Heating, Ventilation and Air-conditioning & 暖通空调与制冷
Refrigeration
IAP Energy Star with Indoor Air Package 能源之星室内空气章
IAQ Indoor Air Quality 室内空气质量
ICC International Code Council 国际标准委员会
ICF Insulated Concrete Form 绝缘混凝土形态
ID Innovation in Design 创新设计
ID&C Interior Design & Construction 室内设计和施工
IDR Innovative Design Report 创新设计报告
IECC International Energy ConservationCode 国际节能标准

 
20/206
 

IESNA Illuminating Engineering Society of North America 北美照明工程师协会


IEQ Indoor Environmental Quality 室内环境质量
IPLV Integrated Part Load Value 部分负荷性能系数
LPMVP International Performance Measurement & 国际性能检测与确认协议
Verification Protocol
IPM Integrated Pest Management 有害物综合治理
IRC International Residence Code 国际居住准则
ISO International Organization for Standardization 国际标准组织
KW Kilowatt 千瓦
KWH Kilowatt-hour 千瓦时
LCA Life Cycle Assessment 生命周期评估
LCC Life Cycle Cost 生命周期成本
LED Light-Emitting Diode 发光二极管
LEED Leadership in Energy and Environmental Design 能源与环境设计先锋
LL LEED Location and Linkages 场址与联接
LPD Light Power Density 光强度
MDF Medium Density Fiberboard 中密度纤维板
MEF Modified Energy Factor 修正能源系数
MERV Minimum Efficiency Reporting Value 最小效率值
MPR Minimum Program Requirements 最小规划要求
MR Materials & Resources 材料与资源
MSDS Material Safety Data Sheet 材料安全数据单
ND Neighborhood Development 社区开发
NFRC National Fenestration Rating Council 国家开窗等级理事会
NPDES National Pollutant Discharge Elimination System 国家污染物去除系统
NPS Non-point Source 非点源
NRC Noise Reduction Coefficient 噪声衰减系数
O&M Operations & Maintenance 运行和维护
ODP Ozone Depleting Potential 臭氧层衰竭潜在值
OPR Owner’s Project Requirements 业主项目要求
OSB Oriented Strand Board 定向刨花板
OSWER U.S. EPA Office of Solid Waste & Emergency (美国)环保署废弃物及紧急食
Response 物处理办公室
PCB PolyChlorinated Biphenyl 聚乙烯联苯
PMV Predicted Mean Vote 预测平均评价值
PPM Parts Per Million 百万分率
RCRA Resource Conservation and Recovery Act 资源保持及回收局
REC Renewable Energy Certificates 可再生能源认证
RESNET Residential Energy Services Network 住宅能源服务网络
SBS Sick Building Syndrome 病态建筑综合症
SCAQMD South Coast Air Quality Management District (美国)南海岸空气质量管理局
SCS Scientific Certification Systems 科学认证系统
SEER Seasonal Energy Efficiency Rating 季节能效比
SHGC Solar Heat Gain Coefficient 太阳得热系数

 
21/206
 

SIP Structural Insulated Panels 结构绝缘板


SMACNA Sheet Metal and Air Conditioning Contractors (美国)金属散热与空气调节承
National Association 包商协会
SWPPP Storm Water Pollution Prevention Plan 雨洪污染物防治计划
SRI Solar Reflectance Index 太阳反射指数
SS LEED Sustainable Site 可持续场址
STC Sound Transmission Class 噪声传播等级
TAG Technical Advisory Group 技术咨询团
TASC Technical Advisory SubCommittee 技术咨询委员会
TP Total Phosphorous 磷总量
TSS Total Suspended Solid 总悬浮颗粒物
UBC Uniform Building Code 统一建筑标准
UL Underwriter’s Laboratory 美国保险商实验室
UPC Uniform Plumbing Code 统一铅标准
USGBC United States Green Building Council 美国绿色建筑委员会
VAV Variable Air Volume 变空气流量
VOC Volatile Organic Compounds 可挥发有机物
WE LEED Water Efficiency 水利用效率
WF Water Factor 水因素
WFA Window-to-floor ratio 窗地比
ZEV Zero Emission Vehicles 零排放车辆

 
22/206
 

Thoughts to remember
Energy usage in commercial buildings( EPA, September 2008):
• 1% office equipment
• 3% personal computers
• 3% cooking
• 6% refrigeration
• 7% ventilation
• 7% cooling
• 8% water heating
• 9% other
• 20% lighting
• 38% space heating

On-site renewable energy Based on energy cost


Green power or RECs, TRCs Based on energy consumed
Building reuse By surface area
Construction Waste Based on weight or volume
Material reuse Based on replacement value(cost)
Recycled content Based on cost
Recycled material assembly Based on weight
Regional materials Based on cost
Regional materials fraction Based on weight
Rapidly renewable material Based on cost
Certified wood Based on cost

MPR: Must: 1) comply with environmental laws; 2) must be a complete, permanent building or space; 3)
must use a reasonable site boundary; 4) must comply with minimum floor area requirements; 5)must
comply with minimum occupancy rate; 6) must commit to sharing whole-building energy and water
usage data; 7) must comply with a minimum building area to site area ratio

(1) Transportation accounts for 32% of the nation’s greenhouse gasemissions and vehicle technology,
transportation
(2) Landscape irrigation consumes 30% of potable water in the U.S. each day on average. (USGBC)
(3) LEED building use 26% less energy than the national everagy.
(4) 40% of waste does construction and demolition debris contribute to landfills each year.
(5) 30% average savings in a commercial building when implementing water efficiency goals.
(6) A site that consists of at least 75% previously developed land is considered a previously developed
site.

Included in the scope of EPAct 1992: water closets; urinals; lavatory faucets; sink faucets;
showerheads; prerinse spray valves
Flush fixtures are rated in Gallons Per Flush (gpf) and includes water closets and urinals
Flow fixtures are rated in Gallons Per Minute (gpm) and includes lavatories, sinks, showerheads and

 
23/206
 

prerinse spray valves


Per EPAct: water closets = 1.6 gpf; urinals = 1.0 gpf; lavatories = 2.2 gpm; faucets = 2.2 gpm;
showerheads = 2.5 gpm;

ID credits for Innovative Performance are awarded for comprehensive strategies which demonstrated
quantifiable environmental benefits such as: Education Outreach Program; Green Housekeeping; High
Volume Fly Ash to divert waste materials from landfills; Low-Emitting Furniture & Furnishings; Organic
Landscaping/Integrated Pest Management Program; using a greenhouse gas budget to demonstrate
carbon neutral design and operations

For LEED NC: Sustainable Sites = 26 pts; Water Efficiency = 10 pts; Energy & Atmosphere = 35 pts;
Materials & Resources = 14 pts; Indoor Environmental Quality = 15 pts

minimum gross floor area = gross land area * 0.02 = (1.25 acres x 43,560 (sf/acre) * 0.02

ASHRAE Standard 52.2-1999 Method of Testing General Ventilation Air Cleaning Devices for
Removal Efficiency by Particle Size standard for methods for testing air cleaners for 2 performance
characteristics: the device's capacity for removing particles from the air stream and the device's
resistance to airflow; MERV air filters
 
24/206
 

ASHRAE Standard 55-2004 Thermal Environmental Conditions for Human Occupancy identifies the
factors of thermal comfort and the process for developing comfort criteria for a building space and its
occupants; indoor space environmental and personal factors that will produce thermal environmental
conditions acceptable to 80% of the occupants within a space
ASHRAE Standard 62.1-2007 Ventilation for Acceptable Indoor Air Quality specifies minimum
ventilation rates; these rates are used to improve indoor air quality as part of the IEQ credit category
ASHRAE Standard 90.1-2007 establishes minimum requirements for the energy efficient design of
buildings (not included are single family homes or multifamily homes less than 3 stories) with regards
to the building envelope, HVAC, service water heating, power, lighting and other equipment

Low-Emitting Materials
Adhesives and Adhesives, Sealants and Sealant South Coast Air Quality Management
Sealants Primers District
(SCAQMD) Rule #1168
Aerosol Adhesives Green Seal Standard
Paints and Coatings Architectural paints and coatings Green Seal Standard
Anti-corrosive and anti-rust paints
Clear wood finishes, floor coatings, South Coast Air Quality Management
stains, primers, and shellacs District (SCAQMD) Rule 1113
Flooring Systems carpet the Carpet and
Rug Institute Green Label Plus1
program.
carpet cushion the Carpet and Rug
Institute Green Label program
hard surface flooring FloorScore standard
Concrete, wood, bamboo and cork South Coast Air Quality Management
floor finishes District (SCAQMD) Rule 1113
Tile setting adhesives and grout South Coast Air Quality Management
District (SCAQMD) Rule 1168
All flooring elements The California Department of Health
Services Standard
Composite Wood Composite wood and agrifiber must contain no added
and Agrifiber products、Laminating adhesives urea-formaldehyde resins
Products

Sheet Metal and Air Conditioning Contractors National Association (SMACNA) IAQ Guidelines
for Occupied Buildings under Construction, 2nd edition, Chapter 3, November 2007 Guidelines for
maintaining healthful indoor air quality during demolitions, renovations and construction
Carpet and Rug Institute Green Label Plus program addresses VOC limits for carpets
Carpet and Rug Institute Green Label program addresses VOC limits for carpet cushions
Green Seal refers to standards establishing VOC limits for Low-Emitting Materials (paints, coatings
sealants)
Green Label refers to standards establishing VOC limits for Low-Emitting Materials (carpets, carpet
cushions)
Green-e establishes standards and guidelines for Renewable energy (Center for Resource Solutions)

 
25/206
 

The ISO 14000 product oriented standards include Environmental Labels and Declaration, Life Cycle
Assessment, and Design for Environment. These standards are intended to be applicable for
assessing the environmental performance of products and services as well as providing guidance on
improving their environmental performance.

The ISO 14021 standard, Environmental Labels and Declaration, are communication tools that convey
information on environmental aspects of a product or service to the market. These standards are used
for recycled materials to label their pre and/or post consumer content.

LEED defines 4 types of occupants: Full Time Staff; Part Time Staff; Peak Transients (students,
volunteers, visitors, customers); Residents

Life Cycle Cost = LCC = Economics


Life Cycle Assessment = LCA = Environment and People

CFC:ODP and GWP great,banned in Montreal Protecol in 1995,


HCFC:22,123(most efficient),ODP,
HFC:134a,410a,ODP zero,GWP great

 
26/206
 
 
1、 A single LEED building will be built on a university campus. Which of the following is a true statement 
about the LEED project’s site area? 
A、Project site area is the entire campus 
B、Project site area may be gerrymandered 
C、Project site area is the entire campus minus public roads and sidewalks 
D、A reasonable and logical project site area must be defined for LEED purposes 
The correct answer is D   
On  a  campus  (college  campus,  military  base,  corporate  campus)  there  is  often  no  defined  boundary 
between  one  building  and  the  next  and  there  are  often  shared  services  for  the  entire  campus  (i.e. 
stormwater  treatment).  The  LEED‐NC  Application  Guide  for  Multiple  Buildings  &  On‐Campus  Building 
Projects  provides  special  considerations  for  such  circumstances  for  LEED  projects  on  campuses.  This  is 
what the guide states about the project side area in such circumstances: A reasonable and logical “LEED 
project site” boundary must be defined for LEED purposes. The project scope of work and the site area 
affected  by  the  construction  generally  suffice  to  inform  this  definition.  The  defined  site  must  remain 
consistent for all LEED credits. 
 
2、 What sustainability concept can xeriscaping contribute to? 
A、    Reducing the heat island effect 
B、    Water efficient irrigation 
C、    Construction waste management 
D、    Indoor air quality 
E、    Certified wood 
The correct answer is:    B.     
 
3、 How can the heat island effect of a parking lot be reduced for LEED credit?A、    Installing asphalt that 
has a high SRI valueB、   Installing pervious pavingC、    Reduce  the  size  of  the  parking  lotD 、 
  Installing shaded parking covers that have low SRI valuesE、    Orienting  the  building  so  that  the 
building shades the parking lot from any afternoon sunThe correct answer is:    A 
 
4、 What is the LEED Minimum Program Requirement for occupancy? 
A、50 FTEs 
B、100 FTEs 
C、10 FTEs 
D、1 FTEs 
The correct answer is: D   
The  LEED  project  must  serve  1  or  more  Full  Time  Equivalent  (FTE)  occupant(s),  calculated  as  an  annual 
average  in  order  to  use  LEED  in  its  entirety.  If  the  project  serves  less  than  1  annualized  FTE,  optional 
credits from the indoor Environmental Quality category may not be earned (the prerequisites must still be 
earned). 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      27 / 206 
 
5、 Which of the following LEED situations would warrant the use of ASHRAE 62.1‐2007 as a reference 
standard? 
A、To compile a survey to determine building occupant thermal comfort 
B、To meet the minimum energy performance requirements for LEED certification 
C、To determine whether a material is pre‐consumer or post‐consumer recycled content 
D、To increase ventilation over the minimum requirement to improve indoor air quality 
The correct answer is: D     
ASHRAE Standard 62.1‐2007 is used to determine minimum ventilation requirements in mechanically and 
naturally ventilated buildings and to determine how to increase ventilation to improve indoor air quality 
in a building. ASHRAE 90.1‐2007 is the reference standard for building energy performance requirements. 
ISO 14021 is the reference standard for recycled content. 
 
6、 Reduce the heat island effect can be realized through?(choose 2)           
A、  install a high‐emissitivity roof                 
B、  install a vegetated roof                
C、  increase parkling space               
D、  extend project boundary     
The correct answer is:    AB 
 
7、 How can people purchase on‐site renewable energy?                 
A、  buy renewable energy from a clean coal plant                 
B、  install a solar water heater                 
C、  purchase energy from local hydropower facility                 
D、  reduce automobile use 
The correct answer is:    B 
             
8、 Which material below is not considered a rapidly renewable resource? 
A、    Bamboo 
B、    Cork 
C、    Straw 
D、    Silk 
E、    Wood 
The correct answer is:    E.     
While wood is an agricultural product, its growth and harvest cycle is longer than 10 years. 
      
9、 What item would NOT be included in comingled recycling?     
A、  Food waste 
B、  Glass 
C、  Metal 
D、  Cardboard 
The correct answer is:    A 
At a minimum, a recycling program should include paper, cardboard, glass, plastic, and metal. Stones, dirt, 
hazardous materials, batteries, mercury‐containing light bulbs, and food waste would not be included.   
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      28 / 206 
10、A company plans to locate its new office building so that it can reduce auto use by employees and 
earn points toward LEED certification. This could be accomplished by: 
A、Providing parking that exceeds the minimum local zoning requirements 
B、Locating within three miles of a bus route 
C、Locating near a taxi stand 
D、Providing no new parking spaces 
The correct answer is D     
Adding no additional parking is a strategy that both reduces the impact of development and provides an 
incentive for individuals to carpool by making it more difficult to find parking. Locating within 1/4 mile of 
two bus routes would reduce automobile use, but three miles (1 mile=1,609m) is too far to reasonably ask 
anyone  to  walk  and  would  not  have  an  impact  on  automobile  use.  Taxis  are  not  considered  alternative 
transportation and would have no impact on overall automobile use.    Increasing parking available over 
minimum zoning requirements would not act as an incentive to carpooling by making it more convenient 
for individuals to drive their own car to a building. 
 
11、What strategy could be used to reduce the use of potable water for sewage conveyance? 
A、A black water collection and recycling system 
B、Sewage treated to binary standards 
C、Plumbing fixtures that meet the requirements of the Energy Policy Act of 1992 
D、A rainwater capture and recycling system 
The correct answer is: D     
If  permitted  local  health  codes,  captured  rainwater  could  be  used  to  offset  potable  water  used  in  a 
building  for  flushing  toilets  and  urinals.  Installing  plumbing  fixtures  that  meet  the  requirements  of  the 
Energy  Policy  Act  of  1992  is  a  minimum  requirement  for  all  buildings  regardless  of  whether  they  are 
pursuing LEED certification or not and would not lead to any additional decrease in potable water used for 
sewage conveyance. Blackwater is sewage.    It is not allowed to reuse blackwater without treating it first. 
Tertiary treatment is the highest level of wastewater treatment and includes removal of organics, solids, 
and  nutrients  and  biological  and  chemical  polishing.  In  LEED,  treatment  of  wastewater  to  tertiary 
standards and then using it on‐site is an acceptable means of reducing the amount of potable water used 
for sewage conveyance. Treatment to binary standards is not high enough to meet LEED requirements. 
  
12、Which strategy will contribute to earning points for both Optimize Energy Performance and On‐site 
Renewable Energy? 
A、Purchase green tags 
B、Solar thermal system 
C、Daylight harvesting system 
D、Ground source heat pump 
The correct answer is B   
On‐site renewable energy can also count as “energy efficiency” for a project pursuing LEED certification 
because of the way credit compliance is calculated. For example, a building 100% powered by solar panels 
would  be  considered  100%  energy  efficient  in  LEED.  Solar  thermal  systems  are  an  acceptable  form  of 
renewable  energy  in  LEED  and  their  output  would  contribute  toward  achievement  of  both  credits. 
Daylighting harvesting systems and ground source heat pumps are not considered acceptable forms of 
renewable energy. Ground source heat pumps (not renewable energy) are not the same as geothermal 
systems (renewable energy). Ground source heat pumps only move heat into or out of a building using 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      29 / 206 
the ground as a source of heat (in the winter) or a sink for heat (in the summer), but the process does not 
create energy. It just moves energy efficiently. A geothermal system used thin areas of the earth’s crust to 
extract energy from the extreme temperatures that come from the mantle.    That energy could either be 
used  to  create  electricity  or  heat  a  building  and  would  therefore  be  considered  a  form  of  renewable 
energy. 
  
13、Which of the following would contribute as a basic service toward community connectivity? 
A、Bicycle path 
B、Apartment building 
C、Commercial office building 
D、Post office 
The correct answer is D   
The list of basic services includes: Bank, Place of Worship, Convenience Grocery, Day Care, Cleaners, Fire 
Station,  Beauty,  Hardware,  Laundry,  Library,  Medical/Dental,  Senior  Care  Facility,  Park,  Pharmacy,  Post 
Office, Restaurant, School, Supermarket, Theater, Community Center, Fitness Center, and Museum. 
 
14、What is directly affected by LEED project boundary?                 
A、  stormwater runoff management                 
B、  protect habitat for wildlife                 
C、  landscape irrigation                 
D、  indoor water usage     
The correct answer is:    A 
 
15、A project team working on a new hotel has come up with an innovative way of saving energy with a 
new  product  that  uses  air  conditioning  condenser  water  to  preheat  the  domestic  hot  water  used  in 
laundry. Will this earn a Innovation and Design Point? 
A、Yes, since this saves energy and is an innovative idea 
B、No, since this a product solution and LEED does not endorse specific products 
C、No, energy efficiency is already accounted for under Optimize Energy 
D、No, unless the energy savings would result in exceeding maximum requirements of Optimize Energy 
Performance 
The correct answer is D   
Innovation in Design credits for innovative performance are awarded for comprehensive strategies which 
demonstrate  quantifiable  environmental benefits  in  green  building categories  not  specifically addressed 
by  LEED.  Innovation  in  Design  points  are  awarded  for  exemplary  performance  for  doubling  credit 
requirements and/or achieving the next incremental percentage threshold. In this example, the system 
would contribute toward the building’s energy efficiency and the project would benefit under Optimize 
Energy  Performance,  so  they  would  not  be  eligible  for  an  innovative  strategy  point.  However,  if  the 
strategy saved them enough energy to help them exceed the maximum requirements of Optimize Energy 
Performance they could potentially earn an exemplary performance point. 
 
16、 How  long  can  a  project  team  take  after  project  completion  to  phase‐out  any  CFC‐based 
refrigerants? 
A、  2 years 
B、  5 years 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      30 / 206 
C、  4 years 
D、  3 years 
The correct answer is:    B 
The project team can take 5 years from project completion to phase out CFC‐based refrigerants, as long as 
the annual leakage rate of CFC‐based refrigerants is reduced to 5% or less. 
 
17、ASHRAE 90.1‐2007 sets design criteria for all of the following except: 
A、Ventilation requirements 
B、Minimum efficiency for motors 
C、Building envelope design 
D、Water heater minimum efficiency 
The correct answer is A   
ASHRAE  Standard  90  addresses  building  energy  efficiency.  Systems  that  would  directly  impact  building 
energy  efficiency  include  the  building  envelope,  motors,  water  heaters,  HVAC  systems,  lighting,  and 
renewable  energy.  Ventilation  requirements  for  buildings  are  set  by  ASHRAE  Standard  62.  Ventilation 
rates affect building energy performance indirectly, but they do so by way of the building HVAC system. 
 
18、To remodeling a house at the age of 50 years, which part must be replaced to improve the energy 
efficiency?                 
A、  exterior glazing                 
B、  structural frame                 
C、  exterior loadbearing wall                 
D、  wood flooring  
The correct answer is:    A 
 
19、What would most likely be considered a supply of potable water? 
A、Captured rain water 
B、Blackwater treated to tertiary standards 
C、Subsurface well 
D、A graywater recyciing system 
The correct answer is C   
Potable  water  is  water  suitable  for  drinking  that  meets  or  exceeds  EPA  drinking  water  standards.  It  is 
supplied  from  wells  or  municipal  water  systems.  Captured  rainwater,  graywater,  and  blackwater  are  all 
types of non‐potable water. 
 
20、Which reference standard sets limits on Volatile Organic Compounds (VOCs) for sealants? 
A、Green Label 
B、SMACNA 
C、South Coast Air Quality Management District 
D、Green Seal 
The correct answer is C   
For  low‐emitting  materials,  the  South  Coast  Air  Quality  Management  District  (SCAQMD)  is  used  as  the 
reference  standard  for  maximum  VOC  concentrations  in  sealants  as  well  as  finishes,  stains,  and  sealers. 
The  carpet  and  Rug  Institute’s  Green  Label  program  is  the  reference  standard  that  sets  maximum  VOC 
concentrations  for  carpets  and  carpet  padding.  The  Sheet  Metal  &  Air  Conditioner  National  Contractor 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      31 / 206 
Association (SMACNA) sets guidelines for buildings under construction to protect air quality. Green seal is 
used by LEED as a reference for low‐VOC aerosols and paints. 
 
21、A building will use structural timbers from a project site 150 miles away, to which credit can this be 
applied? 
A、Material Reuse only 
B、Building Reuse only 
C、Regional Materials only 
D、Material Reuse and Regional Materials 
The correct answer is D   
Project  that  salvage  materials  from  within  500  miles  may  count  the  value  of  the  salvaged  material  for 
Material  Reuse  AND  Regional  Materials.  If  the  material  is  salvaged  outside  of  500  miles,  it  would  only 
count for Material Reuse. If a new material is extracted and manufactured within 500 miles of a project, it 
would only count toward Regional Materials. 
 
22、Use pervious paving can?                 
A、  help to replenish the aquifer                 
B、  increase the heat island effect                 
C、  increase solid waste generation                 
D、  increase indoor water use   
The correct answer is:    A 
 
23、What is the heat island effect? 
A、The increase in temperature in certain areas due to reduced airflow 
B、The increase in carbon dioxide emission in warmer areas 
C、The absorption of heat by dark, non‐reflective hardscapes in urban areas 
D、The decrease of relative humidity in urban areas 
The correct answer is C     
The  heat  island  effect  refers  to  the  absorption  of  heat  by  hardscapes,  such  as  dark,  nonreflective 
pavement and buildings, and its radiation to surrounding areas. Particulary in urban areas, other sources 
may  include  vehicle  exhaust,  air‐conditioners,  and  street  equipment;  reduced  airflow  from  tall  building 
and narrow streets exacerbates the effect. 
 
24、Captured stormwater could be used to help with all of the following EXCEPT: 
A、Reducing the peak rate and quantity of stormwater runoff from a project site 
B、Reducing potable water demand for landscaping irrigation 
C、Reducing a project’s impact on the heat island effect 
D、Reducing potable water used for sewage conveyance 
The correct answer is C     
Capturing stromwater would have no direct impact on the heat island effect. Capturing stormwater serves 
as  an  opportunity  to  both  reduce  the  rate  and  quality  of  stormwater  discharge  from  a  project  site, 
improve  stormwater  runoff  quality,  reduce  potable  water  needed  to  flush  toilets/urinals,  and  reduce 
water necessary for landscaping irrigation. 
 
25、What is a likely benefit for a project that will be located in an urban area? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      32 / 206 
A、Reduced stormwater runoff 
B、Access to racks for bicycle storage 
C、Access to public transportation 
D、Opportunity to redevelop a brownfield 
The correct answer is C   
Locating a site in an urban area increases the likelihood there will ba mass transit nearby. Picking a site in 
an  urban  area  has  no  impact  on  whether  or  not  a  project  will  decide  to  make  secure  bicycle  racks 
available.  Simply  because  a  project  will  be  located  in  an  urban  area  does  not  mean  it  will  have  an 
opportunity  to  redevelop  a  brownfield.  The  vast  majority  of  space  in  urban  areas  is  not  contaminated.   
Locating  in  urban  areas  would  likely  increase  stormwater  runoff  because  of  an  increased  amount  of 
impervious area(sidewalks, streets, etc). 
               
26、Which rating system address acoustical performance?                
A、  LEED for homes                 
B、  LEED for school                 
C、  LEED NC               
D、  LEED CS     
The correct answer is:    B 
 
27、What is the most effective method of minimizing stormwater runoff volume? 
A、Use paving materials with a high emissivity 
B、Use native species of vegetation for landscaping 
C、Reduce the amount of impervious area 
D、Connecting a project to a local stormwater drainage system 
The correct answer is: :    C     
Stormwater runoff increases when impervious area is installed (rooftop, sidewalk, parking lot, etc) which 
prevents water from absorbing into the ground. The most effective means of reducing stormwater runoff 
is  simply  to  increase  the  amount  of  pervious  area.  Connecting  to  a  local  stormwater  drainage  system 
would have no impact on stormwater volume‐ it would just give the stromwater a place to runoff to. High 
emissivity paving materials would have no impact on stormwater runoff. Native species of plants have no 
impact on stormwater runoff. Regardless of whether a rose bush or cactus is planted in the ground, the 
same amount of stormwater will runoff from that location. 
 
28、A project is being built along a path that is 1/4 mile from an outdoor mall with stores and restaurants. 
The project will most likely earn which of the following? 
A、Alternative Transportation – Bicycle Storage and Changing Rooms 
B、Alternative Transportation – Public Access Transportation 
C、Development Density 
D、Community Connectivity 
The correct answer is D     
Locating near basic services, such as the ones likely to be found at an outdoor mall, would help a project 
meet  the  requirements  of  Community  Connectivity.  There  is  no  information  in  the  question  about  the 
density  of  the  surrounding  area,  nor  is  there  any  information  about  bicycle  racks  &  showers  or  mass 
transit. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      33 / 206 
29、What is the intent behind the purchase of Green Power? 
A、Improve energy efficiency 
B、Reduce electrical consumption 
C、Reduce the cost of electricity 
D、Encourage grid source renewable energy 
The correct answer is D       
The  environmental  attributes  of  green  power  include  the  emissions  reduction  benefits  that  result  from 
the  substitution  of  renewable  energy  sources  for  conventional  power  sources.  Source:  LEED  EBOM 
glossary. 
 
30、Which institute will publish the ODP and GWP data?                 
A、  USGBC and GBCI                 
B、  USGBC and LEED                 
C、  USGBC and world meterological organization                 
D、  EPA and world meterological organization   
The correct answer is:    D 
 
31、Which standard can be used to calculate a baseline for on‐site renewable energy? 
A、Green‐e 
B、ASHRAE 62.1‐2007 
C、Commercial Building Energy Consumption Survey 
D、The Advanced Building Benchmarking Tool 
The correct answer is C     
In  order  to  determine  the  number  of  points  that  a  project  will  earn  for  on‐site  renewable  energy,  the 
project team must first determine what percentage of the building’s energy needs the system will supply. 
If a project did whole building energy simulation (i.e. an energy model) for Optimize Energy Performance 
they may use the output of that model as a baseline. If the project did not use an energy model, it may 
use the Commercial Building Energy Consumption Survey (CBECS) to estimate what a similar building in a 
similar  geographic  location  would  use  to  create  the  baseline.  CBECS  data  can  also  be  used  to  create  a 
baseline for green power (off‐site renewable energy) calculations. 
  
32、A construction manager is completing a spreadsheet for a project’s construction waste management 
plan. Which of the following should be included? (Select 2) 
A、Asbestos removed from demolition 
B、Landfill tipping fees 
C、Tons of soil removed from the site during excavation 
D、Concrete from demolition which is ground up and used as backfill 
E、Cardboard sent to a recycler 
The correct answer is DE       
For construction waste management, projects should determine how much material they disposed of and 
how much material they diverted from disposed by recycling, donation or reuse.Concrete from demolition 
ground  up  and  reused  would  count  as  a  material  diverted  from  disposal  as  would  cardboard  sent  to  a 
recycler.  Calculations  are  done  by  weight  or  volume,  so  landfill  tipping  fees  would  not  be  a  necessary 
pieces of information. Earth/trees/fill are all excluded from calculations. Only man‐made materials may 
be  included  in  calculations.  Asbestos  and  other  hazardous  materials  would  be  excluded  from 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      34 / 206 
calculations and should be disposed of because of the risk to human health. 
 
33、The following would be impacted by the use of low flow shower heads: (Select 2) 
A、Materials & Resources 
B、Water Efficiency 
C、Sustainable Sites 
D、Energy & Atmosphere 
E、Indoor Environmental Quality 
The correct answer is BD       
Low  flow  showerheads  would  reduce  the  amount  of  water  building  occupants  use  and  would  benefit 
credits  in  the  Water  Efficiency  credit  category.  Hot  water  is  one  of  the  largest  sources  of  energy 
consumption in buildings, so installing low flow showerheads that reduce hot water consumption would 
also reduce energy demand which benefit credits within the Energy & Atmosphere credit category. 
 
34、Which  of  the  following  would  be  impacted  by  the  pursuit  of  a  daylighting  strategy  and  use  of  a 
daylight harvesting system: (Select 2) 
A、Materials & Resources 
B、Indoor Environmental Quality 
C、Energy & Atmosphere 
D、Sustainable Sites 
E、Innovation 
The correct answer is BC   
The indoor Environmental Quality credit category provides an opportunity for projects to earn a credit for 
having  a  high  level  of  natural  daylighting  in  a  building.  A  daylighting  harvesting  system  lowers  artificial 
when  natural  lighting  is  sufficient  within  a  space.    This  could  also  benefit  credits  within  the  Energy  & 
Atmosphere  credit  category  because  building  lighting  is  a  large  source  of  energy  consumption  and  the 
heat  from  lighting  makes  a  building’s  cooling  system  work  harder  to  keep  indoor  thermal  comfort 
conditions acceptable.    A daylighting strategy might reduce a building’s energy efficiency, however, if the 
project increases the amount of glazing, which is less effective at blocking the transfer of heat than solid 
walls and would reduce the performance of the overall building envelope.   
           
35、A land which is graded is regarded as?                 
A、  greenfield                 
B、  brownfield                 
C、  previously developed land                 
D、  previously undeveloped land 
The correct answer is:    C 

36、A home or building constructed with an insulated foam frame and poured concrete will have a higher 
insulation rating than a home or building constructed with wood and fiberglass insulation. Which of the 
following will decrease the use of energy for heating and cooling? 
A、    By better arrangement 
B、    By proper decoration 
C、    By better lighting 
D、    By proper reflection 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      35 / 206 
E、    A better insulated structure 
The correct answer is:    E 
A  home  or  building  constructed  with  an  insulated  foam  frame  and  poured  concrete  will  have  a  higher 
insulation  rating  than  a  home  or  building  constructed  with  wood  and  fiberglass  insulation.  A  better 
insulated structure will use less energy for heating and cooling due to the superior building envelope.   
 
37、The Montreal Protocol on Substances that deplete the ozone layer is an international treaty designed.   
For what purpose this would be designed? 
A、    To purify the ozone layer 
B、    To reduce the ozone layer 
C、    To clean the ozone layer 
D、    To sublimate the ozone layer 
E、    To protect the ozone layer 
The correct answer is:    E 
The Montreal Protocol on Substances that deplete the ozone layer is an international treaty designed to 
protect  the  ozone  layer  by  phasing  out  the  production  of  a  number  of  substances  believed  to  be 
responsible for ozone depletion. 
 
38、For  both  new  construction  and  existing  buildings,  a  process  must  need  to  reduce  energy.  Which 
process is essential to reduce energy use for both new construction and existing buildings? 
A、    A consecutive commissioning process 
B、    A comprehensive commissioning process 
C、    A continuous commissioning process 
D、    A little commissioning process 
E、    A non commissioning process 
The correct answer is:    B 
For both new construction and existing buildings, a comprehensive commissioning process is essential to 
reduce energy usd.   
 
39、Green purchase is based on                 
A、  purchased energy power                 
B、  purchased green tags                 
C、  energy consumption                 
D、  power volume   
The correct answer is:    B 
 
40、Many undeveloped countries continue to use these ozone depleting and global warming chemicals. 
What is required to meet the needs of developing countries? 
A、    Special protections 
B、    Special provisions 
C、    Special cares 
D、    Special skills 
E、    Special powers 
The correct answer is:    B 
Acknowledging that special provision is required to meet the needs of developing countries. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      36 / 206 
 
41、A commissioning cycle for Existing Buildings is a systematic process for investigating, analyzing, and 
optimizing  the  performance  of  building  systems.  What  should  be  improved  to  ensure  the  continued 
performance of building systems overtime? 
A、    Their maintenance 
B、    Their serviceability 
C、    Their operation and maintenance 
D、    Their operating system 
E、    Their sustainment 
The correct answer is:    C 
A  commissioning  cycle  for  Existing  Buildings  is  a  systematic  process  for  investigating,  analyzing,  and 
optimizing the performance of building systems by improving their operation and maintenance to ensure 
their continued performance over time. 
           
42、Which should be calculated in development density?                 
A、  park                
B、  parking lot                 
C、  public roads                 
D、  right of way       
The correct answer is:    B 
 
43、The project team must make sure the building is functioning as intended based on the design. Which 
are the other functions of project team that need to be make sure? (Choose 2) 
A、    Deliver the serviceability 
B、    The systems function 
C、    The strength of building 
D、    The constructional cost 
E、    Deliver the desired performance 
The correct answer is:    B & E 
Even  if  the  project  was  perfectly  designed  and  the  goals  set,  the  project  teams  need  to  make  sure  the 
systems function and deliver the desired performancd.   
 
44、If  the  design  did  not  account  for  all  sources  of  building  efficiency  then  the  building  systems  can 
underperform. Which are the other reasons of underperforming the building systems? (Choose 3) 
A、    The building systems are not properly analyzed 
B、    The building was not properly configured 
C、    The building strength is high 
D、    The building is not properly maintained 
E、    The use of the building has changed over time 
The correct answer is:    B, D & E 
Building  systems  can  underperform  for  several  reasons:  (1)The  building  was  not  properly  configured, 
(2)The  design  did  not  account  for  all  sources  of  building  efficiency,  (3)The  building  is  not  properly 
maintained, (4)The use of the building has changed over timd.   
 
Many  countries  continue  to  use  these  ozone  depleting  and  global  warming  chemicals.  Which  types  of 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      37 / 206 
countries continue to use these ozone depleting and global warming chemicals? 
A、    Developed countries 
B、    Developing countries 
C、    Undeveloped countries 
D、    Poor countries 
E、    Rich countries 
The correct answer is:    C 
Many undeveloped countries continue to use these ozone depleting and global warming chemicals. 
 
45、 If a project team working on a LEED BD+C project can obtain documentation of where a product is 
manufactured  but  not  where  it  is  harvested  or  extracted,  how  can  they  count  this  material  toward 
compliance with the regional materials credit? 
A、    They may only count 50% of the value of the material 
B、    They may count the entire value of the material 
C、    They cannot count the material at all 
D、    They can count the material, but only if it was manufactured within 100 miles of the project site 
The correct answer is:    C.     
In the Building Design and Construction Rating Systems, a material must be extracted or harvested AND 
processed  or  manufactured  within  500  miles  of  the  project  site  to  be  considered  a  regional  material‐ 
there is no partial credit. 
 
46、 Which LEED category has the greatest total number of points a project can earn? 
A、  Energy and Atmosphere 
B、  Sustainable Sites 
C、  Indoor Environmental Quality 
D、  Water Efficiency 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Energy  and  Atmosphere  has  the  greatest  number  of  points  available  to  earn  in  any  of  the  LEED  rating 
systems. The LEED volunteer committees weighed this group, and thus energy consumption, as having the 
greatest impact on the environment. Water efficiency (WE), while of great importance, can earn the least 
number of points out of the possible choices. In some LEED rating systems Materials and Resources can 
earn slightly less points, though on average the WE category has the least number of points. 
 
47、 Each LEED credit and prerequisite includes the intent of the credit/prerequisite. What is the 'intent' 
of a credit/prerequisite? 
A、  Outlines concerns specific to specific regions 
B、  Addresses the synergies and trade‐offs between credits 
C、  Identifies the main sustainability goal or benefit of the prerequisite or credit 
D、  Details the level of performance needed to achieve a credit 
The correct answer is:    C 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
A  is  what  regional  variations  contain.  B  information  is  covered  in  the  related  credits  section  of  the 
reference guide. C is USGBC's definition of a LEED intent. D is what requirements contain, or exemplary 
performance.   
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      38 / 206 
 
48、 Which Rating System offers an Innovation and Design credit for holding a LEED charrette? 
A、    LEED for Building Design and Construction 
B、    LEED for Interior Design and Construction 
C、    LEED for Operations and Maintenance 
D、    LEED for Homes 
E、    LEED for Neighborhood Development 
The correct answer is:    D.     
 
49、 Solar reflectance is roughly synonymous with what term? 
A、    aquifer 
B、    shielding 
C、    glare 
D、    lumen 
E、    albedo 
The correct answer is:    E.     
Both of these terms refer to the amount of light a surface reflects. 
 
50、"A project use toilet and lavatory with a flush rate of 1.6 gpf and 0.25 gpf respectively, this only meet 
but doesn't exceed the leed rating system requirements, than it is decided to use graywater for these to 
facilities, if a FTE use these facilities 3 time per day, then how much graywater will be used?"       
A、  1.6 gallon                 
B、  0.75 gallon                 
C、  4.8 gallon                
D、  5.55 gallon   
The correct answer is:    D 
 
51、Natural refrigerants are not as effective as refrigerants like HCFCs. For this, what could be required to 
achieve the same amount of cooling? 
A、    Enough chemicals 
B、    Less energy 
C、    More energy 
D、    Less heating 
E、    More cooling 
The correct answer is:    C 
Natural refrigerants are not as effective as refrigerants like HCFCs, so it requires more energy to achieve 
the same amount of cooling. 
 
52、If  the  design  did  not  account  for  all  sources  of  building  efficiency  and  the  building  is  not  properly 
maintained  then  the  building  systems  can  underperform.  Which  are  the  other  reasons  of 
underperforming the building systems? (Choose 2) 
A、    The building systems are not properly analyzed 
B、    The building was not properly configured 
C、    The building strength is high 
D、    The location of building is not suitable 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      39 / 206 
E、    The use of the building has changed over time 
The correct answer is:    B & E 
Building  systems  can  underperform  for  several  reasons:  (1)The  building  was  not  properly  configured, 
(2)The  design  did  not  account  for  all  sources  of  building  efficiency,  (3)The  building  is  not  properly 
maintained, (4)The use of the building has changed over timd.   
 
53、In the U.S., 99% of buildings are existing buildings; of those, 50% are older buildings that have old, 
inefficient, leaky chillers that use CFCs. What type of changes of these units will be suitable to save energy 
while reducing the negative environmental effects of CFC use? 
A、    Repairing or replacing 
B、    Replacing or retrofitting 
C、    Retrofitting or modernizing 
D、    Modernizing or restoring 
E、    Restoring or repairing 
The correct answer is:    B 
In  the  U.S.,  99%  of  buildings  are  existing  buildings;  of  those,  50%  are  older  buildings  that  have  old, 
inefficient,  leaky  chillers  that  use  CFCs.  Replacing  or  retrofitting  these  units  could  save  energy  while 
reducing the negative environmental effects of CFC usd.   
 
54、Which documentation is necessary for determination of community connectivity and development 
density?                 
A、  site map                 
B、  project specification                 
C、  density factor                 
D、  soil erosion and sendimentation plan 
The correct answer is:    A 
 
55、For a great performance we must lower the energy use.    From where it should be lower? 
A、    An end point 
B、    A finishing point 
C、    A pavilion point 
D、    A base point 
E、    A baseline point   
The correct answer is:    E 
Many points are given in LEED for lowering energy use from a baseline point. 
 
56、To use high performance glazing,which is the benefit                 
A、  reduced hvac system                 
B、  acoustical ceiling                   
C、  flooring system                 
D、  external wall   
The correct answer is:    A 
               
57、 Why choose a project site with a high development density? 
A、  The project would reduce sprawl 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      40 / 206 
B、  The project would have access to public parking 
C、  The project would have access to at least 10 basic services   
D、  The project site would be near a public rail line 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Development  density  and  community  connectivity  help  to  reduce  urban  sprawl.  A  dense  development 
does  not  mean  public  parking  will  be  available.  Development  density  does  not  mean  access  to  a  given 
number  of  basic  services.  Development  density  is  the  measure  of  how  much  development  exists  in  a 
given area. The more dense the development, the less sprawl there is (usually). Dense development does 
not mean proximity to public transportation will exist. Some cities have very poor public transportation 
systems despite having dense developments. 
 
58、 Each commercial (non‐homes) rating system is comprised of what elements?(Choose 3) 
A、  Prerequisites 
B、  Minimum Program Requirements 
C、  Strategies 
D、  CIRs 
E、  Credits 
The correct answer is:    ABE 
Reference: GBCI LEED Certification Policy Manual   
Each commercial (non‐homes) rating system is comprised of a series of the following elements: 
1. Minimum Program Requirements 
2. Prerequisites 
3. Credits 
 
59、Use rainwater can reduce the use of what kind of water?               
A、  graywater                 
B、  potable water                
C、  blackwater                 
D、  stormwater   
The correct answer is:    B 
 
60、Carbon dioxide (CO2), Water (H2O), Ammonia (NH3) is the natural refrigerants. What are the other 
natural refrigerants? 
A、    Hydro‐fluorocarbons 
B、    Hydrocarbons 
C、    Air 
D、    Hydrogen 
E、    Oxygen 
The correct answer is:    B & C 
Explanation:  There  are  five  natural  refrigerants  that  are  benign  to  the  earth’s  atmospherd.  They  are 
carbon dioxide (CO2), water (H2O), ammonia (NH3), hydrocarbons (HC), and air. 
 
61、What  would  you  define  as  a  commissioning  cycle  for  Existing  Buildings  for  investigating,  analyzing, 
and  optimizing  the  performance  of  building  systems  by  improving  their  operation  and  maintenance  to 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      41 / 206 
ensure their continued performance over time? 
A、    An efficient process 
B、    A non regular process 
C、    An economical process 
D、    A systematic process 
E、    A non organized process 
The correct answer is:    D 
A  commissioning  cycle  for  Existing  Buildings  is  a  systematic  process  for  investigating,  analyzing,  and 
optimizing the performance of building systems by improving their operation and maintenance to ensure 
their continued performance over time. 
 
62、What step would take to control equitably total global emissions of substances that deplete it, with 
the ultimate objective of their elimination on the basis of developments in scientific knowledge? 
A、    By taking previously protections 
B、    By taking precautionary actions 
C、    By taking previously trials 
D、    By taking precautionary measures 
E、    By taking previously determinations 
The correct answer is:    D 
Determined to protect the ozone layer by taking precautionary measures to control equitably total global 
emissions  of  substances  that  deplete  it, with  the  ultimate  objective  of  their  elimination  on  the  basis  of 
developments in scientific knowledge.   
 
63、When mechanical refrigeration is needed, many natural refrigerants exist for refrigeration, as well as 
refrigerants. Which points are true about these refrigerants? 
A、    Higher ozone depletion potential 
B、    Lower ozone depletion potential 
C、    Higher global warming potential 
D、    Lower global warming potential 
E、    Higher potential energy 
The correct answer is:    B & D 
When  mechanical  refrigeration  is  needed,  many  natural  refrigerants  exist  for  refrigeration,  as  well  as 
refrigerants that have lower ozone depletion potential (ODP) and global warming potential (GWP). 
 
64、Refrigerants have lower ozone depletion potential (ODP) and global warming potential (GWP). What 
is global warming potential that refers to the amount of global warming caused by a substance? 
A、    A component 
B、    A variable 
C、    A portion 
D、    A factor 
E、    A number 
The correct answer is:    E 
Global  warming  potential  (GWP)  is  a  number  that  refers  to  the  amount  of  global  warming  caused  by  a 
substance.   
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      42 / 206 
65、The Montreal Protocol on Substances is an international treaty designee. What is the name of layer 
that is depleted by the Montreal Protocol on Substances? 
A、    Hydrogen layer 
B、    Oxygen layer 
C、    Carbon layer 
D、    Ozone layer 
E、    Water layer 
The correct answer is:    D 
The Montreal Protocol on Substances that deplete the ozone layer is an international treaty designed to 
protect  the  ozone  layer  by  phasing  out  the  production  of  a  number  of  substances  believed  to  be 
responsible for ozone depletion. 
 
66、Hydrocarbons (HC) are used as natural refrigerants. Which could you say hydrocarbons that are used 
as natural refrigerants? (Choose 3) 
A、    Propane 
B、    Ethane 
C、    Ammonia 
D、    Carbon dioxide 
E、    Iso‐pentane 
The correct answer is:    A, B & E 
HC, Hydrocarbons, such propane, butane, ethane, isobutene, and iso‐pentane.   
 
67、Better lighting results in better productivity. Which of the following can reduce the amount of light 
needed for a building as only individual areas need to be illuminated instead of entire spaces? 
A、      Accurate lighting 
B、      Task lighting 
C、      Proper decoration 
D、      Proper reflection 
E、      Proper emission 
The correct answer is:    B 
Better  lighting  results  in  better  productivity.  Task  lighting  can  reduce  the  amount  of  light  needed  for  a 
building  as  only  individual  areas  need  to  be  illuminated  instead  of  entire  spaces.  Cutting  down  on  the 
lighting needs will reduce energy use¡ªone of the greatest expenses in operating a building. 
 
68、If a teacher let the students to collect the food waste and to clean the site after every dinner, it is 
related to?                 
A、  innovation design                 
B、  material and resources                 
C、  sustainable sites                 
D、  indoor environmental quality    
The correct answer is:    D 
 
69、Buildings  that  were  not  designed  for  energy  efficiency  have  HVAC  systems  that  have  an  indirect 
impact on global warming potential. What can be damaged because of their contribution to the emission 
of greenhouse gases from power plants? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      43 / 206 
A、    Buildings 
B、    Power plants 
C、    Cooling systems 
D、    Environment 
E、    Fire suppression systems 
The correct answer is:    D 
Buildings that were not designed for energy efficiency have HVAC systems that have an indirect impact on 
global warming potential and can damage the environment because of their contribution to the emission 
of greenhouse gases from power plants. 
 
70、What is the definition of densely occupancy(how many occupant per 1000 square feet)?   
A、  10 occupant                 
B、  15                 
C、  20                 
D、  25                 
The correct answer is:    D 
 
71、According to the measurement and verification protocol what would be required for determination 
of energy savings? (Choose 2) 
A、    Accurate measurement 
B、    Proper investigation 
C、    Accurate verification 
D、    Proper maintenance 
E、    Replicable methodology 
The correct answer is:    A & E 
The  determination  of  energy  savings  requires  both  accurate  measurement  and  replicable  methodology, 
known as a measurement and verification protocol. 
 
72、Increase the indoor ventilation will require?(choose 2)                
A、  use at least MERV 13 system                 
B、  use natural ventilation                 
C、  use mechnical ventilation                 
D、  indoor flushing out requirement                 
E、  reduce indoor water use   
The correct answer is:    BC 
             
73、Use low‐emitting material is related with indoor environmental quality and which category still?   
A、  material and resources                 
B、  energy and atomsphere                 
C、  sustainable sites                 
D、  water efficiency   
The correct answer is:    B 
 
74、In  1987,  the  Montreal  Protocol  was  signed  and  the  signatory  nations  committed  themselves  for 
changing the use of CFCs and other ozone‐depleting substances. For what type of changing the Montreal 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      44 / 206 
Protocol was signed? 
A、    Reducing 
B、    Increasing 
C、    Modifying 
D、    Converting 
E、    Escalating 
The correct answer is:    A 
In 1987, the Montreal Protocol was signed and the signatory nations committed themselves for reducing 
the use of CFCs and other ozone‐depleting substances. 
 
75、 Open space that would count for a LEED project must be located: 
A、Within the LEED boundary 
B、Within the project boundary 
Only open space that is part of the LEED boundary would be counted   
C、  Within 1/2 mile radius of the project 
D、  Within the property boundary 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
The  open  space  must  be  in  the  LEED  boundary.The  LEED  boundary  is  the  portion  of  the  project  site 
submitted for LEED certification. For single building developments, this is the entire project scope and is 
generally limited to the site boundary ‐ they are not necessarily the same thing. The project boundary is 
the platted property line of the project defining land and water within it. Open space for the project does 
not count if it is part of the surrounding community. The property boundary is the total area within the 
legal  property  boundaries  of  the  site;  it  encompasses  all  areas  of  the  site,  including  constructed  and 
nonconstructed areas. Only open space that is part of the LEED boundary would be counted.   
 
76、A  CFC  phase‐out  plans  need  to  be  completed  for  existing  buildings.  Who  must  complete  a  CFC 
phase‐out plan? 
A、    The design team 
B、    The project team 
C、    The engineers 
D、    The project manager 
E、    The workers 
The correct answer is:    B 
For existing buildings, project teams must complete a CFC phase‐out plan. 
 
77、In  reducing  the  pollution  generated  by  homes  and  buildings,  the  credit  category  of  Energy  & 
Atmosphere has a goal of reducing ozone depletion and climate change. When? 
A、    While reducing electricity use is a significant step 
B、    While increasing electricity use 
C、    While reducing the atmospheric pressure 
D、    While increasing the atmospheric pressure 
E、    While changing the temperature 
The correct answer is:    A 
While  reducing  electricity  use  is  a  significant  step  in  reducing  the  pollution  generated  by  homes  and 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      45 / 206 
buildings,  the  credit  category  of  Energy &  Atmosphere  also  has  a  goal  of  reducing  ozone  depletion  and 
climate change.   
 
78、The  design  should  account  for  all  sources  of  building  efficiency.  If  he  design  is  not  account  for  all 
sources of building efficiency then what could be occurred? 
A、    Building system can underneath 
B、    Building system can underperform 
C、    Building system can undermine 
D、    Building system can undershoot 
E、    Building system can underactive 
The correct answer is:    B 
Building  systems  can  underperform  for  several  reasons:  (1)The  building  was  not  properly  configured, 
(2)The  design  did  not  account  for  all  sources  of  building  efficiency,  (3)The  building  is  not  properly 
maintained, (4)The use of the building has changed over time.   
 
79、Beyond basic refrigerant design LEED projects can choose to install an HVAC system. What is an HVAC 
system? (Choose 3) 
A、    That uses refrigerants 
B、    That does not use refrigerants 
C、    That minimize or eliminate the emissions of compounds 
D、    That increases ozone depletion and global warming 
E、    That contribute to ozone depletion and global warming 
The correct answer is:    A, C & E 
An  HVAC  system  that  uses  refrigerants  that  minimize  or  eliminate  the  emissions  of  compounds  that 
contributes to ozone depletion and global warming. 
 
80、The  project  teams  need  to  make  sure  the  systems  function  and  deliver  the  desired  performance. 
What are the other functions that should be considered by the project team? (Choose 2) 
A、    The life‐cycle of a high performance building 
B、    The energy demands over time 
C、    The strength of building 
D、    The constructional cost 
E、    The design criterion 
The correct answer is:    A & B 
The project teams should consider the life‐cycle of a high performance building and the energy demands 
over time.   
 
81、While reducing electricity use is a significant step in reducing the pollution generated by homes and 
buildings, then what factor could be changed? (Choose 2) 
A、    Increasing ozone depletion 
B、    Increasing pressure 
C、    Reducing ozone depletion 
D、    Reducing pressure 
E、    Climate change 
The correct answer is:    C & E 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      46 / 206 
While  reducing  electricity  use  is  a  significant  step  in  reducing  the  pollution  generated  by  homes  and 
buildings,  the  credit  category  of  Energy &  Atmosphere  also  has  a  goal  of  reducing  ozone  depletion  and 
climate change.   
 
82、Daylighting is another huge consideration that involves many sustainable design choices. What is the 
way to get more natural sunlight for building? 
A、    When the building has proper space 
B、    When the building is in north 
C、    When the building is in south 
D、    Orienting the building in all direction 
E、    Orienting the building in a certain direction 
The correct answer is:    E 
Daylighting  is  another  huge  consideration  that  involves  many  sustainable  design  choices.  Orienting  the 
building in a certain direction allows more natural sunlight to enter the building. 
 
83、Beyond basic refrigerant design LEED projects can choose to make sure fire suppression systems and 
fire extinguishers are halon freE、    What are the other activities that can be chosen by LEED projects? 
(Choose 2) 
A、    Use refrigerants 
B、    Use no refrigerants 
C、    Use CFCs 
D、    Install a mechanical cooling system 
E、    Install an hvac system 
The correct answer is:    B & E 
Beyond basic refrigerant design LEED projects can choose to: use no refrigerants, install an HVAC system, 
and make sure fire suppression systems and fire extinguishers are halon free.   
 
84、To purchase REC, the project can be located in?                 
A、  almost anywhere                 
B、  only with cooperative local utility or power market                 
C、  near wind farm                 
D、  near coal mine   
The correct answer is:    A 
 
85、Commissioning  is  the  process  of  verifying  the  building¡ˉs  energy  related  systems  are  installed, 
calibrated,  and  perform  according  to  the  project  requirements.  What  is  commissioning  in  all  the  LEED 
rating systems? 
A、    A non provision 
B、    A non precaution 
C、    A precaution 
D、    A preconscious 
E、    A prerequisite 
The correct answer is:    E 
Commissioning is a prerequisite in all the LEED rating systems. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      47 / 206 
86、Which can significantly deplete and otherwise modify the ozone layer in a manner that is likely  to 
result in adverse effects on human health and the environment? 
A、    Worldwide emissions of certain substances 
B、    Worldwide radiations of certain substances 
C、    Worldwide convections of certain substances 
D、    Worldwide reflections of certain substances 
E、    Worldwide deflections of certain substances 
The correct answer is:    A 
Recognizing  that  worldwide  emissions  of  certain  substances  can  significantly  deplete  and  otherwise 
modify  the  ozone  layer  in  a  manner  that  is  likely  to  result  in  adverse  effects  on  human  health  and  the 
environment. 
 
87、For basic refrigerant design within the LEED Rating Systems, there is a prerequisite for Fundamental 
Refrigerant Management. What would be required for this Fundamental Refrigerant Management? 
A、    Zero use of CFCs 
B、    Less use of CFCs 
C、    Enough use of CFCs 
D、    Much use of CFCs 
E、    A certain amount use of CFCs 
The correct answer is:    A 
For  basic  refrigerant  design  within  the  LEED  Rating  Systems,  there  is  a  prerequisite  for  Fundamental 
Refrigerant Management which requires zero use of CFCs. 
 
88、For building construction, the life‐cycle of a high performance building and the energy demands over 
time should be considered. Who should consider these two criterions? 
A、    The design team 
B、    The project team 
C、    The engineers 
D、    The project manager 
E、    The workers 
The correct answer is:    B 
The project teams should consider the life‐cycle of a high performance building and the energy demands 
over timd. 
 
89、For building construction, the requirements need to be fulfilled according to the design. Who must 
make sure the building is functioning as intended based on the design? 
A、    The design team 
B、    The project team 
C、    The engineers 
D、    The project manager 
E、    The workers 
The correct answer is:    B 
The project team must make sure the building is functioning as intended based on the design. 
 
90、 What are the environmental benefits of using salvaged wood flooring in a residential project? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      48 / 206 
A、The wood flooring will have a lower installation cost 
B、The wood flooring will have a lower cost since it did not have to be extracted from a forest 
C、The wood flooring will increase the tax base of the local economy 
D、The wood flooring will reduce the demand for virgin resources 
The correct answer is:    D 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
The installation cost is an economic issue, not an environmental issue. A lower cost would be an economic 
benefit.  Most  salvaged  flooring  would  have  a  higher  cost  since  they  tend  to  be  of  higher  quality  wood. 
There  is  a  benefit  to  society  (remember  the  triple  bottom  line?)  assuming  the  material  was  salvaged 
locally and re‐used locally. Salvaged materials reduce the demand for virgin materials and reduce waste. 
Flooring that is taken from a demo project can be reused elsewhere so that trees do not have to be cut 
down to supply wood for new flooring. 
 
91、To implement the sustainable purchasing policy in EBOM, the most important thing is?   
A、  monitoring                 
B、  use sustainable content                 
C、  use green material                   
D、  determine the budget     
The correct answer is:    B 
 
92、 What should be included in a building program detailing the project's green building requirements? 
A、General description of the project 
B、Building construction budget 
C、Room‐by‐room description of the project 
D、Statement of the project's environmental vision and goals 
E、Statement of Work 
The correct answer is:    ACD 
Reference: Sustainable Building Technical Manual: Part II, See page 5 of the reference 
A building program details the project's green building requirements. It includes the project's vision, the 
green building goals, and a general and room‐by‐room description of the project. 
 
93、 Which is not a Minimum Program Requirement? 
A、Permanent building / space 
B、Uniform site boundary 
C、Minimum floor area 
D、Minimum building to site area ratio 
The correct answer is:    B 
Reference: Minimum Program Requirements   
The Minimum Program Requirements are: 
Must comply with environmental laws 
Must be a complete, permanent building or space 
Must use a reasonable site boundary 
Must comply with minimum floor area requirements 
Must comply with minimum occupancy rate 
Must commit to sharing whole‐building energy and water usage data 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      49 / 206 
Must comply with a minimum building area to site area ratio 
 
94、For existing buildings, project teams carry out some important responsibilities. For existing buildings, 
which plan that the project teams must complete? 
A、    A CFC phase‐out plan 
B、    Work distribution plan 
C、    Site selection 
D、    Designing plan 
E、    Fulfill the requirements 
The correct answer is:    A 
For existing buildings, project teams must complete a CFC phase‐out plan. 
 
95、Beyond basic refrigerant design LEED projects can choose to use no refrigerants. What do you mean 
by Use no refrigerants? 
A、    Mechanical cooling 
B、    Electrical cooling 
C、    Natural ventilation 
D、    Heating 
E、    An air conditioning system 
The correct answer is:    C 
Beyond  basic  refrigerant  design  LEED  projects  can  choose  to:  use  no  refrigerants  (known  as  natural 
ventilation),  install  an  HVAC  system,  and  make  sure  fire  suppression  systems  and  fire  extinguishers  are 
halon fred.   
 
96、Fire  extinguishing  agents  are  used  in  fire  suppression  systems.  What  are  used  as  fire  extinguishing 
agents, both in built‐in systems and in handheld portable fire extinguishers? 
A、    Chloroform 
B、    Halons 
C、    Hydrocarbons 
D、    Chlorofluorocarbons 
E、    d.d.t. 
The correct answer is:    B 
Halons  are  used  as  fire  extinguishing  agents,  both  in  built‐in  systems  and  in  handheld  portable  fire 
extinguishers. 
 
97、Whole‐building  design,  as  previously  mentioned  in  this  study,  is  the  ideal  way  to  work  with  LEED 
credits what is created? 
A、      Strategies 
B、      Synergies 
C、      Design process 
D、      Selecting site 
The correct answer is:    B 
Whole‐building design, as previously mentioned in this study, is the ideal way to work with LEED credits to 
create synergies. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      50 / 206 
98、 What are acceptable ways to reference a LEED Registered Project? 
A、  XYZ Building is LEED Qualified 
B、  XYZ Building is registered with the certification goal of LEED Platinum 
C、  XYX Building is registered under the LEED Green Building Rating System 
D、  Upon completion, XYZ Building will apply to become LEED certified 
E、  XYZ Building is LEED Platinum registered 
The correct answer is:    BCD 
Reference: USGBC logo guidelines   
While we receive many negative comments about the relevance of these types of questions the subject 
matter may come up on your exam. You are better off seeing questions from every exam objective than 
being under‐prepared because some questions covering the GBCI exam objectives you will be tested on 
seem silly. This question pertains to exam objective I.P USGBC Policies (e. g., trademark usage; logo usage) 
from the LEED GA Candidate Handbook. 
The reason 'Upon completion, XYZ Building will apply to become LEED certified' is acceptable compared 
to 'LEED Certified' with a capital C is because USGBC allows a lowercase c to be used when speaking of 
general  LEED  certification.  It  refers  to  the  certification  program  itself  and  not  the  lowest  level  of 
certification ‐ LEED Certified.   
 
99、Building  analyzing  software  tools  take  inputs  and  determine  the  energy  behavior  of  a  building’s 
systems  over  time.  What  is  another  feature  of  the  software  weather  data  that  can  be  input  into  the 
software? 
A、    Availability of real‐time 
B、    Maximum time 
C、    Availability of consecutive time 
D、    Minimum time 
E、    Availability of idle time 
The correct answer is:    A 
Another  feature  of  the  software  is  the  availability  of  real‐time  weather  data  that  can  be  input  into  the 
software.   

100、 At a minimum, what materials must a recycling program include? (Choose 3)     
A、    Glass 
B、    Light bulbs 
C、    Batteries 
D、    Metals 
E、    Paper 
The correct answer is:    ADE 

101、 Life‐cycle assessments (LCAs) are a beneficial tool to determine which of the following?   
A、    Environmental benefits and potential impacts of a material, product, or technology 
B、    Economics of building systems during the life of the building 
B、    Environmental impacts of materials during construction 
D、    Social impacts of policies during a fiscal year 
E、    Maintenance implications, including cost, during the life of the building 
The correct answer is:    A   
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      51 / 206 
It is important to remember LCAs not only look at the present impacts and benefits during each phase of 
the process, but future and potential impacts as well. 
 
102、 Which of the following is correct? (Choose one) 
A、    U.S. GBC 
B、    US GBC 
C、    U.S.G.B、  C、   
D、    U.S. Green Building Council 
E、    United States Green Building Council 
The correct answer is:    D 
 
103、 Which of the following statements are true in reference to certification bodies? (Choose two) 
A、    Certification bodies are managed by USGBC     
B、    Certification bodies are accredited to ISO standard 17021. 
C、    Certification bodies are assigned to a project once a project is registered   
D、    Certification bodies are responsible for the responding to appeals. 
E、    Certification bodies help individuals prepare for their accreditation exams. 
The correct answer is:    B and C   
Certification bodies are managed by GBCI and are assigned to a project team after registration, to assist 
with  the  process  for  a  project  seeking  LEED  certification,  including  the  review  of  and  response  to  CIRs. 
GBCI is responsible for the appeals process. 
 
104、 Which rating system addresses the appropriate sizing of a project? (Choose one) 
A、    LEED for Homes 
B  、  LEED for New Construction 
C、    LEED for Core & Shell 
D、    LEED for Neighborhood Development 
The correct answer is:    A 
LEED for Homes is the only rating system where a project can earn or lose points according to the number 
of bedrooms and the size of the house.    Project teams use the Home Size Adjustment tool detailed in the 
LEED for Homes Reference Guide to determine if their project will have points credited or deducted based 
on the proposed size of the home.   
 
105、 Incorporating  green  building  strategies,  such  as  high‐efficiency  mechanical  systems,  on‐site 
photovoltaic systems, and an indoor water wall to help with the indoor air quality and air conditioning, 
plays a role in what type of cost implications? (Choose two) 
A、    Increased life‐cycle costs 
B、    Increased first costs 
C、    Reduced construction costs 
D、    Increased soft costs 
E、    Reduced soft costs 
The correct answer is:    A and B   
Although the strategies listed will increase the first costs for a project, it is important to remember the 
life‐cycle costs, including purchase price, installation, operation, maintenance, and upgrade costs. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      52 / 206 
106、 What must occur if a project includes a CFC phase‐out plan?     
A、  The annual leakage of CFC‐based refrigerants must be reduced to 5% or less 
B、  The project must implement green house gas emissions reporting 
C、  The CFC‐based refrigerants must be replaced with low ODP refrigerants 
D、  The CFC‐based refrigerants must be replaced with HCFCs 
The correct answer is:    A 
The project team can take 5 years from project completion to phase out CFC‐based refrigerants, as long as 
the annual leakage rate of CFC‐based refrigerants is reduced to 5% or less. Projects that have a shown a 
simple‐payback of CFC based refrigerant systems will take more than 10 years can be exempt from this 
requirement, but must still reduce the annual leakage rate to 5% or less. 
 
107、 Which  of  the  following  is  new  to  all  LEED  rating  systems  under  LEED  2009?  (Choose  one)A、   
Minimum  program  requirementsB 、     Credit  interpretations  requestsC 、     Regional  Prioritization 
categoryD、    Awareness & Education category 
The correct answer is:    C     
It is also important to remember, although the Regional Priority category is a new addition to the rating 
systems, no new prerequisites or credits were created to include within the new category. The Regional 
Priority category offers bonus points for achieving existing LEED credits detailed in the other categories. 
      
108、 What are acceptable ways to reference a LEED Registered Project? (Choose 3)     
A、  XYZ Building is registered with the certification goal of Platinum 
B、  XYZ Building is LEED Qualified 
C、  Upon completion, XYZ Building will apply to become LEED certified 
D、  XYZ Building is LEED Platinum registered 
E、  XYX Building is registered under the LEED Green Building Rating System 
The correct answer is:    ACE 
Reference: USGBC logo guidelines 
http://www.usgbc.org/DisplayPage.aspx?CMSPageID=1835 
"The reason 'Upon completion, XYZ Building will apply to become LEED certified' is acceptable compared 
to 'LEED Certified' with a capital C is because USGBC allows a lowercase c to be used when speaking of 
general  LEED  certification.  It  refers  to  the  certification  program  itself  and  not  the  lowest  level  of 
certification ‐ LEED Certifed." 
      
109、 Which of the following statements are true? (Choose two) 
A、    Appeals are mailed to GBCI. 
B、    Appeals can be submitted 25 business days after final certification review. 
C、    Appeals are freE、   
D、    Appeals can pertain only to credits, not prerequisites or MPRs. 
E、    Appeals are submitted through LEED‐Online 
The correct answer is:    B and E       
Appeals are electronically submitted to GBCI through LEED‐Online for a fee, within 25 business days after 
the final results from a design or construction certification review are posted to LEED Online. 
 
110、 Regarding  the  application  process  for  LEED  certification,  which  of  the  following  is  a  correct 
statement? (Choose one)A、    LEED credit submittal templates and documentation may be submitted only 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      53 / 206 
after occupancy.B、    All LEED credit submittal templates and documentation must be submitted prior to 
construction.C、    Prerequisites and credits marked as “Design” may be submitted and reviewed at the 
end of the design phase D、    The optional design‐phase submittal allows projects to secure points for 
specified LEED credits, for which a preliminary certification will be awarded, if the project has earned a 
sufficient number of points. 
The correct answer is:    C 
 
111、 A  LEED  Accredited  Professional  is  presented  with  a  project  that  was  started  without  sustainable 
design or LEED certification in mind and is about to enter the construction documents phase.    However, 
neither the owner nor any of the design team members involved thus far have significant experience with 
either  LEED  or  sustainable  design.  Given  this  situation,  which  of  the  following  would  tend  to  have  the 
most  influence  on  the  effectiveness  of  the  sustainable  design  process  for  a  project  aimed  at  LEED 
certification? (Choose three) 
A、    Starting the sustainable design process and consideration of LEED‐related goals as soon as possible 
B、    Extensive  research,  evaluation,  and  life‐cycle  assessment  for  intended  material  and  technology 
options 
C、    Aggressive value engineering of individual line items to ensure that the budget is not exceeded 
D、    Collectively  delegating  responsibility  for  specific  target  LEED  credits  and  associated  strategies  to 
appropriate team members 
E、    Establishing  means  of  collaborative,  interdisciplinary  communication  among  team  members  as  a 
departure from a conventionally more segmented design process   
The correct answer is:    A, D, and E   
Although  it  is  strongly  encouraged  to  begin  the  integrative  design  process  and  to  incorporate  green 
building technologies and strategies as early as possible in the design process, it is not intended to be an 
elaborate process. Value engineering should not be needed if the triple bottom line principles are applied. 
 
112、 Which of the following types of properties is best suited for a LEED project? (Choose two) 
A、    Prime farmland 
B、    Floodplains 
C、    Habitat for any endangered species 
D、    Within 500 feet of wetlands 
E、    Within 250 feet of a body of water 
F、    Public parkland 
The correct answer is:    D and E       
Although sites near wetlands and bodies of water should be avoided, to comply with the Sustainable Sites 
credit, LEED projects should not be within 100 feet of wetlands or 50 feet of a body of water. 
 
113、 Which  of  the  following  street  grid  density  descriptions  promotes  a  more  pedestrian  friendly 
community? (Choose one) 
A、    A higher street grid density with narrow streets interconnecting 
B、    A higher street grid density with wide streets interconnecting 
C、    A lower street grid density with wide streets interconnecting 
D、    A lower street grid density with narrow streets interconnecting 
The correct answer is:    A     
LEED  for  Neighborhood  Development  projects  are  encouraged  to  provide  a  higher  street  density  with 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      54 / 206 
narrow streets interconnecting to prevent sprawl and to manage stormwater. 
 
114、 Which  of  the  following  are  sustainable  strategies  that  should  be  implemented  on  an 
auto‐dependent green building? (Choose four) 
A、    Provide priority parking for carpools/vanpools. 
B、    Provide a mass transit discount program to employees. 
C、    Supply alternative fuel vehicles and accessibility to recharging stations. 
D、    Offer discounted parking rates for multioccupant vehicles. 
E、    Incorporate basic services (such as a bank, gym, cleaners, or pharmacy) for occupant usage in the 
new building. 
The correct answer is:    A, C, D, and E     
If  a  LEED  project’s  site  does  not  offer  masstransit  accessibility,  and  is  therefore  dependent  on  car 
commuting,  it  is  best  to  encourage  the  occupants  to  carpool,  offer  alternative  fuelefficient  vehicles,  or 
incorporate conveniences within the building or on‐site.   
 
115、 The design team has attempted to address 50 percent of the hardscape surfaces on the project’s 
site  to  meet  the  requirements  to  reduce  the  heat  island  effect  for  LEED  compliance.  Which  of  the 
following strategies should the LEED Accredited Professional discuss with the design team? (Choose three) 
A、    Effective tree‐shaded area of hardscape features 
B、    Solar reflectance index for all nonstandard paving materials proposed 
C、    Percentage of perviousness for proposed open‐grid paving materials 
D、    Emissivity of all low‐albedo hardscape features in the design 
E、    Runoff coefficients for impervious paving materials selected 
The correct answer is:    A, B, and C   
The  LEED  rating  systems  recommend  to  combine  the  following  three  strategies  to  reduce  heat  island 
effects: provide shade (within five years of occupancy), install paving materials with an SRI of at least 29, 
and implement an open‐grid pavement system (less than 50 percent impervious). 
 
116、 If an existing building seeks water efficiency strategies but has a limited budget, installing which of 
the following would be economically viable options? (Choose two) 
A、    Aerators 
B、    Low‐flow toilets 
C、    Waterless urinals 
D、    Capturing rainwater for irrigation 
E、    Flush valves 
The correct answer is:    A and E   
Aerators and flush valves are the two most economically feasible options if fixtures cannot be replaced.   
 
117、 The  major  renovation  of  a  four‐story,  40,000‐square‐foot  building  in  Florida  includes  repaving 
existing parking areas along the entire length of the south and west facades of the building. The building 
and parking areas compose the entire site to its boundaries, not leaving any green space. The common 
afternoon  rain  showers  have  led  the  design  team  to  select  open‐grid  paving  with  vegetated  cells 
equivalent to 50 percent of its surface in lieu of a lower‐first‐cost solution, such as black asphalt. Based on 
the information provided, which of the following benefits and LEED strategies might the open‐grid paving 
strategy contribute? (Choose three) 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      55 / 206 
A、    Reduced site disturbance 
B、    Water‐efficient landscaping 
C、    Heat island effect 
D、    Stormwater management 
E、    Optimize energy performance 
F、    Water use reduction 
The correct answer is:    C, D, and E     
Installing open‐grid pavers in lieu of asphalt minimizes the contributions to the urban heat island effect, as 
pavers do not absorb the heat from the sun as opposed to asphalt. By reducing heat gain, energy use is 
optimized,  as  the  building  has  less  of  a  demand  for  cooling  loads.  The  pavers  also  allow  stormwater  to 
penetrate through to reduce runoff.   
 
118、 Which of the following are potential sources of nonpotable water? (Choose three) 
A、    Blackwater 
B、    Municipally supplied reclaimed water 
C、    Captured rainwater 
D、    Wastewater from a toilet 
E、    Graywater 
The correct answer is:    BCE 
 
119、 Which of the following are categorized as regulated energy?(Choose three) 
A、    Computers 
B、    Space heating 
C、    Refrigeration 
D、    Service hot water 
E、    Lighting 
The correct answer is:    B, D, and E     
Regulated energy uses include lighting, HVAC, and service water for domestic or space heating. 
 
What is the primary intent of the Green Power credit? (Choose one) 
A、    To comply with the Montreal Protocol 
B、    To encourage more solar farms in the United States and avoid carbon trading 
C、    To encourage the development and use of renewable clean energy that is connected to the utility 
grid 
D、    To minimize production of greenhouse gases by generating on‐site renewable energy 
The correct answer is:    C   
Green power should be remembered with off‐site renewable energy, as green power is purchased and not 
installed. 
 
120、 Which energy demand reduction strategies are missing from the list below? (Choose two)A、    Size 
the  building  appropriatelyB、    Use  thermal  storageC、    Monitor  consumptionD、    Use  energy 
simulationE、    Purchase off‐site renewable energy 
The correct answer is:    A and C     
Using  thermal  storage  and  energy  simulation  helps  to  use  energy  more  efficiently.  Purchasing  off‐site 
renewable energy is a strategy to offset what cannot be produced on‐site.   
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      56 / 206 
 
121、 Which of the following best represents the typical range of plug loads for office buildings? 
A、    0.1‐0.25 watts per square foot 
B、    0.5‐1.00 watts per square foot 
C、    20‐30 watts per square foot 
D、    5‐10 watts per square foot 
The correct answer is:    B 
 
122、 Which  of  the  following  materials  could  contribute  to  earning  the  Recycled  Content  credit,  as 
preconsumer recycled content? (Choose three) 
A、    Metal stud manufacturing scrap sent back into the same manufacturing process 
B、    Paper towels manufactured from cardboard used for packaging 
C、  Medium‐density fiberboard panels manufactured with sawdust generated by the manufacturing of 
structural insulated panels 
D、    Concrete made with fly ash collected from coal‐burning power plants 
E、    Carpet padding manufactured with waste fiber collected from textile manufacturing plants 
The correct answer is:    C, D, and E   
Remember,  preconsumer  recycled  content  refers  to  scrap  and  trim  material  generated  from  the 
manufacturing  process,  but  does  not  enter  into  the  consumer  cycle  of  goods.  Preconsumer  recycled 
materials are used to manufacture a different product than what it was originally intended for. 
 
123、 Local codes and regulations may affect which of the following two strategies? 
A、    Construction waste management 
B、    Use of rainwater for toilet flushing 
C、    Minimizing parking capacity 
D、    Managing indoor air quality during construction 
E、    Purchasing green power 
The correct answer is:    B. C.     
Plumbing  codes  in  some  jurisdictions  do  not  allow  for  collected  rainwater  to  be  brought  inside  the 
building for use to flush toilets. Additionally, many zoning codes set minimum parking capacities that must 
be met for certain types of projects. 
 
124、 Which of the following are considered “appropriate” building sites under the LEED Rating Systems? 
A、    Prime farmland 
B、    Habitat for endangered species 
C、    Previously undeveloped land within 50 feet of a water body 
D、    A brownfield 
E、    A previously developed urban site 
The correct answer is:    D. E.     
The  LEED  Rating  System  discourages  developing  on  prime  farmland,  habitat  for  endangered  species  or 
close  to  a  water  body  by  awarding  a  point  for  projects  that  avoid  these  types  of  sites.  Conversely,  the 
rating  system  awards  a  point  for  building  on  a  brownfield  or  on  a  previously  developed  urban  site 
(development density and community connectivity). 
 
125、 Local zoning is against the south location of building to get daylight, what is the ideal path without 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      57 / 206 
violating local zoning                 
A、  educate the community to pursuade them and pursue a variation           
B、  locate as it is designed                 
C、  build as the local zoning prescribed                 
D、  write a letter to USGBC and let it to communicate with local community         
The correct answer is:    C 
 
126、 Which of the following statements are not true about green building materials? (Choose two) 
A、    Rapidly renewable materials are harvested within ten years. 
B、    Cradle‐to‐grave materials can be recycled   
C、    Products with postconsumer recycled content can contribute to earning the Recycled Content LEED 
credit while products with preconsumer recycled content cannot. 
D、    Cotton insulation can be considered a type of rapidly renewable material. 
The correct answer is:    B and C   
Cradle‐to‐cradle products can be recycled while cradle‐to‐grave materials are landfilled.    Products with 
either  or  both  preconsumer  and  postconsumer  recycled  content  can  contribute  to  earning  the  LEED 
credit. 
 
127、 A process to collect, reprocess and market the recovered solid waste is called       
A、  recyling                 
B、  salvage materials                 
C、  material reuse                 
D、  reducing   
The correct answer is: A   
 
128、 Which  of  the  following  design‐team  deliverables  and  team  members  are  most  likely  to  play  a 
significant role in achieving a Construction IAQ Management Plan? (Choose two) 
A、    Project specifications 
B、    Civil engineer 
C、    Construction documents 
D、    Lighting designer 
E、    General contractor 
F、    Electrical engineer 
The correct answer is:    A and E   
Project  specifications  will  give  the  contractor  direction  on  how  to  comply  with  the  IAQ  credit 
requirements such as MERV filters, flush‐out, and low‐emitting materials. 
 
129、 Which of the following most closely represents an appropriate level  of overall illumination on an 
office work surface, including daylighting, ambient artificial lighting, and task lighting? (Choose one) 
A、    1‐2 footcandles 
B、    5‐10 footcandles 
C、    15‐25 footcandles 
D、    40‐60 footcandles 
E、    75‐120 footcandles 
F、    150‐200 footcandles 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      58 / 206 
The correct answer is:    D 
 
130、 Pursuing  an  Innovation  in  Design  opportunity  is  appropriate  when  at  least  one  of  which  of  the 
following are true? (Choose two) 
A、    The project is unable to meet the requirements established by an existing LEED credit. 
B、    The compliance paths offered within an existing LEED credit are not possible to pursue 
C、    The  project  has  exceeded  or  is  projected  to  exceed  the  minimum  performance  established  by  an 
existing LEED credit. 
D、    The project has achieved measurable performance in a LEED credit within another rating system. 
The correct answer is:    CD 
 
131、 Which of the following are sources of graywater?  (Choose 2)     
A、    Showers 
B、    Toilets 
C、    Municipal potable water supply systems 
D、    Wells 
E、    Washing machines 
The correct answer is:    AE 
"Graywater is water from laundry machines or showers that is not suitable for drinking, but can be used 
for other purposes such as irrigation and flushing toilets." "Graywater is defined by the Uniform Plumbing 
Code  (UPS)  as  untreated  house‐hold  wastewater  which  has  not  come  into  contact  with  toilet  waste  or 
kitchen sinks."Some states and local codes have other definitions. 
 
132、 What is an advantage of comingled recycling vs. separate containers?     
A、    Recycling fees will be reduced 
B、    People and contractors are more likely to use it 
C、    More materials can be put into one container 
D、    The materials can be donated more easily 
The correct answer is:    B 
"Comingled recycling uses one bin for all recycled materials. This approach is common for curbside pickup 
recycling programs for residences." "People with items to throw away find it easier to throw the item into 
one  container,  especially  subcontractors  on  a  construction  project  who  are  pressed  for  time.  Research 
shows that participation and recycling levels increase when sorting is not required."  
         
133、 Potable water comes from what sources?     
A、    Wells 
B、    Cooling towers 
C、    Cisterns 
D、    Municipal water supply 
The correct answer is:    AD 
Potable water is water that meets or exceeds EPA's drinking water standards and comes from wells or the 
municipal water supply.   
 
134、 What are adaptive plants?     
A、    Plants that are invasive 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      59 / 206 
B、    Plants that require more water than other plants 
C、    Plants that are low maintenance 
D、    Flowering plants that only bloom once a year 
The correct answer is:    C 
"non‐native, introduced plants that reliably grow well in a given habitat with minimal winter protection, 
pest  control,  fertilization  or  irrigation  once  their  root  systems  are  established;  adapted  plants  are 
considered low, maintenance and not invasive" 
     
135、 Which  of  the  following  assess  environmental  performance  of  products  and  services  and  provide 
guidance on improving their environmental performance?     
A、    ISO 14000 
B、    LEED 
C、    IESNA 
D、    ASHRAE 
The correct answer is:    A 
IESNA: Illuminating Engineering Society of North America 
     
136、 A  counter  made  of  recycled  glass  obtained  and  manufactured  within  500  miles  of  project  would 
contribute toward:     
A、    Recycled materials only 
B、    Both local and recycled materials 
C、    Local materials only 
D、    Neither local nor recycled materials 
The correct answer is:    B 
     
137、 What would NOT qualify as a previously developed site?     
A、    Lot where there used to be a road 
B、    Lot that was recently graded 
C、    Greenfield lot donated to the city 
D、    Lot reseeded with native grasses 
The correct answer is:    C 
 
138、 Which of the following would help with water efficient landscaping?     
A、    Replacing hardscapes with open grid paving 
B、    Using drip irrigation 
C、    Increasing the permeability of the landscape 
D、    Increasing open space 
The correct answer is:    B 
 
139、 What is a car share membership program?    
A、    A program where two people share a common parking space in urban areas 
B、    A program where cars can be rented on an hourly or daily basis to reduce automobile ownership 
C、    A shuttle that ferries people from mass transit to the workplace, school, etc 
D、    A program where two or more people drive together to reduce automobile use 
The correct answer is:    B 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      60 / 206 
"Car  sharing  is  an  alternative  to  car  rental  and  car  ownership.  Cars  are  located  throughout  cities  in 
convenient locations. People who sign up for the program can reserve the cars and use them for a short 
period of time. See zipcar.com for an example. "     
 
140、 What needs to be included when providing bicycle storage for people?     
A、    Bicycle lanes for accessibility 
B、    Bicycle security 
C、    Shared bicycles for employees to move between buildings 
D、    Car bike racks 
The correct answer is:    B 
SS C4.2 Provide secure bicycle racks and/or storage.   
     
141、 What  minimum  floor  area  is  needed  for  New  Construction,  Core  and  Shell,  Schools,  Existing 
Buildings: Operations and Maintenance projects?    
A、    10,000 sq. ft. 
B、    1,000 sq. ft. 
C、    There is no minimum 
D、    5,000 sq. ft. 
The correct answer is:    B 
1,000 sq. ft. minimum for commercial projects. 
250 sq. ft. for commercial interior projects.   
     
142、 Section 608 of the EPA Clean Air Act established regulations that helped with what issue?   
A、    Smog 
B、    Using and recycling ozone‐depleting compounds 
C、    Humidity from heat islands 
D、    CO2 levels inside buildings 
The correct answer is:    B 
     
143、 What strategy is effective at reducing potable water consumption indoors?     
A、    Implementing cooling tower water management 
B、    Increasing potable water demand 
C、    Installing fixtures that meet the EPAct 1992 standard 
D、    Installing low‐flow flushing fixtures 
The correct answer is:    D 
     
144、 What does the emissivity of a material refer to?    
A、    Measure  of  a  material's  ability  to  reflect  sunlight  (including  the  visible,  infrared,  and  ultraviolet 
wavelengths) on a scale of 0 to 1 
B、    The environmental benefits of the material over time 
C、    The ratio of energy radiated by a particular material to energy radiated by a black body at the same 
temperature 
D、    How hot a surface would get relative to standard black and standard white surface 
The correct answer is:    C 
"The emissivity of a material is the ratio of energy radiated by a particular material to energy radiated by a 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      61 / 206 
black body at the same temperature.    It is a measure of a material's ability to radiate absorbed energy."
   
     
145、 What is an appropriate use of the USGBC Logo?    
A、    On a website used as a link to a third‐party site describing LEED 
B、    On a product, such as white roofing material, that can help earn LEED credits 
C、    Next to text that discusses the LEED Rating System 
D、    To indicate that a company is a USGBC member 
The correct answer is:    C 
See USGBC Website on Logo use:   
http://www.usgbc. org/DisplayPage. aspx?CMSPageID=1829   
The USGBC logo cannot be used to link to third‐party websites or for product certification.   
The USGBC Member logo is used to denote USGBC membership, not the USGBC logo.   
         
146、 The EPA Act of 1992 does NOT address what type of water consuming devices? (Choose 2) 
A、    Urinals 
B、    Kitchen faucets 
C、    Cooling towers 
D、    Boilers 
The correct answer is:    CD 
     
147、 Which of the following will NOT help reduce the non‐roof heat island effect?     
A、    Placing parking under cover 
B、    Planting large non‐native trees for shading 
C、    Using paving materials with high SRI values 
D、    Increasing the number of parking spaces 
The correct answer is:    D 
     
148、 What implies a direct impact on global warming?     
A、    Ozone depleting potential 
B、    Global warming potential 
C、    Service life 
D、    Refrigerant charge 
The correct answer is:    B 
     
149、 What  percentage  of  waste  does  construction  and  demolition  debris  contribute  to  landfills  each 
year?     
A、    20% 
B、    30% 
C、    40% 
D、    50% 
The correct answer is:    C 
 
150、 What is submitted to document that the requirements of a credit or prerequisite were met? 
A、  CIR 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      62 / 206 
B、  Building operating plan 
C、  Letter templates 
D、  LEED Scorecard 
The correct answer is:    C 
The  LEED  Credit  Checklist  helps  project  teams  track  their  credits  against  requirements  for  certification. 
The LEED Credit Checklist is also called the LEED Scorecard. CIRs are used for technical guidance on credits. 
Anyone on the project team can submit a CIR, as long as the person has access to LEED Online (through 
the project administrator). B would be used by operations and maintenance staff to keep up the building. 
Each  rating  system  will  have  its  own  set  of  forms  that  must  be  completed  and  submitted  for 
documentation and verification. These forms are called letter templates, and are dynamic PDF forms that 
can  be  filled  out  and  saved  on  a  computer  then  uploaded  directly  back  to  LEED  Online. 
Credits/prerequisites are assigned by the project administrator. Whoever has been assigned responsibility 
for the credit/prerequisite by the administrator fills out the letter template and uploads it to LEED Online 
upon  completion.  Once  all  of  the  letter  templates  are  uploaded  for  those  credits  being  attempted,  the 
project  administrator  will  submit  the  project  for  review.  The  credit  forms  are  also  referred  to  as  letter 
templates, credit templates, submittal templates, or submittals. 
 
151、 What happens after the project registration fee is paid to GBCI?     
A、    The project will receive a certification plaque 
B、    The project will receive pre‐certification 
C、    The project team gains access to LEED Online 
D、    The project will have a Green Rater assigned to the project 
The correct answer is:    C 
 
152、 What are ways to reduce water pollution from stormwater runoff?(Choose 2)    
A、    Rain gardens 
B、    Open grid paving 
C、    Increasing the building footprint 
D、    Impervious concrete hardscapes 
The correct answer is:    AB 
     
153、 What  additional  LEED  certification  could  a  building  earn  if  the  building  has  already  earned  LEED 
Core & Shell?     
A、    LEED for Homes 
B、    LEED Interior Design & Construction (Commercial Interiors) 
C、    LEED Core & Shell post‐certification 
D、    LEED Building Design & Construction (New Construction) 
The correct answer is:    B 
      
154、 What is the baseline water demand of a building?     
A、  The annual installed fixture and fitting water consumption rate 
B、  The annual water rate as determined by water bills 
C、  The annual fixture and fitting water consumption based on the rates from the EPAct 1992 standard 
D、  The amount of graywater and rainwater harvesting a building is planning to use 
The correct answer is:    C 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      63 / 206 
To calculate water consumption in a building, a baseline water demand is compared to an installed design 
case."The baseline demand uses the fixture and flow rates from the EPAct 1992 standard. For example, 
commercial toiletshave 1.6 gallons per flush, commercial urinals have 1.0 gallons per flush. These rates for 
all  toilets,  urinals,  and  faucets  are  used  to  create  a  baseline.    Also  used  is  the  number  of  Full  Time 
Equivalents  (FTEs)  to  determine  how  frequently  the  fixtures  will  be  used."  "The  design  case  water 
consumption (or design demand) calculates the rates based on the higher efficiency fixtures that will be 
installed. For example if waterless urinals are used the design case will calculate them at their zero gallon 
per flush rate. The percent in water savings is determined by dividing the design case by the baseline case 
and subtracting that from the number 1" 
    Example: 
    Baseline case: 100,000 gallons of water / year 
    Design case: 60,000 gallons of water /year 
    60,000/100,000 = 0.6 
    1 ‐0.6 = 0.4 
    Percent reduction = 40% reduction 
      
155、 What is the most environmentally appropriate water to use for flushing a toilet?     
A、    Water from the municipal supply 
B、    Graywater 
C、    Blackwater 
D、    Well water 
The correct answer is:    B 
     
156、 What is the function of the ozone layer?     
A、    Keeps the earth's atmosphere warm 
B、    Prevents smog creation 
C、    Protects the earth from solar wind 
D、    Absorbs ultraviolet light 
The correct answer is:    D 
     
157、 Which of the following are transient occupants? (Choose 2)     
A、    Full time employees 
B、    Part‐time receptionists 
C、    Shift workers 
D、    College students in a classroom 
E、    Shoppers 
The correct answer is:    DE 
 
158、 USGBC was organized and then LEED was created because the green building industry lacked which 
important factor?     
A、    An oversight organization to bring together all parts of the green building industry 
B、    A certification award to encourage interest in the real estate industry 
C、    A standard measurement and definition of green building 
D、    A system and organization to spread green building information 
The correct answer is:    C 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      64 / 206 
     
159、 What  term  refers  to  the  investigation  and  valuation  of  the  environmental  impacts  of  a  given 
product or service caused or necessitated by its existence?     
A、    Durability analysis 
B、    Hard cost 
C、    Soft cost 
D、    Life‐cycle analysis 
E、    Life‐cycle costing 
The correct answer is:    D 
     
160、 Which of the following will have a direct environmental impact?     
A、    Offering rebates on solar systems 
B、    Meeting the project schedule 
C、    Minimizing erosion during construction 
D、    Taking advantage of utility incentives 
The correct answer is:    C 
     
161、 What  will  have  to  be  included  in  the  project  work  if  the  project  is  to  be  considered  a  major 
renovation?     
A、    Complete HVAC overhaul 
B、    Toilet replacements 
C、    Carpet and flooring upgrades 
D、    Installation of a new irrigation system 
The correct answer is:    A 
     
162、 The ASHRAE standards cover which LEED topics? (Choose 3)     
A、    VOC emissions 
B、    Carbon emissions 
C、    Minimum requirements for the energy efficient design of most buildings 
D、    Ventilation rates 
E、    Thermal comfort conditions 
The correct answer is:    CDE 
"ASHRAE  Standard  52.2‐1999  Method  of  Testing  General  Ventilation  Air  Cleaning  Devices  for  Removal 
Efficiency by Particle Size standard for methods for testing air cleaners for 2 performance characteristics: 
the  device's  capacity  for  removing  particles  from  the  air  stream  and  the  device's  resistance  to  airflow; 
MERV  air  filters  ASHRAE  Standard  55‐2004  Thermal  Environmental  Conditions  for  Human  Occupancy 
identifies  the  factors  of  thermal  comfort  and  the  process  for  developing  comfort  criteria  for  a  building 
space  and  its  occupants;  indoor  space  environmental  and  personal  factors  that  will  produce  thermal 
environmental conditions acceptable to 80% of the occupants within a space ASHRAE Standard 62.1‐2007 
Ventilation for Acceptable Indoor Air Quality specifies minimum ventilation rates; these rates are used to 
improve  indoor  air  quality  as  part  of  the  IEQ  credit  category  ASHRAE  Standard  90.1‐2007  establishes 
minimum requirements for the energy efficient design of buildings (not included are single family homes 
or  multifamily  homes  less  than  3  stories)  with  regards  to  the  building  envelope,  HVAC,  service  water 
heating, power, lighting and other equipment." 
     
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      65 / 206 
163、 What urban area is a best choice for a LEED project?    
A、    Areas with a high development density 
B、    Areas that are not previously developed 
C、    Areas with low development density 
D、    Areas with zero development density 
The correct answer is:    A 
     
164、 Water use reduction helps with what other project area?    
A、    Erosion control 
B、    Energy use 
C、    Heat islands 
D、    Plumbing codes 
The correct answer is:    B 
         
165、 Which of the following assists with synergies among prerequisites and credits?     
A、    LEED AP 
B、    LEED Score Card 
C、    USGBC 
D、    LEED Online 
The correct answer is:    A 
         
166、 What does the use of light colored pervious paving help with?    
A、    Construction waste management 
B、    Heat island effect 
C、    Durability 
D、    Irrigation 
The correct answer is:    B 
     
167、 A project design will include the use of native trees for landscaping. What project area would this 
strategy NOT affect?     
A、    Reducing potable water use 
B、    Increasing the use of sustainable materials 
C、    Reducing water for landscaping 
D、    Restoring a previously developed site 
The correct answer is:    B 
     
168、 When should innovative techniques first be addressed for a LEED project?     
A、    Throughout the construction process as new ideas arise 
B、    During the planning process 
C、    When products are ordered 
D、    After the design phase is complete 
The correct answer is:    B 
     
169、 Which of the following statements are true regarding regional priority credits (RPCs)?   
A、    RPCs can be earned by reducing automobile use 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      66 / 206 
B、    RPCs are not new credits; they are 'bonus points' 
C、    RPCs are awarded for using local green power 
D、    RPCs are awarded for locating the project in urban areas 
The correct answer is:    B 
     
170、 What gives the ozone layer legal protection?     
A、    Montreal Protocol 
B、    US DOE 
C、    ASHRAE Standards 
D、    Kyoto Protocol 
The correct answer is:    A 
"According to Treatment by LEED of Environmental Impact of HVAC Refrigerants, the legal protection of 
the  ozone  layer  is  well  in  place  throughout  most  of  the  international  community  via  the  Montreal 
Protocol." Under the Montreal Protocol, CFC production in the United States ended in 1995. To implement 
the Montreal Protocol, the EPA established Section 608 of the EPA Clean Air Act for regulating the use and 
recycling of ozone‐depleting compounds. 
         
171、 The heat island effect can vary temperatures by more than ________.     
A、    15 degrees Fahrenheit 
B、    5 degrees Fahrenheit 
C、    20 degrees Fahrenheit 
D、    10 degrees Fahrenheit 
The correct answer is:    D 
"The heat island effect is created when developed areas have higher temperatures than surrounding rural 
areas. An urban heat island effect is caused by sunlight heating up dark colored surfaces such as roads and 
rooftops.  Huge  quantities  of  heat  are  generated  in  buildings  that  have  dark  rooftops  and  absorb  heat 
rather  than  reflect  it."  LEED  defines  a  heat  island  as  one  whose  temperatures  are  at  least  10  degrees 
higher than those of surrounding suburban or rural areas. 
     
172、 Developing nations banned chlorofluorocarbons under the:     
A、    Montreal Protocol 
B、    Executive Order 95‐231 
C、    EPA Clean Air Act 
D、    Kyoto Treaty 
The correct answer is:    A 
     
173、 What site and/or project characteristics would contribute to maximizing open space?   
A、    Creating a narrow 10 story building instead of a wider 5 story building 
B、    Building next door to a park 
C、    Building on a Greenfield site 
D、    Building on a previously developed site 
The correct answer is:    A 
     
174、 What may happen if a project does not comply with the minimum program requirements? 
A、    Certification may be revoked 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      67 / 206 
B、    The project team will need to submit a CIR 
C、    Additional fees or fines may be incurred 
D、    An alternative compliance path can be used 
The correct answer is:    A 
     
175、 What is an example of climate change?     
A、    A five‐year drought 
B、    An unexpected snowstorm in Phoenix 
C、    A century‐long decrease in temperature by 1 degree 
D、    A significant two‐year increase in wind speeds 
The correct answer is:    C 
     
176、 A multi‐building development has five buildings each on a two‐acre sitE、    How is the LEED project 
boundary determined?     
A、    Each building has the boundary at the edge of the two‐acre area 
B、    The project team determines the boundary 
C、    The boundary is at the edge of the building footprint 
D、    The boundary is at the edge of the ten‐acre area 
The correct answer is:    B 
"LEED  project  boundary:  portion  of  the  project  site  submitted  for  LEED  certification;  for  single  building 
developments,  this  is  the  entire  project  scope  and  is  limited to  the site  boundary;  for  multiple building 
developments,  the  LEED  project  boundary  may  be  a  portion  of  the  development  as  determined  by  the 
project team" 
     
177、 How can projects reduce waste sent to a landfill?  (Choose 2)     
A、    Recycle materials 
B、    Use materials with low lifecycle costs 
C、    Reuse materials 
D、    Use local materials 
The correct answer is:    AC 
     
178、 Which of the following causes depletion of the ozone layer?     
A、    Solar radiation 
B、    Halons 
C、    Heat islands 
D、    Mercury 
The correct answer is:    B 
     
179、 The project team will not meet the threshold requirements of a particular LEED credit. What is the 
proper course of action that the team should take regarding this credit?     
A、    Appeal the credit 
B、    Apply for an exception 
C、    Submit a CIR 
D、    Not include the credit in the final application 
The correct answer is:    D 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      68 / 206 
     
180、 Which items can contribute to Construction Waste Management?(Choose 2)     
A、    Tree stumps 
B、    Brick 
C、    Asbestos flooring 
D、    Sheetrock 
The correct answer is:    BD 
     
181、 What is the difference between HFCs and HCFCs?     
A、    HFCs are slightly less efficient refrigerants than HCFCs 
B、    HFCs are being phased out by the Montreal Protocol while HCFCs are not 
C、    HFCs are natural refrigerants 
D、    HCFCs have a higher global warming potential and higher ozone depletion potential than HFCs 
The correct answer is:    A 
Reference: Treatment by LEED of HVAC Refrigerants 
     
182、 What is at the core of an integrated project?     
A、    Individual rewards 
B、    Working in unison 
C、    Collaborative team members 
D、    Cost‐based decision making 
The correct answer is:    C 
Reference: AIA Integrated Project Delivery 
Integrated projects are based on integrated teams and frequent, collaborative communications. 
     
183、 What can help reduce indoor potable water use?     
A、    Installing reduced‐flow aerators on sinks 
B、    Installing a green roof 
C、    Installing a blackwater system 
D、    Replacing fixtures with salvaged toilets manufactured in 1992 
The correct answer is:    A 
     
184、 Which of the following would not curb automobile use?     
A、    Creating a ride share board 
B、    Setting parking fees at levels to encourage carpooling 
C、    Encouraging street parking 
D、    Creating incentive programs for carpooling 
The correct answer is:    C 
     
185、 Which of the following is a type of biofuel?     
A、    Wind 
B、    Corn oil 
C、    Solar 
D、    Hydro 
The correct answer is:    B 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      69 / 206 
     
186、 Which items are considered pre‐consumer recycled items?     
A、    Demolition debris used on another project 
B、    Steel beams created from metal reclaimed from the manufacturing line 
C、    Cotton insulation manufactured from factory reject denim jeans 
D、    Carpets made from nylon that include scraps from production 
The correct answer is:    C 
     
187、 Which of the following would be classified as a soft construction cost?     
A、    Civil engineer consulting fee 
B、    Down payment on the property 
C、    Purchase of some steel 
D、    Rental of a dumpster 
The correct answer is:    A 
     
188、 What community issues are of primary importance for the project team to research?(Choose 3) 
A、    Local incentives, policies, and regulations that promote green design 
B、    Requirements for parking spaces 
C、    Local voting records on city sales and other taxes 
D、    Building codes 
E、    Availability of RECs 
The correct answer is:    ABD 
     
189、 Which of the following is an example of a source control waste reduction strategy?   
A、    Reusing salvaged materials onsite 
B、    Pre‐ordering materials cut to size 
C、    Using comingled recycling 
D、    Installing recycling bins onsite 
The correct answer is:    B 
     
190、 Which of the following statements is true about innovative design?    
A、    Prerequisites cannot earn innovative design credits 
B、    Coming in under budget and on schedule is innovative design 
C、    Using graywater on a project is innovative design 
D、    Having an integrated project team is innovative design 
The correct answer is:    A 
     
191、 What is submitted to document that the requirements of a credit or prerequisite were met? A、   
CIR 
B、    Letter templates 
C、    Building operating plan 
D、    LEED Scorecard 
The correct answer is:    B 
     
192、 Each LEED 2009 Rating System has ___ regional priority credits specified by zip code and can earn 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      70 / 206 
___ points for this section.     
A、    6, 4 
B、    6, 5 
C、    4, 4 
D、    6, 3 
The correct answer is:    A 
Each rating system has the option of earning 4 regional priority credits out of 6 selected for the project 
site's zip code by USGBC. 
     
193、 An office cubicle that contains post‐consumer aluminum content would contribute to what credit 
area?     
A、    Construction Waste Management 
B、    Certified Materials 
C、    Recycled Content 
D、    Rapidly Renewable Materials 
The correct answer is:    C 
     
194、 What  type  of  residences  have  at  least  15%  more  efficiency  than  the  International  Energy 
Conservation Code?     
A、    LEED Home Silver certified 
B、    EarthCraft 
C、    ComfortWise 
D、    ENERGY STAR 
The correct answer is:    D 
Reference: LEED Homes Glossary 
See www.energystar.gov/homes 
     
195、 How long must an existing building be occupied before the LEED application process may begin for 
LEED for Existing Buildings: Operations and Maintenance certification? 
A、  3 months 
B、  12 months 
C、  The application process can begin as soon as regular occupancy is reached 
D、  6 months 
The correct answer is:    B 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Introduction 
This question is asking about the Existing Buildings: Operations and Maintenance rating system. For this 
rating system, the LEED project must be in a state of typical physical occupancy, and all building systems 
must be operating at a capacity necessary to serve the current occupants, for a period that includes all 
performance  periods  as  well  as  at  least  the  12  continuous  months  immediately  preceding  the  first 
submission  for  a  review.  In  short,  for  Existing  Buildings:  Operations  and  Maintenance  you  must  wait 
twelve  months  after  the  building  is  occupied  before  applying  (not  registering,  applying).  LEED  requires 
this because this provides 12 months worth of utility bills which are needed for measurements. 
 
196、 The  leakage  rate  is  the  speed  at  which  an  appliance  loses  refrigerant,  measured  between 
refrigerants charges or over _____, whichever is shorter.     
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      71 / 206 
A、    12 months 
B、    24 months 
C、    6 months 
D、    18 months 
The correct answer is:    A 
Reference: O&M Glossary 
     
197、 What term refers to a mandatory project characteristic, measurement, quality, value or function as 
identified within the LEED rating system?     
A、    Credit 
B、    Prerequisite 
C、    Certification Requirement 
D、    Minimum Project Requirement 
The correct answer is:    B 
http://www.gbci.org/DisplayPage.aspx?CMSPageID=172#Rating_Systems‐Prerequisites 
     
198、 Sustainable design strategies are effectively implemented only by using a:     
A、    Flexible approach 
B、    Incremental approach 
C、    Conventional approach 
D、    Whole building approach 
The correct answer is:    D 
     
199、 What is the average housing density of a high density development area?     
A、    20 or more dwelling units per acre of buildable land 
B、    7 or more dwelling units per acre of buildable land 
C、    15 or more dwelling units per acre of buildable land 
D、    10 or more dwelling units per acre of buildable land 
The correct answer is:    D 
Reference:  LEED  for  Homes  Rating  System,  Compact  Development  For  residential  areas,  ten  or  more 
dwelling units per acre of buildable land qualify as high density. Seven or more is moderate density, while 
20 or more is very high density. 
     
200、 Which statement is true about CFCs in the United States?    
A、    CFC production in the United States will be phased out by 2030 
B、    CFC production in the United States ended in 1995 
C、    CFC production in the United States will be phased out by 2010 
D、    CFCs are no longer used in the United States 
The correct answer is:    B 
"Under  the  Montreal  Protocol,  CFC  production  in  the  United  States  ended  in  1995.  To  implement  the 
Montreal  Protocol,  the  EPA  established  Section  608  of  the  EPA  Clean  Air  Act  for  regulating  the  use  and 
recycling of ozone‐depleting compounds.""Many refrigeration systems of existing buildings still use CFCs 
in  the  United  States.  For  these  projects,  the  project  team  can  take  5  years  from  project  completion  to 
phase out CFC‐based refrigerants, as long as the annual leakage rate of CFC‐based refrigerants is reduced 
to 5% or less." 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      72 / 206 
     
201、 A preliminary rating would NOT include what item?     
A、    Completed LEED Score Card 
B、    Targeted LEED certification level 
C、    Credits that will be attempted 
D、    Conceptual design 
The correct answer is:    D 
The preliminary LEED rating would include three things: 
1. The targeted LEED award level (Certified, Silver, Gold, or Platinum). 
2. The credits that have been selected to meet the targeted award level. 
3. A completed LEED Score Card to help determine the target certification level. 
         
202、 If a project is not located near mass transit, what might the team do to help reduce automobile use? 
A、    Nothing can be done 
B、    Require employees to use mass transit 
C、    Provide a shuttle to mass transit 
D、    Petition community board for additional transit lines 
The correct answer is:    C 
     
203、 What are acceptable ways to reference USGBC in text?(Choose 2)   
A、    U.S. GBC 
B、    United States Green Building Council 
C、    U.S. Green Building Council 
D、    USGBC 
E、    US Green Building Council 
The correct answer is:    CD 
Reference: USGBC logo guidelines 
     
204、 What statement is true about RECs?     
A、    RECs are sold within a 500 mile radius of the project 
B、    RECs are sold separately from electricity 
C、    RECs may only be sold in locations approved by Green‐e 
D、    RECs can be sold back to an electricity provider through net‐metering 
The correct answer is:    B 
Reference: Guide to Purchasing Green Power "RECs represent the reduced emissions of renewable energy 
compared  to  conventional  fossil  fuels.  RECs  are  sold  separately  allowing  people  to  purchase  the 
'greenness' of the electricity. This allows anyone to purchase an REC even if the power to their building is 
not green power." "RECs have no geographic constraints, because they are sold separately from electricity.   
A  project  in  Maine  can  purchase  RECs  from  any  other  state."  Renewable  Energy  Certificates  (RECs)  are 
synonymous with Green tags, and Tradable Renewable Certificates (TRCs). 
       
205、 What are the purposes of LEED Minimum Program Requirements?(Choose 3)    
A、    Ensure prerequisites are met 
B、    Verify buildings are meeting environmental goals 
C、    Give clear guidance to customers 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      73 / 206 
D、    Protect the integrity of the LEED program 
E、    Reduce certification process challenges 
The correct answer is:    CDE 
Reference: GBCI website, Minimum Program Requirements 
LEED 2009 Minimum Program Requirements 
     
206、 What area would NOT be considered previously developed?     
A、    Site of an old barn 
B、    Railroad yard 
C、    Wetland 
D、    Vacant urban lot 
The correct answer is:    C 
 
207、 On a project with older existing HVAC&R system that uses CFCs, what can the project team do to 
earn LEED certification?     
A、    Replace the CFCs with natural refrigerants 
B、    Replace the CFCs with Halons 
C、    Purchase carbon credits 
D、    Purchase RECs to offset the CFC use 
The correct answer is:    A 
"The project team can replace or retrofit the existing system with one that is CFC‐free, or agree to have a 
phase out plan that is completed 5 years after project completion." 
     
208、 The Green Label Plus certification is used for what material?     
A、    Carpets 
B、    Cleaning products 
C、    Wood 
D、    Floors 
The correct answer is:    A 
         
209、 How can a new building be designed to use no refrigerants?     
A、    The building has a CFC phase‐out plan in place 
B、    The building uses halons for cooling 
C、    The building is cooled with natural refrigerants such as propane or ammonia 
D、    The building uses natural ventilation 
The correct answer is:    D 
     
210、 Which of the following are not alternative fuel vehicles acceptable by LEED?     
A、    Methanol powered truck 
B、    Liquid natural gas powered van 
C、    Diesel powered car 
D、    Gas‐electric hybrid 
The correct answer is:    C 
     
211、 What area is included in the building footprint?    
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      74 / 206 
A、    Stone walkways 
B、    Parking lots made with permeable concrete 
C、    Ponds 
D、    Area of the building structure 
The correct answer is:    D 
     
212、 Which of the following can reduce the volume of recycled materials sent to recycling facilities? 
A、    Using comingled recycling 
B、    Purchasing materials with recycled content 
C、    Installing recycling chutes 
D、    Reusing materials 
The correct answer is:    D 
     
213、 What information should not appear in a CIR?(Choose 2) 
A、    Supporting information 
B、    Background information on the issue 
C、    Confidential information 
D、    Attachments such as photographs, drawings, and product information sheets 
The correct answer is:    CD 
 
214、 What  should  direct  the  activities  of  the  design  team  from  the  pre‐design  stage  through  all 
subsequent stages of the project?     
A、    LEED Reference Guide 
B、    Plumbing codes 
C、    Landscape design 
D、    Refrigerant choice 
The correct answer is:    A 
     
215、 What is the primary benefit of integrated project planning?     
A、    Reducing costs over traditional construction practices 
B、    Achieving the highest LEED rating possible 
C、    Maximizing opportunities for integrated, cost‐effective adoption of green design and construction 
strategies 
D、    Obtaining local, state, and federal incentives for green design and construction strategies 
The correct answer is:    C 
 
216、 What term also means site area?     
A、    Lot 
B、    Building footprint 
C、    Property area 
D、    Development footprint 
The correct answer is:    C 
     
217、 Which of the following would not be included in local zoning / code requirements?   
A、    Minimum parking spaces 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      75 / 206 
B、    Fire supression systems 
C、    Green power 
D、    Open space limits 
The correct answer is:    C 
"Zoning  laws  are  found  in  almost  every  municipality  in  the  United  States,  affecting  land  use,  lot  size, 
building  heights,  density,  setbacks,  landscaping,  exterior  lighting  and  other  aspects  of  property  use 
Building codes are laws or standards established and enforced by local government to address areas such 
as  structural  integrity,  insulation,  plumbing,  HVAC,  electrical,  lighting,  fire  protection,  life  safety,  VIII 
Project Surroundings and Public Outreach" 
     
218、 What is the average LEED certification fee for a project registered by a USGBC member? 
A、    $2,000   
B、    $10,000   
C、    $5,000   
D、    $1,000   
The correct answer is:    A 
Reference: USGBC's LEED FAQs. LEED certification fees vary by project size but the average certification 
cost is $2000. 
         
219、 Which is not a Minimum Program Requirement?     
A、    Uniform site boundary 
B、    Minimum floor area 
C、    Permanent building / space 
D、    Minimum building to site area ratio 
The correct answer is:    A 
     
220、 For the purposes of LEED certification, a project building includes all areas except:    
A、    Parking lots 
B、    An occupied and operational building 
C、    Shared parking structure on a neighboring property 
D、    The grounds around the building 
The correct answer is:    C 
     
221、 What has a long atmospheric life, causing harm to the ozone layer?    
A、    CFC 
B、    NH3 
C、    HC 
D、    HCFC 
The correct answer is:    A 
     
222、 What  tool  provides  cost‐effective  streamlined  certification  processes  for  multiple  building 
certifications?    
A、    ENERGY STAR Target Finder 
B、    LEED Online 
C、    ENERGY STAR Portfolio Manager 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      76 / 206 
D、    USGBC Portfolio Program 
The correct answer is:    D 
         
223、 Construction waste management should address what items?     
A、    Deciding if comingled vs. separate recycling containers will be used 
B、    Identifying where new materials will be purchased from 
C、    Selecting products that have less packaging 
D、    Determining what sustainable materials will be used for construction 
The correct answer is:    A 
     
224、 Why should a project team choose local products for construction?    
A、    Increased source reduction 
B、    Reduced transportation costs and transportation emissions 
C、    Increased durability 
D、    Higher quality materials 
The correct answer is:    B 
 
What  is  a  working  fluid  that  flows  through  a  machine  that  is  designed  to  pump  heat  from  a  lower 
temperature to a higher temperature?     
A、  Potable water 
B、  Graywater 
C、  Green power 
D、  Refrigerants 
The correct answer is:    D 
The  Treatment  by  LEED  of  Environmental  Impact  of  HVAC  Refrigerants  states  that  a  'refrigerant'  is  a 
working fluid that flows through a machine that is designed to pump heat from a lower temperature to a 
higher temperature. 
      
225、 What environmental benefit does green power have?     
A、  Reduced environmental regulation 
B、  Emission reductions 
C、  Stability of electrical prices 
D、  Avoiding electricity blackouts 
The correct answer is:    B 
Reference: See Guide to Purchasing Green Power 
The environmental attributes of green power differ from the financial benefits. Emission reductions are an 
environmental benefit. The other choices are financial benefits. 
         
226、 What information is needed to calculate the SRI of a material? (Choose 2)     
A、  Emissivity 
B、  Albedo factor 
C、  Reflectance 
D、  Thermal gradient 
The correct answer is:    AC 
SRI is calculated by using emissivity and reflectance values. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      77 / 206 
         
227、 What would qualify as preferred parking?     
A、  Visitor drop‐off areas 
B、  Delivery truck parking 
C、  Providing discounted parking passes 
D、  Bicycle parking 
The correct answer is:    C 
"Preferred parking spaces are parking spaces that are closest to the main entrance of a project, but they 
do not include handicapped parking. Other forms of preferred parking include discounted parking passes, 
designated covered spaces, and guaranteed passes in a lottery system."Preferred parking is a strategy by 
LEED to reduce automobile use.   
      
228、 What standard might need to be consulted for increasing building energy performance? 
A、  Green‐e 
B、  ASHRAE 90.1‐2007 
C、  ISO 14020 
D、  SMACNA 
The correct answer is:    B 
ASHRAE 90.1‐2007 is used to measure building energy performance.   
      
229、 Some  door  handles  from  a  renovation  project  were  refurbished  and  reused  onsite.  They  would 
contribute toward all of the following EXCEPT:     
A、  Local materials 
B、  Construction waste management 
C、  Recycled content 
D、  Salvaged materials 
The correct answer is:    C 
"The door handle would be a salvaged material since it was found and used onsite. This material would 
also  be  a  local  material,  and  contribute  towards  construction  waste  management."  Do  not  confuse 
recycled content with salvaged materials. 
         
230、 What defines the density of a nonresidential building?     
A、  Building Footprint / Acre of Buildable Land 
B、  Floor Area / 120,000 sq. ft. 
C、  Site Area / Acre of Buildable Land 
D、  Floor Area / Acre of Buildable Land 
The correct answer is:    D 
Reference: LEED for Homes Rating System, Glossary 
         
231、 What would be included in hard cost estimates? (Choose 2)     
A、  Furniture 
B、  Carpet 
C、  Fire sprinkler system 
D、  Art 
The correct answer is:    BC 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      78 / 206 
Hard costs have to deal with fixed assets. They are directly related to improving real property. Hard costs 
are  the  purchase  price  of  a  hard  asset  such  as  land,  building,  inventory,  equipment  or  machine,  as 
opposed to accounting, banking, financing, or legal cost. "Art and furniture are not fixed assets (they can 
be moved) and are thus not considered in the hard cost calculations. Think of a home. There is the price 
of the home and the price of the furnishings. The furnishings are not included in the price of the home or 
the mortgage because they are not fixed assets." 
 
232、 What are key memebers of an integrated team?(choose 3)       
A、  owner                 
B、  builder                 
C、  architect                 
D、  interior designer                 
E、  cleaner     
The correct answer is:    ABC 
 
233、 What  is  the  minimum  occupancy  rate  required  for  an  Existing  Buildings  O&M  project  (Building 
Operations & Maintenance) to earn certification?    
A、  80% of FTEs 
B、  1 FTE 
C、  Typical physical occupancy 
D、  75% of FTEs 
The correct answer is:    C 
Reference: GBCI website, Policy Manual, Minimum Occupancy Rates 
For O&M the building must be in a state of typical physical occupancy. "For example, a hotel usually has a 
typical occupancy of about 60% of the rooms rented out.    The O&M certification could not be attempted 
until the hotel was at least 60% occupied. If the hotel was just constructed and didn't have any occupants 
the  certification  could  not  be  earned."  "A  school  dormitory  is  another  example.  If  the  dormitory  was 
completed in April but will not be occupied until the fall semester in September, the project is not yet in 
typical occupancy because no students are living in the dorm between April ‐ August." 
         
234、 Which items are considered pre‐consumer recycled content?     
A、  Excavated soil 
B、  Leftover drywall from a renovation 
C、  Magazine overruns 
D、  Wooden pallets used by a shipping company 
The correct answer is:    C 
Print overruns are considered pre‐consumer recycled content. Pallets are post‐consumer waste since the 
shipping company did not manufacture them (they used them, they did not make them). 
         
235、 What two terms mean the same thing?    (Choose 2)     
A、  Albedo 
B、  SRI 
C、  Heat island 
D、  Solar reflectance 
E、  Emissivity 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      79 / 206 
The correct answer is:    AD 
"Solar reflectance (aka albedo) is a measure of a material's ability to reflect sunlight (including the visible, 
infrared, and ultraviolet wavelengths) on a scale of 0 to 1. An albedo value of 0.0 indicates that the surface 
absorbs all solar radiation, and a 1.0 albedo value represents total reflectivity." 
         
236、 What environmental issue is associated with refrigerants used in HVAC&R systems? 
A、  Pollution of water bodies 
B、  Damage to the Earth's ozone layer 
C、  Increased air pollution 
D、  Increased use of fossil fuels 
The correct answer is:    B 
Reference: Treatment by LEED of HVAC Refrigerants 
"Refrigerants  have  ozone  depletion  potential  (ODP)  and  global  warming  potential  (GWP)  due  to 
greenhouse gas emissions. Low values of each are best for refrigerant choices." 
         
237、 A site described as accessible means the site meets the requirements of which standard? 
A、  AIA 
B、  USGBC 
C、  GBCI 
D、  ADA 
The correct answer is:    D 
See GBCI reference document ‐ FCR ‐ ADA standards for assessable design 
AIA: American Institute of Architects 
"ADA:  This  document  contains  scoping  and  technical  requirements  for  accessibility  to  sites,  facilities, 
buildings, and elements by individuals with disabilities.    The requirements are to be applied during the 
design, construction, additions to, and alteration of sites, facilities, buildings, and elements to the extent 
required  by  regulations  issued  by  Federal  agencies  under  the  Americans  with  Disabilities  Act  of  1990 
(ADA)." 
     
238、 What are attributes of native plants? (Choose 2)     
A、  Require less fertilizer 
B、  Require less sunlight 
C、  Require less pesticides 
D、  Require less pruning 
The correct answer is:    AC 
"Native  plants  are  those  that  grow  naturally  in  an  area,  or  that  have  been  in  an  area  for  many  years. 
Native plants require less water, fertilizer, and pest control. These plants can be trees, shrubs, flowers, or 
grasses. Adaptive plants are non‐native plants that perform well in the local climate. Native and adaptive 
plants  require  less  water,  and  are  more  disease  resistant  because  they  are  suited  to  the  region's  usual 
rainfall, soil, and temperature." Sunlight is dependent on the plant requirements, as is pruning. 
         
239、 How many points are listed for prerequisites on the LEED Scorecard?     
A、  0 
B、  1 
C、  2 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      80 / 206 
D、  18 
The correct answer is:    A 
Prerequisites are required and are not assigned any points. 
      
240、 What is a natural conflict between the prevention of ozone depletion and global warming?   
A、  Refrigerants that are neutral to the ozone layer are less efficient 
B、  Refrigerants that deplete the ozone layer are less efficient 
C、  Global warming is caused by ozone layer gases 
D、  Global warming gases are used in refrigerants 
The correct answer is:    A 
"See  Treatment  by  LEED  of  Environmental  Impact  of  HVAC  Refrigerants.  If  a  cooling  system  achieves 
greater efficiency only at the environmental price of using a chlorine‐containing refrigerant, an inevitable 
environmental conflict exists." 
         
241、 What type of fixture can earn EPA's WaterSense label?     
A、  Washing machine 
B、  Showerhead 
C、  HET dual flush toilet 
D、  Dishwasher 
The correct answer is:    C 
Reference: EPA WaterSense 
WaterSense  helps  consumers  identify  water  efficient  fixtures.  Only  toilets  and  faucets  can  earn  the 
WaterSense label at this time."Showerheads are in the process of being added to the certification process. 
On  August  30,  2007,  EPA  issued  a  notification  of  intent  to  develop  a  specification  for  showerheads. 
WaterSense anticipates establishing a single maximum flow rate between 1.5 gpm and 2.0 gmp." 
 
242、 What is the heat island effect? 
A、  The absorption of heat by dark surfaces and its radiation to surrounding areas 
B、  The differences in air quality caused by the burning of fossil fuels 
C、  The reflection of heat in urban areas to the surrounding countryside 
D、  The increase in humidity in urban areas caused by stormwater runoff 
The correct answer is:    A 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
Refers to the absorption of heat by hardscapes, such as dark, nonreflective pavement and buildings, and 
its radiation to surrounding areas. Particularly in urban areas, other sources may include vehicle exhaust, 
air‐conditioners,  and  street  equipment;  reduced  airflow  from  tall  buildings  and  narrow  streets 
exacerbates the effect. (USGBC) 
 
243、 Who can use the USGBC logo? 
A、  Only organizations that have received approval by the USGBC marketing department 
B、  Any USGBC member 
C、  Any LEED AP 
D、  Any USGBC member or USGBC chapter 
The correct answer is:    A 
Use of the USGBC logo is granted through their marketing department. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      81 / 206 
This question pertains to exam objective I.P USGBC Policies (e.g., trademark usage; logo usage) from the 
LEED GA Candidate Handbook. While we receive many comments about the relevance of these types of 
questions, the subject matter may come up on your exam. 
The use of the USGBC and LEED logos are listed in the exam objectives to prevent misuse of these logos 
and to purposely or inadvertently spread incorrect information about LEED and USGBC. It is important to 
know how you can and cannot use the logo so that you help the green building movement rather than 
hinder it. 
The USGBC logo cannot be used to link to third‐party websites or for product certification. 
The  USGBC  Member  logo  is  used  to  denote  USGBC  membership,  not  the  USGBC  logo.  The  USGBC  logo 
cannot be used to indicate membership ‐ the USGBC member logo is required to be used. There is both a 
USGBC logo and a USGBC member logo, both of which have differing uses and requirements. 
USGBC members must use the USGBC member logo. 
USGBC chapters use the USGBC chapter logo. 
LEED APs do not use the USGBC logo to designate they are a LEED AP. 
 
244、 Which  of  the  following  strategies  have  earned  innovation  in  design  /  operations  in  the 
past?(Choose 2)     
A、  Organic Cafeteria Plan 
B、  Green Parking 
C、  Educational Outreach Program 
D、  High Volume Fly Ash 
The correct answer is:    CD 
Reference: ID Credit Guidance 
SG: Types of strategies that are indicative of Innovation in Design are: 
• Developing an educational outreach program 
• Using a greenhouse gas budget to demonstrate carbon neutral design and operations 
• Incorporating high levels of fly ash in concrete to divert waste materials from landfills" 
     
245、 What is the benefit of installing bicycle racks?     
A、  Reducing heat islands 
B、  Innovation in Design 
C、  Reducing automobile use 
D、  Communitiy connectivity 
The correct answer is:    C 
Bicycle  use  is  one  of  the  ways  to  promote  alternative  modes  of  transportation  in  the  Sustainable  Sites 
section. 
         
246、 What are the life cycle costing benefits of a vegetated roof? (Choose 2)     
A、  Reduced heat islands 
B、  Longer product life 
C、  Reduction in storm water runoff 
D、  Lower maintenance costs 
The correct answer is:    BD 
Life  cycle  costing  is  used  to  evaluate  economic  performance  and  takes  into  account  operational  and 
maintenance costs throughout the life of the product. Reducing stormwater runoff and heat islands are 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      82 / 206 
environmental benefits which would be determined by life‐cycle analysis (environmental analysis). 
         
247、 If a refrigeration system is inefficient, what is the indirect impact?     
A、  Decreased green house gas emissions 
B、  Increased energy consumption 
C、  Decreased water use 
D、  Increased heat islands 
The correct answer is:    B 
Reference: Treatment by LEED of HVAC Refrigerants 
"Systems  with  low  efficiency  will  have  an  INDIRECT  impact  through  increased  energy  use.  Increased 
energy use generates additional CO2 emissions due to electricity consumption." 
         
248、 What has the lowest priority in building design?     
A、  Plumbing codes 
B、  Building codes 
C、  Fire protection codes 
D、  LEED Rating System 
The correct answer is:    D 
"Although  the  LEED  Rating  System  is  critical  to  a  successful  green  building  project,  all  local,  state,  and 
federal codes and regulations have precedent over any LEED standards. A project team can't ignore local 
codes in favor of a green building strategy. Both must be addressed." Certain locales have their own set of 
green codes, which must be addressed as well. 
         
249、 How can the site boundary differ from the LEED project boundary?    
A、  The  site  boundary  is  the  portion  of  the  site  submitted  for  LEED  while  the  LEED  project  boundary 
marks where the LEED project ends 
B、  They can be the same, but site boundary includes only the area submitted for LEED 
C、  The  site  boundary  is  the  property  line  while  the  LEED  project  boundary  the  portion  of  the  site 
submitted for LEED 
D、  They are exactly the same 
The correct answer is:    C 
USGBC Definition of LEED project boundary ‐ portion of the project site submitted for LEED certification. 
For  single  building  developments,  this  is  the  entire  project  scope  and  is  generally  limited  to  the  site 
boundary ‐ they are not necessarily the same thing." 
 
250、 Natural refrigerants are not as effective as refrigerants like HCFCs, so it requires more energy. For 
which purpose it requires more energy? 
A、    To achieve the same amount of cooling 
B、    To achieve the same amount of heating 
C、    To achieve the same amount of energy 
D、    To achieve the same amount of ozone depletion 
E、    To achieve the same amount of global warming 
The correct answer is:    A 
Natural refrigerants are not as effective as refrigerants like HCFCs, so it requires more energy to achieve 
the same amount of cooling. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      83 / 206 
 
251、 Energy efficiency and occupant comfort go hand in hanD、    A building that provides task lighting 
allows  its  occupants  to  control  the  amount  of  lighting  they  need  to  work.  How  can  you  get  the  better 
productivity? 
A、      By better arrangement 
B、      By proper decoration 
C、      By better lighting 
D、      By proper reflection 
E、      By creating a shield 
The correct answer is:    C 
Energy efficiency and occupant comfort go hand in hand.    A building that provides task lighting allows its 
occupants  to  control  the  amount  of  lighting  they  need  to  work.  Better  lighting  results  in  better 
productivity. 
 
252、 What types of land is NOT considered previously developed?     
A、  Site of an old drive‐in theatre 
B、  Farmland 
C、  Graded site that has grown over with grass 
D、  Tree mill 
The correct answer is:    B 
Reference: LEED for Homes Glossary "Previously developed land has pre‐existing paving, construction, or 
significantly  altered  landscapes.  Land  that  has  been  altered  and  turned  into  a  natural  use  such  as 
agricultural, forestry, or nature preservation does not count." 
         
253、 When does a successful integrated project begin?     
A、  At the project handover 
B、  In the construction phase 
C、  After occupancy 
D、  In the design phase 
The correct answer is:    D 
Reference:  AIA  Integrated  Project  Delivery  "Successful  integrated  projects  will  begin  in  the  pre‐design 
phase when all team members get together and discuss the project's vision, the projects green building 
goals, the technologies and strategies that will be used, etc. When projects wait until later phases to start 
integrated,  its  often  too  late  and  becomes  much  more  expensive.  The  reason  green  buildings  perform 
better is because the systems are integrated and work together to achieve maximum benefits." 
         
254、 Which of the following are NOT strategies to reduce construction waste?     
A、  Sell unused materials 
B、  Maximize the building footprint 
C、  Use salvaged materials 
D、  Use recycled materials 
The correct answer is:    B 
To  reduce  construction  waste,  divert  any  unused  materials  from  the  waste  stream‐namely,  landfills  and 
incinerators. Materials can be donated, sold, or recycled, to keep them out of landfills and to help reduce 
the demand for virgin materials. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      84 / 206 
     
255、 What does the Montreal Protocol ban?     
A、  Coal‐fired power plants 
B、  Incandescent light bulbs 
C、  Mercury in light bulbs 
D、  CFCs 
The correct answer is:    D 
Chlorofluorocarbons (CFCs) are now banned under the Montreal Protocol. Refer to the Treatment by LEED 
of  Environmental  Impact  of  HVAC  Refrigerants.  Under  the  Montreal  Protocol,  CFC  production  in  the 
United States ended in 1995. To implement the Montreal Protocol, the EPA established Section 608 of the 
EPA Clean Air Act for regulating the use and recycling of ozone‐depleting compounds. 
 
256、 HVAC system is used to                 
A、  generate process energy from low temperature to high temperature           
B、  generate thermal energy from low temperature to high temperature           
C、  reduce light pollution                 
D、  reduce landscaping water use   
The correct answer is:    B 
         
257、 What should a project's budget include?     
A、  Project goals 
B、  Building program 
C、  Lifecycle cost analysis 
D、  Statement of work 
The correct answer is:    C 
Reference: Sustainable Building Technical Manual Part II 
"Whole building design looks at the project over its lifetime, so a lifecycle cost analysis helps define the 
long‐term  operations  and  maintenance  costs.  For  example,  if  a  Carpet  A  costs  $10,000  but  only  lasts  5 
years,  and  Carpet  B  costs  $20,000  but  lasts  20  years,  Carpet  B  is  a  better  choice  because  it  has  lower 
lifecycle costs." 
      
258、 What are acceptable ways to reference LEED in product literature? (Choose 2)     
A、  ABC  Bamboo  flooring  complies  with  all  requirements  of  MR  Credit  6  Rapidly  Renewable  Materials 
under LEED 
B、  ABC Bamboo flooring is a LEED product 
C、  ABC Bamboo flooring contributes to satisfying MR Credit 6 Rapidly Renewable Materials under LEED 
D、  ABC Bamboo flooring is LEED qualified product 
E、  ABC Bamboo flooring complies with MR Credit 6 Rapidly Renewable Materials 
The correct answer is:    AC 
Reference: USGBC logo guidelines 
Exam objective I.P addresses USGBC policies include trademark and logo usage. "This question asks about 
how  LEED  can  be  used  by  various  parties/organizations  when  referenced  in  product  literature. 
Manufacturers are allowed to say certain things regarding their products and how they can be used for 
LEED credits. Claiming that product is 'LEED certified' for example is wrong." 
      
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      85 / 206 
259、 A project will include underground parking. This change can have a positive impact on what issue?   
A、  Community connectivity 
B、  Pedestrian access 
C、  Heat island effect 
D、  Parking capacity 
The correct answer is:    C 
The heat island effect would be reduced because the parking has been moved underground. The parking 
capacity would remain unchanged. Pedestrian access to the surrounding buildings and services would not 
be  affected."The  heat  island  effect  is  created  when  developed  areas  have  higher  temperatures  than 
surrounding rural areas. An urban heat island effect is caused by sunlight heating up dark colored surfaces 
such  as  roads  and  rooftops.  Huge  quantities  of  heat  are  generated  in  buildings  that  have  dark rooftops 
and absorb heat rather than reflect it." LEED defines a heat island as one whose temperatures are at least 
10 degrees higher than those of surrounding suburban or rural areas. 
      
260、 If an HVAC engineer is a LEED AP and also a principle participant on a project, what type of credit 
can be earned??     
A、  Innovation in Design 
B、  Platinum 
C、  Quantifiable 
D、  Bonus 
The correct answer is:    A 
Projects can earn one Innovation in Design point (and only one) for having at least one principle on the 
project that is a LEED AP. 
      
261、 Which of the following does NOT help achieve a water‐efficient landscape?     
A、  Micro misters 
B、  Planting with native plants 
C、  Alternative mowing 
D、  Green roof 
The correct answer is:    D 
Alternative  mowing,  micro  misters,  and  native  plants  are  all  strategies  to  reduce  the  quantity  of  water 
needed for irrigation. A green roof does not necessarily reduce water needs. 
      
262、 What should potable water be used for?     
A、  Cooling towers 
B、  Irrigation 
C、  Flushing toilets 
D、  Drinking 
The correct answer is:    D 
"Potable  water  meets  or  exceeds  EPA's  drinking  water  standards.  Potable  water  can  be  used  for  any 
purpose, though the intent of the water efficiency credits is to reduce the use of potable water." 
      
263、 What are attributes of open space? (Choose 2)     
A、  Open space has been previously developed 
B、  Open space is pervious 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      86 / 206 
C、  Open space is 100 ft. beyond the building perimeter 
D、  Open space is shaded 
E、  Open space is vegetated 
The correct answer is:    BE 
Open space are the ground areas that are vegetated and pervious. Green roofs can be considered open 
space  but  only  for  urban  areas.  For  the  purposes  of  LEED,  open  space  is  the  property  area  minus  the 
development footprint, when local zoning does not define open spacd. 
      
264、 Which of the following are NOT LEED Rating Systems?     
A、  LEED for Schools 
B、  LEED for Neighborhood Development 
C、  LEED for Retail 
D、  LEED for Warehouses 
The correct answer is:    D 
LEED for Warehouses does not exist. 
      
265、 Who decides if wastewater from showers can be used for irrigation?     
A、  Universal plumbing code 
B、  USGBC via the CIR process 
C、  Local authorities with jurisdiction in the area 
D、  Project team 
The correct answer is:    C 
Reference: USGBC Glossary 
"Blackwater  does  not  have  a  single  definition  accepted  nationwide.  Adjacent  cities  may  have  different 
codes  that  allow  or  prohibit  the  use  of  sink/shower  water  for  non‐potable  uses.  On  jurisdiction  may 
define sink/shower water as blackwater and not permit its use, while another may define it as graywater 
and  will  permit  its  use.  Review  local  codes  before  making  design  decisions  based  on  the  use  of 
wastewater." 
      
266、 What is a way LEED encourages the purchase and use of low‐emitting and fuel‐efficient vehicles? 
A、  Setting up a carpool notification system 
B、  Locating the project in a densely developed neighborhood 
C、  Implementing car share membership 
D、  Providing discounted parking passes, if parking fees exist 
The correct answer is:    D 
Discounted  parking  passes  given  to  the  owners  of  these  vehicles  may  encourage  their  purchase  by 
offsetting  any  parking  costs.  "Locating  the  project  in  a  densely  developed  neighborhood  helps  channel 
development  to  urban  areas  with  existing  infrastructure,  protect  greenfields  and  preserver  habitat  and 
natural resources." 
      
267、 What does ASHRAE 55‐2004 specify?     
A、  Commuting surveys 
B、  Energy performance 
C、  Thermal comfort 
D、  Indoor air quality 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      87 / 206 
The correct answer is:    C 
"ASHRAE  55‐2004  Thermal  Environmental  Conditions  for  Human  Occupancy  help  with  defining  what 
makes a comfortable indoor environment for occupants. Indoor conditions are considered acceptable if 
80% or more of occupants find them acceptable." 
      
268、 How can regional priority credits be earned?     
A、  Using 100% native plants for the site's landscaping 
B、  Developing an educational or training system that addresses local building issues 
C、  Using materials that are located within 500 miles of the project site 
D、  Addressing green measures or strategies that are more important to a climate or region 
The correct answer is:    D 
Regional credits are bonus points awarded for addressing needs specific to a region. 
      
269、 What credit category is given the greatest weighting?     
A、  Water Efficiency 
B、  Materials and Resources 
C、  Sustainable Sites 
D、  Energy and Atmosphere 
The correct answer is:    D 
The Energy and Atmosphere category has the most points available and the most environmental impact. 
      
270、 What resources are available to team members to find more information about other LEED projects?
  (Choose 2)     
A、  USGBC publications 
B、  USGBC's monthly magazine 
C、  LEED Online 
D、  USGBC Chapters 
The correct answer is:    AD 
Reference: USGBC website 
USGBC  publications  provide  information  about  LEED  projects.  USGBC  Chapters  are  local  resources  that 
help spread the word about LEED. USGBC has no monthly magazine. LEED Online is for use by the project 
team and does not contain information about other projects. 
      
271、 What will NOT help with water efficient landscaping?     
A、  Planting native plants 
B、  Creating a sediment basin 
C、  Mulching around plants 
D、  Xeriscaping 
The correct answer is:    B 
A sediment basin is useful strategies for stormwater management, but is not used to reduce water use in 
landscaping. 
      
272、 What information can be entered in the LEED Score Card?     
A、  USGBC Member ID 
B、  Certification estimate 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      88 / 206 
C、  Points attempted for prerequisites 
D、  If the credit will be streamlined 
The correct answer is:    B 
Reference: Any LEED v2009 Score Card 
 
273、 There are some credits that can earn exemplary performancE、    Reducing which of the following 
the heat will be reduced? 
A、  Heat island effect 
B、  Insulation effect 
C、  Hvac effect 
D、  Iqe effect 
The correct answer is:    A 
Reducing the heat island effect the total amount of heat will be decreased.   
 
274、 What is the greatest savings associated with water efficiency in most buildings?     
A、  Reduced maintenance costs 
B、  Reduced dependence on municipal water supplies 
C、  Keeping contaminants at safe levels in reservoirs and aquifers 
D、  Reduced energy costs 
The correct answer is:    D 
"Energy  is  used  to  heat,  cool,  and  distribute  water  within  a  building.  Water  heating  in  commercial 
buildings accounts for 15% of total energy use (CBECS). Reducing the quantity of water used has a direct 
impact  on  the  energy  it  takes  to  heat,  cool,  and  distribute  the  water."  Municipal  energy  is  also  saved 
because less water must be treated at sewage plants. 
      
275、 LEED Minimum Project Requirements prohibit gerrymandering. What does this mean? 
A、  Hiding project costs in ROI calculations 
B、  Defining the site area to exclude green space between campus projects 
C、  Adjusting a project boundary for the benefit of earning credits/prerequisites 
D、  Making the project building area < 2% of the site area 
The correct answer is:    C 
Reference: GBCI website, Minimum Project Requirements 
"Gerrymandering  is  prohibit:  'The  boundary  may  not  unreasonably  exclude  sections  of  land  to  create 
boundaries in unreasonable shapes for the sole purpose of complying with prerequisites or credits'." 
      
276、 What amount of parking will encourage alternative transportation and maximize open space? 
A、  Enough for parking for FTE building occupants 
B、  The minimum amount required by any local code 
C、  Enough parking to handle peak occupant demand 
D、  25% less parking spaces than peak load 
The correct answer is:    B 
"Maximizing  open  space  requires  less  parking.  Providing  carpool  programs,  shuttle  services,  etc.  While 
providing no more parking spaces as required by local code helps encourage alternative transportation." 
For the purposes of LEED, open space is the property area minus the development footprint, when local 
zoning does not define open space. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      89 / 206 
      
277、 If local code permits, what types of water should be used for flushing toilets? (Choose 2)   
A、  Well water 
B、  Graywater 
C、  Stormwater 
D、  Dishwasher water 
The correct answer is:    BC 
Reference: USGBC Glossary 
Waste water from toilets and urinals is considered blackwater and cannot be used for irrigation (unless it 
has  been  treated  first).  Graywater  is  defined  by  the  Uniform  Plumbing  Code  (UPS)  as  untreated 
house‐hold wastewater which has not come into contact with toilet waste or kitchen sinks. Some states 
and local codes have other definitions. Graywater includes used water from bathtubs, showers, bathroom 
wash  basins,  and  water  from  clothes‐washer  and  laundry  tubs.  Dishwasher  water  is  considered 
blackwater (by most jurisdictions), and cannot be used without being treated first. 
      
278、 How is the quantity of locally harvested and manufactured materials used on a project calculated? 
A、  By the materials' proportion of cost 
B、  By the number of board feet 
C、  By the materials' average distance from the project site 
D、  By the amount of leftovers diverted from landfills 
The correct answer is:    A 
Regional materials are calculated based on the proportional (percent) cost of all materials' total value.   
      
279、 What should be used during all project phases to verify the green building goals are being met? 
A、  Materials checklist 
B、  Commissioning plan 
C、  ID Credit Catalog 
D、  LEED Score Card 
The correct answer is:    D 
"The  LEED  Score  Card  is  the  quick  list  of  what  credits  the  project  team  has  decided  to  pursue  in  the 
pre‐design phase, based on the project vision and the project's green building goals." Through each phase 
this checklist is consulted to ask 'are we on track and are we working towards meeting those credits we 
set out to do?' The commissioning plan is  used to verify the installed systems are working as designed. 
The  ID  Credit  Catalog  is  a  list  of  all  ID  credits  previous  projects  have  achieved.  The  materials  checklist 
would be used by contractors to purchase materials needed for the project. 
      
280、 What type of plants should be used on a green roof?    
A、  Tall plants that provide shade 
B、  Plants with high watering needs 
C、  Native plants 
D、  Lightweight plants 
The correct answer is:    C 
The  vegetation  for  a  green  roof  should  use  native  plants,  just  like  the  rest  of  the  project  landscape.   
"Native  plants  are  those  that  grow  naturally  in  an  area,  or  that  have  been  in  an  area  for  many  years. 
Native plants require less water, fertilizer, and pest control. These plants can be trees, shrubs, flowers, or 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      90 / 206 
grasses.  Adaptive  plants  are  non‐native  plants  that  perform  well  in  the  local  climate.    Native  and 
adaptive plants require less water, and are more disease resistant because they are suited to the region's 
usual  rainfall,  soil,  and  temperature.  "  "Green  roofs  help  reduce  heat  islands.  They  also  help  provide 
greater  insulation  of  the  roof  to  reduce  energy  consumption,  and  they  have  a  longer  life‐cycle  than 
traditional roofs." 
      
281、 What landscaping strategy will best eliminate the need for irrigation?     
A、  Mulching 
B、  Micro‐irrigation 
C、  Drip irrigation 
D、  Xeriscaping 
The correct answer is:    D 
Xeriscaping is a landscaping method that employs drought‐resistant plants to minimize or eliminate water 
use. Micro‐irrigation and drip irrigation are both irrigation techniques. Mulching helps retain moisture for 
plants, but it is not the BEST strategy from the choices given. 
      
282、 What is the most common way to meet the requirements of off‐site renewable energy? 
A、  Obtaining energy from a geothermal system 
B、  Installing a rooftop photovoltaic array 
C、  Purchasing RECs 
D、  Directly purchasing green power from local utility companies 
The correct answer is:    C 
"The most common way (according to LEED) of meeting the requirements of off‐site renewable energy is 
by  purchasing  RECs.  Many  local  utility  companies  currently  are  either  closed  markets  or  do  not  offer 
renewable  alternatives."  Photovoltaic  arrays  and  geothermal  systems  are  types  of  on‐site  renewable 
energy. "RECs represent the reduced emissions of renewable energy compared to conventional fossil fuels. 
RECs are sold separately allowing people to purchase the 'greenness' of the electricity. This allows anyone 
to  purchase  an  REC  even  if  the  power  to  their  building  is  not  green  power."  RECs  have  no  geographic 
constraints, because they are sold separately from electricity. A project in Maine can purchase RECs from 
any other state. 
      
283、 A Green Education program is widely known as an innovative strategy worthy of an ID point in the 
LEED rating systems. What characteristics does this program display that must be present in all innovative 
performance strategies? (Choose 2)     
A、  Quantifiable 
B、  Comprehensive 
C、  Rare 
D、  Unique 
The correct answer is:    AB 
Reference: ID Credit Guidance 
ID  credits  must  be  comprehensive  and  quantifiable.  "Comprehensive:  The  strategy  must  be  used 
everywhere  throughout  the  project,  where  possible.  For  example,  if  a  new  material  could  be  used  in 
every floor of a building, the project team can't use it in just one floor." Quantifiable: The strategy must 
be measurable. How much environmental benefit did the strategy achieve? 
      
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      91 / 206 
284、 What tool is used to determine the target certification level?     
A、  LEED Online 
B、  EPA's Target Finder 
C、  LEED Score Card 
D、  CIR 
The correct answer is:    C 
The LEED Scorecard helps teams decide what credits to achieve. 
      
285、 What site features are included in the landscape area?     
A、  Paved bicycled path 
B、  Area with invasive plants 
C、  Walkway made of recycled rubber tires 
D、  The building 
The correct answer is:    B 
The  landscape  area  of  the  site  is  the  total  site  area  less  the  building  footprint,  hardscape  area,  water 
bodies,  etc.  Even  though  the  area  includes  invasive  plants  which  are  undesirable,  they  must  still  be 
included in the calculation. Invasive plants should be removed if possible.   
      
286、 What  important  documents  should  be  created  for  the  purpose  of  selecting  the  design 
team?(Choose 2)     
A、  Bidding documents 
B、  Operations and maintenance manuals 
C、  Statement of work 
D、  Request for qualifications 
The correct answer is:    CD 
Reference: Sustainable Building Technical Manual Part II, pg. 6 
"From  the  guide:  'The  Statement  of  Work  (SOW)  includes  the  project  criteria,  including  green  building 
issues.    The Request for Qualifications (RFQ) identifies the skills required for participation in the project, 
including green building expertise.'" 
      
287、 LEED Online can be used for all of the following except:     
A、  Accessing online reference guides 
B、  Submit technical inquiries regarding LEED Credits 
C、  Document compliance with LEED Credit Requirements 
D、  Managing public facing project details 
The correct answer is:    A 
Reference: leedonline.com introduction page 
Reference guides are not available in LEED Online 
Using LEED Online you can: 
    ‐Submit documentation to USGBC for review 
    ‐Document compliance with LEED Credit Requirements 
    ‐Coordinate resources among project team members 
    ‐Manage public facing project details 
    ‐Submit technical inquiries regarding LEED Credits 
    ‐Track progress towards LEED Certification 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      92 / 206 
      
288、 What does the global warming potential measure?     
A、  Harm done by refrigerants to the ozone layer 
B、  Embodied energy of a refrigerant 
C、  Lifespan of refrigerants 
D、  Chemical contribution to global warming 
The correct answer is:    D 
See The Treatment of LEED of the Environmental Impact of HVAC Refrigerants reference materials, page iv. 
      
289、 Which projects would NOT be eligible for LEED certification? (Choose 2)     
A、  An existing building project that reduces CFC‐based refrigerants by 95% prior to submitting the LEED 
application 
B、  A new building project that uses CFC‐based refrigerants 
C、  A new building project that uses no refrigerants 
D、  A new building project that uses hydrocarbons (HCs) as refrigerants 
E、  An existing building project that phases out the use of CFC‐based refrigerants no later than 5 years 
after the project is completed 
The correct answer is:    AB 
New buildings cannot use CFC‐based refrigerants. This is called Fundamental Refrigerant Management in 
LEED."For existing buildings with CFC‐based refrigerants, a phase out plan must be in place that eliminates 
all CFC‐based refrigerants within 5 years of project completion. For such projects, the refrigerant leakage 
rate must be reduced to no more than 5% each year." Hydrocarbons (HCs) are a category of refrigerants 
called  natural  refrigerants,  such  as  Propane,  Butane,  Ammonia  (NH3),  etc.The  use  of  no  refrigerants  is 
preferred, when possible. 
      
290、 What design decisions would help reduce the quantity or improve the quality of stormwater runoff?
     
A、  Replacing all roads and hardscapes with impervious asphalt 
B、  Using drip lines for irrigation 
C、  Adding a constructed wetland 
D、  Placing the building next to a park or other natural area 
The correct answer is:    C 
Adding  constructed  wetlands  reduces  the  quantity  of  stormwater  runoff  by  providing  a  location  for  the 
stormwater to collect. Using drip lines vs. conventional irrigation does not impact stormwater. However 
the  source  of  the  water  for  irrigation  is  important  ‐  potable  vs.  stormwater  or  graywater.  Placing  the 
building next to a park or natural area does not address the issue.   
      
291、 In an integrated design approach, when does the green building process end?     
A、  At the design phase 
B、  At the construction phase 
C、  At the bidding phase 
D、  At final occupancy 
The correct answer is:    D 
Reference: Sustainable Building Technical Manual Part II 
"The  extra  phases  of  green  building  begin  in  the  pre‐design  and  end  at  final  occupancy.  The  integrated 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      93 / 206 
team  doesn't  meet  just  once  in  the  design  phase;  they  communicate  throughout  the  entire  project  to 
ensure that the green goals are being met." 
      
292、 What types of green energy qualify as green power for LEED projects?     
A、  Energy reductions 
B、  On‐site renewable energy 
C、  Using no refrigerants 
D、  Renewable energy certificates 
The correct answer is:    D 
Reference: Guide to Purchasing Green Power 
    Green power off‐site generated power. 
    Green power is not generated on site (that is called on‐site renewable energy). 
    RECs can be purchased to show green power is used for the building's energy supply. 
      
293、 What should be included in a construction waste management plan?     
A、  The percent of recycled materials 
B、  Erosion control 
C、  Where construction debris will be diverted 
D、  Asbestos removal 
The correct answer is:    C 
The plan should include the goals of the team as well as what will be diverted, where to, and by whom. 
Hazardous waste is not included and must be disposed of based on local codes. 
      
294、 What best defines non‐potable water?     
A、  Water obtained from rainwater harvesting 
B、  Water that is not treated to drinking water standards 
C、  Reclaimed water 
D、  Recycled water from a municipal supply 
The correct answer is:    B 
Non‐potable water is water that is not treated to drinking water standards and is not meant for human 
consumption. 
      
295、 Cardboard boxes that are collected at curbside pickups or from an onsite comingled recycling area 
are examples of what materials?     
A、  Recycled materials 
B、  Durable materials 
C、  Remanufactured materials 
D、  Salvaged materials 
The correct answer is:    A 
Reference: See O&M Glossary 
      
296、 Green  power  refers  to  electricity  products  that  include  significant  proportions  of  electricity 
generated from energy resources that     
A、  Come from hydroelectric sources 
B、  Are environmentally preferable 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      94 / 206 
C、  Are greenhouse gas neutral 
D、  Have zero emissions 
The correct answer is:    B 
Reference: Guide to Purchasing Green Power 
Green  power  is  synonymous  with  renewable  energy.  "The  term  'green  power'  refers  to  electricity 
products that include significant proportions of electricity generated from energy resources that are both 
renewable and environmentally preferable." (such as an on‐site photovoltaic system). 
      
297、 Which vehicle is NOT considered an alternative‐fuel vehicle by the LEED Rating Systems? 
A、  Vehicle that run on liquid natural gas 
B、  Efficient gas‐electric hybrid 
C、  Vehicle that have achieved a minimum green score of 40 
D、  Vehicle that gets 40 mpg 
The correct answer is:    D 
Alternative‐fuel  vehicles  use  nongasoline  fuels  such  as  electricity,  hydrogen,  etc.  Efficient  gas‐electric 
hybrids are also included in this group. 
      
298、 If  a  building  has  already  earned  LEED  for  New  Construction  certification,  what  additional 
certifications could the project earn? (Choose 2)     
A、  Core & Shell 
B、  Neighborhood Development 
C、  Operations & Maintenance 
D、  Commercial Interiors 
The correct answer is:    CD 
Core  &  Shell  cannot  occur  after  New  Construction  certification.  Neighborhood  Development  applies  to 
the community, not to a building. 
      
299、 Having a LEED AP on a project who works exclusively on the HVAC system will earn a point in what 
category?    
A、  Energy and Atmosphere 
B、  Innovation in Design 
C、  No credit would be earned for this strategy 
D、  Regional Priority 
The correct answer is:    C 
"The  purpose  of  having  a  LEED  AP  on  the  project  is  to  work  on  sustainable  design  and  synergies,  and 
streamlining  the  process.    Working  in  isolation,  which  is  not  an  integrated  design,  does  not  meet  the 
credit requirements." 
      
300、 If a mechanical engineer needs guidance on whether a particular software package can be used to 
measure energy efficiency, how should the engineer proceed?     
A、  Submit a CIR to the project administrator 
B、  Submit a CIR to the LEED Steering Committee 
C、  See if the credit is marked 'Anticipated' during the design phase review 
D、  Submit a CIR using LEED Online 
The correct answer is:    D 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      95 / 206 
"Because  it  is  unclear  whether  the  strategy  applies  to  the  given  credit,  a  CIR  must  be  submitted  using 
LEED Online. The design phase review would not mark a credit as 'Denied' in this case for choosing one 
software package over another." 
      
301、 What project issues are addressed by guidelines from SMACNA?     
A、  VOCs in materials 
B、  Refrigerant quantities 
C、  Air quality issues from construction or renovation 
D、  Carpet durability 
The correct answer is:    C 
"The Sheet Metal and Air Conditioning National Contractors Association (SMACNA) has a set of indoor air 
quality  guidelines  that  are  used  to  help  manage  air  quality  issues  resulting  from  construction  and 
renovation." 
      
302、 A  vehicle  must  meet  which  requirement  to  be  considered  low‐emitting  and  fuel‐efficient?  A、 
Green Label score of 40 or more 
B、  Green score of 40 or more 
C、  Green Seal score of 40 or more 
D、  Green‐e score of 40 or more 
The correct answer is:    B 
"Vehicles must be classified as a Zero Emission Vehicle (ZEV) by the California Air Resources Board or have 
a green score of 40 or more from the ACEEE annual vehicle rating guide." 
      
303、 What helps minimize the space requirements of occupant recycling? (Choose 2)   
A、  Installing can crushers 
B、  Locating the recycling bins in the basement of the building 
C、  Having onsite cardboard bailers 
D、  Having multiple bins for each recycled material 
The correct answer is:    AC 
Can  crushers  and  cardboard  bailers  help  reduce  the  volume  of  the  materials  to  be  recycled.    Multiple 
bins would increase space requirements, compared to comingled recycling. Locating bins in the basement 
would deter recycling due to the inconvenience involved. 
      
304、 What type of water has the highest quality?     
A、  Stormwater 
B、  Graywater 
C、  Non‐potable water 
D、  Well water 
The correct answer is:    D 
Potable  water  is  water  that  is  suitable  for  drinking.  Potable  water  is  water  that  meets  or  exceeds  EPA's 
drinking water standards and comes from wells or the municipal water supply. 
      
305、 A project team discovers a new way to avoid the heat island effect. How does the LEED certification 
process reward this new concept?    
A、  An innovative performance point would be awarded 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      96 / 206 
B、  An extra Heat Island Effect point would be awarded 
C、  An exemplary performance point would be awarded 
D、  Heat Island Effect is covered by LEED, so no additional points would be given 
The correct answer is:    D 
"Innovative  performance  as  part  of  the  Innovation  in  Design  or  Operations  category  is  meant  for  green 
building categories not specifically addressed by LEED. Innovation credits are not awarded for the use of a 
particular product or design strategy if the technology aids in the achievement of an existing LEED credit." 
"USGBC/GBCI uses the CIR process for cases like this. A CIR could be submitted that specifies an alternate 
way to earn the Heat Island credit. However only the Heat Island credit would be earned, not an ID point 
or extra points." 
      
306、 On what should the priorities for the project design criteria be based? (Choose 2)     
A、  Value engineering 
B、  Environmental guidelines 
C、  Project constraints 
D、  Carbon offsets 
The correct answer is:    BC 
Reference: Sustainable Building Technical Manual Part II, pg. 5 
'Prioritize design options based on environmental guidelines and project constraints' 
      
307、 What is the EPAct of 1992 used for?     
A、  To define ODP and GWP limits for refrigerants 
B、  To define the VOC content limits of certain building materials 
C、  To set the baseline water flow requirements of toilets and fixtures 
D、  To determine the baseline building energy performance for buildings 20,000 sq. ft. or less 
The correct answer is:    C 
EPAct of 1992 set water flow limits on toilets and fixtures. 
      
308、 Biomass is what type of material?     
A、  Fly‐ash 
B、  Landfill gas 
C、  Animal waste 
D、  Plant material 
The correct answer is:    D 
Reference: O&M Glossary 
Biomass is plant material converted to heat energy to produce electricity. 
      
309、 The  use  of  native  plants  on  the  project  site  can  most  assist  projects  teams  with  what  other 
sustainable intents?     
A、  Reducing stormwater quantity 
B、  Using sustainable materials 
C、  Protecting existing local habitat 
D、  Construction waste management 
The correct answer is:    C 
"Native  plants  are  those  that  grow  naturally  in  an  area,  or  that  have  been  in  an  area  for  many  years. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      97 / 206 
Native plants require less water, fertilizer, and pest control.    These plants can be trees, shrubs, flowers, 
or  grasses.  Adaptive  plants  are  non‐native  plants  that  perform  well  in  the  local  climate.  Native  and 
adaptive plants require less water, and are more disease resistant because they are suited to the region's 
usual  rainfall,  soil,  and  temperature."  Native  plants  help  with  both  protecting  and  restoring  local 
ecosystems  and  habitat.  "Native  plants  don't  necessarily  perform  any  better  at  reducing  stormwater 
quantity.    A  stormwater  management  plan  that  included  vegetated  areas  would  help,  but  the  plants 
could  be  either  native  or  non  native  and  still  do  the  job."  Native  plants  are  not  a  building  material,  so 
using sustainable materials would not be a correct choice. 
      
310、 What is the most commonly used energy code in the United States and includes information such 
as R‐values for insulation?     
A、  HERS 
B、  ENERGY STAR Rating 
C、  RESCHECK 
D、  International Energy Conservation Code 
The correct answer is:    D 
The  International  Energy  Conservation  Code  is  used  as  the  basis  for  energy  codes  in  the  US  for  many 
building components. 
      
311、 What  accounting  methodology  is  used  to  evaluate  the  economic  performance  of  a  product  or 
system over its useful life?     
A、  Life‐cycle costing 
B、  Cradle‐to‐cradle analysis 
C、  Triple bottom line accounting 
D、  Life‐cycle assessment 
The correct answer is:    A 
Life  cycle  costing  evaluates  a  product's  'economic  performance'.  This  differs  from  life  cycle  assessment 
which evaluates a products 'environmental impact'. 
      
312、 What types of old materials does LEED NOT suggest reusing on a project?     
A、  Trees 
B、  Asphalt 
C、  Showerheads 
D、  Furniture 
The correct answer is:    C 
"Old plumbing fixtures tend to be more inefficient than newer models and consume more water. For new 
construction or renovations, consider higher efficiency models, such as waterless urinals" 
      
313、 What organization publishes Ozone Depletion and Global Warming Potential scores? 
A、  USGBC 
B、  United Nation 
C、  World Meteorological Organization 
D、  Montreal Protocol 
The correct answer is:    C 
"The Treatment by LEED of Environmental Impact of HVAC Refrigerants states that values are published by 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      98 / 206 
the Environmental Protection Agency [3‐6] and the World Meteorological Organization (WMO). Because 
the WMO values are better documented, we use that publication as the preferred source, supplemented 
with values from the EPA where necessary." 
      
314、 What environmental issue occurs from stormwater runoff?     
A、  Ozone depletion 
B、  Heat islands 
C、  Blackwater 
D、  Sedimentation 
The correct answer is:    D 
"Stormwater consists of rainwater and melted snow that run off streets, lawns, farms, and construction 
and industrial sites. Stormwater runoff can lead to sedimentation. Sedimentation is where pollutants from 
natural or human activities add particles to water bodies. Pollutants come from soil, fertilizer, oil or gas on 
roadways,  pesticides,  etc."  Stormwater  runoff  should  be  controlled  onsite  by  harvesting  the  water, 
increasing open space, and reducing impervious surfaces. 
      
315、 How can the heat island effect on the roof of a building be reduced?     
A、  Installing a cistern on the roof 
B、  Installing a green roof 
C、  Painting the surface with dark colored coatings 
D、  Covering the roof with high VOC materials 
The correct answer is:    B 
"Heat islands on a roof can be reduced by reducing the amount of area that is dark, either through solar 
panels or a green roof, or painting exposed areas with light colored materials. A material with an SRI of 
100 is light colored."    "Green roofs help reduce heat islands. They also help provide greater insulation of 
the  roof  to  reduce  energy  consumption,  and  they  have  a  longer  life‐cycle  than  traditional  roofs."  "The 
heat island effect is created when developed areas have higher temperatures than surrounding rural areas. 
An  urban  heat  island  effect  is  caused  by  sunlight  heating  up  dark  colored  surfaces  such  as  roads  and 
rooftops.  Huge  quantities  of  heat  are  generated  in  buildings  that  have  dark  rooftops  and  absorb  heat 
rather  than  reflect  it."  LEED  defines  a  heat  island  as  one  whose  temperatures  are  at  least  10  degrees 
higher than those of surrounding suburban or rural areas. 
      
316、 What is not a credit category in LEED?     
A、  Sustainable Sites 
B、  Water Efficiency 
C、  Materials and Resources 
D、  Indoor Air Quality 
The correct answer is:    D 
The correct category is Indoor Environmental Quality, not Air. Air quality is a subset of IEQ. 
      
317、 How long can a project team take after project completion to phase‐out any CFC‐based refrigerants?
     
A、  3 years 
B、  5 years 
C、  2 years 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      99 / 206 
D、  4 years 
The correct answer is:    B 
"The project team can take 5 years from project completion to phase out CFC‐based refrigerants, as long 
as the annual leakage rate of CFC‐based refrigerants is reduced to 5% or less." 
      
318、 Increasing the use of graywater in a building can help with:     
A、  Reducing stormwater runoff 
B、  Reducing rainwater harvesting 
C、  Reducing potable water used by urinals 
D、  Reducing potable water use in faucets 
The correct answer is:    C 
Graywater can be used for flushing in water closets and urinals, or some process water needs. Graywater 
would not be recycled for people to use for hand washing. 
      
319、 Why should a project team aim to achieve more points than are required for the target certification 
level?     
A、  Achieving more points will increase the energy efficiency of the building 
B、  If some credits are denied, the project will still earn enough points for the target certification 
C、  In case extra points are achieved during the construction process, the next certification level can be 
achieved 
D、  To earn regional priority credits 
The correct answer is:    B 
Achieving  five  or  more  points  than  the target  certification  level  helps  the  project  hit  the target  if  some 
credits are denied. "Extra points are not normally achieved during construction. If they were that would 
be a sign of poor design, indicating the team either didn't model correctly or made late decisions that may 
have a negative impact on the whole building design." Achieving more points doesn't necessarily increase 
the energy efficiency of the building. 
 
320、 Halons  (type  of  pollutants)  are  organic  compound  and  they  are  thought  to  release  bromine  that 
depletes the ozone layer. For what purpose halons could be used? 
A、    As additives 
B、    As cooling agents   
C、    As fire extinguishing agents 
D、    As lubricants 
E、    As anesthetic agents 
The correct answer is:    C 
Halons  are  used  as  fire  extinguishing  agents,  both  in  built‐in  systems  and  in  handheld  portable  fire 
extinguishers. 
 
321、 Why choose a project site with a high development density?     
A、  The project would have access to at least 10 basic services 
B、  The project would reduce sprawl 
C、  The project would have access to public parking 
D、  The project site would be near a public rail line 
The correct answer is:    B 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      100 / 206 
Development  density  and  community  connectivity  help  to  reduce  urban  sprawl.  "Development  density 
does not mean access to a given number of basic services. Development density is the measure of how 
much  development  exists  in  a  given  area.  The  more  dense  the  development,  the  less  sprawl  there  is 
(usually)." "Dense development does not mean proximity to public transportation will exist. Some cities 
have  very  poor  public  transportation  systems  despite  having  dense  developments."    A  dense 
development does not mean public parking will be available.   
      
322、 Which  of  the  following  projects  would  not  meet  the  minimum  program  requirements  for 
certification?     
A、  A new laboratory building that will be located partially underground 
B、  A new building on an office campus located next door to an existing certified building 
C、  A building project that is three stories high 
D、  A classroom that can be moved to another location on the school property 
The correct answer is:    D 
Reference: GBCI website, Policy Manual 
Structures must be permanent ‐ a temporary classroom would not qualify. 
      
323、 How can green power be purchased?    
A、  By purchasing biofuel based power 
B、  By installing solar panels 
C、  By selecting a Green‐e certified power provider 
D、  By purchasing any renewable energy source 
The correct answer is:    C 
Green‐e is the organization that certifies green power. 
      
324、 Why does the USGBC outline rules on use of its trademarks and logos?     
A、  USGBC wants customers to be directed to its website for clear information 
B、  USGBC wants to make sure it retains control over what is said about LEED 
C、  USGBC wants to make sure its message is spread accurately 
D、  USGBC wants to be able to charge a fee for logo use 
The correct answer is:    C 
"The  USGBC  Logo  Guidelines  assist  the  community  in  the  use  of  USGBC  proprietary  marks  and 
corresponding language that accurately and consistently convey USGBC's messages and identity." 
      
325、 What strategy does the EPA rank highest as having the greatest impact on waste reduction? 
A、  Reuse 
B、  Recycling 
C、  Source reduction 
D、  Selecting sustainable materials 
The correct answer is:    C 
Reducing waste at its source is the best way to reduce waste. Less packaging and fewer materials reduce 
the demand for virgin materials. 
      
326、 What items would NOT be included in comingled recycling?     
A、  Stone 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      101 / 206 
B、  Plastic 
C、  Cardboard 
D、  Aluminum cans 
The correct answer is:    A 
At a minimum, a recycling program should include paper, cardboard, glass, plastic, and metal. Stones, dirt, 
hazardous materials, batteries, mercury‐containing light bulbs, and food waste would not be included. 
      
327、 What is the best type of site to develop on?     
A、  Wetland 
B、  Nature preserve 
C、  Previously developed site 
D、  Greenfield 
The correct answer is:    C 
Selecting a previously developed site avoids disturbing natural areas that have not been developed. 
      
328、 What attributes should recycled materials have in order to take advantage of synergies with local 
materials?     
A、  The recycled material should be remanufactured locally 
B、  The recycled material should be extracted locally 
C、  The recycled material should have low VOCs 
D、  The recycled material should be more durable 
The correct answer is:    A 
Only the choice of being remanufactured locally would help with earning credit for local materials 
     
329、 Construction and demolition debris includes all but which of the following?     
A、  Concrete 
B、  Steel from a demolished building 
C、  Rocks 
D、  Drywall 
The correct answer is:    C 
Reference: See O&M Glossary 
Rocks would be part of the excavation whereas concrete would not as it is part of the building. 
      
330、 A  granite  countertop  taken  from  a  demolition  project  and  reused  in  a  residence  is  what  type  of 
product?     
A、  Locally extracted 
B、  Locally recovered 
C、  Locally manufactured 
D、  Salvaged 
The correct answer is:    D 
While the product may be a local material, it is definitely a salvaged material. 
 
331、 What types of water should be used for irrigation? (Choose 2)     
A、  Stormwater 
B、  Graywater 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      102 / 206 
C、  Potable water 
D、  Blackwater 
The correct answer is:    AB 
Blackwater is water from toilets or kitchen sinks that has not been treated. 
"Potable  water  usually  comes  from  wells  or  municipal  supplies  and  should  not  be  used  for  irrigation. 
Onsite waste water treatment systems can turn stormwater, graywater, and blackwater into potable water 
as well." "Graywater is water from laundry machines or showers that is not suitable for drinking, but can 
be  used  for  other  purposes  such  as  irrigation  and  flushing  toilets.  Graywater  is  defined  by  the 
International  Plumbing  Code  and  Uniform  Plumbing  Code.  Some  states  and  local  codes  have  differing 
definitions." 
      
332、 At  a  minimum,  a  project  team  must  successfully  do  which  of  the  following  to  obtain  a  LEED 
Certification?    (Choose 2)     
A、  Gather documentation for 40 points of the 110 points available 
B、  Gather documentation for the prerequisites 
C、  Record all vendors used on the project 
D、  Hire a USGBC approved consultant 
The correct answer is:    AB 
Projects must meet all prerequisites, the minimum certification level is 40, and all projects must register. 
      
333、 Which of the following includes standards for accessible design?     
A、  Americans with Disabilities Act 
B、  Section 504 of the Rehabilitation Act 
C、  ASHRAE 
D、  Fair Housing Amendments Act 
The correct answer is:    A 
The Americans with Disabilities Act includes accessibility guidelines. 
      
334、 Cement, steel, tile, and construction worker labor are all what type of project expense?    (Choose 
2)     
A、  Soft cost 
B、  Indirect cost 
C、  Direct cost 
D、  Hard cost 
The correct answer is:    CD 
Hard costs are directly related to the project. Soft costs are indirectly related to the project. 
      
335、 LEED  for  New  Construction,  Core  &  Shell,  Schools,  and  Existing  Buildings:  Operations  & 
Maintenance were designed to evaluate what building types? (Choose 3)     
A、  Interior spaces 
B、  High‐rise residential buildings 
C、  Institutional buildings 
D、  Commercial buildings 
E、  Community development 
The correct answer is:    BCD 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      103 / 206 
Reference: GBCI website, Minimum Project Requirements 
You should go to gbci.org and review the Minimum Project Requirements pagE、   
      
336、 What needs to be done for water management?     
A、  Use drip irrigation 
B、  Install an onsite wastewater system 
C、  Establish a baseline water demand 
D、  Use waterless urinals 
The correct answer is:    C 
"The first step in water management is determining how much water is being used, or will be usec. This 
'baseline' allows project teams to determine how much they can save." 
      
337、 What does USGBC's Portfolio Program help with?     
A、  Comparing design case energy use among buildings 
B、  Comparing baseline energy use among buildings 
C、  Policy support for LEED documentation 
D、  Cost‐effective LEED certification on a volume scale 
The correct answer is:    D 
Reference: USGBC website 
      
338、 Which item can contribute to Construction Waste Management? (Choose 2)     
A、  Concrete 
B、  Fill dirt 
C、  Hazardous construction debris 
D、  Steel and wallboard 
The correct answer is:    AD 
Hazardous  debris  does  not  qualify  for  this  credit;  therefore,  hazardous  construction  debris  is  incorrect.   
Fill dirt does not qualify for this credit; therefore, fill dirt (excavated soil) is incorrect. 
      
339、 Within what distance must a material be extracted, harvested, recovered, or manufactured to be 
considered a regional material?     
A、  100 miles 
B、  500 miles 
C、  250 miles 
D、  200 miles 
The correct answer is:    B 
Reference: See O&M Glossary 
      
340、 How are the sections in the LEED Scorecard grouped?     
A、  By environmental category 
B、  Alphabetically 
C、  By cost 
D、  By credit weight 
The correct answer is:    A 
The LEED Scorecard is organized just like the LEED Rating System ‐ by environmental category 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      104 / 206 
      
341、 An  office  park  design  includes  a  parking  lot.  How  could  the  parking  be  redesigned  to  reduce  the 
heat island effect?     
A、  Encourage occupants to use public transportation one day a week 
B、  Use black asphalt for the parking lot 
C、  Place the parking underground 
D、  Designate preferred parking spaces 
The correct answer is:    C 
Moving a parking lot/spaces under the building is one way to reduce the heat island effect. This reduces 
the  amount  of  impervious area  above  ground.  "The  heat  island  effect  is  created  when  developed areas 
have  higher  temperatures  than  surrounding  rural  areas.    An  urban  heat  island  effect  is  caused  by 
sunlight  heating  up  dark  colored  surfaces  such  as  roads  and  rooftops.  Huge  quantities  of  heat  are 
generated in buildings that have dark rooftops and absorb heat rather than reflect it." LEED defines a heat 
island as one whose temperatures are at least 10 degrees higher than those of surrounding suburban or 
rural areas. 
      
342、 On a project with older existing HVAC&R system that uses CFCs, what can the project team do to 
earn LEED certification?     
A、  Get a state exemption for the HVAC&R system 
B、  Recharge the equipment with CFCs 
C、  Eliminate all refrigerant leaks 
D、  Make a phase out plan for the removal of the CFC based refrigerants 
The correct answer is:    D 
The project team can replace or retrofit the existing system with one that is CFC‐free, or agree to have a 
phase out plan that is completed 5 years after project completion   
     
343、 An old door taken from one project site and reused on another project site is considered what type 
of material?     
A、  Certified wood 
B、  Salvaged 
C、  Locally harvested 
D、  Rapidly renewable 
The correct answer is:    B 
"Salvaged  materials  or  reused  materials  are  construction  materials  recovered  from  existing  buildings  or 
construction sites and reused. The materials may be used for the same purpose (a door used as a door) or 
a  different  purpose  (a  door  turned  into  a  table).  Some  common  material  that  is  salvaged  includes  old 
flooring, brick, doors, cabinets, and structural beams." 
      
344、 Wastewater from sinks can:    
A、  Never be recycled and used for irrigation 
B、  Always be recycled and used for irrigation 
C、  Always be used for makeup water in cooling towers 
D、  Sometimes be recycled and used for irrigation, depending on local codes 
The correct answer is:    D 
Reference: USGBC Glossary 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      105 / 206 
"Blackwater  does  not  have  a  single  definition  accepted  nationwide.  Adjacent  cities  may  have  different 
codes  that  allow  or  prohibit  the  use  of  sink/shower  water  for  non‐potable  uses.  On  jurisdiction  may 
define sink/shower water as blackwater and not permit its use, while another may define it as graywater 
and  will  permit  its  use.  Review  local  codes  before  making  design  decisions  based  on  the  use  of 
wastewater." 
 
345、 A commissioning cycle for existing buildings is a systematic process. If the first time a building has 
been analyzed then how would you define a commissioning cycle? 
A、    Referred to as retro‐commissioning 
B、    Referred to as re‐commissioning 
C、    Referred to as comprehensive commissioning 
D、    Referred to as primary commissioning 
E、    Referred to as first commissioning 
The correct answer is:    A 
A commissioning cycle for Existing Buildings (sometimes referred to as retro‐commissioning if it is the first 
time a building has been analyzed) is a systematic process. 
 
346、 When  mechanical  refrigeration  is  needed,  many  natural  refrigerants  exist  for  refrigeration.  How 
many natural refrigerants could have that are benign to the earth¡ˉs atmosphere? 
A、    Three 
B、    Four 
C、    Five 
D、    Six 
E、    Seven 
The correct answer is:    C 
There are five natural refrigerants that are benign to the earth’s atmosphere.   
      
347、 Which of the following causes depletion of the ozone layer?     
A、  Ammonia 
B、  CFCs 
C、  Propane 
D、  CO2 
The correct answer is:    C 
Reference: Treatment by LEED of HVAC Refrigerants 
CO2, ammonia, and propane are natural refrigerants that are not detrimental to the ozone layer. 
      
348、 How long must an existing building be occupied before the LEED application process may begin? 
A、  12 months 
B、  The application process can begin as soon as regular occupancy is reached 
C、  6 months 
D、  3 months 
The correct answer is:    A 
"The  LEED  project  must  be  in  a  state  of  typical  physical  occupancy,  and  all  building  systems  must  be 
operating  at  a  capacity  necessary  to  serve  the  current  occupants,  for  a  period  that  includes  all 
performance  periods  as  well  as  at  least  the  12  continuous  months  immediately  preceding  the  first 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      106 / 206 
submission for a review." 
      
349、 What project team meeting is used to integrate green strategies across all aspects of the building 
design, drawing on the expertise of all participants?     
A、  Technical Advisory Group 
B、  LEED roundtable 
C、  Design charrette 
D、  Steering committee 
The correct answer is:    C 
Reference: LEED for Homes Rating System, Integrated Project Planning 
      
350、 What area would NOT be considered previously developed?     
A、  Old torn down steel mill 
B、  Parking lot grown over into a field 
C、  Unoccupied big‐box retail store 
D、  Tree farm 
The correct answer is:    D 
Reference: LEED for Homes Glossary 
"Previously  developed  land  has  pre‐existing  paving,  construction,  or  significantly  altered  landscapes.   
Land  that  has  been  altered  and  turned  into  a  natural  use  such  as  agricultural,  forestry,  or  nature 
preservation does not count." 
      
351、 The EPAct 1992 standard does NOT address what type of water consuming devices? 
A、  Faucets 
B、  Showerheads 
C、  Dishwashers 
D、  Water closets 
The correct answer is:    C 
References: EPAct 1992 standard 
Dishwashers  and  clothes  washers  are  outside  the  scope  of  EPAct.  EPAct  1992  has  a  2.5  gpm  flow 
restriction on showerheads. WaterSense doesn't cover showerheads yet. 
      
352、 What is a characteristic of open‐grid pavement?     
A、  Vegetation can grow in it 
B、  It is at least 75% impervious 
C、  It is 100% impervious 
D、  It is at least 50% impervious 
The correct answer is:    A 
See O+M glossary 
      
353、 Which of the following statements are true about a CIR? (Choose 2)     
A、  The credit name must be stated 
B、  CIR submission text is limited to 600 words 
C、  CIRs can be submitted for Prerequisites 
D、  Your contact information should be included 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      107 / 206 
The correct answer is:    BC 
Refer to the USGBC Guidelines for CIR Customers: 
http://www.usgbc. org/ShowFile.aspx?DocumentID=1510 
From USGBC: "Inquiries must request guidance on just one credit or prerequisite (unless there is technical 
justification to do otherwise) and generally contain one concise question or a set of related questions. It is 
often helpful to discuss the inquiry within context of the credit's intent.'" 
      
354、 What  information  is  needed  to  determine  if  a  product  will  help  with  the  heat  island  effect  of  a 
non‐roof surface?     
A、  Area of shading from site trees 
B、  Run‐off coefficients for the paving materials that are selected 
C、  Emissivity of pervious surfaces 
D、  Albedo of the paving materials selected 
The correct answer is:    D 
Reference: LEED O+M Glossary: 
Solar Reflectence (Albedo) is: 'A measure of a material's ability to reject solar heat, as shown by a small 
temperature  rise.  "Standard  black  (reflectance  0.05,  emittance  0.90)  is  0  and  a  standard  white 
(reflectance 0.80, emittance 0.90) is 100. For example, a standard black surface has a temperature rise of 
90  degrees  F  (50  degrees  C)  in  full  sun,  and  a  standard  white  surface  has  a  temperature  rise  of  14.6 
degrees F (8.1 degrees C)." Once the maximum temperature rise of a given material has been computed, 
the SRI can be computed by interpolating between the values for white and black.' "The heat island effect 
is created when developed areas have higher temperatures than surrounding rural areas. An urban heat 
island  effect  is  caused  by  sunlight  heating  up  dark  colored  surfaces  such  as  roads  and  rooftops.  Huge 
quantities of heat are generated in buildings that have dark rooftops and absorb heat rather than reflect 
it." LEED defines a heat island as one whose temperatures are at least 10 degrees higher than those of 
surrounding suburban or rural areas. 
      
355、 What types of systems are not acceptable by LEED as sources of renewable energy?   
A、  Wind 
B、  Low‐impact hydropower 
C、  Hydropower 
D、  Biomass 
The correct answer is:    C 
"While  low‐impact  hydropower  is  accepted,  hydropower  is  not.  Hydropower  is  not  considered 
environmentally  friendly  because  of  water  quality  issues,  and  the  negative  impact  it  has  on  fish  and 
wildlife." 
      
356、 How should a project team view all green building costs when budgeting for a project?  
A、  Individually 
B、  Cumulatively 
C、  Synergistically 
D、  As soft costs 
The correct answer is:    C 
"The best answer for this question is synergistically. Costs are not cumulative since the cost of adopting 
one sustainable strategy for LEED may assist in earning points in other areas. Costs are also not individual 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      108 / 206 
for this reason. LEED of course includes soft costs, but not all LEED elements will be soft costs." 
      
357、 Purchased  power  must  meet  which  certification's  standards  to  qualify  as  renewable  sources  of 
energy for LEED projects?     
A、  Green Seal 
B、  Green Label 
C、  Green Label Plus 
D、  Green‐e 
The correct answer is:    D 
Off‐site  Green  Power  must  come  from  renewable  resources  that  meet  the  Green‐e  certification 
requirements as defined by the Center for Resource Solutions. 
      
358、 What is the minimum certification level in LEED?     
A、  Approved 
B、  Accredited 
C、  certified 
D、  Certified 
The correct answer is:    D 
Buildings are certified, people are accredited. Sometimes people get that backwards. The LEED levels are 
Certified, Silver, Gold, and Platinum. 'certified' with a lowercase 'c' is incorrect. 
      
359、 What is the primary purpose of registering your project for LEED?     
A、  To obtain free USGBC consulting 
360、 B、  To qualify for local, state, and federal incentives 
C、  To get your company and the project media publicity 
D、  To gain access to project tools and resources 
The correct answer is:    D 
See the GBCI website for registration: http://www.gbci.org/ProjectNav.aspx?PageID=1&CMSPageID=117 
The  purpose  for  registering  a  project  is  to  gain  access  to  the  project  tools  needed  for  the  certification 
process. 
      
361、 What is NOT a natural refrigerant?     
A、  NH3 
B、  HFC 
C、  CO2 
D、  HC 
The correct answer is:    B 
Reference: Treatment by LEED of Environmental Impact of HVAC Refrigerants. 
There are five refrigerants that are benign to the earth's atmosphere. They are: 
    CO2 ‐ Carbon dioxide 
    H2O ‐ Water 
    NH3 ‐ Amonia 
    HC ‐ Hydrocarbons, such propane, butane, ethane, isobutene, and isopentane 
    Air 
Make  sure  you  do  not  confuse  HC,  which  is  good  refrigerant,  with  HFC  or  HCFC,  which  are  refrigerants 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      109 / 206 
that cause environmental issues. 
      
362、 What LEED Rating System is used for interior tenant improvements?     
A、  LEED for Existing Buildings Operations & Maintenance 
B、  LEED for New Construction 
C、  LEED for Commercial Interiors 
D、  LEED for Core & Shell 
The correct answer is:    C 
LEED  for  Commercial  Interiors  is  used  for  tenant  spaces  primarily  in  office,  retail,  and  institutional 
buildings. 
      
363、 How do the LEED Rating Systems reward the development and adoption of new technologies and 
strategies that can produce quantifiable environmental and human health benefits?    
A、  Discounts in certification fees 
B、  Additional points 
C、  Additional plaque for showing creativity 
D、  Upgrade to the next certification level 
The correct answer is:    B 
Reference:  Additional  points  (ID  points)  can  be  earned  for  implementing  strategies  or  measures  not 
addressed in the current rating systems. 
 
364、 What defines the floor area ratio (FAR)?     
A、    The total buildable land area / 60,000 sq. ft. 
B 、     The  total  non‐residential  building  floor  area  /  the  total  buildable  land  area  available  for 
non‐residential uses 
C、    The total building floor area / the total hardscapes 
D、    The total land area of the project site / the portion of the site where construction can occur 
The correct answer is:    B 
Reference: https://www.usgbc.org/ShowFile.aspx?DocumentID=5744 
"Floor  Area  Ratio  (FAR)  is  the  measure  of  the  density  of  non‐residential  land  use.  It  is  the  total 
non‐residential  building  floor  area  divided  by  the  total  buildable  land  area  available  for  non‐residential 
uses." 
     
365、 What generally defines the LEED project boundary? 
A、    Area of disturbance and all surrounding roadways 
B、    Building footprint and hardscapes 
C、    Site boundary 
D、    Building footprint 
The correct answer is:    C 
"LEED  project  boundary:  portion  of  the  project  site  submitted  for  LEED  certification;  for  single  building 
developments,  this  is  the  entire  project  scope  and  is  limited to  the site  boundary;  for  multiple building 
developments,  the  LEED  project  boundary  may  be  a  portion  of  the  development  as  determined  by  the 
project team" 
      
366、 What type of water is rainwater?     
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      110 / 206 
A、  Blackwater 
B、  Non‐potable water 
C、  Graywater 
D、  Potable water 
The correct answer is:    B 
Rainwater is not suitable for drinking, therefore it is non‐potable. 
      
367、 How is ozone created?    
A、  A sunlight‐driven chemical reaction between molecules 
B、  Transportation emissions 
C、  Emissions from factories 
D、  Emissions from incinerators 
The correct answer is:    A 
See the reference guide glossary entry for Ozone.   
      
368、 What  standard  helps  businesses  and  households  compare  and  select  clean  renewable  energy 
options?     
A、  Green Label 
B、  Green‐e 
C、  Green Score 
D、  Green Seal 
The correct answer is:    B 
LEED accepts Green‐e certified power as a Green Power source. 
      
369、 Which refrigerant has the lowest Ozone Depletion Potential (ODP)?    
A、  CFC 
B、  HFC 
C、  Halon 
D、  HCFC 
The correct answer is:    B 
Reference: Treatment by LEED of HVAC Refrigerants 
      
370、 What does the baseline water case represent?     
A、  The amount of water metered for the entire project 
B、  Flow and flush rates of all design case fixtures 
C、  The amount of water metered for the building's indoor areas 
D、  The Energy Policy Act of 1992 (EPAct 1992) flow and flush rates 
The correct answer is:    D 
"All  Water  Efficiency  credits  measure  water  savings  by  comparing  a  baseline  case  against  the  proposed 
design case. The baseline case uses the flow and fixture rates from the EPAct 1992 standard." The baseline 
water  usage  is  based  on  estimated  occupant  usage  (Full  Time  Equivalent  calculations)  and  the  water 
fixtures and fittings, such as: 
    Commercial toilets have a baseline water use of 1.6 gallons per flush 
    Commercial urinals have a baseline water use of 1.0 gallons per flush 
    Commercial lavatory faucets have a baseline water use of 2.2 gallons per minute 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      111 / 206 
    Residential toilets have a baseline water use of 1.6 gallons per flush 
    Residential lavatory faucets have a baseline water use of 2.2 gallons per minute 
    Residential kitchen faucets have a baseline water use of 2.2 gallons per minute 
    Residential showerheads have a baseline water use of 2.5 gallons per minute 
      
371、 What are the collection requirements for the storage and collection of recyclables in a building? 
A、  The area must be easily accessible 
B、  Collect light bulbs and batteries 
C、  Include space to collect organic materials (food) 
D、  Collect either light bulbs or batteries 
The correct answer is:    A 
"The collection of recycled materials (at a minimum these materials include paper, corrugated cardboard, 
glass, plastics, and metals) requires an easily accessible dedicated area for collection and storage. When 
implementing  the  storage  area  consider  using  signs  to  help  people  find  the  area,  and  to  show  what 
materials  go  in  what  bins  (for  non‐comingled  recycling).  If  the  storage  area  is  outside  make  sure  it  is 
protected from the elements and nobody can steal your materials (metals can be worth a lot of money)." 
    At a minimum, a recycling program must include: 
    paper 
    cardboard 
    glass 
    plastics 
    metals 
    Stones,  dirt,  hazardous  materials,  batteries,  mercury‐containing  light  bulbs,  and  food  waste 
would not be included. 
      
372、 What is the root cause of global climate change?     
A、  Topsoil loss 
B、  The use of halons 
C、  Greenhouse gases 
D、  Ozone depletion 
The correct answer is:    C 
     
373、 Which rating system can be used to compare the energy performance of two buildings? 
A、  LEED 
B、  ENERGY STAR 
C、  Energy‐10TM 
D、  DOE‐2 eQUEST 
The correct answer is:    B 
ENERGY  STAR  is  specific  to  energy  performance.  LEED  compares  the  greenness  of  two  buildings,  which 
includes much more than just the energy performance. 
 
374、 What type of program is Zipcar?    
A、  An alternative vehicle refueling program 
B、  Preferred parking program 
C、  Car pooling program 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      112 / 206 
D、  Car share membership program 
The correct answer is:    D 
"Car  sharing  is  an  alternative  to  car  rental  and  car  ownership.  Cars  are  located  throughout  cities  in 
convenient locations. People who sign up for the program can reserve the cars and use them for a short 
period of time. See zipcar.com for an example." 
      
375、 How many points would a project earn for having 3 LEED APs on the project?    
A、  1 
B、  3 
C、  0 
D、  2 
The correct answer is:    A 
No  matter  how  many  LEED  APs  are  working  on  a  project,  there  is  still  only  one  point  available  for  this 
credit. 
      
376、 What site features are included in the landscape area?     
A、  Tree save area 
B、  Parking lot with high albedo surfaces 
C、  Open grid paved surfaces 
D、  Neighboring green space property 
The correct answer is:    A 
The  landscape  area  of  the  site  is  the  total  site  area  less  the  building  footprint,  hardscape  area,  water 
bodies,  etc.  The  tree  save  area  would  be  included  in  the  landscape  area.  The  neighboring  property  is 
outside of the LEED project boundary. 
      
377、 What strategies does the EPA recommend for waste reduction? (Choose 3)     
A、  Reuse 
B、  Locally manufactured materials 
C、  Source reduction 
D、  Sustainable materials 
E、  Recycling 
The correct answer is:    ACE 
Reference: EPA 
Source reduction, reuse, and recycling are the three ways EPA ranks as reducing waste the most. 
      
378、 What does the IPMVP Volume III provide information on?    
A、  Best management practices for construction activity pollution prevention 
B、  Best practices for verifying the energy performance of a new building 
C、  Best design techniques for acoustics in schools 
D、  Government restrictions for the water flow limits of fixtures 
The correct answer is:    B 
The IPMVP Volume III is used for measurement & verification, and provides best practice techniques for 
verifying the energy performance of a new building. 
      
379、 How can the heat island effect on the roof of a building be reduced?     
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      113 / 206 
A、  Increasing the amount of roof insulation 
B、  Providing underground parking 
C、  Painting the roof with a high SRI coating 
D、  Covering the roof with recycled materials 
The correct answer is:    C 
"Heat islands on a roof can be reduced by reducing the amount of area that is dark, either through solar 
panels or a green roof, or painting exposed areas with light colored materials. A material with an SRI of 
100 is light colored. " "The heat island effect is created when developed areas have higher temperatures 
than  surrounding  rural  areas.  An  urban heat  island  effect  is  caused  by  sunlight  heating  up  dark  colored 
surfaces  such  as  roads  and  rooftops.  Huge  quantities  of  heat  are  generated  in  buildings  that  have  dark 
rooftops and absorb heat rather than reflect it." LEED defines a heat island as one whose temperatures 
are at least 10 degrees higher than those of surrounding suburban or rural areas. 
      
380、 Which of the following are mandatory for LEED certification? (Choose 2)    
A、  Prerequisites 
B、  Minimum Program Requirements 
C、  Credits 
D、  Regional Priorities 
E、  Innovation in Design 
The correct answer is:    AB 
Reference: GBCI website, Policy Manual 
"MPRs and prerequisites are mandatory for certification. Credits are optional, though a certain number of 
credits are needed for certification. The project team chooses which credits to pursue. Prerequisites are 
not a choice." 
      
381、 What does a building need to have for community connectivity?     
A、  Pedestrian access to mass transit within 1/4 mile 
B、  Pedestrian access to nearby buildings 
C、  Density of 60,000 sq. ft. / acre 
D、  Pedestrian access to basic services 
The correct answer is:    D 
"Community connectivity helps channel development to urban areas with existing infrastructure.   
Pedestrian  access  is  needed  for  occupants  to  take  advantage  of  basic  services."  Access  to  public 
transpiration (mass transit) helps with reducing automobile use in the LEED Rating System, it is not part of 
the community connectivity credit. 
 
382、 How many of the 110 possible LEED points address regionally specific environmental issues?  
A、  10 
B、  4 
C、  2 
D、  1 
The correct answer is:    B 
Reference: USGBC Website: http://www.usgbe.org/Docs/News/Regional%20Priority%20Credits.pdf 
"LEED  points  are  awarded  on  a  100‐point  scale,  and  credits  are  weighted  to  reflect  their  potential 
environmental impacts.   
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      114 / 206 
Additionally,  10  bonus  credits  are  available,  four  of  which  address  regionally  specific  environmental 
issues." All rating systems with 110 points (any of the LEED 2009 rating systems) have 4 points for regional 
priority. 
      
383、 What does an REC represent?     
A、  The amount of energy an electricity provider purchases from renewable sources 
B、  The amount of energy purchased from a Green‐e supplier 
C、  The environmental, social, and other positive attributes of power generated by renewable resources 
D、  The quantity of fossil fuels avoided by purchasing renewable energy, expressed in tons 
The correct answer is:    C 
Reference: Guide to Purchasing Green Power 
"A  REC  represents  the  environmental,  social,  and  other  positive  attributes  of  power  generated  by 
renewable resources. These attributes may be sold separately from the underlying commodity electricity." 
"RECs represent the reduced emissions of renewable energy compared to conventional fossil fuels. RECs 
are sold separately allowing people to purchase the 'greenness' of the electricity. This allows anyone to 
purchase  an  REC  even  if  the  power  to  their  building  is  not  green  power."  RECs  have  no  geographic 
constraints, because they are sold separately from electricity. A project in Maine can purchase RECs from 
any other state. 
      
384、 In a state with a closed electricity market, how can off‐site green power be purchased?  
A、  Enroll in a Green‐e renewable power program from the utility provider 
B、  Purchase power from a USGBC approved provider 
C、  Through an ENERGY STAR approved utility provider 
D、  Have certified wood scraps delivered onsite for burning 
The correct answer is:    A 
Some utility companies allow the purchase of renewable energy, sometimes for a price premium. Make 
sure the source of the energy is Green‐e certified.   
      
385、 A project team has decided to shrink the building footprint. This change can have a positive impact 
on what issue?     
A、  Pedestrian access 
B、  Open space 
C、  Car pool parking 
D、  Parking capacity 
The correct answer is:    B 
Reducing the size of the building footprint may allow for more open space (fields, grasslands, landscaping, 
etc.)    Open space are the ground areas that are vegetated and pervious. Green roofs can be considered 
open space but only for urban areas. For the purposes of LEED, open space is the property area minus the 
development footprint, when local zoning does not define open space. 
      
386、 Which of the following is a way to reduce pollution associated with automobile use?   
A、  Provide shuttle services to mass transit 
B、  Shade all parking spaces with trees 
C、  Install low albedo parking surfaces 
D、  Only provide enough parking to meet the peak parking demand 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      115 / 206 
The correct answer is:    A 
Shuttle services to mass transit allow employees to take public transportation. The shuttle service would 
ferry occupants from mass transit to their building/home. 
      
387、 At what point can a project earn points for credits?     
A、  After the statement of work has been uploaded to LEED Online 
B、  After the design phase 
C、  After the LEED Scorecard is completed and submitted 
D、  After the construction phase 
The correct answer is:    D 
"No points can be earned after the design phase. Points may be marked as Anticipated in LEED Online, but 
points are only Achieved after the construction phase. This is true of all credits and prerequisites." 
      
388、 A  product's  materials  were  extracted  300  miles  from  a  project  site,  while  the  product  was 
manufactured 600 miles from the project sitE、    What statement is true about the product? 
A、  The product is considered a locally harvested and manufactured material 
B、  The product can count as a salvaged material 
C、  The product counts toward source reduction 
D、  The product does not count as a locally harvested and manufactured material 
The correct answer is:    D 
LEED  gives  credit  when  certain  percentages  of  materials  are  extracted,  harvested  or  recovered,  and 
manufactured within 500 miles. 
      
389、 What should be included in a building program detailing the project's green building requirements?
    (Choose 3)     
A、  Statement of Work 
B、  Building construction budget 
C、  Room‐by‐room description of the project 
D、  Statement of the project's environmental vision and goals 
E、  General description of the project 
The correct answer is:    CDE 
Reference: Sustainable Building Technical Manual Part II, pg. 5 
"A building program details the project's green building requirements. It includes the project's vision, the 
green building goals, and a general and room‐by‐room description of the project." 
      
390、 Ozone‐friendly refrigerants differ from ozone‐damaging refrigerants in what way?    
A、  Ozone‐friendly refrigerants are more energy efficient 
B、  Ozone‐friendly refrigerants are global warming neutral 
C、  Ozone‐friendly refrigerants cause less global warming 
D、  Ozone‐friendly refrigerants cause more global warming 
The correct answer is:    D 
"According to Treatment by LEED of Environmental Impact of HVAC Refrigerants, 'some refrigerants cause 
more ozone depletion than others, but the most ozone‐friendly refrigerants cause more global warming.'" 
      
391、 What site and/or project characteristics would contribute to maximizing open space?   
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      116 / 206 
A、  Planting non‐invasive plants 
B、  Clustering the parts of the development 
C、  Installing rain gardens to capture stormwater 
D、  Developing a soil and erosion management plan 
The correct answer is:    B 
Clustering the development reduces the expanse of hardscapes (roads, walkways, parking lots) from the 
property.  Open  space  are  the  ground  areas  that  are  vegetated  and  pervious.  Green  roofs  can  be 
considered  open  space  but  only  for  urban  areas.  For  the  purposes  of  LEED,  open  space  is  the  property 
area minus the development footprint, when local zoning does not define open space. 
      
392、 What practice identifies and removes unnecessary expenditures?     
A、  Life cycle costing 
B、  Life cycle assessment 
C、  Value engineering 
D、  Environmentally responsive design 
The correct answer is:    C 
"Value engineering (VE) is a systematic method to improve the 'value' of goods or products and services 
by using an examination of function. In conventional building many building features are VEd out to cut 
the budget. Because of the integrated design in green buildings, VEing out a feature often messes up the 
performance  of  the  system  as  a  whole.  Take  out  better  quality  and  more  costly  insulation  for  example, 
and now your utility bills go up and the HVAC system is probably undersized. " 
      
393、 The baseline water demand within a building includes the measurements of which of the following 
items? (Choose 3)     
A、  Urinals 
B、  Cooling towers 
C、  Bathroom faucets 
D、  Toilets 
E、  Irrigation systems 
The correct answer is:    ACD 
"The baseline water demand within a building includes the measurement of fixtures and fittings (toilets, 
faucets). Toilets are measured in gallons per flush, while fixtures are measured in gallons per minute. " 
      
394、 When project team members discuss the albedo of a product, to what are they referring? A、  VOC 
content 
B、  Solar reflectance 
C、  Recycled content 
D、  Emissivity 
The correct answer is:    B 
Reference: LEED O+M Glossary: 
Solar Reflectence (Albedo) is: 'A measure of a material's ability to reject solar heat, as shown by a small 
temperature rise."Standard black (reflectance 0.05, emittance 0.90) is 0 and a standard white (reflectance 
0.80, emittance 0.90) is 100. For example, a standard black surface has a temperature rise of 90 degrees F 
(50  degrees  C)  in  full  sun,  and  a  standard  white  surface  has  a  temperature  rise  of  14.6  degrees  F  (8.1 
degrees C)." Once the maximum temperature rise of a given material has been computed, the SRI can be 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      117 / 206 
computed by interpolating between the values for white and black. 
      
395、 Which vehicle is NOT considered an alternative‐fuel vehicle by the LEED Rating Systems? 
A、  Electric car 
B、  ZEV 
C、  Propane powered car 
D、  Shuttle used for mass transit 
The correct answer is:    D 
Alternative‐fuel  vehicles  use  nongasoline  fuels  such  as  electricity,  hydrogen,  etc.  Efficient  gas‐electric 
hybrids are also included in this group.    A shuttle would not be in this category. 
      
396、 LEED addresses ozone depletion by setting requirements on the following: (Choose 2) 
A、  Fire suppression system chemicals 
B、  Refrigerants 
C、  Green power use 
D、  Automobile reduction 
The correct answer is:    AB 
Refrigerants  are  a  requirement  that  must  be  addressed  for  certification.  The  use  of  green  power  and 
automobile use are credits, not prerequisites. 
      
397、 What is purchasing products with less packaging an example of?     
A、  Comingled recycling 
B、  Construction waste management 
C、  Source reduction 
D、  Waste diversion 
The correct answer is:    C 
Reference: O&M Glossary 
"Source reduction is the EPA's top‐ranked strategy for reducing waste. Source reduction chooses products 
with  less  packaging  and material,  which have  a  greater  environmental  impact  throughout  the product's 
life cycle." 
      
398、 A site that consists of at least ____ previously developed land is considered a previously developed 
site. 
A、  100% 
B、  75% 
C、  25% 
D、  50% 
The correct answer is:    B 
Reference: LEED for Homes Rating System 
      
399、 A  door  found  onsite  and  turned  into  a  table  as  part  of  a  major  renovation  would  automatically 
qualify as:     
A、  Rapidly renewable material 
B、  Pre‐consumer content 
C、  Comingled material 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      118 / 206 
D、  Regional material 
The correct answer is:    D 
The door would be extracted (salvaged) and used within 500 miles, qualifying it as regional material. 
      
400、 Which of the following does NOT help achieve a water‐efficient landscape?     
A、  Adaptive plantings 
B、  Perennials 
C、  Overhead sprinklers 
D、  Installing hardscapes 
The correct answer is:    C 
Overhead sprinklers contribute to runoff and evaporation by wind and sun. Hardscapes can increase the 
heat island effect and stormwater runoff, but they do reduce the size of the area that needs irrigation. 
 
401、 How is environmental performance evaluated through the use of LEED?     
A、    Through the amount of energy reduction 
B、    Throughout the building's life cycle 
C、    Through an integrated design approach 
D、    Through a cradle‐to‐cradle analysis 
The correct answer is:    B 
Reference: EBOM introduction   
 
402、 What needs to occur to have an integrated team?     
A、  Regular meetings of the owner, architect, and contractor 
B、  Durability planning 
C、  Quarterly meetings between engineers 
D、  Regular meetings of all key project members 
The correct answer is:    D 
Reference: AIA Integrated Project Delivery 
Frequent  meetings  of  all  key  project  members  and  the  ability  to  call  emergency  meetings  if  a  decision 
must be made quickly are both needed for project team decision making. 
      
403、 Which items are considered pre‐consumer recycled content?     
A、  Soda cans 
B、  Wood chips from a mill 
C、  Milk jugs 
D、  Cardboard boxes 
The correct answer is:    B 
Sawdust, shavings, and wood chips are pre‐consumer material that can be used elsewhere, even if they 
are used for landscaping purposes. 
      
404、 Which of the following is a natural refrigerant?     
A、  HFC 
B、  HCFC 
C、  CO2 
D、  CFC 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      119 / 206 
The correct answer is:    C 
Reference: Treatment by LEED of Environmental Impact of HVAC Refrigerants 
      
405、 Who rules on CIRs?     
A、  Green Raters 
B、  Technical Advisory Group 
C、  LEED Standards Board 
D、  Local USGBC Chapter 
The correct answer is:    B 
Make sure you understand what CIRs are and how they work: 
http://www.gbci.org/DisplayPage. aspx?CMSPageID=142 
Also see Guidelines for CIR Customers from USGBC. 
      
406、 Which of the following are strategies to reduce construction waste?     
A、  Use FSC certified materials 
B、  Select sustainable building materials 
C、  Haul unused materials to a landfill 
D、  Give unused materials to a salvage yard 
The correct answer is:    D 
To  reduce  construction  waste,  divert  any  unused  materials  from  the  waste  stream‐namely,  landfills  and 
incinerators. Materials can be donated, sold, or recycled, to keep them out of landfills and to help reduce 
the demand for virgin materials. 
      
407、 What does the success of an integrated project team depend on?     
A、  Commitment to the sustainability goals 
B、  The choice of materials used 
C、  Leniency of building codes 
D、  Meeting the project schedule 
The correct answer is:    A 
Reference: Sustainable Building Technical Manual Part II 
      
408、 Which is not a LEED 2009 MPR (Minimum Program Requirements)?    
A、  Permanent building / space 
B、  Minimum height 
C、  Minimum floor area 
D、  Minimum building ratio 
The correct answer is:    B 
Minimum Program Requirements: 
    Must comply with environmental laws 
    Must be a complete, permanent building or space 
    Must use a reasonable site boundary 
    Must comply with minimum floor area requirements 
    Must comply with minimum occupancy rate 
    Must commit to sharing whole‐building energy and water usage data 
    Must comply with a minimum building area to site area ratio 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      120 / 206 
      
409、 What is a financial benefit of implementing an occupant recycling program?     
A、  Reduced extraction of virgin materials 
B、  Reduced landfill fees 
C、  Minimized air pollution 
D、  Reduced energy use 
The correct answer is:    B 
"Recycling  can  result  in  reduced  landfill  and  tipping  fees  since  the  materials  are  diverted  from  landfills. 
Sometimes the recycled materials can be sold to waste haulers, creating a net gain." 
      
410、 What statements are true regarding regional priority credits (RPCs)?     
A、  RPCs are referenced by zip code 
B、  RPCs reward the use of local materials 
C、  RPCs reward the use of salvaged materials 
D、  RPCs are prerequisites 
The correct answer is:    A 
Reference: RPC FAQ 
RPCs are referenced by zip code. Pre‐2009 rating systems are not eligible unless the project moves to the 
LEED 2009 rating system. RPCs are not new credits; they are 'bonus points' for existing credits. 
      
411、 What would planting native trees near a parking lot help with?     
A、  Source reduction 
B、  Reducing heat islands 
C、  Minimizing energy performance 
D、  Improving water quality 
The correct answer is:    B 
By shading the walkways the trees help reduce the heat island effect (non‐roof). The heat island effect is 
created  when  developed  areas  have  higher  temperatures  than  surrounding  rural  areas.  An  urban  heat 
island  effect  is  caused  by  sunlight  heating  up  dark  colored  surfaces  such  as  roads  and  rooftops.  Huge 
quantities of heat are generated in buildings that have dark rooftops and absorb heat rather than reflect it. 
LEED  defines  a  heat  island  as  one  whose  temperatures  are  at  least  10  degrees  higher  than  those  of 
surrounding suburban or rural areas. 
      
412、 After project registration, how can the project team use the LEED logo?     
A、  The logo cannot be used 
B、  The logo can be used in press releases 
C、  The logo can be used in advertisements or marketing materials 
D、  The logo can be used to indicate pre‐certification 
The correct answer is:    A 
Reference: GBCI logo guidelines 
Project registration does not permit logo usage of any kind. 
      
413、 In whole building design, at what starting point in the process would the facilities managers, end 
users, contractors, and suppliers all be involved at the same time?     
A、  Pre‐design 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      121 / 206 
B、  Pre‐occupancy 
C、  Design phase 
D、  Construction phase 
The correct answer is:    A 
Reference: AIA Integrated Project Delivery 
In whole building design, all team members begin at the earliest point in the building process to define 
common goals. 
      
414、 What type of plants do the most to help reduce water use for landscaping?     
A、  Trees 
B、  Native plants 
C、  Turf grass 
D、  Annual flowers 
The correct answer is:    B 
"Native  plants  are  those  that  grow  naturally  in  an  area,  or  that  have  been  in  an  area  for  many  years.   
Native plants require less water, fertilizer, and pest control. These plants can be trees, shrubs, flowers, or 
grasses. Adaptive plants are non‐native plants that perform well in the local climate. Native and adaptive 
plants  require  less  water,  and  are  more  disease  resistant  because  they  are  suited  to  the  region's  usual 
rainfall, soil, and temperature. " 
      
415、 What type of products would carry a Green Seal Label?     
A、  HVAC systems 
B、  Wood 
C、  Brick 
D、  Paints 
The correct answer is:    D 
"Green Seal is a nonprofit organization that has created several standards used to certify products that are 
more environmentally friendly. This includes paints, coatings, and cleaning products." 
      
416、 In a new building how much CFC‐based refrigerant can be used?     
A、  2% of the total refrigerants 
B、  None 
C、  5% of the total refrigerants, as long as they are not used in fire suppression systems 
D、  5% of the total refrigerants 
The correct answer is:    B 
"The  rating  systems  have  a  prerequisite  for  Fundamental  Refrigerant  Management  which  requires  zero 
use  of  CFCs.    CFCs  are  known  to  cause  ozone  depletion."  "For  buildings  with  existing  systems  that  use 
CFC‐based refrigerants, the systems must be phased out within 5 years after    the project is completed, 
unless a third‐party audit shows the simple payback for retrofitting/replacement is more than 10 years." 
"Fundamental  Refrigerant  Management  differs  from  Enhanced  Refrigerant  Management  which  requires 
either  using  no  refrigerants  or  using  refrigerants  that  have  low  Ozone  Depletion  Potential  and  Global 
Warming Potentials (ODP and GWP)." 
      
417、 A vehicle must meet which requirement to be considered low‐emitting and fuel‐efficient? 
A、  SCQAMD air quality standards 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      122 / 206 
B、  Zero Emission Vehicle (ZEV) by the California Air Resources Board 
C、  Green‐e Certified 
D、  EPA Transportation and Air Quality standard 
The correct answer is: B 
"Vehicles must be classified as a Zero Emission Vehicle (ZEV) by the California Air Resources Board or have 
a green score of 40 or more from the ACEEE annual vehicle rating guide." 
      
418、 What type of water has the highest quality?     
A、  Waste water 
B、  Potable water 
C、  Process water 
D、  Green water 
The correct answer is:    B 
Potable water is water that is suitable for drinking. 
Potable water is water that meets or exceeds EPA's drinking water standards and comes from wells or the 
municipal water supply. 
      
419、 What project site factors may require certain landscape restrictions? (Choose 3) 
A、  Local ordinances 
B、  Building codes 
C、  Neighborhood covenants 
D、  Energy efficiency laws 
E、  Zoning 
The correct answer is:    ABC 
Neighborhood  covenants,  local  ordinances,  and  even  some  building  codes  may  dictate  how  your 
landscape can look. "Zoning is going to define for what purpose the land can be used ‐ office space, retail, 
residential, farmland, etc. Zoning doesn't get into the detail of what trees can be planted and how many." 
Energy efficiency laws do not dictate your landscape design. 
      
420、 What environmental issue is associated with refrigerants used in HVAC&R systems?   
A、  Increasing greenhouse gas emissions 
B、  Soil contamination 
C、  Increased CO2 indoors 
D、  Groundwater contamination 
The correct answer is:    A 
Reference: Treatment by LEED of HVAC Refrigerants 
"Refrigerants  have  ozone  depletion  potential  (ODP)  and  global  warming  potential  (GWP)  due  to 
greenhouse gas emissions. Low values of each are best for refrigerant choices." 
      
421、 The LEED project boundary may not include land that is owned by a party other than that which 
owns the LEED project unless:     
A、  The land is part of a larger campus project 
B、  The land is associated with and supports normal building operations for the LEED project building 
C、  The land will be included in a future LEED certification 
D、  The land will be donated for the purposes of earning an ID point 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      123 / 206 
The correct answer is:    B 
Reference: GBCI website, Policy Manual, Reasonable Site Boundary 
"The only exception to the LEED project boundary of land not owned by the project owner is land that is 
associated with and supports normal building operations for the LEED project building." 
      
422、 Which of the following is a strategy to prevent stormwater runoff?     
A、  Installing a vegetated roof 
B、  Replacing native plants with turf grass to capture and filter the water 
C、  Locating the building 40 feet from a water body 
D、  Minimizing the quantity of open space in the project boundary 
The correct answer is:    A 
A  vegetated  roof  helps  capture  stormwater  on  a  roof.  Minimizing  open  space  would  negatively  affect 
runoff  ‐  you  need  to  maximize  open  space.  "Turf  grass  should  be  avoided  because  it  requires  more 
watering  than  native  plants.  Replacing  plants  with  turf  grass  may  have  a  negative  effect,  because  turf 
grass may have more compact soil and not infiltrate as well." 
      
423、 To earn LEED credits for environmentally preferable materials, wood used on a project should be: 
A、  FSC certified 
B、  ASHRAE approved 
C、  Harvested within 1,500 miles of the project site 
D、  Green Seal certified 
The correct answer is:    A 
FSC certified wood is the type of wood LEED accepts as environmentally preferable due to how the forest 
is managed. 
      
424、 What is the goal of providing secure bicycle storage?    
A、  To keep bicycles dry 
B、  To increase the life cycle of bicycles 
C、  To meet local regulations 
D、  To prevent theft 
The correct answer is:    D 
Glossary: Secure storage is any method or methods that prevent theft 
      
425、 What is SRI?    
A、  Measure of a material's ability to reflect sunlight 
B、  Measure of air quality 
C、  Measure of an automobile's emissions 
D、  Measure of VOC levels in paint 
The correct answer is:    A 
"SRI is an index from 0 to 100 of a materials ability to reflect sunlight. The higher the number the more 
the sunlight the material can reflect. Black asphalt has an SRI of 0." 
      
426、 What standard sets the baseline for commercial plumbing fixtures when establishing a water use 
reduction strategy?    
A、  EPAct of 1992 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      124 / 206 
B、  EPA's WaterSense 
C、  EPAct of 2005 
D、  UPC and IPC Standards for Plumbing Fixture Water Use 
The correct answer is:    A 
The EPA Act of 1992 is used to determine the baseline for commercial fixtures, fittings, and appliances. 
    Commercial toilets: 1.6 gpf 
    Commercial urinals: 1.0 gpf 
    Commercial faucets: 2.2 gpm 
    Etc.   
      
427、 What issues do the ASHRAE standards NOT address?   (Choose 2)     
A、  Plumbing codes 
B、  Energy efficiency 
C、  Heat island measurement 
D、  Thermal comfort 
The correct answer is:    AC 
"ASHRAE  62.1‐2007  Ventilation  for  Acceptable  Indoor  Air  Quality  specifies  minimum  ventilation  rates. 
These rates are used to improve indoor air quality as part of the IEQ credit category." "ASHRAE 55‐2004 
Thermal Environmental Conditions for Human Occupancy help with defining what makes a comfortable 
indoor  environment  for  occupants.  Indoor  conditions  are  considered  acceptable  if  80%  or  more  of 
occupants find them acceptable. " "ASHRAE 90.1‐2007 establishes minimum requirements for the energy 
efficient  design  of  buildings  (not  included  are  single  family  homes  or  multifamily  homes  less  than  3 
stories)." 
      
428、 Letter templates must be signed by which person?     
A、  Assignator 
B、  Project owner 
C、  Declarant 
D、  Project manager 
The correct answer is:    C 
The  declarant  is  the  person  who  will  sign  a  submittal  template.  Each  template  can  have  a  different 
declarant. "Each rating system will have its own set of forms that must be completed and submitted for 
documentation and verification. These forms are called submittals or credit templates, and are dynamic 
PDF forms that can be filled out and saved on a computer then uploaded directly back to LEED Online." 
The  credit  forms  are  also  referred  to  as  letter  templates,  credit  templates,  submittal  templates,  or 
submittals. 
      
429、 What is true about setting the preliminary rating of the project?     
A、  The project team cannot change their target certification level 
B、  The project is guaranteed to achieve the target certification level 
C、  Project fees are assessed based on the preliminary rating 
D、  The preliminary rating determines what credits have been selected to meet the target award level 
The correct answer is:    D 
The  preliminary  rating  defines  the  green  building  goals  of  the  building,  what  credits  will  be  attempted, 
and the targeted certification level. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      125 / 206 
      
430、 USGBC's online portal to green building education is located at what website?     
A、  leedonline.com 
B、  USGBC.org 
C、  greenbuild365.org 
D、  GBCI.org 
The correct answer is:    C 
     
431、 Which of the following are counted as part of the buildable land area?     
A、  Public streets 
B、  Public rights‐of‐way 
C、  Land excluded from residential development by law 
D、  Areas with trees 
The correct answer is:    C 
Reference: LEED for Homes Rating System, Compact Development 
"Buildable land is the portion of the site where construction can occur. When used in density calculations, 
the calculation for buildable land excludes public streets and other public rights of way, and land excluded 
from development by law." 
      
432、 How many Innovation & Design Process Points can a non‐home project earn in LEED v3? 
A、  10 
B、  8 
C、  4 
D、  6 
The correct answer is:    D 
     
433、 What would contribute to community connectivity?   (Choose 2)     
A、  A location near a restaurant 
B、  A location near a parking deck 
C、  A location near mass transit 
D、  A location with pedestrian access 
The correct answer is:    AD 
"Community connectivity channels development to urban areas with existing infrastructure. This includes 
areas with walkways and areas near basic services." "Basic services are those services that are open to the 
public, and are common services that people might use regularly.    People must be able to walk between 
the  project  and  the  service  without  being  blocked  by  walls,  highways,  or  other  barriers  (this  is  called 
pedestrian access). LEED encourages building near a variety of basic services, not just one type of service 
such as twelve clothing stores in a strip mall. LEED provides examples of basic services as:" 
    Bank 
    Church 
    Supermarket / convenience store 
    Day care 
    Dry cleaner / laundry mat 
    Fire station 
    Salon 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      126 / 206 
    Hardware store 
    Library 
    Medical / dental office 
    Park 
    Pharmacy 
    Post office 
    Restaurant 
    School 
    Theatre / museum 
    Community center 
    Gym 
  
434、 Which statement is true about CFCs in the United States? 
A、  CFC production in the United States will be phased out by 2030 
B、  CFC production in the United States ended in 1995 
C、  CFCs are no longer used in the United States 
D、  CFC production in the United States will be phased out by 2010 
The correct answer is:    B 
Under  the  Montreal  Protocol,  CFC  production  in  the  United  States  ended  in  1995.  To  implement  the 
Montreal  Protocol,  the  EPA  established  Section  608  of  the  EPA  Clean  Air  Act  for  regulating  the  use  and 
recycling of ozone‐depleting compounds. Many refrigeration systems of existing buildings still use CFCs in 
the United States. For these projects, the project team can take 5 years from project completion to phase 
out CFC‐based refrigerants, as long as the annual leakage rate of CFC‐based refrigerants is reduced to 5% 
or less. 
  
435、 Which  of  the  following  is  not  an  alternative  LEED  recommends  for  reducing  stratospheric  ozone 
depletion? 
A、  Selecting refrigerants that have a long atmospheric lifetimes 
B、  Selecting refrigerants with lower ODP and GWP 
C、  Using natural refrigerants 
D、  Designing a building to use natural ventilation 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
Refrigerants that are in the atmosphere longer would have a longer (greater) impact on the ozone layer. 
Refrigerants with lower ODP and GWP have a lesser effect on the ozone layer.    Natural refrigerants are 
benign to the atmosphere. Natural ventilation does not require the use of refrigerants and would result in 
no refrigerants gassing into the ozone layer. 
 
436、 What should be included in a construction waste management plan? 
A、  Disposal site for refrigerants 
B、  The goals to be accomplished 
C、  The environmental concerns 
D、  Durability planning 
The correct answer is:    B 
Refrigerants would not be included in construction waste management. They would be disposed of by an 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      127 / 206 
HVAC engineer. The plan should include the goals of the team as well as what will be diverted, where to, 
and  by  whom.  This  is  outside  the  scope of  a  written  construction  waste  management  plan.    Durability 
planning is not part of waste management. 
  
437、 What amount of time do people in the United States spend on average indoors? 
A、  90% 
B、  60% 
C、  70% 
D、  50% 
E、  80% 
The correct answer is:    A 
The  importance  of  the  Indoor  Environmental  Quality  (IEQ)  category  is  partly  due  to  how  much  time 
people  spend  indoors.  How  healthy  the  indoor  environment  is,  such  as  air  quality,  is  related  to  human 
health.   
 
438、 What is NOT a natural refrigerant? 
A、  CO2 
B、  HC 
C、  NH3 
D、  HFC 
The correct answer is:    D 
Make  sure  you  do  not  confuse  HC,  which  is  good  refrigerant,  with  HFC  or  HCFC,  which  are  refrigerants 
that cause environmental issues. 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants   
There are five refrigerants that are benign to the earth's atmosphere. They are: 
CO2 ‐ Carbon dioxide 
H2O ‐ Water 
NH3 ‐ Amonia 
HC ‐ Hydrocarbons, such propane, butane, ethane, isobutene, and isopentane 
Air 
 
439、 Reducing  the  light  pollution  of  a  project  site  to  preserve  night  views  and  not  interfere  with 
nocturnal species may negatively impact what project areas? 
A、Safety and security 
B、Energy conservation 
C、Heat islands 
D、Onsite renewable energy 
The correct answer is:    A 
Light  pollution  and  onsite  renewable  energy  are  unrelated  with  the  exception  the  onsite  renewable 
energy  may  power  part  of  the  building.  Safety  and  security  are  important  issues  when  thinking  about 
external lighting at night. Reducing light pollution helps with energy conservation.    Heat islands and light 
pollution are unrelatee. 
  
440、 If an HVAC engineer is a LEED AP and also a principle participant on a project, what type of credit 
can be earned?? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      128 / 206 
A、Platinum 
B、Bonus 
C、Quantifiable 
D、Innovation in Design 
The correct answer is: D 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Platinum is the highest certification level that can be achieved. Innovation in Design credits and Regional 
Priority credits are grouped as 'bonus points' but there are no 'bonus credits'. There is not a 'quantifiable 
credit'. A requirement of earning an ID point for innovative performance is the credit must be quantifiable 
(measurable).    Projects can earn one Innovation in Design point (and only one) for having at least one 
principle on the project that is a LEED AP. 
  
441、 On a project with older existing HVAC&R system that uses CFCs, what can the project team do to 
earn LEED certification? 
A、Make a phase out plan for the removal of the CFC based refrigerants 
B、Get a state exemption for the HVAC&R system 
C、Recharge the equipment with CFCs 
D、Eliminate all refrigerant leaks 
The correct answer is:    A 
During the phase out plant the leakage rate must be reduced. However just reducing leaks doesn't meet 
LEED requirements. The project team can replace or retrofit the existing system with one that is CFC‐free, 
or agree to have a phase out plan that is completed 5 years after project completion. 
  
442、 Which of the following includes standards for accessible design? 
A、Americans with Disabilities Act 
B、Fair Housing Amendments Act 
C、ASHRAE 
D、Section 504 of the Rehabilitation Act 
The correct answer is:    A 
The Americans with Disabilities Act includes accessibility guidelines. 
 
443、 What is an environmental benefit of increasing the quantity of open space on a project? 
A、A reduction in the LEED boundary 
B、Protection of the site from landslides and floods 
C、More habitat for vegetation and wildlife 
D、A reduction in groundwater recharge 
The correct answer is:    C 
The  groundwater  recharge  should  increase  ‐  not  decrease  ‐  because  there  would  be  more  pervious 
surfaces. Increasing open space helps provide habitat for vegetation and wildlife, stormwater control, and 
reducing the urban heat island effect. 
  
444、 The LEED Credit Checklist allows project teams to mark potential credit achievement as: 
A、Yes/No 
B、Anticipated/Achieved/Denied 
C、Yes/Maybe/No 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      129 / 206 
D、Pursuing/Not Pursuing 
The correct answer is: C 
Reference: Sample credit checklist for LEED v3   
The  LEED  Credit  Checklist  helps  project  teams  track  their  credits  against  requirements  for  certification. 
The LEED Credit Checklist is also called the LEED Scorecard. 
 
445、 CIR submissions should be done: 
A、To determine a project's baseline water use 
B、To change the rating system a project is certifying under 
C、When filling out the LEED checklist 
D、After project registration 
The correct answer is:    D 
CIR  submissions  are  available  only  after  a  project  has  been  registered.  CIRs  are  not  used  to  determine 
baseline measurements for water use. A project team can decide to change the rating system the project 
will be certified under, but the CIR process would not be used for that.    When the project team fills out 
the  LEED  checklist  they  are  determining  what  credits  the  project  is  likely  to  achieve.  CIR  submissions 
would be done after the credits that will be or may be attempted have been selected. 
  
446、 If put the solid waste to landfill,then it will                
A、  reduce the pre‐consumer content                
B、  reduct the post‐consumer content                
C、  the solid waste should be isolated in recycling facility                 
D、  to be diverted in landfill  
The correct answer is:    C 
 
447、 What is the benefit of installing bicycle racks? 
A、Reducing automobile use 
B、Innovation in Design 
C、Reducing heat islands 
D、Communitiy connectivity 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Bicycle  use  is  one  of  the  ways  to  promote  alternative  modes  of  transportation  in  the  Sustainable  Sites 
section. 
 
448、 Which of the following does not help achieve a water‐efficient landscape? 
A、Green roof 
B、Planting with native plants 
C、Planting with adaptive plants 
D、Micro misters 
The correct answer is:    A 
Micro misters, drip irrigation, native and adaptive plants are all strategies to reduce the quantity of water 
needed for irrigation. A green roof does not necessarily reduce water needs. In LEED green roofs help with 
reducing  the  heat  island  effect.  They  can  also  increase  the  energy  efficiency  of  a  building  by  providing 
insulation. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      130 / 206 
  
449、 What is the baseline water demand of a building? 
A、The annual water rate as determined by water bills 
B、The annual fixture and fitting water consumption based on the rates from the EPAct 1992 standard 
C、The annual installed fixture and fitting water consumption rate 
D、The amount of graywater and rainwater harvesting a building is planning to use 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
To calculate water consumption in a building, a baseline water demand is compared to an installed design 
case. The baseline demand uses the fixture and flow rates from the EPAct 1992 standard. For example, 
commercial toilets have 1.6 gallons per flush, commercial urinals have 1.0 gallons per flush. These rates 
for  all  toilets,  urinals,  and  faucets  are  used  to  create  a  baseline.  Also  used  is  the  number  of  Full  Time 
Equivalents  (FTEs)  to  determine  how  frequently  the  fixtures  will  be  used.  The  design  case  water 
consumption (or design demand) calculates the rates based on the higher efficiency fixtures that will be 
installed. For example if waterless urinals are used the design case will calculate them at their zero gallon 
per flush rate. The percent in water savings is determined by dividing the design case by the baseline case 
and subtracting that from the number 1 
Example: 
Baseline case: 100,000 gallons of water / year 
Design case: 60,000 gallons of water /year 
60,000/100,000 = 0.6 
1 ‐0.6 = 0.4 
Percent reduction = 40% reduction 
 
450、 Which of the following causes depletion of the ozone layer? 
A、Mercury 
B、Halons 
C、Heat islands 
D、Solar radiation 
The correct answer is:    B 
Reference: Treatment by LEED of HVAC Refrigerants 
Halons are chemicals commonly used in fire suppression systems and cause ozone depletion. 
 
451、 What attribute should recycled materials have in order to take advantage of synergies with regional 
materials? 
A、Lower life‐cycle costs 
B、More durability 
C、Remanufactured regionally 
D、Low VOCs 
The  correct  answer  is:    COnly  the  choice  of  being  remanufactured  regionally  would  help  with  earning 
credit  for  regional/locally  sourced  materials.  You  may  hear  regional  materials  also  referred  to  as  local 
materials.  Exam  objective  V.B  from  the  GBCI  handbook  is  'Locally  (regionally)  Harvested  and 
Manufactured Materials'. The USGBC GA study guide also has 'Regional/Locally Sourced Materials' in the 
book's  definitions.  The  terms  mean  the  same  thing.  For  LEED,  regional  materials  are  materials  that 
originate within 500 miles of the project site. To be considered regional the materials must be extracted, 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      131 / 206 
processed,  and  manufactured  within  500  miles  of  the  project  site.  For  example  if  lumber  is  extracted 
1,000  miles  away  and  turned  into  flooring  250  miles  from  the  project  site  the  flooring  would  not  be 
considered a regional material. 
 
452、 What statement is true regarding a facility manager? 
A、A facility manager would be most involved in a project for LEED for Existing Buildings: Operations and 
Maintenance 
B、A facility manager that is a LEED AP could not earn a project an Innovation in Design point 
C、A facility manager would not be part of an integrated team 
D、The facility manager has sole responsibility for designing a building recycling plan 
The correct answer is:    A 
In an integrated team more than one person would be involved in the design of any aspect of the LEED 
project.    The  people  running  the  day  to  day  activities  in  an  existing  building  such  as  the  property  or 
facility manager will have the greatest impact on LEED EB success. If the facility manager were a principal 
participant  then  an  ID  point  could  be  earned  for  having  a  LEED  AP  on  the  project.  A  facility  manager 
would be part of the integrated team. 
 
453、 What can help reduce indoor potable water use? 
A、Replacing fixtures with salvaged toilets manufactured in 1992 
B、Installing reduced‐flow aerators on lavatory faucets 
C、Installing a blackwater system 
D、Installing a green roof 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Fixtures made pre‐1993 do not comply with EPAct 1992 and are less efficient than many newer fixtures. 
Retrofitting/designing a building with flow‐restrictors and reduced‐flow aerators helps reduce water use. 
A green roof does not impact the baseline indoor water use. 
  
454、 Average housing density is defined as: 
A、Square Footage of Housing Units / Acres of Buildable Land 
B、Square Footage of Housing Units / 120,000 sq. ft. 
C、Housing Units / 120,000 sq. ft. 
D、Housing Units / Acres of Buildable Land 
The correct answer is:    D 
Reference: LEED for Homes Rating System 
The LEED definition of average housing density is defined as Housing Units / Acres of Buildable Land. 
 
455、 The submittal of a Credit Interpretation Request (CIR) should include: 
A、Drawings 
B、One specific inquiry not in excess of 600 words 
C、A payment of $220 
D、Plans 
E、Cut‐sheets 
The correct answer is:    BC 
Reference: GBCI Credit Interpretation Request (CIR) 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      132 / 206 
CIRs  should  not  include  attachments,  cut‐sheets,  plans,  or  drawings.    CIRs  should  contain  one  concise 
question not in excess of 600 words or 4,000 characters.    Each CIR can be submitted for a fee of $220.00 
  
456、 What is an economic benefit of using Regional Materials? 
A、Reduced transportation costs 
B、Support the use of local resources 
C、Reduce the use and depletion of finite raw materials 
D、To encourage responsible forest management 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
This  question  asks  for  an  economic  benefit.  A  project  that  uses  Regional  Materials  will  reduce  the 
transportation costs of delivering the materials to the project site. B is a social benefit of using Regional 
Materials  because  the  community  is  helped.  C  is  an  environmental  benefit  of  using  rapidly  renewable 
materials. D is an environmental benefit of using certified wood. 
  
457、 Which green building strategies help conserve natural resources? 
A、Installing composting toilets 
B、Choosing product materials with low VOCs 
C、Providing pedestrian access between a project building and basic services 
D、Removing asbestos tiles from an existing building 
The correct answer is:    A 
Asbestos is a hazardous material. Its removal does not help conserve natural resources. Saving water is an 
example of conserving a natural resource. Composting toilets require no water, and thus conserve water 
use.  Low  VOC  products  help  with  indoor  air  quality.  This  impacts  occupant  health  and  does  not  help 
conserver natural resources. Providing pedestrian access between a project building and a basic service is 
an example of community connectivity, not saving natural resources. 
  
458、 What must a project team do prior to phasing out CFC‐based refrigerants? 
A、Reduce the annual leakage of CFCs to 5% or less using EPA Clean Air Act procedures 
B、Select a replacement refrigerant with a long atmospheric lifetime 
C、Select a replacement refrigerant with a nonzero Ozone Depletion Potential (ODP) 
D、Vent any remaining CFCs for disposal to the air prior to decommissioning any equipment 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Venting the CFCs to the air is what you don't want to do. CFCs in the atmosphere are what cause ozone 
depletion. The question asks what must the project team do. Before the phase‐out begins, LEED requires 
reducing the annual leakage of CFCs to 5% or less using EPA Clean Air Act procedures. Refrigerants should 
be selected with short atmospheric lifetimes, not long atmospheric lifetimes. Refrigerants that are best for 
the environment have zero ODP. LEED doesn't require selecting refrigerants with zero ODP, but suggests 
refrigerants be chosen that have low/no ODP. 
  
459、 Which of the following can increase the heat island effect in urban areas? 
A、Reduced air flow from tall buildings and narrow streets 
B、Hardscapes shaded by trees 
C、Large areas of turf grass 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      133 / 206 
D、Underground parking 
The correct answer is:    A 
Underground parking is a LEED strategy to reduce the heat island effect because it reduces the need for 
paved parking surfaces exposed to the sun. The primary cause of the heat island effect is dark surfaces 
such  as  rooftops  or  dark  asphalt  pavement  that  absorb  heat  and  radiate  it  into  the  surrounding  areas. 
Reduced air flow between buildings and narrow streets also increases the effect. Other causes of the heat 
island effect include air‐conditioners, vehicle exhaust, and street equipment. Hardscapes shaded by trees 
is a strategy to reduce the heat island effect. Any type of vegetation will help reduce the heat island effect. 
Plants absorb the heat and do not radiate it. 
  
460、 Designing a building with a natural ventilation system will impact what credit categories? 
A、Materials and Resources 
B、Energy and Atmosphere 
C、Indoor Environmental Quality 
D、Sustainable Sites 
The correct answer is:    BC 
No  credits  from  this  category  are  impacted  by  designing  a  building  with  natural  ventilation.  No  credits 
from MR are impacted by designing a building with natural ventilation. A natural ventilation system (aka 
passive ventilation) will reduce the energy demands of a building. No mechanical cooling system will need 
to installed and run. A natural ventilation system impacts the indoor air quality of a building. Indoor air 
quality is part of this credit category. 
         
461、 What are the results of incorporating green measures through a comprehensive, holistic design? 
A、    Longer schedules 
B、    Credit synergies 
C、    Cost savings 
D、    Shorter schedules 
The correct answer is:    B 
 
462、 What types of water can NOT be used for irrigation purposes?    
A、    Blackwater 
B、    Potable water 
C、    Stormwater 
D、    Laundry water 
The correct answer is:    A 
 
463、 What is a density radius calculation used for?     
A、    To define the project site area 
B、    To define the area where basic services are located 
C、    To measure any bus/rail line locations relative to the entrance of a building 
D、    To define properties included in the development density calculation 
The correct answer is:    D 
 
464、 What is a characteristic of open‐grid pavement? 
A、It is 100% impervious 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      134 / 206 
B、Vegetation can grow in it 
C、It is at least 50% impervious 
D、It is at least 75% impervious 
The correct answer is:    B 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
Open grid pavement is pavement that is less than 50% impervious and contains vegetation in the open 
cells.Here is an example of open grid pavement: 
http://i.treehugger.com/files/th_images/hastings.jpg 
Open grid pavement is different than pervious pavement. 
Pervious pavement is designed to allow percolation or infiltration of stormwater through the surface into 
the  soil  below  where  the  water  is  naturally  filtered  and  pollutants  are  removed.  In  contrast  normal 
pavement is an impervious surface that sheds rainfall and associated surface pollutants forcing the water 
to run off paved surfaces directly into nearby storm drains and then into streams and lakes. 
Here is an example of pervious pavement: 
http://www.us‐concrete.com/images/news_pervious_a. jpg 
 
465、 The life cycle cost analysis of a green roof would include what factors? 
A、Design of the roof 
B、Quantity of stormwater diverted 
C、Irrigation costs 
D、Yearly inspection fees for the roof 
The correct answer is:    CD 
Inspection fees are a maintenance cost issue that would be included.   
Life  cycle  costing  is  used  to  evaluate  economic  performance  and  takes  into  account  operational  and 
maintenance  costs  throughout  the  life  of  the  product.    The  initial  design  is  not  an  operational  or 
maintenance cost.   The  quantity of  stormwater  diverted  is unrelated.  Irrigation  costs  are  an  operational 
cost that would be included. 
  
466、 A project is anticipating earning Innovation in Design for exemplary performance for three different 
credits. What statement is true about this achievement? 
A、A LEED AP will need to submit the credits for review 
B、The credits will be submitted for final review by the project administrator 
C、The credits are submitted using the CIR process 
D、The project team will need to submit fees for each of the credits 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
LEED APs help streamline the certification process but are not required to submit any/all documentation. 
For the final review the project administrator is responsible for submitting all credits for review. ID credits 
are not part of the CIR process. ID credits are included as part of the LEED application process and do not 
have separate fees. CIRs have extra fees that must be paid when submitting them. 
  
467、 What strategies does the EPA recommend for waste reduction? 
A、Locally manufactured materials 
B、Reuse 
C、Sustainable materials 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      135 / 206 
D、Source reduction 
E、Recycling 
The correct answer is:    BDE 
Source reduction, reuse, and recycling are the three ways EPA ranks as reducing waste the most. The use 
of sustainable materials helps the environment but does not necessarily impact waste reduction. 
                
468、 The calculation of total cost and yearly savings in comparison with convential projects is called:   
A、  energy star                 
B、  life cycle assessment                 
C、  carbon footprint                 
D、  development footprint       
The correct answer is:    B 
  
469、 Which statement is true regarding the LEED for Commercial Interiors rating system? 
A、  A project must occupy at least 1,000 square feet (93 square meters) of gross floor area to earn LEED 
for Commercial Interiors certification 
B、  Projects with tenants that occupy the entire building are ineligible for LEED for Commercial Interiors 
certification 
C、  Tenants  that  occupy  less  than  10%  of  the  building  can  earn  LEED  for  Commercial  Interiors 
certification 
D、  LEED for Commercial Interiors certification can only be achieved if the building has already achieved 
LEED for Core and Shell certification 
The correct answer is:    C 
Reference: USGBC Website 
A  project  must  occupy  at  least  250  square  feet  (22  square  meters)  of  gross  floor  area  to  earn  LEED  for 
Commercial  Interiors  certification.  A  tenant  can  occupy  100%  of  a  building  and  still  receive  LEED  CI 
certification. There are no space requirements for LEED CI certification, other than the Minimum Program 
Requirements  for  any  certification  which  requires:  'The  LEED  project  must  include  a  minimum  of  250 
square  feet  (22  square  meters)  of  gross  floor  area.'  While  LEED  CI  and  LEED  CS  often  go  hand‐in‐hand, 
LEED CS is not required as a precursor to LEED CI certification. 
 
470、 Gray or white concrete generally have a _________ reflectance and a ________ SRI valuE、   
A、  lower, higher 
B、  higher, lower 
C、  lower, lower 
D、  higher, higher 
The correct answer is:    D 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary   
Solar Reflectance Index (SRI): a value that incorporates both solar reflectance and emittance in a single 
value to represent a material's temperature in the sun. SRI quantifies how hot a surface would get relative 
to standard black and standard white surfaces. It is expressed as a fraction (0.0 to 1.0) or percentage (0% 
to 100%). Materials with the highest SRI values are the coolest choices for paving.Dark paving materials 
generally  have  a  low  reflectance  and  low  SRI.Gray/white  paving  materials  generally  have  a  higher 
reflectance and a higher SRI value. To reduce the heat island effect cover the surface with materials that 
have a high (not low) SRI value.   
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      136 / 206 
 
471、 Refrigerants  have  lower  ozone  depletion  potential  (ODP)  and  global  warming  potential  (GWP). 
What is ozone depletion potential that refers to the amount of ozone depletion caused by a substance? 
A、    A number 
B、    A variable 
C、    A component 
D、    A factor 
E、    A portion 
The correct answer is:    A 
Ozone Depletion Potential (ODP) is a number that refers to the amount of ozone depletion caused by a 
substance.   
 
472、 What refrigerant has the greatest ozone depletion potential (ODP)? 
A、  CO2 
B、  HFC‐23 
C、  CFC‐11 
D、  HCFC‐22 
The correct answer is:    C 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
HCFC‐22  has  a  low  ODP,  but  HCFCs  were  still  banned  under  the  Montreal  Protocol.  CO2  is  a  natural 
refrigerant  and  has  an  ODP  of  zero.  HFCs  have  a  negligible  ODP  but  a  higher  global  warming  potential 
(GWP). CFC‐11 and CFC‐12 set the bar for ozone depletion potential against what all other refrigerants are 
measured.   
 
473、 Which LEED category has the least total number of points a project can earn? 
A、  Sustainable Sites 
B、  Energy and Atmosphere 
C、  Water Efficiency 
D、  Indoor Environmental Quality 
The correct answer is:    C 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Energy  and  Atmosphere  has  the  greatest  number  of  points  available  to  earn  in  any  of  the  LEED  rating 
systems.  The LEED  volunteer  committees  weighted  this  group,  and thus  energy consumption,  as  having 
the greatest impact on the environment.    Water efficiency (WE), while of great importance, can earn the 
least number of points out of the possible choices. In some LEED rating systems, Materials and Resources 
can earn slightly less points, though on average the WE category has the least number of points. 
 
474、 The number of occupants in a building would be used for what calculations? 
A、  Water use baseline 
B、  Development density 
C、  Energy use intensity 
D、  Building density 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
The number of occupants, the flush and flow rates of fixtures, and usage patterns are used to calculate 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      137 / 206 
baseline and design case water use rates. Development density is the total square footage of all buildings 
within  a  particular  area,  measured  in  square  feet  per  acre  or  units  per  acre(USGBC).  C  is  the  energy 
consumption divided by the number of square feet in a building. Building density is the floor area of the 
building divided by the total area of the site (square feet per acre). (USGBC) 
  
475、 What strategy is least applicable to successful waste reduction? 
A、  Providing reusable water bottles to occupants 
B、  Installing personal recycling bins 
C、  Finding local haulers to reduce transportation costs 
D、  Finding products that use less packaging 
The correct answer is:    C 
Reducing  transportation  costs  does  not  reduce  waste.  The  remaining  choices  are  examples  of  source 
reduction, reuse, and recycling. These three integrated strategies maximize waste reduction. 
               
476、 What are counted as recycled materials?(choose 2)       
A、  aluminium can                 
B、  excavated soil                 
C、  carpet                 
D、  granit flooring    
The correct answer is:    AC 
 
477、 When encouraging bicycle use, what should be addressed for campus projects or office buildings? 
A、  Providing shaded spots for the bicycles 
B、  Providing showering and changing facilities 
C、  Providing free helmets to bicyclers 
D、  Allowing extra time for people to commute 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Bicycle  racks,  lockers,  indoor/outdoor  storage  rooms  must  be  secure.  Showering  facilities  must  be 
provided for commercial projects. 
 
478、 What type of water has the highest quality? 
A、  Stormwater 
B、  Well water 
C、  Graywater 
D、  Non‐potable water 
The correct answer is:    B 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary   
Potable  water  is  water  that  is  suitable  for  drinking.  Potable  water  is  water  that  meets  or  exceeds  EPA's 
drinking  water  standards  and  comes  from  wells  or  the  municipal  water  supply.    Stormwater  is  not 
potable.  Graywater  is  not  potable.    Graywater  is  defined  by  the  Uniform  Plumbing  Code  (UPS)  as 
untreated  house‐hold  wastewater  which  has  not  come  into  contact  with  toilet  waste  or  kitchen 
sinks.Graywater  includes  used  water  from  bathtubs,  showers,  bathroom  wash  basins,  and  water  from 
clothes‐washer  and  laundry  tubs.  It  does  not  include  water  from  kitchen  sinks  or  dishwashers. 
Non‐potable  water  is  not  suitable  for  drinking.  Non‐potable  water  includes  stormwater,  graywater,  and 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      138 / 206 
blackwater. 
  
479、 What is a Minimum Project Requirement (MPR) for LEED Certification? 
A、  A minimum occupancy rate of 300 Full Time Equivalents (FTEs) 
B、  A minimum occupancy rate of 100 Full Time Equivalents (FTEs) 
C、  A minimum occupancy rate of 25 Full Time Equivalents (FTEs) 
D、  A minimum occupancy rate of 1 Full Time Equivalent (FTE) 
The correct answer is:    D 
Reference: Minimum Program Requirements 
LEED MPRs require 1 FTE on an annual average   
 
480、 What may happen if a project does not comply with the minimum program requirements? 
A、  An alternative compliance path can be used 
B、  The building's certification may be revoked, if the project has earned a LEED certification 
C、  Additional fees or fines may be incurred 
D、  The project team will need to submit a CIR 
The correct answer is:    D 
A project must adhere to the LEED Minimum Program Requirements, (MPRs) in order to achieve/retain 
LEED certification. Failure to comply with MPRs may result in the certification being revoked. No fees will 
be refunded. A project can meet the MPRs prior to certification, then earn project certification, and later 
on something may change where the project no longer meets the MPRs. An example of this scenario is if 
the occupancy rate of the building decreases. Note that after the project is certified (attained any LEED 
certification at any level) the project must continue to meet the MPRs or certification can be revoked. For 
example if a hotel is certified and then the hotel shuts down, the hotel is not maintaining the minimum 
occupancy levels required by the MPRs. The certification could be revoked.   
 
481、 What minimum water savings are LEED v3 projects required to achieve? 
A、  20% 
B、  10% 
C、  15% 
D、  0% 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
The  Water  Use  Reduction  prerequisite  requires  a  20%  reduction  of  the  design  case  compared  to  the 
baseline case.   
 
482、 What site features are included in the landscape area? 
A、  Paved bicycled path 
B、  Walkway made of recycled rubber tires 
C、  Area with invasive plants 
D、  The building 
The correct answer is:    A 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
The  landscape  area  of  the  site  is  the  total  site  area  less  the  building  footprint,  hardscape  area,  water 
bodies,  etc.  The  question  asked  what  areas  are  included.    Any  area  that  has  plants  must  be  included, 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      139 / 206 
whether  the  plants  are  invasive  or  not.  Even  though  the  area  includes  invasive  plants  which  are 
undesirable,  they  must  still  be  included  in  the  calculation.  Invasive  plants  should  be  removed  from  the 
landscape if possible.   
 
483、 Which of the following credits do NOT qualify for exemplary performance? 
A、Brownfield Redevelopment 
B、On‐site Renewable Energy 
C、Material Reuse 
D、Green Power 
The correct answer is A   
There is no opportunity to earn an exemplary performance points for Brownfield Redevelopment. Green 
Power,  On‐site  Renewable  Energy,  and  Material  Reuse  all  present  opportunities  for  projects  to  exceed 
minimum credit requirements and earn an exemplary performance point. 
 
484、 A bioswale would be used to help earn credit in what LEED category? 
A、  Indoor Environmental Quality 
B、  Sustainable Sites 
C、  Water Efficiency 
D、  Energy and Atmosphere 
The correct answer is:    C 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Bioswales are landscape elements designed to remove silt and pollution from surface runoff water. They 
consist of a swaled drainage course with gently sloped sides and filled with vegetation, compost and/or 
riprap. Bioswales would be used to help improve the quality of stormwater runoff. 
 
485、 What does the use of light colored pervious paving help with? 
A、  Heat island effect 
B、  Construction waste management 
C、  Durability 
D、  Irrigation 
The correct answer is:    A 
Don't confuse pervious paving with irrigation demand. Pervious paving can help with stormwater runoff 
but  doesn't  reduce  water use  for  irrigation.  Light  colored  paving, or  paving  with  a  high  SRI  value,  helps 
reduce  the  heat  island  effect.  Pervious  paving  helps  with  reducing  stormwater  runoff  by  allowing 
stormwater to percolate through the pavement. The heat island effect is created when developed areas 
have higher temperatures than surrounding rural areas. An urban heat island effect is caused by sunlight 
heating  up  dark  colored  surfaces  such  as  roads  and  rooftops.  Huge  quantities  of  heat  are  generated  in 
buildings that have dark rooftops and absorb heat rather than reflect it. Pervious paving is not necessarily 
more durable than regular paving. 
  
486、 What is a brownfield? 
A、  A site without vegetation 
B、  A site that may be contaminated with hazardous waste or pollution 
C、  A site without grass 
D、  A site that has been graded 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      140 / 206 
The correct answer is:    B 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
A brownfield is 'real property whose use may be complicated by the presences or possible presence of a 
hazardous substance, pollutant, or contaminant.' (USGBC) Projects may get special deals on developing on 
these sites if the owner cleans them up first. 
 
487、 A project team discovers a new way to avoid the heat island effect. How does the LEED certification 
process reward this new concept? 
A、  An extra Heat Island Effect point would be awarded 
B、  An innovative performance point would be awarded 
C、  An exemplary performance point would be awarded 
D、  Heat Island Effect is covered by LEED, so no additional points would be given 
The correct answer is:    D 
Innovative  performance  as  part  of  the  Innovation  in  Design  or  Operations  category  is  meant  for  green 
building categories not specifically addressed by LEED. Innovation credits are not awarded for the use of a 
particular product or design strategy if the technology aids in the achievement of an existing LEED credit. 
USGBC/GBCI uses the CIR process for cases like this. A CIR could be submitted that specifies an alternate 
way to earn the Heat Island credit. However only the Heat Island credit would be earned, not an ID point 
or extra points. 
 
488、 What area is NOT considered previously developed? 
A、  Unused parking lot 
B、  Nature preserve 
C、  Stone quarry 
D、  Racetrack 
The correct answer is:    B 
Reference: LEED for Homes Rating System 
A parking lot has paving on it and would be considered previously developed.Previously developed land 
has pre‐existing paving, construction, or significantly altered landscapes. Land that has been altered and 
turned  into  a  natural  use  such  as  agricultural,  forestry,  or  nature  preservation  can  no  longer  count  as 
previously developed. A stone quarry is an altered landscape.    A race track is an altered landscape. 
  
489、 In a state with a closed electricity market, how can off‐site green power be purchased? 
A、  Have certified wood scraps delivered onsite for burning 
B、  Through an ENERGY STAR approved utility provider 
C、  Purchase power from a USGBC approved provider 
D、  Enroll in a Green‐e renewable power program from the utility provider 
The correct answer is:    D 
Reference: Guide to Purchasing Green Power 
A may help with generating on‐site renewable energy. ENERGY STAR does not approve power providers. 
USGBC  does  not  approve  power  providers.  Some  utility  companies  allow  the  purchase  of  renewable 
energy, sometimes for a price premium. Make sure the source of the energy is Green‐e certified for it to 
qualify for LEED credit. 
  
490、 A site described as accessible means the site meets the requirements of which standard? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      141 / 206 
A、  AIA 
B、  GBCI 
C、  USGBC 
D、  ADA 
The correct answer is:    D 
ADA stands for Americans with Disabilities Act. 
Accessible describes a site, building, facility, or portion thereof that complies with the guidelines outlined 
in the ADA Standards for Accessible Design. 
 
491、 What statement is true regarding the Clean Air Act? 
A、  No production and no importing of any HCFCs will be allowed after 2030 under the Clean Air Act 
B、  The  Sustainable  Sites  category  references  the  Clean  Air  Act  in  regards  to  airborne  dust  generation 
from construction activities 
C、  The Clean Air Act provides recommendations on carbon emissions for all new commercial buildings 
D、  The Clean Air Act defines what constitutes a low‐emitting or fuel‐efficient vehicle 
The correct answer is:    A 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
The  United  States  implemented  HCFC  phaseout  through  Clean  Air  Act  Regulations.  Under  the  Clean  Air 
Act in 2030 no production and no importing of any HCFCs is allowed. This is achieved by following the EPA 
Construction General Permit, or local codes, whichever is more stringent. Neither LEED, nor the Clean Air 
Act provides any type of limit or recommendation on how much carbon emission a building should have. 
LEED has its own definitions of low‐emitting and fuel‐efficient vehicles. The Clean Air Act provides no such 
definitions. 
  
492、 A rainwater harvesting system can help with: 
A、  Water efficiency 
B、  Stormwater management 
The  most  effective  method  to  minimize  runoff  volume  and  treatment  requirements  is  to  reduce  the 
amount of impervious areA、   
C、  Heat island effect 
D、  Site restoration 
The correct answer is:    AB 
Rainwater harvesting does not help restore sites. 
Stormwater can be diverted into cisterns or other storage tanks for use in landscaping, inside for fixture 
flushing, and for process water needs. Rainwater cisterns (tanks) can be used as a structural measure to 
remove pollutants from runoff. Rainwater harvesting does not reduce the heat island effect. 
 
493、 What would the drawing of a 1/2 mile radius around a project on a site map help the project team 
determine? 
A、  Proximity to basic services 
B、  Proximity to public transportation 
C、  Proximity to open space 
D、  Proximity to off‐site renewable energy 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      142 / 206 
A  is  how  project  teams  determine  basic  services  for  community  connectivity.  Access  to  public 
transportation is determined by measuring walking distance to the transit stop.    Open space is part of 
the  project  site,  not  around  it.  Off‐site  renewable  energy  can  be  purchased  from  anywhere  and  is  not 
limited by distance or a radius around the project site. 
  
494、 What  percentage  of  waste  does  construction  and  demolition  debris  contribute  to  landfills  each 
year in the United States? 
A、  30% 
B、  20% 
C、  40% 
D、  50% 
The correct answer is:    C 
Construction and demolition debris make up 40% of the solid waste stream in the United States.   
 
495、 A project that uses 100% green power can earn credit in what LEED categories? 
A、  Sustainable Sites 
B、  Innovation in Design 
C、  Water Efficiency 
D、  Indoor Environmental Quality 
E、  Energy and Atmosphere 
The correct answer is:    BE 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
A project can also earn points for exemplary performance under Innovation in Design if the project meets 
the  exemplary  performance  requirements.  For  example  in  the  LEED  NC  rating  system  a  project  would 
need  to  purchase  100%  green  power  to  earn  exemplary  performance.  Green  power  is  awarded  points 
under the Energy and Atmosphere credit category. 
  
496、 What  statement  is  true  regarding  wool  carpet  made  from  wool  leftover  from  the  carpet 
manufacturing process? 
A、  This material does not contain recycled content 
B、  This material is an example of post‐consumer recycled content 
C、  This material is an example of post‐industrial recycled content 
D、  This material is an example of pre‐consumer recycled content 
The correct answer is:    A 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
A would not be considered any type of recycled material. If a manufacturing process uses scraps and puts 
them back in the assembly line, it is a good practice but it does not count towards pre or post consumer 
recycled content.    Post‐consumer  material  ‐  is  material  recycled  from  consumer  waste.  Postconsumer 
recycled  content  ‐  is  the  percentage  of  material  in  a  product  that  was  consumer  waste.  The  recycled 
material was generated by household, commercial, industrial, or institutional end‐users and can no longer 
be  used  for  its  intended  purpose.  It  includes  returns  of  materials  from  the  distribution  chain.  Examples 
include  construction  and  demolition  debris,  materials  collected  through  recycling  programs,  discarded 
products  (e.g.,  furniture,  cabinetry,  decking),  and  landscaping  waste  (e.g.,  leaves,  grass  clippings,  tree 
trimmings).  (ISO  14021)  Pre‐consumer  content  ‐  formerly  known  as  post‐industrial  content,  is  the 
percentage of material in a product that is recycled from manufacturing waste. Examples include planer 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      143 / 206 
shavings, plytrim, sawdust, chips, bagasse, sunflower seed hulls, walnut shells, culls, trimmed materials, 
print overruns, overissue publications, and obsolete inventories. Excluded are materials such as rework, 
regrind,  or  scrap  generated  in  a  process  and  capable  of  being  reclaimed  within  the  same  process  that 
generated it (ISO 14021). Post‐industrial content is now called pre‐consumer content. 
  
497、 With regards to refrigerants, what is a natural conflict between the prevention of ozone depletion 
and global warming? 
A、  Refrigerants that deplete the ozone layer are less efficient 
B、  Refrigerants contain global warming gases 
C、  Refrigerants contain ozone layer gases 
D、  Refrigerants that are neutral to the ozone layer are less efficient 
The correct answer is:    D 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
If  a  cooling  system  achieves  greater  efficiency  only  at  the  environmental  price  of  using  a 
chlorine‐containing refrigerant, an inevitable environmental conflict exists. 
 
498、 What environmental issue occurs from stormwater runoff? 
A、  Ozone depletion 
B、  Heat islands 
C、  Sedimentation 
D、  Blackwater 
The correct answer is:    C 
Stormwater  consists  of  rainwater  and  melted  snow  that  run  off  streets,  lawns,  farms,  and  construction 
and industrial sites. Stormwater runoff can lead to sedimentation. Sedimentation is where pollutants from 
natural or human activities add particles to water bodies. Pollutants come from soil, fertilizer, oil or gas on 
roadways,  pesticides,  etc.  Stormwater  runoff  should  be  controlled  onsite  by  harvesting  the  water, 
increasing open space, and reducing impervious surfaces. 
 
499、 On average what part of a building consumes the most energy in the United States? 
A、  Water heating 
B、  Cooling 
C、  Lighting 
D、  Space heating 
The correct answer is:    D 
Reference: Green Building & LEED Core Concepts Guide 
Water heating consumes 8% of a building's energy use. Cooling consumes 7% of a building's energy use. 
Lighting consumes 20% of a building's energy use. Space heating consumes 38% of a building's energy use, 
on average. While our study guide states 'Lighting is often the largest contributor to a building's energy 
use'  on  average  space  heating  is  the  greatest  contributor.  The  difference  can  be  the  climate  where  the 
building is located. 
  
500、 What percent of water chillers in existing buildings still use CFCs? 
A、  30% 
B、  40% 
C、  50% 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      144 / 206 
D、  20% 
The correct answer is: C 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
In  the  U.S.,  99%  of  buildings  are  existing  buildings;  of  those,  50%  are  older  buildings  that  have  old, 
inefficient,  leaky  chillers  that  use  CFCs.  Replacing  or  retrofitting  these  units  could  save  energy  while 
reducing the negative environmental effects of CFC use.   
 
501、 A multi‐family building that is 3 stories in height would be certified under what rating system? 
A、  LEED for Core and Shell 
B、  LEED for Commercial Interiors 
C、  LEED for Homes 
D、  LEED for New Construction 
The correct answer is: C 
LEED  for  Core  &  Shell  is  a  green  building  rating  system  for  designers,  builders,  developers  and  new 
building  owners  who  want  to  address  sustainable  design  for  new  core  and  shell  construction.  Core and 
shell  covers  base  building  elements  such as  structure, envelope  and  the  HVAC  system.  LEED  for  Core  & 
Shell is designed to be complementary to the LEED for Commercial Interiors rating system, as both rating 
systems  establish  green  building  criteria  for  developers,  owners  and  tenants.  LEED  for  Commercial 
Interiors  is  appropriate  for  interior  spaces  that  are  undergoing  alteration  work  for  at  least  60%  of  the 
certifying  gross  floor  area.  LEED  for  Homes  is  appropriate  for  single  family  and  low‐rise  (1‐3  stories) 
multifamily  residential  buildings  that  are  undergoing  new  construction  or  a  gut  rehab.  Projects  with 
kitchens,  dormitories  and  assisted  living  facilities  may  use  LEED  for  Homes.  Mid‐rise  (4‐6  stories) 
multifamily residential buildings, dormitories, and assisted living facilities may use either LEED for Homes 
or the LEED for Homes Mid‐Rise Pilot Rating System. This depends on whether kitchens are present in the 
units.  LEED  for  New  Construction  is  primarily  for  whole  buildings  that  are  new  or  undergoing  major 
construction.  This  rating  system  is  appropriate  for  any  project  that  does  not  have  another  LEED  rating 
system  defined  (Schools,  Healthcare,  Retail).  LEED  NC  can  be  used  for  residential  projects  of  4  or  more 
stories. 
  
502、 Which statement is true regarding a LEED for New Construction project? 
A、  No refrigerants are used in the building 
B、  This rating system can be used for tenant spaces 
C、  The owner or tenant must occupy more than 50% of the building's leasable square footage 
D、  No refrigerants are used in the HVAC systems 
The correct answer is: C 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
LEED NC projects allow the use of refrigerants. Projects for tenant spaces would use LEED for Commercial 
Interiors (CI). The owner or tenant must occupy more than 50% of the building's leasable square footage 
to  pursue  LEED  NC  otherwise  the  project  should  pursue  LEED  for  Core  &  Shell.  Do  not  confuse  no 
refrigerants  with  no  CFC‐based  refrigerants.  This  rating  system  allows  the  use  of  refrigerants,  just  not 
CFC‐based ones. 
  
503、 What is Global Warming Potential as it relates to refrigerants? 
A、  The efficiency of a refrigerant 
B、  Speed at which an appliance loses its refrigerant 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      145 / 206 
C、  A measurement of how much effect the given refrigerant will have on global warming in relation to 
carbon dioxide. 
D、  The potential for a single molecule of the refrigerant to destroy the ozone layer 
The correct answer is: C 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
A is no LEED value which identifies refrigerant efficiency. B is the leakage rate for a piece of equipment. 
CO2 has a GWP of 1. This is usually measured over a 100‐year period. In this case the lower the value of 
GWP the better the refrigerant is for the environment. D is the Ozone Depletion Potential (ODP). 
  
504、 Reduced emissions are a benefit of purchasing: 
A、  RECs 
B、  Recycled water 
C、  Materials with high SRI 
D、  Certified wood 
The correct answer is: A 
Reference: Guide to Purchasing Green Power 
RECs are a tradable commodity representing the 'greenness' of green power. They are purchased when a 
project does not have access to green power through their utility provider. However, this isn't a way to 
bypass purchasing power; when RECs are purchased the project still needs to pay the normal electricity 
bills.  RECs  represent  the  reduced  emissions  of  renewable  energy  compared  to  conventional  fossil  fuels. 
RECs are sold separately allowing people to purchase the 'greenness' of the electricity. This allows anyone 
to  purchase  an  REC  even  if  the  power  to  their  building  is  not  green  power.  RECs  have  no  geographic 
constraints, because they are sold separately from electricity. A project in Maine can purchase RECs from 
any  other  state.  RECs  cannot  be  purchased  for  a  project's  own  on‐site  renewable  energy  systems.  For 
example if a project has a solar array, the building owner could not issue RECs to themselves. Recycled 
water supplied by municipalities helps reduce potable water use. Materials with high SRI help reduce the 
heat island effect.    Sustainable forestry is the environmental benefit of certified wood. 
  
505、 Which of the following strategies have earned innovation in design / operations in the past? 
A、  Implementing a green parking design 
B、  Using organic foods in a cafeteria 
C、  Using high volume fly ash in concrete 
D、  Implementing an educational outreach program 
The correct answer is: CD 
Green  education  is  one  of  the  most  common  innovation  points  projects  often  add.  These  programs 
outline the green building strategies used in the building. The programs may include self‐guided tours or 
computer kiosks in the main entryway of the building so visitors can learn about the building.    Reducing 
the parking requirements is covered in LEED in the reduced parking design credits.   Organic  food  use  is 
not considered an innovative design. Fly ash is a byproduct of burning coal and can be used to offset the 
quantity of cement used in concrete mix. 
  
506、 What information can be entered in the LEED Score Card? 
A、  Certification estimate 
B、  Points attempted for prerequisites 
C、  USGBC Member ID 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      146 / 206 
D、  If the credit will be streamlined 
The correct answer is: A 
Reference: Sample credit checklist for LEED v3 
The  LEED  Credit  Checklist  helps  project  teams  track  their  credits  against  requirements  for  certification. 
The LEED Credit Checklist is also called the LEED Scorecard. Filling out the scorecard allows project teams 
to determine a project's preliminary certification rating (or level). 
 
507、 What are indigenous plants? 
A、  Plants that require lots of fertilizer 
B、  Plants with high watering requirements 
C、  Plants that are high maintenance 
D、  Plants that have been in the area for many years and are not invasive 
The correct answer is: D 
Native plants are those that grow naturally in an area, or that have been in an area for many years. Native 
plants require less water, fertilizer, and pest control. These plants can be trees, shrubs, flowers, or grasses. 
Adaptive plants are non‐native plants that perform well in the local climate. Native and adaptive plants 
require less water, and are more disease resistant because they are suited to the region's usual rainfall, 
soil, and temperature.   
 
508、 A project that builds on a greenfield has selected what type of site? 
A、  A site that was previously public parkland 
B、  A site that is farmland 
C、  A site located in an urban area 
D、  A site that hasn't been developed on before 
The correct answer is: D 
Reference: Green Building & LEED Core Concepts Guide 
Public parkland may or may not be a greenfield but not all greenfields are public parkland.    Farmland can 
be  considered  a  greenfield  but  not  all  greenfields  are  farmland.  Greenfields  are  normally  in  suburban 
areas.    Greenfields are sites not previously developed or graded that could support open space, habitat, 
or agriculture. LEED prefers not building on greenfields but using previously developed land instead.   
  
509、 What does the IPMVP Volume III provide information on? 
A、  Best practices for verifying the energy performance of a new building 
B、  Government restrictions for the water flow limits of fixtures 
C、  Best design techniques for acoustics in schools 
D、  Best management practices for construction activity pollution prevention 
The correct answer is: A 
The IPMVP Volume III is used for measurement & verification, and provides best practice techniques for 
verifying the energy performance of a new building.You can view the IPMVP v3 here if you want to take a 
quick look: http://www.p2pays.org/ref/41/40512.pdf 
Don't spend too much time in this document ‐ the link is only provided to reinforce your knowledge. The 
document isn't in the exam reference materials so don't read this document for more than a minute. The 
standard is used in the rating systems and you should be familiar with what the standard is used for. 
 
510、 To earn LEED credits for environmentally preferable materials, wood used on a project should be: 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      147 / 206 
A、  Green Seal certified 
B、  FSC certified 
C、  Harvested within 1,500 miles of the project site 
D、  ASHRAE approved 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Green Seal is a certification for paints, not wood. FSC certified wood is the type of wood LEED accepts as 
environmentally preferable due to how the forest is managed. If the wood was harvested within 500 miles 
it would be environmentally preferable. ASHRAE is unrelated to wood. 
  
511、 A project team has excluded a section of land in order to meet the requirements of one of the LEED 
credits. What is true about this action? 
A、  This action is allowed if the gross floor area of the LEED project building is less than 2% of the gross 
land area within the LEED project boundary 
B、  Certain  sections  of  land  can  be  excluded  from  the  site  boundary  if  a  responsible  party  submits  a 
licensed professional exemption form 
C、  This action would not be allowed under any of the rating systems 
D、  This action would only be allowed under the LEED for Existing Buildings: Operations & Maintenance 
rating system 
The correct answer is: C 
Reference: LEED 2009 Minimum Program Requirements 
If the gross floor area is less than 2% of the gross land area within the LEED project boundary the project 
doesn't  meet  the  Minimum  Program  Requirements.  'The  Licensed  Professional  Exemption  Form  can  be 
used  by  a  project  team's  registered  professional  engineer,  registered  architect,  or  registered  landscape 
architect to submit a streamlined path to certain credits, bypassing otherwise required submittals.' ‐ O&M 
Introduction    Land cannot be excluded for the purposes of complying with a credit/prerequisite. This is 
known as gerrymandering. 
  
512、 Which of the following statements are true about Credit Interpretation Requests (CIRs)? 
A、  CIRs can be submitted for prerequisites 
B、  CIRs can only be submitted during the design phase of a project 
C、  Product vendors can access all CIRs to meet any updated credit requirements 
D、  CIRs cannot be submitted in regards to the LEED Accredited Professional credit 
The correct answer is: A 
Reference: Guidelines for CIR Customers 
CIRs can be submitted for any prerequisite or credit for the project's rating system.   CIRs can be submitted 
at any time up until the project administrator submits all of the documentation for certification. Inquiries 
must  request  guidance  on  just  one  credit  or  prerequisite  (unless  there  is  technical  justification  to  do 
otherwise) and generally contain one concise question or a set of related questions. It is often helpful to 
discuss the inquiry within context of the credit's intent. Anyone on the project team (after being added to 
LEED Online for that project) can submit the CIR, then someone has to pay GBCI for the review of the CIR. 
Anyone on the project team can access the CIRs for that specific project. A project vendor does not have 
access to all CIRs. CIRs can be submitted for any prerequisite or credit for the project's rating system. 
  
513、 Selecting which of the following sites would have the greatest positive environmental impact? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      148 / 206 
A、  Parkland near basic services 
B、  An old building 
C、  A previously undeveloped site 
D、  Locating the project near public parking 
The correct answer is: B 
Parkland is open space (though not for the project) and should be avoided for building on. Redeveloping 
(or  reuse)  of  an  existing  site  significantly  minimizes  the  project's  impact  on  the  environment.  It  also 
provides the project team opportunity to reuse existing infrastructure. This is a greenfield site and would 
not be the best choice for building on.    Locating the project near public parking may reduce the project's 
parking needs but this is not the best answer choice.   
  
514、 What would qualify as preferred parking for LEED? 
A、  Providing discounted parking passes for low‐emitting and fuel efficient vehicles 
B、  Delivery truck parking 
C、  Bicycle parking 
D、  Visitor drop‐off areas 
The correct answer is: A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Preferred  parking  spaces  are  for  particular  users  and  are  parking  spaces  that  are  closest  to  the  main 
entrance  of  a  project.  They  do  not  include  handicapped  parking.  For  LEED,  other  forms  of  preferred 
parking include discounted parking passes, designated covered spaces, and guaranteed passes in a lottery 
system.  Preferred  parking  is  a  strategy  by  LEED  to  reduce  the  pollution  from  automobiles.  Preferred 
parking  is  reserved  for  carpools,  vanpools,  and  occupants  who  drive  low‐emitting  and  fuel  efficient 
vehicles.  Each  of  these  drivers  help  reduce  automobile  use  and/or  emissions.  LEED  allows  providing 
discounted  parking  passes  to  owners  of  low‐emitting  and  fuel‐efficient  vehicles.  The  discounted  passes 
may help to encourage the purchase of these vehicles that are better for the environment. 
 
515、 What project team meeting is used to integrate green strategies across all aspects of the building 
design, drawing on the expertise of all participants? 
A、  LEED roundtable 
B、  Steering committee 
C、  Technical Advisory Group 
D、  Design charrette 
The correct answer is: D 
Reference: LEED for Homes Rating System 
Design Charrette: No later than the design development phase and preferably during schematic design, 
conduct  at  least  one  full‐day  integrated  design  workshop  with  the  project  team.  Use  the  workshop  to 
integrate  green  strategies  across  all  aspects  of  the  building  design,  drawing  on  the  expertise  of  all 
participants. (USGBC) 
 
516、 What is the primary purpose of registering a project for LEED? 
A、  To register individuals for the GBCI exams 
B、  To get your company and the project media publicity 
C、  To obtain free USGBC consulting 
D、  To gain access to project tools and resources 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      149 / 206 
The correct answer is: D 
Reference: GBCI website for registration   
Project registration is unrelated to exam registration.   While  this  is  a  secondary  benefit  it  is  not  the 
primary  purpose.  USGBC  consulting  is  not  free.  The  primary  purpose  for  registering  a  project  is  to  gain 
access to the project tools needed for the certification process. 
  
517、 How does a life cycle assessment (LCA) differ from life cycle costing (LCC)? 
A、  LCA takes into account economic performance while LCC does not 
B、  LCA does not take into account economic performance while LCC does 
C、  LCA is cradle‐to‐cradle while LCC is not 
D、  LCA does not take into account environmental performance while LCC does 
The correct answer is: B 
Life  cycle  assessment  is  an  analysis  that  takes  into  account  the  environmental  aspects  and  potential 
impacts  associated  with  a  product,  process,  or  service.  Life  cycle  costing  is  used  to  evaluate  economic 
performance. 
 
518、 What statement is true about exemplary performance? 
A、  Exemplary performance will result in rebates of all certification fees 
B、  Exemplary performance will earn a project a Platinum rating 
C、  Locating a project near ten basic services is exemplary performance 
D、  Exemplary performance is not available for all credits 
The correct answer is: D 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
Exemplary  performance  is  a  type  of  innovative  design.  An  example  is  reducing  water  use  by  a  higher 
threshold  than  required  by  the  credit  (e.g.,  the  project  uses  50%  less  water  compared  to  the  20%  less 
water  required).  Exemplary  performance  is  not  available  for  all  credits.  The  reference  guides  for  each 
rating system indicate which credits are eligible for exemplary performance. 
 
519、 What best defines the project boundary? 
A、  Total area within the platted property line not including any nonconstructed areas 
B、  Portion of the project site submitted for LEED certification 
C、  Total  area  within  the  legal  property  boundaries  of  the  site;  it  encompasses  all  areas  of  the  site, 
including constructed and nonconstructed areas 
D、  Platted property line of the project defining land and water within it 
The correct answer is: D 
While you may have a different definition of some terms the LEED exams test on the USGBC definitions, 
not  on  personal  experience  or  beliefs.  Therefore  the  practice  tests  include  the  definitions  from  USGBC. 
The LEED boundary is the portion of the project site submitted for LEED certification.    For single building 
developments, this is the entire project scope and is generally limited to the site boundary ‐ they are not 
necessarily the same thing. In the case of a multiple building project the LEED boundary is that part of the 
entire  project  being  submitted  for  certification  as  determined  by  the  project  team.  For  example  for  a 
campus  project  that  might  have  5  buildings,  each  building  is  submitted  separately  for  certification.  The 
LEED boundary is set for each of the 5 buildings though they cannot overlap if they property is contiguous.   
The property boundary is the total area within the legal property boundaries of the site; it encompasses 
all areas of the site, including constructed and nonconstructed areas. (USGBC) The project boundary is the 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      150 / 206 
platted property line of the project defining land and water within it.     
 
520、 What has the lowest priority in building design? 
A、  Plumbing codes 
B、  LEED Rating System 
C、  Building codes 
D、  Fire protection codes 
The correct answer is: B 
Although  the  LEED  Rating  System  is  critical  to  a  successful  green  building  project,  all  local,  state,  and 
federal codes and regulations have precedent over any LEED standards. A project team can't ignore local 
codes in favor of a green building strategy. Both must be addressed. Certain locales have their own set of 
green codes, which must be addressed as well. 
 
521、 What project design strategy would minimize a project's water usage the most? 
A、  Increasing the area of permeable surfaces 
B、  Installing a landscape that needs no irrigation 
C、  Directing runoff into retention ponds or bioswales 
D、  Minimize the quantity of hardscapes on the project site 
The correct answer is: B 
A  strategy  can  help  with  stormwater  control.  A  landscape  that  requires  no  irrigation  uses  less  water.  C 
strategy  helps  with  stormwater  control.  D  strategy  helps  with  stormwater  control  and  increasing  open 
space. 
  
522、 A project team demos an existing building and will reuse the shell of the building and recycle the 
rest  of  the  construction  and  demolition  debris.  What  credit  areas  could  the  project  earn  points  under? 
(Choose 2) 
A、  Building Reuse 
B、  Recycled Content 
C、  Community Connectivity 
D、  Construction Waste Management 
The correct answer is: AD 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Building  reuse  can  be  earned  when  projects  reuse  existing  portions  of  a  building  including  the  exterior 
walls,  roof,  structural  flooring,  interior  walls,  etc.  Note  the  difference  between  recycling  and  the  use  of 
recycled content. Recycling is the act of keeping materials out of landfills to reduce the demand for virgin 
resources. Recycled content are materials that contain pre or post consumer recycled content. Reusing an 
existing  building  does  not  imply  community  connectivity  can  be  earned.  Community  connectivity  is 
achieved  when  a  project  is  located  near  basic  services,  and  there  is  pedestrian  access  between  those 
services.  The  recycled  debris  would  help  the  project  divert  waste  from  landfills  and  earn  credit  for 
construction waste management. 
  
523、 Which of the following is NOT a type of biofuel? 
A、  Geothermal 
B、  Soybean oil 
C、  Cow manure 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      151 / 206 
D、  Wood chips 
The correct answer is: A 
Biofuels are made from organic material, such as animal and plant waste. Geothermal energy comes from 
the ground. 
  
524、 There  are  typical  laws  and  guidelines  followed  on  most  projects.  Which  of  the  following  is  not 
specifically relevant to green building vs. typical construction? 
A、  Illuminating Engineering Society's lighting standards 
B、  ISO 14021 
C、  Local zoning 
D、  ASHRAE standards 
The correct answer is: C 
Reference: Sustainable Building Technical Manual: Part II, 
IESNA specifies lighting power densities for external lighting to help reduce light pollution. The ISO 14000 
product  oriented  standards  include  Environmental  Labels  and  Declaration,  Life  Cycle  Assessment,  and 
Design for Environment. These standards are intended to be applicable for assessing the environmental 
performance  of  products  and  services  as  well  as  providing  guidance  on  improving  their  environmental 
performance. The ISO 14021 series standards, Environmental Labels and Declaration, are communication 
tools  that  convey  information  on  environmental  aspects  of  a  product  or  service  to  the  market.  These 
standards are used for recycled materials to label their pre and/or post consumer content. Local zoning 
must  be  followed  regardless  of  the  type  of  project.  Local  zoning  are  the  local  government  regulations 
imposed  to  promote  orderly  development  of  private  lands  and  prevent  land‐use  conflicts.  ASHRAE 
standards are referenced in many building codes both for green and conventional building. 
  
525、 Some  wood  flooring  recovered  onsite  from  a  renovation  project  was  refurbished  and  reused 
onsitE、    What type of material is the wood flooring considered?(Choose 2) 
A、  Recycled content 
B、  Salvaged material 
C、  Virgin wood 
D、  Regional/local material 
The correct answer is: BD 
The question is asking about which groups of materials the wood flooring would be included in. Do not 
confuse  recycled  content  with  salvaged  materials.  Recycled  content  contains  materials  that  have  been 
recycled. An example is insulation made from recycled newspapers. Salvaged materials are construction 
materials recovered from building sites and reused on different building sites in the same or a different 
capacity.  Examples  can  include  flooring,  brick,  beams,  and  doors.    The  flooring  would  be  a  salvaged 
material  since  it  was  found  and  used  onsite.  Virgin  wood  is  new  wood.  Since  the  wood  flooring  was 
obtained  from  the  renovation  project  the  wood  was  not  new  and  was  not  cut  down  from  a  forest 
specifically for the use in the project. This material would also be a regional/local material since it came 
from onsite. You may hear regional materials also referred to as local materials. Exam objective V.B from 
the GBCI handbook is 'Locally (regionally) Harvested and Manufactured Materials'. The USGBC GA study 
guide also has 'Regional/Locally Sourced Materials' in the book's definitions. The terms mean the same 
thing. 
  
526、 In an existing building, what can a project team replace CFCs with and still earn LEED certification? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      152 / 206 
(Choose 2) 
A、  Any other refrigerant 
B、  Only HFCs or natural refrigerants 
C、  Only natural refrigerants 
D、  Natural ventilation 
The correct answer is: AD 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
Any non CFC‐based refrigerant is acceptable to earn LEED certification. HCFCs and HFCs can be used as 
refrigerants as well as natural refrigerants. HCFCs and HFCs can be used as refrigerants as well as natural 
refrigerants.    The  team  can  choose  to  re‐design  the  building  to  use  natural  ventilation  in  place  of 
refrigerants. 
  
527、 Which of the following are transient occupants? (Choose 2) 
A、  Full time employees 
B、  Shoppers 
C、  Part‐time receptionists 
D、  Shift workers 
E、  College students in a classroom 
The correct answer is: BE 
Transient occupants are occupants that do not use facilities consistently and on a regular or daily basis. 
Students, shoppers, and museum visitors are all types of transient occupants. Full‐time equivalent (FTE) 
represents  a  regular  building  occupant  in  a  project  building.  An  FTE  of  1.0  means  that  the  person  is 
equivalent  to a  full‐time  worker,  while  an  FTE  of  0.5  signals  that the  worker  is  only  half‐time.  Transient 
occupants,  along  with  Full  Time  Equivalents,  are  used  when  calculating  reductions  in  water  usage,  and 
some alternative transportation credits. 
 
528、 The ASHRAE standards cover which LEED topics? (Choose 3) 
A、  VOC emissions 
B、  Carbon emissions 
C、  Ventilation rates 
D、  Minimum requirements for the energy efficient design of most buildings 
E、  Thermal comfort conditions 
The correct answer is: CDE 
ASHRAE 55‐2004 Thermal Environmental Conditions for Human Occupancy help with defining what makes 
a comfortable indoor environment for occupants. Indoor conditions are considered acceptable if 80% or 
more of occupants find them acceptable. VOC emissions are addressed by Green Seal and Green Label. 
LEED does not reference a standard for carbon emissions. ASHRAE 62.1‐2007 Ventilation for Acceptable 
Indoor Air Quality specifies minimum ventilation rates. These rates are used to improve indoor air quality 
as part of the IEQ credit category. ASHRAE 90.1‐2007 establishes minimum requirements for the energy 
efficient  design  of  buildings  (not  included  are  single  family  homes  or  multifamily  homes  less  than  3 
stories). 
  
529、 What general documentation is not submitted for LEED certification? 
A、  Project photos / drawings 
B、  Legal contracts 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      153 / 206 
C、  Project narrative 
D、  Typical floor plans 
E、  Elevations 
The correct answer is: B 
 
530、 What is a way a project team can increase the density of a building? 
A、  Designing a smaller building footprint and maximizing the floor‐area ratio 
B、  Building on a brownfield 
C、  Locate the building near mass transit 
D、  Designing a net‐zero building 
The correct answer is: A 
Reference: Green Building & LEED Core Concepts Guide   
Building density is the floor area of the building divided by the total area of the site (square feet per acre) 
(USGBC).  LEED  suggests  building  up  rather  than  out  to  increase  the  density  of  the  building  while 
preserving the land in the project area. Building on a brownfield is unrelated to project density.    Locating 
the  building  near  mass  transit  assists  with  providing  alternative  transportation  compared  with  single 
occupant commuting with automobiles.    Net‐zero  buildings  are  buildings  that  generate  enough 
electricity to meet their energy demands. 
  
531、 What is an example of an ongoing operating cost? 
A、  Design of a sedimentation control plan 
B、  Carpet installation 
C、  Attorney fees for building contracts 
D、  Salaries for building janitorial services 
The correct answer is: D 
Design of a sedimentation control plan is a soft cost. Soft costs: These costs involve all of the other fees 
involved in the completion of the project. You would include your attorney fees, other professional fees, 
testing, appraisal, marketing, office, and overhead expenses. Soft costs are those expenditures necessary 
to  complete  a  project  but  not  directly  'bricks  and  mortar,'  such  as  design  and  consultant  fees, 
communications costs, interim housing, moving or relocation costs, and additional district staffing. Carpet 
installation is a hard cost. Hard costs: By far the largest portion of the expenses in a construction budget, 
the hard costs are mostly comprised of the actual construction costs incurred to build the project. In most 
cases, it will include the land, but that particular cost is usually separated in order to find out the actual 
construction expenses. Examples include masonry, wood, steel, carpet, tile, mechanical systems, roofing.   
Attorney fees are a type of soft cost. Soft costs: These costs involve all of the other fees involved in the 
completion of the project. You would include your attorney fees, other professional fees, testing, appraisal, 
marketing,  office,  and  overhead  expenses.  Soft  costs  are  those  expenditures  necessary  to  complete  a 
project  but  not  directly  'bricks  and  mortar,'  such  as  design  and  consultant  fees,  communications  costs, 
interim housing, moving or relocation costs, and additional district staffing. Operating costs are another 
type  of  cost  for  a  building  in  addition  to  hard  and  soft  costs.  These  costs  occur  after  the  building  is 
complete  and  up  and  running.  These  costs  include  utilities  such  as  water  and  electricity  as  well  as  the 
costs of maintenance personnel ‐ janitorial, landscape, security. 
  
532、 What urban area is a best choice for a LEED project? 
A、  Areas farthest from transportation services 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      154 / 206 
B、  Areas with community connectivity 
C、  Areas with long commute times 
D、  Areas that require updated infrastructure 
The correct answer is: B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Choosing urban areas that are previously developed with high development densities can earn a project 
LEED  points  for  community  connectivity.  Replacing  infrastructure  can  earn  points  under  the  LEED  for 
Neighborhood Development rating system, however this is not the best choice.   
  
533、 A  product's  materials  were  extracted  300  miles  from  a  project  site,  while  the  product  was 
manufactured 600 miles from the project site. What statement is true about the product? 
A、  The product does not count as a regionally harvested and regionally manufactured material 
B、  The product is considered a regionally harvested and regionally manufactured material 
C、  The product counts toward source reduction 
D、  The product can count as a salvaged material 
The correct answer is: A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
LEED gives credit for regional materials when certain percentages of materials are extracted, harvested or 
recovered,  and  manufactured  within  500  miles.  In  this  example  the  material  was  extracted  within  500 
miles, but it was not manufactured within 500 miles. An example would be flooring where the trees for 
the  flooring  was  extracted  (cut  down)  300  miles  from  the  project  site,  but  the  flooring  was  milled  and 
finished 600 miles from the project site. Because the flooring was 'manufactured' outside of the 500 mile 
limit,  the  material  doesn't  count  as  regional.  B  is  not  a  regional  material  because  it  was  manufactured 
outside of the 500 mile radius LEED requires for a material to be considered regional. Source reduction is 
a  method  to  reduce  construction  waste  by  choosing  materials  with  less  packaging  or  that  are  sized 
correctly.  Salvaged  materials  are  materials  that  are  being  reused.  The  question  states  the  material  is 
extracted and manufactured so it is new not salvaged.   
  
534、 Letter templates must be signed by which person? 
A、  Project manager 
B、  Assignator 
C、  Project owner 
D、  Declarant 
The correct answer is:    D 
The  declarant  is  the  person  who  will  sign  a  submittal  template.  Each  template  can  have  a  different 
declarant. Each rating system will have its own set of  forms that must be completed and submitted for 
documentation and verification. These forms are called submittals or credit templates, and are dynamic 
PDF forms that can be filled out and saved on a computer then uploaded directly back to LEED Online. The 
credit forms are also referred to as letter templates, credit templates, submittal templates, or submittals. 
 
535、 Using rainwater for irrigation will likely have a negative impact on what project area? 
A、  Building energy use 
B、  Heat island effect 
C、  Innovation 
D、  Stormwater management 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      155 / 206 
The correct answer is:    A 
Rainwater systems require pumps to move the water and the added pumps would require added energy. 
The  heat  island  effect  is  not  impacted  by  stormwater  collection.  Innovation  would  not  be  negatively 
impacted. Stormwater management would be positively ‐ not negatively – impacted. 
 
536、 Installing photovoltaic cells on a building's rooftop will help with what green building area? 
A、  Recycled Materials 
B、  Onsite Renewable Energy 
C、  Green Power 
D、  Fundamental Refrigerant Management 
The correct answer is:    B 
Mechanical  equipment  cannot  be  included  in  the  recycled  materials  calculations.  Onsite  renewable 
energy is used to reduce the energy demand from grid sources, such as coal burning plants. Photovoltaic 
cells,  or  solar  panels,  are  one  of  the  most  common  types  of  onsite  renewable  energy.  Green  power  is 
offsite renewable energy. Fundamental refrigerant management addresses zero use of CFCs in a building's 
base HVAC&R systems. 
 
537、 Building permit fees for a project are what type of cost? 
A、  Hard cost 
B、  Life cycle cost 
C、  Soft cost 
D、  Operating cost 
The correct answer is:    C 
Operating  costs  are  another  type  of  cost  for  a  building  in  addition  to  hard  and  soft  costs.  These  costs 
occur after the building is complete and up and running. These costs include utilities such as water and 
electricity as well as the costs of maintenance personnel ‐ janitorial, landscape, security. Hard costs: By far 
the largest portion of the expenses in a construction budget, the hard costs are mostly comprised of the 
actual  construction  costs  incurred  to  build  the  project.  In  most  cases,  it  will  include  the  land,  but  that 
particular cost is usually separated in order to find out the actual construction expenses. Examples include 
masonry,  wood,  steel,  carpet,  tile,  mechanical  systems,  roofing.  Life  cycle  costing  is  used  to  evaluate 
economic performance and takes into account operational and maintenance costs throughout the life of 
the product. Soft costs: These costs involve all of the other fees involved in the completion of the project. 
You  would  include  your  attorney  fees,  other  professional  fees,  testing,  appraisal,  marketing,  office,  and 
overhead  expenses.  Soft  costs  are  those  expenditures  necessary  to  complete  a  project  but  not  directly 
'bricks and mortar,' such as design and consultant fees, communications costs, interim housing, moving or 
relocation costs, and additional district staffing. 
 
538、 How does drip irrigation save water? 
A、  By reducing the microclimate factor 
B、  By reducing the heat island effect 
C、  By using only non‐potable water 
D、  By increasing irrigation efficiency 
The correct answer is:    D 
Water efficient landscaping helps reduce the need from potable water from local and regional aquifers. 
Drip irrigation is a highly effective way to deliver water to a plant's roots because the water isn't lost to 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      156 / 206 
the  wind,  evaporation,  or  runoff.  Drip  irrigation  has  a  90%  irrigation  efficiency  compared  to  65%  for 
conventional sprinkler systems. 
 
539、 A member company wants to display its USGBC member logo. What would be an appropriate use 
for the USGBC member logo? 
A、  On company letterhead 
B、  On a company's product to show product endorsement 
C、  On the company's website home page linking to the company's LEED projects 
D、  On any partner website of the member company 
The correct answer is:    A 
Reference: USGBC Website on Logo use 
This question pertains to exam objective I.P USGBC Policies (e.g., trademark usage; logo usage) from the 
LEED GA Candidate Handbook. While we receive many comments about the relevance of these types of 
questions, the subject matter may come up on your exam. The use of the USGBC and LEED logos are listed 
in  the  exam  objectives  to  prevent  misuse  of  these  logos  and  to  purposely  or  inadvertently  spread 
incorrect information about LEED and USGBC. It is important to know how you can and cannot use the 
logo so that you help the green building movement rather than hinder it. Use of the USGBC member logo 
is limited to member companies. See the logo usage document for the limits on use. From the document: 
Member Logo on Product Packaging. USGBC does not review, certify, or endorse products. As such, the 
Member Logo may not be used to indicate any kind of endorsement by USGBC of any product or service, 
to  indicate  that  any  official  status  for  any  product  or  service  has  been  conferred  by  or  is  otherwise 
associated with USGBC, or to show any kind of relationship with USGBC other than to signify the company 
is a USGBC member. 
 
540、 Which of the following statements are true regarding regional priority credits (RPCs)? 
A、  RPCs are awarded for using local green power 
B、  RPCs are not new credits; they are 'bonus points' 
C、  RPCs are awarded for locating the project in urban areas 
D、  RPCs are always awarded for reducing automobile use 
The correct answer is:    B 
Reference: RPC FAQ 
Projects can use green power from any certified source, not just 'local' sources. Regional Priority Credits ‐ 
these are bonus points for encouraging teams to attempt LEED credits that address specific environmental 
priorities in the project's region. Each zipcode in the U.S. has 6 LEED credits that are extra important to 
that  zipcode.  A  project  that  achieves  one  of  those  credits  earns  a  bonus  point,  up  to  a  maximum  of  4. 
Here is an example. In Georgia zipcode 30002 saving water is important, because Georgia has had a lot of 
droughts lately. 
See what is important in your zipcode here: 
http://www.usgbc.org/DisplayPage.aspx?CMSPageID=1984 
RPCs are not new credits; they are 'bonus points' for existing credits. 
Pre‐2009 rating systems are not eligible unless the project moves to the LEED 2009 rating system. 
RPCs for international projects do not exist. D depends on the zipcode, so it is not 'always'. 
 
541、 What gives the ozone layer legal protection? 
A、  Montreal Protocol 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      157 / 206 
B、  ASHRAE Standards 
C、  US DOE 
D、  Kyoto Protocol 
The correct answer is:    A 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
According to Treatment by LEED of Environmental Impact of HVAC Refrigerants, the legal protection of the 
ozone layer is well in place throughout most of the international community via the Montreal Protocol. 
Under  the  Montreal  Protocol,  CFC  production  in  the  United  States  ended  in  1995.  To  implement  the 
Montreal  Protocol,  the  EPA  established  Section  608  of  the  EPA  Clean  Air  Act  for  regulating  the  use  and 
recycling of ozone‐depleting compounds. 
 
542、 What type of residences have at least 15% more efficiency than the 2004 International Residential 
Code? 
A、  Residences with energy efficient appliances 
B、  ENERGY STAR 
C、  Residences built with sustainable materials 
D、  ComfortWise 
The correct answer is:    B 
Reference: LEED for Homes Rating System 
ENERGY STAR qualified homes are at least 15 percent more energy efficient than homes built to the 2004 
International Residential Code (IRC). Many of the rating systems use parts of the Energy Star standard for 
meeting the requirements of some credits. It is important to know Energy Star is a government standard, 
because you will come across it. LEED Homes using Energy Star ratings to measure energy performance. 
Energy Star is run by the EPA. 
 
543、 Which of the following are strategies to reduce construction waste? 
A、  Select sustainable building materials 
B、  Give unused materials to a salvage yard 
C、  Use FSC certified materials 
D、  Haul unused materials to a landfill 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
To  reduce  construction  waste,  divert  any  unused  materials  from  the  waste  stream‐namely,  landfills  and 
incinerators. Materials can be donated, sold, or recycled, to keep them out of landfills and to help reduce 
the demand for virgin materials. 
 
544、 What should be included in a construction waste management plan? 
A、  Where construction debris will be diverted 
B、  Erosion control 
C、  The percent of certified wood used on the project 
D、  Asbestos removal 
The correct answer is:    A 
Hazardous waste is not included and must be disposed of based on local codes. The plan should include 
the goals of the team as well as what will be diverted, where to, and by whom. Erosion control is not part 
of construction waste management. 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      158 / 206 
 
545、 Biomass is what type of material? 
A、  Plant material 
B、  Fly‐ash 
C、  Animal waste 
D、  Landfill gas 
The correct answer is:    A 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
Biomass is plant material converted to heat energy to produce electricity. 
 
546、 What are some of the goals of filling in the LEED Score Card? 
A、  To obtain owner buy‐in for the project 
B、  To determine credit responsibilities 
C、  To determine the target certification level 
D、To estimate the ROI of the project 
The correct answer is:    C 
Reference: Sample credit checklist for LEED v3 
The LEED Score Card is a tool used to determine how many points the project can reasonably assume will 
be achieved. B is set in LEED Online and is determined by the project team. Some type of reporting would 
determine the ROI. Owner buy‐in is outside the scope of the LEED Scorecard. 
 
547、 IEQ ensures excellent indoor air quality and comfort. What is reduced by it? 
A、      Toxins 
B、      Air elements 
C、      Dust 
D、      Viruses 
The correct answer is:    A 
Indoor  Environmental  Quality:  Ensure  Excellent  Indoor  Air  Quality  (IEQ)  and  Comfort,  Reduce  Toxins  & 
Pollutants. 
 
548、 If the systems are yielding the benefits that were anticipated from the initial investment then which 
help determine from following below? 
A、    Justification 
B、    Verification 
C、    Explanation 
D、    Measurement 
E、    Substantiation 
The correct answer is:    D 
Measurement also helps determine if the systems are yielding the benefits that were anticipated from the 
initial investment. 
 
549、 What tool is used to determine the target certification level? 
A、  EPA's Target Finder 
B、  LEED Online 
C、  CIR 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      159 / 206 
D、  LEED Score Card 
The correct answer is:    D 
Reference: Sample credit checklist for LEED v3 
Target Finder is a no‐cost online tool that enables architects and building owners to set energy targets and 
receive an EPA energy performance score for projects during the design process. LEED Online is the tool 
used  for  documenting  the  project.  CIRs  are  specific  questions  regarding  one  credit  or  one  prerequisite. 
They are submitted using LEED Online or using a standalone CIR form. The LEED Scorecard helps teams 
decide what credits to achieve.   
 
550、 What are the environmental benefits of using salvaged materials on a project? (Choose 2) 
A、  Reduced transportation costs 
B、  Reduced demand for virgin resources 
C、  Reduced waste 
D、  They contain recycled content 
The correct answer is:    BC 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Reduces transportation costs are a benefit of regional materials. The question did not state the salvaged 
materials  were  located  within  500  miles  of  the  project  site.  Salvaged  materials  reduce  the  demand  for 
virgin materials and reduce waste. For example flooring that is taken from a demo project can be reused 
elsewhere so that trees do not have to be cut down to supply wood for new flooring. Waste is reduced 
because the materials are already manufactured. For example, if salvaged acoustical tile is used, the tiles 
are already cut to size. There is no need for manufacturing new tiles which could result in waste from the 
manufacturing  process.  Salvaged  materials  will  usually  not  have  information  about  the  content  of  the 
material. Containing recycled content isn't of itself an environmental benefit. 
 
551、 The size of the parking lot for a project will be determined by: 
A、  Size of the LEED boundary 
B、  Size of the project boundary 
C、  Local zoning 
D、  Size of the property boundary 
The correct answer is:    C 
Local zoning, if it exists, will specify the amount of parking required. The size of the project site does not 
alone determine the quantity of parking. The type of building and the estimated number of occupants will. 
A  100  acre  site  doesn't  mean  200  parking  spaces  are  required  if  the  site  is  only  going  to  have  a  single 
1,000 square foot office. 
 
552、 The process of life cycle assessment encompasses what stages of the building process? 
A、  All stages 
B、  Design and construction 
C、  Planning 
D、  Operations 
E、  Design 
The correct answer is:    A 
All parts of the building process are considered as a part of the life cycle assessment. The goal of LCA is to 
compare the full range of environmental and social damages assignable to products and services, to be 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      160 / 206 
able  to  choose  the  least  burdensome  one.  A  'Life  Cycle  Assessment'('LCA',  also  known  as  'life  cycle 
analysis',  'ecobalance',  and  'cradle‐to‐grave  analysis')  is  the  investigation  and  valuation  of  the 
environmental impacts of a given product or service caused or necessitated by its existence. 
 
553、 When  addressing  materials  and  resources,  a  project  team  should  incorporate  which  of  the 
following to comply with the credits and prerequisites of the MR category within the LEED rating systems? 
(Choose three) 
A、    The purchasing policy of the manufacturer 
B、    Location of manufacturing plant of steel 
C、    The type of car the CEO drives 
D、    Postconsumer recycled content of a chair 
E、    Extraction location of silica 
The correct answer is:    B, D, and E     
Although  evaluating  all  of  the  vendor’s  procurement  policies  to  ensure  that  sustainable  purchasing 
procedures  are  in  place  could  possibly  contribute  to  earning  an  Innovation  in  Design  credit,  it  is  not 
required for compliance with any of the MR credits. The CEO’s automobile choice is also not evaluated or 
assessed for LEED compliance. 
 
554、 An  environmental  tobacco  smoke  control  policy  best  addresses  which  of  the  following?  (Choose 
one) 
A、    Providing ventilation requirements to effectively remove tobacco smoke 
B、    Providing dedicated smoking rooms 25 feet away from building entrances 
C、    Preventing tobacco smoke from contaminating indoor environments 
D、    Preventing tobacco smoke from entering the air occupied by nonsmokers 
The correct answer is:    D 
 
555、 Which of the following is a way to reduce pollution associated with automobile use? 
A、  Only provide enough parking to meet the peak parking demand 
B、  Install low albedo parking surfaces 
C、  Shade all parking spaces with trees 
D、  Provide shuttle services to mass transit 
The correct answer is:    D 
Shuttle services to mass transit allow employees to take public transportation. The shuttle service would 
ferry occupants from mass transit to their building/home. LEED rewards projects that install the minimum 
amount of parking required by local code. This choice would result in the maximum amount of parking to 
accommodate peak demand. It is true that implementing strategies such as providing shuttle services or 
installing bicycle racks do not guarantee a reduction in single‐occupant drivers. However the goal of these 
strategies are to provide an alternative with the hope that they would. 
 
556、 What is the goal of providing secure bicycle storage? 
A、  To increase the life cycle of bicycles 
B、  To prevent theft 
C、  To meet local regulations 
D、  To keep bicycles dry 
The correct answer is:    B 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      161 / 206 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
Secure storage is any method or methods that prevent theft 
 
557、 A  LEED  for  Existing  Buildings:  Operations  &  Maintenance  project  must  comply  with  what 
building‐related environmental laws between the project's performance period through the expiration of 
the LEED certification? 
A、  Federal and state laws only 
B、  All federal, state, and local laws 
C、  Federal laws only 
D、  Federal laws and LEED referenced standards only 
The correct answer is:    B 
Reference: Minimum Program Requirements 
All projects, regardless of the rating system, must meet the MPRs defined by GBCI. 
All federal, state, and local environmental laws and regulations must be complied with. For LEED EB: O&M 
projects, this includes complying with federal, state, and local environmental laws and regulations starting 
at the performance period through the expiration date of the LEED certification. 
 
558、 Which is regarded as exemplary performance?                 
A、  indoor water usage reduced by 30%                 
B、  daylight can cover 65% of the occupant area                 
C、  construction waste will be 75% managed                 
D、  double the density of development   
The correct answer is:    D 
 
559、 What statement is true regarding green building? 
A、  Green design is a cost neutral add‐on 
B、  LEED buildings were increasingly common until construction costs rose 30% in the last two years 
C、  LEED teams are achieving certification through widely diverse methods 
D、  The construction of green buildings have no major significant cost difference to non‐green buildings 
The correct answer is:    D 
Reference: Cost of Green Revisited 
Green  design  should  not  be  an  add‐on.  Green  design  should  be  considered  in  the  pre‐design  phasE、   
When green design is considered later (construction) phase the costs go up significantly and the building 
usually doesn't perform as well. LEED building is still taking place despite increases in construction costs. 
LEED  teams  are  achieving  LEED  certification  through  similar,  low  cost  approaches.  Most  times  the 
strategies  among  projects  are  very  similar  for  those  projects  that  have  similar  goals.  Widely  diverse 
methods  would  indicate  every  project  is  doing  something  significantly  different  than  other  projects. 
According to Cost of Green Revisited ‐ The 2006 study shows essentially the same results as 2004: there is 
no significant difference in average costs for green buildings as compared to non‐green buildings. 
 
560、 What is a way LEED encourages the purchase and use of low‐emitting and fuel‐efficient vehicles? 
A、  Setting up a carpool notification system 
B、  Implementing car share membership 
C、  Providing discounted parking passes, if parking fees exist 
D、  Locating the project in a densely developed neighborhood 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      162 / 206 
The correct answer is:    C 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Discounted  parking  passes  given  to  the  owners  of  these  vehicles  may  encourage  their  purchase  by 
offsetting  any  parking  costs.  Locating  the  project  in  a  densely  developed  neighborhood  helps  channel 
development  to  urban  areas  with  existing  infrastructure,  protect  greenfields  and  preserver  habitat  and 
natural resources. 
 
561、 In whole building design, at what starting point in the process would the facilities managers, end 
users, contractors, and architects all be involved at the same time? 
A、  Pre‐occupancy 
B、  Design phase 
C、  Construction phase 
D、  Pre‐design 
The correct answer is:    D 
Reference: AIA Integrated Project Delivery 
In whole building design, all team members begin at the earliest point in the building process to define 
common goals. 
 
562、 A  project  using  recycled  materials  manufactured  750  miles  from  a  project  site  would  not  impact 
what LEED credit area? 
A、  Recycled Materials 
B、  Construction Waste Management 
C、  Regional Materials 
D、  Community Connectivity 
The correct answer is:    D 
The question states the materials are recycled, so that of course would impact recycled materials. The use 
of any material may impact the amount of construction debris. For example, if a project purchased steel 
rebar  that  contained  recycled  steel  and  had  to  cut  the  rebar  to  length,  the  scraps  may  end  up  being 
recycled again or going to a landfill. The quantity of regional materials a project uses is determined by the 
percent  of  materials  used on  a  project. Even  though  the  recycled materials  are  outside  of  the 500  mile 
limit,  the  cost  of  those  materials  are  still  going  to  be  part  of  the  regional  materials  calculations. 
Community  connectivity  addresses  development  in  urban  areas  to  use  existing  infrastructure,  protect 
greenfields, and preserve habitat. 
 
563、 Who decides if wastewater from showers can be used for irrigation? 
A、  Universal plumbing code 
B、  Project team 
C、  USGBC via the CIR process 
D、  Local authorities with jurisdiction in the area 
The correct answer is:    D 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
Blackwater  does  not  have  a  single  definition  accepted  nationwide.  Adjacent  cities  may  have  different 
codes  that  allow  or  prohibit  the  use  of  sink/shower  water  for  non‐potable  uses.  On  jurisdiction  may 
define sink/shower water as blackwater and not permit its use, while another may define it as graywater 
and  will  permit  its  use.  Review  local  codes  before  making  design  decisions  based  on  the  use  of 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      163 / 206 
wastewater. 
 
564、 Why use commingled recycling? (Choose 2) 
A、  Recycled materials can be sold for more money 
B、  Commingled recycling takes up less space 
C、  Materials are less likely to be contaminated 
D、  More kinds of materials can be recycled 
E、  People are more likely to participate in the recycling program 
The correct answer is:    BE 
Commingled  recycling  is  also  frequently  used  because  it  is  easier  for  contractors/occupants  to  put 
material  into  one  bin.  Commingled  recycling  uses  one  bin  for  all  recycled  materials.  This  approach  is 
common for curbside pickup recycling programs for residences. 
 
565、 What is the best type of site to develop on? 
A、  Greenfield 
B、  Nature preserve 
C、  Previously developed site 
D、  Wetland 
The correct answer is:    C 
Selecting a previously developed site avoids disturbing natural areas that have not been developed.   
 
566、 Which participant (as principle participant) can earn one point for project team?(choose 2) 
A、  mechnical engineer                 
B、  outside consultant                 
C、  green rater for home project                 
D、  commission agent                 
E、  supplier                 
The correct answer is:    CD 
 
567、 What  are  differences  between  Hydrocarbons  (HCs)  and  Hydrochlorofluorocarbons  (HCFCs)? 
(Choose 2) 
A、  HCs have a lower global warming potential (GWP) than HCFCs 
B、  HCs  can  be  used  as  refrigerants  in  new  buildings  while  LEED  requires  zero  use  of  HCFC‐based 
refrigerants in new base building elements 
C、  HCs are environmentally benign to the atmosphere while HCFCs are not 
D、  HCs are an ideal replacement for CFCs while HCFCs are not 
The correct answer is:    AC 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
'No  ideal  alternative  for  CFCs  has  been  developed  and  some  alternatives  are  not  suitable  for  retrofits.' 
(USGBC)   HCs are benign to the atmosphere and thus have a low direct global warming potential (GWP). 
Because HCs are less efficient they require more energy to achieve the same level of refrigeration and the 
increased use of fossil fuels indirectly increases global warming. LEED requires zero use of CFC‐based (not 
HCFC‐based) refrigerants in new base building elements for Fundamental Refrigerant Management, with 
the intent of reducing stratospheric ozone depletion. HCs, or hydrocarbons, are natural refrigerants that 
include  propane,  butane,  ethane,  isobutene,  and  isopentane.  Natural  refrigerants  are  benign  but  they 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      164 / 206 
require a greater amount of energy to achieve the same level of cooling as refrigerants such as HFCs and 
HCFCs.  HCs  are  not  an  ideal  replacement  for  CFCs  because  they  require  a  greater  amount  of  energy  to 
achieve the same level of cooling as HFCs and HCFCs. 
 
568、 What information should not appear in a CIR? (Choose 2) 
A、  Confidential information 
B、  Background information on the issue 
C、  Supporting information 
D、  Attachments such as photographs, drawings, and product information sheets 
The correct answer is:    AD 
Reference: Guidelines for CIR Customers   
CIRs  do  not  include  confidential  project  information.  Since  there  is  no  way  to  include  attachments,  the 
focus  should  be  on  a  clearly  written  statement.  'Inquiries  must  request  guidance  on  just  one  credit  or 
prerequisite  (unless  there  is  technical  justification  to  do  otherwise)  and  generally  contain  one  concise 
question  or  a  set  of  related  questions.  It  is  often  helpful  to  discuss  the  inquiry  within  context  of  the 
credit's intent.' (USGBC) 
 
569、 What is at the core of an integrated project? 
A、  Individual rewards 
B、  Working toward individual goals 
C、  Collaborative team members 
D、  Cost‐based decision making 
The correct answer is:    C 
Reference: AIA Integrated Project Delivery 
Integrated projects are based on integrated teams and frequent, collaborative communications. 
 
570、 What types of water can NOT be used for irrigation purposes? 
A、  Stormwater 
B、  Potable water 
C、  Laundry water 
D、  Blackwater 
The correct answer is:    D 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary   
Waste water from toilets and urinals is considered blackwater and cannot be used for irrigation (unless it 
has  been  treated  first).  Graywater  is  defined  by  the  Uniform  Plumbing  Code  (UPS)  as  untreated 
house‐hold  wastewater  which  has  not  come  into  contact  with  toilet  waste  or  kitchen  sinks.  Graywater 
includes used water from bathtubs, showers, bathroom wash basins, and water from clothes‐washer and 
laundry tubs. It does not include water from kitchen sinks or dishwashers. We receive many questions on 
this graywater issue ‐ does the soap from showers matter, what if someone washed diapers in the laundry 
‐ the main point to remember is that the definition of graywater includes shower and laundry water and 
that LEED allows graywater use.   
 
571、 What benefit to society does a project that uses Regional Materials contribute? 
A、  Reduced air and water pollution 
B、  Supporting the local economy 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      165 / 206 
C、  Reducing a project's soft costs 
D、  Reducing demand for virgin resources 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
A  is  an  environmental  benefit  of  using  Regional  Materials  because  transportation  is  reduced.    This 
question  asks  for  a  benefit  to  society.  B  is  a  social  benefit  of  using  Regional  Materials  because  the 
community  is  helped  through  increased  jobs  and  taxes.  Purchased  materials  are  a  hard  cost,  not  a  soft 
cost. D an environmental benefit of using recycled materials. 
  
572、 LEED Minimum Project Requirements prohibit gerrymandering. What does this mean? 
A、  Hiding project costs in ROI calculations 
B、  Defining the site area to exclude green space between campus projects 
C、  Adjusting a project boundary for the benefit of earning credits/prerequisites 
D、  Making the project building area less than 2% of the site area 
The correct answer is:    C 
Reference: Minimum Program Requirements 
Gerrymandering  is  prohibit:  'The  boundary  may  not  unreasonably  exclude  sections  of  land  to  create 
boundaries in unreasonable shapes for the sole purpose of complying with prerequisites or credits'. 
 
573、 Selecting products that have been developed with a sustainable design is an example of: 
A、  Recycling 
B、  Waste diversion 
C、  Reuse 
D、  Source reduction 
The correct answer is:    D 
Source reduction reduces the materials brought into a building. This includes products that have reduced 
packaging and products developed with sustainable design principles. 
 
574、 What amount of potable water does landscaping consume in the U.S. each day on average? 
A、  50% 
B、  20% 
C、  30% 
D、  40% 
The correct answer is:    C 
Landscape irrigation consumes 30% of potable water in the U.S. each day on average. 
 
575、 What is a density radius calculation used for? 
A、  To define properties included in the development density calculation 
B、  To define the area where basic services are located 
C、  To define the project site area 
D、  To measure any bus/rail line locations relative to the entrance of a building 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
While not directly referenced in the requirements of Develop Density and Community Connectivity, the 
density radius is used in the density calculations as is applicable under exam objective II.A / II.B 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      166 / 206 
The  density  radius  calculation  is  used  to  draw  a  circle  around  the  project  plan  and  identify  properties 
within  or  intersecting  that  radius.  Those  properties  must  be  factored  into  the  development  density 
calculation for certain credits. 
 
576、 Which of the following are not examples of on‐site generated renewable energy? 
A、  REC 
B、  Biofuel‐based electrical system 
C、  Wind 
D、  Solar 
The correct answer is:    A 
Reference: Guide to Purchasing Green Power 
A  REC  represents  the  environmental,  social,  and  other  positive  attributes  of  power  generated  by 
renewable resources. These attributes may be sold separately from the underlying commodity electricity. 
RECs  are  not  energy  themselves.  Biofuel‐based  electrical  systems:  Electrical  power  systems  that  run  on 
renewable  fuels  derived  from  organic  materials,  such  as  wood  by‐products  and  agricultural  waste.  For 
purposes of LEED, biofuels include untreated wood waste (e.g., mill residues), agricultural crops or waste, 
animal waste and other organic waste, and landfill gas. Wind can be generated on‐site and is a renewable 
energy source. Solar power can be generated on‐site and is a renewable energy source.   
 
577、 What is SRI? 
A、  Measure of a material's ability to reflect solar heat 
B、  Measure of air quality 
C、  Measure of VOC levels in paint 
D、  Measure of an automobile's emissions 
The correct answer is:    A 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
Solar  Reflectance  Index  (SRI)  is  a  measure  of  how  well  a  material  rejects  solar  heat.  SRI  is  a  value  that 
incorporates both solar reflectance and emittance in a single value to represent a material's temperature 
in  the  sun.  SRI  quantifies  how  hot  a  surface  would  get  relative  to  standard  black  and  standard  white 
surfaces. It is expressed as a fraction (0.0 to 1.0) or percentage (0% to 100%). Materials with the highest 
SRI values are the coolest choices for paving. The higher the SRI number the more solar heat the material 
can reflect. Black asphalt has an SRI of 0. 
 
578、 What term also means site area? 
A、  Building footprint 
B、  Building lot 
C、  Development footprint 
D、  Property area 
The correct answer is:    D 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
Site area is defined as: 'The total area within the project boundary of the applicant building, and includes 
all  areas  of  the  property,  both  constructed  areas  and nonconstructed  areas.  The  open  space of  the  site 
area is the portion not covered by the building footprint.' The building footprint is the area of the building 
as defined by the perimeter of the structure. Parking lots, walk ways, and landscaping are not included. 
The development footprint is the area of the project site that has been disturbed for development. This 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      167 / 206 
area includes the building footprint, hardscapes, and parking lots. The intent of this question is for you to 
learn about how LEED defines different areas of the project. While other definitions may exist the exam 
will  test  on  how  LEED  defines  these  areas  and  not  on  personal  experience  or  if  students  think  the 
definition is correct or not. 
 
579、 How many points would a project earn for having 3 LEED APs as principal participants on a project? 
A、  1 
B、  3 
C、  0 
D、  2 
The correct answer is:    A 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
No  matter  how  many  LEED  APs  are  working  on  a  project,  there  is  still  only  one  point  available  for  this 
credit.  For  example  if  a  project  had  100  LEED  APs  working  on  a  project  as  principal  participants,  the 
project would not earn 100 points and get a Platinum certification. 
 
580、 Locating a project near mass transit would have what economic benefit? 
A、  Habitat and natural resources would be preserved 
B、  Parking capacity can be reduced 
C、  Transportation costs for material delivery would be reduced 
D、  Greenfields would be protected 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Protecting habitat and natural resources is one of the environmental goals of community connectivity. The 
parking  capacity  can  be  reduced  which  would  reduce  the  amount  of  money  spent  on  the  parking 
structure or area. Mass transit isn't used to deliver project materials to a site. Protecting greenfields is one 
of the environmental goals of community connectivity. 
 
581、 What aspects of integrated project planning are NOT the most important to be integrated? 
A、  Systems 
B、  Business structures 
C、  Financing 
D、  People 
The correct answer is:    C 
Reference: AIA Integrated Project Delivery   
'Integrated Project Delivery (IPD) is a project delivery approach that integrates people, systems, business 
structures  and  practices  into  a  process  that  collaboratively  harnesses  the  talents  and  insights  of  all 
participants  to  optimize  project  results,  increase  value  to  the  owner,  reduce  waste,  and  maximize 
efficiency through all phases of design, fabrication, and construction.' 
 
582、 When there are two or more rating systems that might be applicable to a project, how should the 
project team decide which rating system to use? 
A、  Choose the rating system that will result in the lowest certification costs 
B、  Choose the rating system that has the most regional priority credits 
C、  Choose LEED for Core & Shell 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      168 / 206 
D、  Use the 40/60 rule 
The correct answer is:    D 
Reference: LEED Rating System Selection Policy 
If a particular rating system is appropriate for 60% or more of a LEED project building or space, then that 
rating system should be used. Project teams with buildings and spaces that do not fall into the scenarios 
described in a) and b) must independently assess their situation and decide which rating system is most 
applicable.  Most  of  the  time  the  certification  costs  will  be  the  same  for  new  construction  projects. 
Regional  priority  credits  are  for  regions,  not  for  individual  rating  systems.  Each  region  (zipcode)  has  six 
regional priority credits. A project team would not pick LEED for Core & Shell by default. LEED has a 40/60 
rule to help project teams decide on a rating system: If a particular rating system is appropriate for 40% or 
less of a LEED project building or space, then that rating system should not be used. 
 
583、 In what instances would a project team submit a Credit Interpretation Request (CIR)? (Choose 2) 
A、  When a conflict in a credit or prerequisite requires resolution 
B、  When appealing a credit that has been denied 
C、  When the person registering the project has a question about the registration process 
D、  When the reference guide does not address a specific issue 
The correct answer is:    AD 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Introduction 
CIRs should be used when there are conflicts in a credit/prerequisite. CIRs are not used to appeal a credit. 
Projects that haven't been registered do not have access to submit a CIR. CIRs should be used when you 
can't find the answer in the reference guide. 
 
584、 What products would be considered pre‐consumer recycled content under LEED? 
A、  Cement containing fly‐ash as supplementary cementitious material 
B、  Salvaged doors 
C、  Countertops made of glass bottles 
D、  Ground up tires used for walkways 
The correct answer is:    A 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
Pre‐consumer  content  ‐  formerly  known  as  post‐industrial  content,  is  the  percentage  of  material  in  a 
product that is recycled from manufacturing waste. Examples include planer shavings, plytrim, sawdust, 
chips,  bagasse,  sunflower  seed  hulls,  walnut  shells,  culls,  trimmed  materials,  print  overruns,  overissue 
publications, and obsolete inventories. Excluded are materials such as rework, regrind, or scrap generated 
in  a  process  and  capable  of  being  reclaimed  within  the  same  process  that  generated  it  (ISO  14021). 
Salvaged doors are a materials that qualify for building reuse. Glass bottles are a post‐consumer recycled 
material. Tires are a post‐consumer recycled material. 
 
585、 What are the benefits of reducing potable water use in buildings? (Choose 2) 
A、  Reduced contamination of nearby water bodies 
B、  Decreased building operating costs 
C、  Increase in irrigation efficiency 
D、  Reduced drawdown of potable water from water bodies and aquifers 
The correct answer is:    BD 
Contamination  of  nearby  water  bodies  would  be  caused  by  sedimentation.  When  low  flow  fixtures  and 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      169 / 206 
fittings  are  used,  the  quantity  of  water  that  needs  to  be  heated  is  reduced  thereby  decreasing  energy 
consumption. The type of water does not affect the efficiency of an irrigation system. Less water is taken 
from nature which helps preserve the environment for future generations. 
 
586、 Which  of  the  following  are  not  required  to  be  identified  in  writing  to  achieve  an  Innovation  in 
Design (ID) credit for innovative performance? 
A、  The intent of the proposed credit 
B、  The baseline threshold of the existing LEED credit 
C、  The proposed requirement for compliance 
D、  The proposed submittals to demonstrate compliance 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
Innovative performance is for topics not addressed in the LEED rating system, therefore, there would be 
no existing LEED credit. 
The following are required when submitting an ID credit for innovative performance: 
The intent of the proposed credit   
The proposed requirement for compliance   
The proposed submittals to demonstrate compliance   
The strategies used to meet the requirements 
 
587、 What is the function of the ozone layer? 
A、  Keeps the earth's atmosphere warm 
B、  Absorbs ultraviolet light 
C、  Protects the earth from solar wind 
D、  Prevents smog creation 
The correct answer is:    B 
The  ozone  layer  absorbs  97‐99%  of  the  sun's  high  frequency  ultraviolet  light‐light  that  is  potentially 
damaging to life on earth. Source: NASA   
 
588、 What can help reduce indoor potable water use? (Choose 2) 
A、  Smaller kitchen sinks 
B、  Composting toilets 
C、  Stacking the building design 
D、  Gravity based irrigation system 
E、  Waterless urinals 
The correct answer is:    BE 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
The  indoor  water  efficiency  credits  address  both  reducing  potable  water  use  through  water  conserving 
fixtures, and offsetting potable water use by using graywater, stormwater, and recycled water. Waterless 
urinals and composting toilets have a tremendous water savings over conventional flush fixtures (water 
closets, toilets, conventional urinals). Composting toilets are not practical for many applications, such as 
high‐rise buildings. 
 
589、 Sustainable design strategies are effectively implemented only by using a: 
A、  Conventional approach 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      170 / 206 
B、  Flexible approach 
C、  Incremental approach 
D、  Whole building approach 
The correct answer is:    D 
Conventional building is what sustainable design is moving away from. While the LEED Rating System is 
flexible and independent, effective sustainable design strategies rely on a whole building approach, not a 
part  or  incremental  approach.  While  the  LEED  Rating  System  is  flexible  and  independent,  effective 
sustainable design strategies rely on a whole building approach, not a part or incremental approach. By 
taking into consideration the building site, the building structure, all of the systems, and the use of the 
building, the project team applies a 'whole building' approach. 
 
590、 If a refrigeration system is inefficient, what is the indirect impact? 
A、  Decreased water use 
B、  Decreased green house gas emissions 
C、  Increased heat islands 
D、  Increased energy consumption 
The correct answer is:    D 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
Systems with low efficiency will have an indirect impact through increased energy use.    Increased energy 
use generates additional CO2 emissions due to electricity consumption. Using a CFC‐based refrigeration 
system is an example of a direct impact because CFCs have a direct impact on depleting ozone.   
 
591、 What practice identifies and removes unnecessary expenditures? 
A、  Life cycle assessment 
B、  Life cycle costing 
C、  Environmentally responsive design 
D、  Value engineering 
The correct answer is:    D 
Life‐cycle‐analysis (LCA, also known as life cycle assessment, ecobalance, and cradle‐to‐grave analysis) is 
the  investigation  and  valuation  of  the  environmental  impacts  of  a  given  product  or  service  caused  or 
necessitated by its existence. LCA evaluates a products 'environmental impact'. Life cycle costing is used to 
evaluate economic performance. Life‐cycle costing is a method of costing that looks at a product's entire 
value chain from a cost perspective. Other types of costing generally look only at the production process, 
whereas  life‐cycle  costing  tracks  and  evaluates  costing  from  the  research  and  development  phase  of  a 
product's life, through to the decline and eventual conclusion of a product's life. This differs from value 
engineering because life cycle costing considers the products impact over the life of the building, whereas 
value engineering tends to look a product's cost relative to the building's current budget (in the present, 
without  regards  for  future  implications).  Environmentally  responsive  design  is  a  design  approach  that 
incorporates  sustainable  strategies  into  the  design  of  a  building.  Value  engineering  (VE)  is  a  systematic 
method to improve the 'value' of goods or products and services by using an examination of function. In 
conventional  building  many  building  features  are  VEd  out  to  cut  the  budget.  Because  of  the  integrated 
design in green buildings, VEing out a feature often messes up the performance of the system as a whole. 
For  example  if  a  building  owner  decides  to  take  out  better  quality  and  more  costly  insulation,  the 
building's utility bills will most likely go up and the HVAC system could be undersized. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      171 / 206 
592、 In cooler climates how can a new building be designed to use no refrigerants? 
A、  The building could have a CFC phase‐out plan in place 
B、  The building could use halons for cooling 
C、  The building could use natural ventilation 
D、  The building could be cooled with natural refrigerants such as propane or ammonia 
The correct answer is:    C 
Natural  refrigerants  are  still  refrigerants.  With  a  CFC‐phase  out  plan  you  are  usually  replacing  one 
refrigerant with another, not going from mechanical to natural ventilation. Halons are primarily used in 
fire suppression. The no refrigerant option for buildings can be achieved with natural ventilation. Natural 
ventilation  can  be  done  in  cooler  climates  where  ventilation  can  be  provided  by  opening  windows  or 
using fans to pull in outside air to cool the building. Using refrigerants requires mechanical ventilation. 
 
593、 The irrigation efficiency of a landscape would impact what LEED credit categories? (Choose 2) 
A、  Sustainable Sites 
B、  Water Efficiency 
C、  Materials and Resources 
D、  Energy and Atmosphere 
The correct answer is:    BD 
Irrigation  efficiency  is  not  a  strategy  that  will  earn  credits  in  Sustainable  Sites.  For  example  an  efficient 
irrigation  system  doesn't  earn  a  project  LEED  points  for  reducing  stormwater  runoff.    Increasing  the 
efficiency of a sprinkler system (by using drip irrigation as an example) would help earn credit in Water 
Efficiency. Irrigation is not a topic addressed in Materials and Resources. A more efficient irrigation system 
consumes less energy. 
 
594、 The baseline water demand within a building includes the measurements of which of the following 
items? (Choose 3) 
A、  Cooling towers 
B、  Irrigation systems 
C、  Bathroom faucets 
D、  Toilets 
E、  Urinals 
The correct answer is:    CDE 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
The water use of cooling towers is not included in the baseline water demand of a building. The water use 
from  irrigation  is  not  included  in  the  baseline  water  demand  of  a  building.  The  baseline  water  demand 
within a building includes the measurement of fixtures and fittings (toilets, faucets). Toilets are measured 
in gallons per flush, while fixtures are measured in gallons per minute. 
 
595、 Landscaping restrictions would be least impacted by which of the following? 
A、  Building codes 
B、  Neighborhood covenants 
C、  Energy efficiency laws 
D、  Local ordinances 
The correct answer is:    C 
Energy efficiency laws do not usually dictate your landscape design, thus they would have the least impact 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      172 / 206 
on average. Neighborhood covenants, local ordinances, and even some building codes may dictate how 
your landscape can look. 
 
596、 What is true regarding a material's emittance and solar reflectance (albedo)? 
A、  A material's emittance and solar reflectance mean the same thing 
B、  Emittance and solar reflectance are used to calculated a materials perviousness 
C、  Emittance and solar reflectance are combined to determine a material's SRI value 
D、  Emittance is based on a material's solar reflectance 
The correct answer is:    C 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
LEED defines solar reflectance as: A measure of the ability of a surface material to reflect sunlight‐visible, 
infrared,  and  ultraviolet  wavelengths‐on  a  scale  of  0  to  1.  Solar  reflectance  is  also  called  albedo.  Black 
paint  has  a  solar  reflectance  of  0;  white  paint  (titanium  dioxide)  has  a  solar  reflectance  of  1.  The 
emittance of a material refers to its ability to release absorbed heat. Scientists use a number between 0 
and 1, or 0% and 100%, to express emittance. With the exception of metals, most construction materials 
have  emittances  above  0.85  (85%).  Emittance  is  used  by  manufacturers  to  calculate  the  SRI.  SRI  is 
calculated  by  using  emissivity  and  solar  reflectance  values.  These  values  are  not  used  to  calculate  how 
pervious  a  material  is.  Solar  Reflectance  Index  (SRI)  is  a  value  that  incorporates  both  solar  reflectance 
(albedo) and emittance in a single value to represent a material's temperature in the sun. SRI quantifies 
how hot a surface would get relative to standard black and standard white surfaces. It is expressed as a 
fraction  (0.0  to  1.0)  or  percentage  (0%  to  100%).  Materials  with  the  highest  SRI  values  are  the  coolest 
choices  for  paving.  The  higher  the  SRI  number  the  more  the  sunlight  the  material  can  reflect.  Black 
asphalt has an SRI of 0. 
 
597、 What does ASHRAE 62.1‐2007 specify? 
A、  Thermal comfort 
B、  Commuting surveys 
C、  Indoor air quality 
D、  Energy performance 
The correct answer is:    C 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
ASHRAE  62.1‐2007  Ventilation  for  Acceptable  Indoor  Air  Quality  specifies  minimum  ventilation  rates. 
These rates are used to improve indoor air quality as part of the IEQ credit category. 
 
598、 Which  of  the  following  is  not  a  strategy  to  minimize  the  negative  impacts  of  refrigerants  on  the 
environment? 
A、  Selecting refrigerants with zero or low ozone depletion potential (ODP) and minimal global warming 
potential (GWP). 
B、  Reducing the annual leakage rate of refrigerants to 10% or less 
C、  Designing a building with natural ventilation 
D、  Designing a building that does not use chemical refrigerants 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
If  a  building  does  use  chemical  refrigerants  the  project  team  should  try  to  select  refrigerants  with  low 
ODP and GWP. When phasing out CFC‐based refrigerants or when a phase out is not economically feasible, 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      173 / 206 
LEED requires reducing the annual leakage of CFCs to 5% or less using EPA Clean Air Act procedures. This 
applies  to  CFCs  but  any  new  building  should  not  have  a  refrigeration  system  that  leaks  10%  of  the 
refrigerant  annually.  A  building  that  uses  natural  ventilation  (also  called  passive  cooling)  does  not  use 
refrigerants. Examples of natural ventilation include the use of open windows. This strategy is often viable 
in cooler climates. A building that does not use chemical refrigerants will not have a negative impact on 
the environment. 
 
599、 A project schedule for an environmentally responsive design process would include additional time 
in the schedule for all of the following except: 
A、  Additional systems testing 
B、  Unconventional materials or building techniques 
C、  Additional research 
D、  Bidding 
The correct answer is:    D 
Reference: Sustainable Building Technical Manual: Part II, 
Additional systems testing insures systems are running as designed. Time for reviewing new or unfamiliar 
building techniques may be required. Time for additional research of project materials or strategies may 
be needed. Bidding doesn't require additional time between conventional vs. green building projects. 
 
600、 What are the environmental benefits of selecting a previously developed site for a project? 
A、  The site would have a greater development density 
B、  Local tax savings may be available 
C、  The site would be located near mass transit 
D、  Preserving open space 
The correct answer is:    D 
Reference: Green Building & LEED Core Concepts Guide 
The  development  density  of  the  project  depends  on  the  building  design,  not  the  type  of  land  chosen. 
Greenfields  are  sites  not  previously  developed  or  graded  that  could  support  open  space,  habitat,  or 
agriculture. Tax savings are an economic benefit. A previously developed site doesn't mean mass transit 
will  be  available.  There  are  plenty  of  cities  that  have  no  or  poor  public  transportation  systems.  The 
question asks for an environmental benefit.LEED prefers not building on greenfields but using previously 
developed land instead. Preserving greenfields means more open space will be available. 
 
601、 The selection  of a less  efficient refrigerant for HVAC&R systems can result in an increase in what 
types of emissions? 
A、  Radon 
B、  CFCs 
C、  VOCs 
D、  NH3 
E、  CO2 
The correct answer is:    E 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
Radon is a naturally‐occurring radioactive gas that may cause cancer, and may be found in drinking water 
and  indoor  air.  Some  people  who  are  exposed  to  radon  in  drinking  water  may  have  increased  risk  of 
getting cancer over the course of their lifetime, especially lung cancer. Radon in soil under homes is the 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      174 / 206 
biggest  source  of  radon  in  indoor  air,  and  presents  a  greater  risk  of  lung  cancer  than  radon  in  drinking 
water. CFCs are some of the most efficient refrigerants, but they are bad for the environment and banned 
under  the  Montreal  Protocol.  VOCs,  or  volatile  organic  compounds,  are  an  emission  from  building 
materials such as carpets and paints. New car smell is an example of a VOC. NH3 is ammonia and a type of 
natural refrigerant. Less efficient refrigerants will consume more energy (usually  consuming fossil fuels) 
resulting in greater release of CO2 into the atmosphere by the electricity provider. 
 
602、 What statement is true about RECs? 
A、  RECs are reduced from utility bills 
B、  RECs depreciate in value 
C、  RECs are tradable commodities 
D、  RECs provide electricity 
The correct answer is:    C 
Reference: Guide to Purchasing Green Power 
RECs are not reduced from utility bills.   RECs do not lose value. RECs represent the reduced emissions of 
renewable  energy  compared  to  conventional  fossil  fuels.  RECs  are  sold  separately  allowing  people  to 
purchase the 'greenness' of the electricity. This allows anyone to purchase an REC even if the power to 
their building is not green power. RECs have no geographic constraints, because they are sold separately 
from electricity. RECs are not electricity. 
 
603、 Which of the following has the greatest indirect impact on global warming? 
A、  Global warming potential 
B、  Refrigerant leakage 
C、  Chillers' operating efficiency 
D、  Service life of equipment 
The correct answer is:    C 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants   
Global  warming  potential  is  a  direct  impact.  Refrigerant  leakage  would  have  a  direct  impact,  since  the 
refrigerant goes straight into the atmosphere and impacts the ozone. Natural refrigerants (Carbon dioxide, 
ammonia,  propane)  have  no  ozone  depletion  potential.  Since  these  refrigerants  are  much  less  efficient 
than HCFCs or HFCs, more energy is needed to get the same refrigeration levels. Equipment that burns 
more  energy  for  cooling  as  a  result  of  lower  efficiency  or  the  use  of  natural  refrigerants  can  result  in 
greater global warming. While natural refrigerants do not directly impact global warming, they indirectly 
impact global warming by requiring more energy to achieve lower refrigeration temperatures. The service 
life of equipment would have a more direct impact, since this deals with the refrigerants. If the equipment 
fails early, the refrigerants may be leaked when replacing parts or when removing all of the refrigerants 
prior to replacing the equipment. 
 
604、 What type of program is Zipcar? 
A、  An alternative vehicle refueling program 
B、  Car pooling program 
C、  Preferred parking program 
D、  Car share membership program 
The correct answer is:    D 
Car  sharing  is  an  alternative  to  car  rental  and  car  ownership.  Cars  are  located  throughout  cities  in 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      175 / 206 
convenient locations. People who sign up for the program can reserve the cars and use them for a short 
period of time. See zipcar.com for an example.   
 
605、 What are the life cycle costing benefits of a vegetated roof? (Choose 2) 
A、  Longer product life 
B、  Reduction in storm water runoff 
C、  Lower maintenance costs 
D、  Reduced heat islands 
The correct answer is:    AC 
According to some studies and some LEED documentation vegetated roofs have a longer product life than 
conventional roofs. Maybe that is due to the yearly maintenance and upkeep that should occur. Reducing 
stormwater  runoff  is  an  environmental  benefit  which  would  be  determined  by  life‐cycle  analysis 
(environmental  analysis).  Life  cycle  costing  is  used  to  evaluate  economic  performance  and  takes  into 
account operational and maintenance costs throughout the life of the product. Reducing heat islands is an 
environmental benefit which would be determined by life‐cycle analysis (environmental analysis). 
 
606、 A density radius calculation would be used for what purpose? 
A、  To locate parks near the project that can be counted as open space 
B、  To identify any building near the project site to include in project density calculations 
C、  To identify distance to mass transit 
D、  To locate basic services near a project site 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Open  space  not  within  the  project  boundary  is  not  counted  as  open  space  for  the  project.  The  density 
radius  is  calculated  using  a  formula  provided  by  LEED.  Any  building  within  the  radius  is  included  in  the 
calculations to determine the average density of the area. Projects are awarded credit for building within 
dense areas. Public roads and waterways are excluded from the calculations. Mass transit is identified by 
using a map and measuring the walking distance to the transit.    Basic services are identified by drawing a 
1/2 mile circle around a project site on a map. 
  
607、 What is a financial benefit of implementing an occupant recycling program? 
A、  Reduced landfill fees 
B、  Minimized air pollution 
C、  Reduced energy use 
D、  Reduced extraction of virgin materials 
The correct answer is:    A 
Recycling  can  result  in  reduced  landfill  and  tipping  fees  since  the  materials  are  diverted  from  landfills. 
Sometimes the recycled materials can be sold to waste haulers, creating a net gain. 
 
608、 Which of the following can increase the heat island effect in urban areas? (Choose 2) 
A、  Street equipment 
B、  Buildings that have passive ventilation 
C、  Air‐conditioners 
D、  Rooftops covered with a high SRI material 
The correct answer is:    AC 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      176 / 206 
Other  causes  of  the  heat  island  effect  include  air‐conditioners,  vehicle  exhaust,  and  street  equipment. 
Passive ventilation impacts energy use but would not increase the heat island effect. Other causes of the 
heat island effect include air‐conditioners, vehicle exhaust, and street equipment. High SRI materials with 
reflect the heat rather than absorb it and radiate the heat back later on. The primary cause of the heat 
island effect is dark surfaces such as rooftops or dark asphalt pavement that absorb heat and radiate it 
into  the  surrounding  areas.  Reduced  air  flow  between  buildings  and  narrow  streets  also  increases  the 
effect. 
 
609、 What environmental issue is associated with refrigerants used in HVAC&R systems? 
A、  Increased CO2 indoors 
B、  Soil contamination 
C、  Increasing greenhouse gas emissions 
D、  Groundwater contamination 
The correct answer is:    C 
Reference: The Treatment by LEED of the Environmental Impact of HVAC Refrigerants 
Refrigerants  have  ozone  depletion  potential  (ODP)  and  global  warming  potential  (GWP)  due  to 
greenhouse gas emissions. Low values of each are best for refrigerant choices. 
 
610、 Which items can contribute to Construction Waste Management credit? (Choose 2) 
A、  Asbestos flooring 
B、  Sheetrock 
C、  Brick 
D、  Tree stumps 
The correct answer is:    BC 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
Hazardous  material  and  excavation  do  not  count  toward  this  credit.  For  the  purposes  of  the  LEED 
Construction  Waste  Management  credit,  hazardous  material  and  excavation  do  not  count  toward  this 
credit.  The  reason  LEED  does  not  allow  this  is  because  these  materials  can  skew  the  amount  of 
construction waste kept from landfills. Consider a project that removes 50 tons of dirt from the site and 
the total waste for the construction site was 100 tons. With those values you could say 50% of waste was 
diverted  but  that  is  not  how  the  LEED  calculations  are  done.  The  project  team  hasn't  kept  any 
construction waste from the landfill ‐ they only hauled off some dirt to another location. The 50 tons of 
dirt are excluded from any calculations. Only your actual construction and demolition debris are included 
‐ wood scraps, metal, drywall, cardboard boxes, etc.   
 
611、 Which of the following are LEED strategies to reduce single occupant automobile transportation to 
the project site? 
A、  Size the parking to accommodate peak visitor use 
B、  Decreasing the LEED boundary 
C、  Have a lack of parking spaces at the site 
D、  Locate the project near existing development 
The correct answer is:    C 
Reference: Green Building and LEED Core Concepts Guide 
Parking  should  be  sized  to  the  minimum  required  by  local  zoning  to  earn  LEED  credit.    The  project 
boundary  has  nothing  to  do  with  automobile  use.  This  is  an  actual  LEED  strategy,  like  it  or  not.  Having 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      177 / 206 
limited parking is supposed to discourage people from driving alone to work because they will not be able 
to find a convenient parking spot which is supposed to get them to think about alternative ways to get to 
work. Projects can limit parking by only installing enough parking as required by local code. For example if 
local code requires 20 spaces, the project limits the parking installing 20 spaces and not any extra spaces. 
Locating the project near existing development helps reduce infrastructure needs. 
 
612、 USGBC was organized and then LEED was created because the green building industry lacked which 
important factor? 
A、  A certification award to encourage interest in the real estate industry 
B、  An oversight organization to bring together all parts of the green building industry 
C、  A standard measurement and definition of green building 
D、  A system and organization to spread green building information 
The correct answer is:    C 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Introduction 
After  the  formation  of  the  USGBC,  the members  realized  that the sustainable  design  industry  needed  a 
system to define and measure green building. 
 
613、 What statements are true regarding the LEED for Commercial Interiors rating system? 
A、  Projects are only eligible if the tenants purchase the space 
B、  This rating system is appropriate for interior spaces that are undergoing alteration work 
C、  This rating system can only be used if envelope upgrades are done 
D、  The rating system requires HVAC replacement 
The correct answer is:    B 
Reference: LEED Rating System Selection Policy   
Tenants don't normally purchase space, they lease space. In either case LEED for Commercial Interiors can 
be used. This rating system is appropriate for interior spaces that are undergoing alteration work for at 
least  60%  of  the  certifying  gross  floor  area.  Envelope  upgrades  are  a  major  renovation  and  would  fall 
under LEED for New Construction or LEED for Core & Shell. HVAC replacement is a major renovation and 
would fall under LEED for New Construction. 
 
614、 What happens after the project registration fee is paid to GBCI? 
A、  The project team gains access to LEED Online 
B、  The project will have a Green Rater assigned to the project 
C、  The project will receive a certification plaque 
D、  The project will receive pre‐certification 
The correct answer is:    A 
When  a  project  registers  and  pays  the  registration  fee,  the  team  will  have  immediate  access  to  LEED 
Online, LEED project tools and resources and will be entered into the LEED project database. Green Raters 
are  specific  to  LEED  for  Homes.  This  occurs  after  the  project  has  been  reviewed,  not  after  registration. 
Pre‐certification is available only to LEED Core & Shell, not to every project. 
 
615、 What is true about integrative design? 
A、  Integrative design is applicable to any phase in the life cycle of a building or land‐use project 
B、  Integrative design results in longer construction schedules 
C、  Integrative design is only used for new construction design processes 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      178 / 206 
D、  Integrative design is a linear process 
The correct answer is:    A 
Reference: Green Building & LEED Core Concepts Guide 
Integrative  design  can  be  applied  to  any type  of  project  no  matter the  stage  of  the  project.  One  of  the 
main  potential  benefits  of  IPD  is  the  reduction  of  construction  time  due  to  the  extensive  planning  and 
changes  to  project  processes.  (AIA  IPD  Guide)  Integrative  design  is  not  limited  to  new  construction 
projects. Conventional design is linear. Integrative design is more collaborative and concurrent. 
 
616、 What landscaping strategy will best eliminate the need for irrigation? 
A、  Xeriscaping 
B、  Mulching 
C、  Micro‐irrigation 
D、  Drip irrigation 
The correct answer is:    A 
Xeriscaping is a landscaping method that employs drought‐resistant plants to minimize or eliminate water 
use.  Mulching  helps  retain  moisture  for  plants,  but  it  is  not  the  BEST  strategy  from  the  choices  given. 
Micro‐irrigation and drip irrigation are both irrigation techniques. Micro‐irrigation and drip irrigation are 
both irrigation techniques. 
 
617、 Development footprint with which difference with leed project boundary?   
A、  excluded undisturbed areas                 
B、  have landscape in it                 
C、  with the building structure in it                 
D、  with hardscape in it       
The correct answer is: D   
 
618、 What is a drawback of using bioenergy? 
A、Production is unreliable or inconsistent 
B、  Bioenergy is not acceptable for LEED purposes 
C、  The lack of regulatory oversight 
D、  The amount of fossil fuel used to produce it 
The correct answer is:    D 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
USGBC  defines  Renewable  Energy  as  'Energy  from  sources  that  are  not  depleted  when  used.    This 
includes energy from the sun, wind, and small hydropower. Ways to capture energy from the sun include 
photovoltaic,  thermal  solar  energy  systems,  and  bioenergy.  One  issue  with  bioenergy  is  the  amount  of 
fossil fuel energy used to produce it.' Biofuel‐based electrical systems are defined by USGBC as 'Electrical 
power systems that run on renewable fuels derived from organic materials, such as wood by‐products and 
agricultural  waste.  For  purposes  of  LEED,  biofuels  include  untreated  wood  waste  (e.g.,  mill  residues), 
agricultural crops or waste, animal waste and other organic waste, and landfill gas.' Bioenergy such as the 
burning of ethanol from corn, requires energy to produce the fuel. 
 
619、 Which of the following materials would be considered post‐consumer recycled content? 
A、  Certified wood flooring 
B、  Bamboo flooring 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      179 / 206 
C、  Wool carpet made from wool leftover from the manufacturing process 
D、  Flooring made from recycled milk jugs and sawdust 
The correct answer is:    D 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary   
Certified wood is wood from sustainably managed forests. Bamboo is a type of rapidly renewable material. 
C would not be considered any type of recycled material. If a manufacturing process uses scraps and puts 
them back in the assembly line, it is a good practice but it does not count towards pre or post consumer 
recycled content. Recycled milk jugs are a post‐consumer recycled product. 
Post‐consumer material ‐ is material recycled from consumer waste. Postconsumer recycled content ‐ is 
the percentage of material in a product that was consumer wastE、    The recycled material was generated 
by household, commercial, industrial, or institutional end‐users and can no longer be used for its intended 
purpose. It includes returns of materials from the distribution chain. Examples include construction and 
demolition  debris,  materials  collected  through  recycling  programs,  discarded  products  (e.g.,  furniture, 
cabinetry,  decking),  and  landscaping  waste  (e.g.,  leaves,  grass  clippings,  tree  trimmings).  (ISO  14021) 
Pre‐consumer  content  ‐  formerly  known  as  post‐industrial  content,  is  the  percentage  of  material  in  a 
product that is recycled from manufacturing waste. Examples include planer shavings, plytrim, sawdust, 
chips,  bagasse,  sunflower  seed  hulls,  walnut  shells,  culls,  trimmed  materials,  print  overruns,  overissue 
publications, and obsolete inventories. Excluded are materials such as rework, regrind, or scrap generated 
in a process and capable of being reclaimed within the same process that generated it (ISO 14021). 
 
620、 What statement is true regarding the use of Halons? 
A、  A building that uses Halons in fire suppression systems cannot earn any LEED certification. 
B、  A  building  that  uses  Halons  in  fire  suppression  systems  could  not  earn  LEED  for  Existing  Buildings: 
Operations and Maintenance certification 
C、  A building that uses Halons in fire suppression systems must implement a 5‐year phase out plan as 
part of the application process 
D、  A building that uses Halons in fire suppression systems can still earn LEED certification 
The correct answer is:    D 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Enhanced Refrigerant Management (a LEED credit) can be earned for zero use of Halons, but remember 
that this credit does not have to be pursued if the project team chooses not to. Phase out plans are used 
when  an  existing  building  uses  CFC‐based  refrigerants.  LEED  prerequisites  do  not  require  zero  use  of 
Halons from a building in order to earn certification. Fundamental Refrigerant Management requires zero 
use of CFCs. 
 
621、 How is the documentation for Innovation in Design credits for innovative performance submitted? 
A、  Using GBCI's website 
B、  Using LEED Online 
C、  Using the CIR process 
D、  Using USGBC's website 
The correct answer is:    B 
ID credits are submitted just like any other LEED credit ‐ using LEED Online.   
 
622、 At a minimum, what materials must a recycling program include? (Choose 3) 
A、  Light bulbs 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      180 / 206 
B、  Metals 
C、  Glass 
D、  Paper 
E、  Food waste 
The correct answer is:    BCD 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
At  a  minimum,  a  recycling  program  must  include:  Paper,  cardboard,  glass,  plastics,  metals.  Stones,  dirt, 
hazardous  materials,  batteries,  mercury‐containing  light  bulbs,  and  food  waste  would  not  be  included. 
The collection of recycled materials requires an easily accessible dedicated area for collection and storage. 
When implementing the storage area consider using signs to help people find the area, and to show what 
materials  go  in  what  bins  (for  non‐comingled  recycling).  If  the  storage  area  is  outside  make  sure  it  is 
protected from the elements and nobody can steal your materials (metals can be worth a lot of money). 
 
623、 What are the negative consequences of not diverting construction demolition and debris? (Choose 
2) 
A、  Groundwater contamination 
B、  Sedimentation 
C、  Landfill gas emissions 
D、  Ozone depletion 
The correct answer is:    AC 
Trash in landfills can contain hazardous chemicals. Eventually rain works its way down and carries these 
chemicals into subsurface groundwater and aquifers. Sedimentation is caused by lack of erosion control 
and stormwater runoff. One of the negative environmental consequences of landfills is the gas emissions 
they produce. Ozone depletion is caused by refrigerants reacting in the ozone layer. 
 
624、 What type of plants do the most to help reduce water use for landscaping? 
A、  Native plants 
B、  Turf grass 
C、  Annual flowers 
D、  Trees 
The correct answer is:    A 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary 
Native plants are those that grow naturally in an area, or that have been in an area for many years. Native 
plants require less water, fertilizer, and pest control. These plants can be trees, shrubs, flowers, or grasses. 
Adaptive plants are non‐native plants that perform well in the local climate. Native and adaptive plants 
require less water, and are more disease resistant because they are suited to the region's usual rainfall, 
soil, and temperature. 
 
625、 An  office  park  design  includes  a  parking  lot.  How  could  the  parking  be  redesigned  to  reduce  the 
heat island effect? 
A、  Encourage occupants to use public transportation one day a week 
B、  Place the parking underground 
C、  Use black asphalt for the parking lot 
D、  Designate preferred parking spaces 
The correct answer is:    B 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      181 / 206 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Moving a parking lot/spaces under the building is one way to reduce the heat island effect. This reduces 
the  amount  of  impervious  area  above  ground.  The  heat  island  effect  is  created  when  developed  areas 
have higher temperatures than surrounding rural areas. An urban heat island effect is caused by sunlight 
heating  up  dark  colored  surfaces  such  as  roads  and  rooftops.  Huge  quantities  of  heat  are  generated  in 
buildings  that  have  dark  rooftops  and  absorb  heat  rather  than  reflect  it.  Adding  preferred  parking  does 
not reduce the heat island effect. 
 
626、 To help with water use reduction in LEED, a lavatory faucet must use less water than the rates set 
by: 
A、  Clean Water Act 
B、  Local code 
C、  WaterSense 
D、  EPAct 1992 
The correct answer is:    D 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
The Clean Water Act does not address flush/flow fixtures.   The rates of local codes are not used to set the 
baseline rate for water use reduction calculations. WaterSense is an EPA certification awarded to fixtures 
that use less water than comparable fixtures. LEED does not use this certification to for the baseline rate 
calculations. EPAct 1992 is the standard used to calculate baseline water usage, not the design case. EPAct 
1992 mandated  the  use  of  water  conserving  plumbing  fixtures  in  residential,  commercial  and  industrial 
buildings.  The  answer  choice  of  'Installing  fixtures  that  meet  the  EPAct  1992  standard'  only  meets  the 
baseline  standard  and  does  not  contribute  to  reducing  potable  water  use  for  the  purposes  of  earning 
LEED credits. The fixture and flow rates of EPAct 1992 are used to set the water use baseline for a building. 
The design case must reduce water use 20% over the baseline. In order to do this, low flow fixtures must 
be  used  in the  design,  or  replacing  potable  water  with  graywater/stormwater.  Think  of  the  fixtures  and 
flow rates of EPAct 1992 as the worst case scenario. 
 
627、 What statement is true regarding CIRs? 
A、  CIRs are not applicable prior to LEED for Core & Shell precertification 
B、  CIRs cannot be submitted during the performance period for LEED for Existing Building: Operations & 
Maintenance projects 
C、  CIRs that have been ruled on should be submitted with a project's application 
D、  CIRs may only be submitted after the project's design review is complete 
The correct answer is:    C 
Reference: GBCI Credit Interpretation Request (CIR) 
CIRs can be submitted anytime after project registration. This includes prior to precertification for LEED 
for Core & Shell projects. CIRs can be submitted anytime after project registration. This includes during 
the performance period of LEED EB: O&M projects.    'Project Teams must submit the CIR inquiry and the 
ruling with their LEED application in order to ensure a complete review.' (GBCI) You don't want a credit to 
be denied because of a lack of information. If a CIR was ruled on regarding a specific credit, the CIR should 
be submitted along with the credit during the final review so the reviewers can award the credit. CIRs can 
be submitted anytime after project registration. CIRs can thus be submitted before the design review in 
the case of a split‐review. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      182 / 206 
628、 What does the use of light colored pervious paving help with? (Choose 2) 
A、  Regional materials 
B、  Stormwater management 
C、  Recycling 
D、  Heat island effect 
The correct answer is:    BD 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
The heat island effect is created when developed areas have higher temperatures than surrounding rural 
areas. An urban heat island effect is caused by sunlight heating up dark colored surfaces such as roads and 
rooftops.  Huge  quantities  of  heat  are  generated  in  buildings  that  have  dark  rooftops  and  absorb  heat 
rather than reflect it. Pervious paving helps with reducing stormwater runoff by allowing stormwater to 
percolate through the pavement. Light colored paving, or paving with a high SRI value, helps reduce the 
heat island effect. 
 
629、 Which LEED rating system has pre‐certification? 
A、  LEED for Commercial Interiors 
B、  LEED for New Construction 
C、  LEED for Core and Shell 
D、  LEED for Schools 
E、  LEED for Existing Buildings: Operations and Maintenance 
The correct answer is:    C 
'Once  a  project  is  registered  as  a  LEED  for  Core  &  Shell  project,  the  project  team  may  apply  for 
precertification.  LEED  for  Core  &  Shell  precertification  is  a  formal  recognition  by  the  USGBC  given  to  a 
candidate  project  for  which  the  developer/owner  has  established  a  goal  to  develop  a  LEED  for  Core  & 
Shell building. Once precertification is granted, the developer/owner can market the building's proposed 
green features to potential tenants and financiers.' ‐USGBC 
 
630、 How do the LEED Rating Systems reward the development and adoption of new technologies and 
strategies that can produce quantifiable environmental and human health benefits? 
A、  Additional plaque for showing creativity 
B、  Additional points 
C、  Discounts in certification fees 
D、  Upgrade to the next certification level 
The correct answer is:    B 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Additional points (ID points) can be earned for implementing strategies or measures not addressed in the 
current rating systems. 
 
631、 For a single building commercial project that is not part of a multi‐building project, increasing the 
amount of open space a project has would impact the: (Choose 2) 
A、  Size of the area to plant native vegetation 
B、  Community connectivity 
C、  Quantity of rainwater available for irrigation 
D、  Size of the LEED boundary 
The correct answer is:    AD 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      183 / 206 
Increasing  the  open  space  would  impact  the  size  of  the  area  to  plant  any  vegetation,  including  native. 
Increasing open space helps provide habitat for vegetation and wildlife, stormwater control, and reducing 
the urban heat island effect. The same amount of rain is going to fall from the sky regardless of what's on 
the property. Altering the size of the open space does not change the LEED boundary. 
 
632、 Which of the following fixtures would not be included in the baseline water use calculations? 
A、  Prerinse spray valve 
B、  Residential toilet 
C、  Lavatory faucet 
D、  Commercial urinal 
E、  Steam cooker 
The correct answer is:    E 
Reference: LEED 2009 for New Construction and Major Renovations Rating System   
A steam cooker is not an appliance that is included in the water use reduction calculation. 
The  following  fixtures/fittings  have  baseline  measurements  from  the  EPAct  1992  standard  and  are 
included in the baseline calculations: 
toilets (water closets)   
urinals   
bathroom faucets   
Commercial prerinse spray valves   
Showerheads 
 
633、 How is lighting power density determined? 
A、  By conducting energy modeling using special software 
B、  By submetering a building's energy use 
C、  By calculating the energy consumption divided by the square feet in a building 
D、  By measuring the installed lighting power per unit area 
The correct answer is:    D 
Reference: LEED 2009 for New Construction and Major Renovations Rating System 
Reducing  the  lighting  power  density  for  a  project  can  reduce  energy  use.  Energy  modeling  can  help 
determine a building's overall energy use. Submetering helps to measure specific energy consumption in 
a  building.  Lighting  power  density  is  the  measurement  of  the  installed  lighting  power  per  unit 
area.(USGBC) 
 
634、 What area is included in the building footprint? 
A、  Stone walkways 
B、  Parking lots made with permeable concrete 
C、  Ponds 
D、  Area of the building structure 
The correct answer is:    D 
Reference: LEED for Existing Buildings: Operations & Maintenance Reference Guide, Glossary   
The area of the site occupied by the building structure, not including parking lots, landscapes, and other 
nonbuilding facilities. 
 
635、 When are CFC based refrigerants allowed to be used in a LEED® project? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      184 / 206 
A、    Anytime 
B、    In Existing Buildings 
C、    If a CFC phase‐out is economically infeasible 
D、    If the refrigerant leakage rate is below 10% annually 
The correct answer is:    C.   
LEED allows for projects where a CFC phase‐out is shown to have a payback period of over ten years (for 
conversion and replacement scenarios) maintain their existing CFCbased systems as long as their leakage 
rate is below 5% annually. 
 
636、 What information should be provided as part of a CIR submission? 
A、    Photos or Drawings 
B、    Background Project Information 
C、    Applicable Confidential Information 
D、    The Credit Name 
E、    Your contact information 
The correct answer is:    B.     
CIRs  cannot  contain  any  attachments  including  drawings  and  since  CIRs  are  published,  they  should  not 
contain  any  confidential  information  about  the  project.  All  of  the  other  options  are  tracked  by  the  CIR 
system and would be redundant. 
 
637、 What LEED Process can set precedents for future LEED projects? 
A、    Prerequisite Submission 
B、    CIR Process 
C、    Credit Documentation Review Process 
D、    Appeal Process 
The correct answer is:    B.     
Credit Interpretation Rulings are applicable to all future projects, not just the project that submitted the 
CIR. All other process listed are project specific. 
 
638、 What  is  an  individual  who  is  working  for  a  LEED®  for  Homes  Provider  and  performs  on‐site 
inspections and testing for the LEED for Homes Rating System Called? 
A、    A Home Inspector 
B、    A Project Manager 
C、    A Home Rater 
D、    A Green Rater 
E、    A Commissioning Authority 
The correct answer is:    D.     
 
639、 Which of the following are pre‐consumer products?(choose 3)      
A、  aluminium can                 
B、  saw dust                 
C、  walnut sheet                 
D、  milk jugs                
E、  concrete fly ash     
The correct answer is:    BCE 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      185 / 206 
 
640、 Which of the following regulations is likely to be contained in zoning regulations? (Choose 3) 
A、    Landscaping Regulations 
B、    Regulations on Energy Usage 
C、    Parking Space Requirements 
D、    Open Space Requirements 
E、    Stormwater Management Regulations 
The correct answer is:    A. C. D.   
Regulations  on  Energy  Use  are  typically  contained  in  building  codes  and  stormwater  regulations  are 
handled by the local sewer district, not the zoning authority. 
 
641、 Which Rating Systems will award a project one or more points for already being LEED Certified in 
another rating system? (Choose 3) 
A、    LEED for Schools 
B、    LEED for Homes 
C、    LEED for Commercial Interiors 
D、    LEED for Operations and Maintenance 
E、    LEED for Core and Shell 
The correct answer is:    B. C. D.     
 
642、 What are the three components of the triple bottom line? (Choose 3) 
A、    Social Responsibility 
B、    Environmental Stewardship 
C、    Ongoing Education 
D、    Government Regulations 
E、    Economic Prosperity 
The correct answer is:    A. B. E.   
The triple bottom line is also commonly referred to as “people, planet and prosperity”. 
 
643、 Which  of  the  following  is  not  a  required  design  consideration  for  the  recycling  collection  and 
storage area prerequisite? 
A、    Convenient location 
B、    Collection truck access 
C、    Appropriate signage 
D、    Protection from the elements 
The correct answer is:    B.     
While  it  is  important  to  consider  how  a  waste  management  truck  might  collect  recyclables,  it  is  not  a 
required component of the prerequisite. 
 
644、 When  a  general  contractor  is  collecting  documentation  for  the  construction  waste  management 
credit,  which  two  of  the  following  pieces  of  information  regarding  measurement  of  materials  diverted 
would be most helpful? (Choose 2) 
A、    The number of assorted windows donated to Habitat for Humanity 
B、    The weight of concrete used as fill material 
C、    The volume of scrap metal sent to a recycler 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      186 / 206 
D、    The volume of land‐clearing debris composted 
E、    The linear footage of wood waste burned (incinerated) on site 
The correct answer is:    B. C. 
The construction waste management credit is calculated based on weight or volume, therefore the total 
number of windows of assorted sizes will not be helpful because they will all have different weights and 
volumes. Also, landscaping debris is excluded from the calculation of this credit and incineration is not an 
acceptable diversion method. 
 
645、 The Heat Island Effect may raise the temperature in an urban area by how many degrees above the 
temperature in nearby rural areas? 
A、    2 degrees 
B、    4 degrees 
C、    6 degrees 
D、    8 degrees 
E、    10 degrees 
The correct answer is:    E.     
 
646、 Which of the following is not considered to be a “basic service”? 
A、    Bank 
B、    Grocery Store 
C、    Parking Lot 
D、    Beauty Salon 
E、    Church 
The correct answer is:    C.     
 
647、 Open grid paving systems used in a parking lot can help with what two site related sustainability 
concepts/credits? (Choose 2) 
A、    Stormwater Management, Quantity 
B、    Site Selection 
C、    Water Use Reduction 
D、    Alternative Transportation, Parking Capacity 
E、    Heat Island Effect, Non‐Roof 
The correct answer is:    A. E.   
open grid paving increased impervious area, thus helping promote stormwater infiltration and the open, 
vegetated cells help mitigate the heat effect by not contributing to heat build‐up 
 
648、 What are the two primary sources of potable water? (Choose 2) 
A、    Captured rainwater 
B、    A lake or stream 
C、    Municipal water systems 
D、    The ocean 
E、    A private or public well 
The correct answer is:    C. E.   
None of the other options are considered potable without treatment. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      187 / 206 
649、 If a contractor wishes to use source control as a component of a construction waste management 
plan, which of the following strategies might he pursue for this portion of his plan? 
(Choose 2) 
A、    Salvaging materials by donating them to Habitat for Humanity 
B、    Ordering pre‐assembled products 
C、    Using modular construction techniques 
D、    Recycling product packaging materials 
E、    Reusing scrap materials on‐site 
The correct answer is:    B. C.     
While  all  of  the  other  options  are  sound  means  of  reducing  construction  waste,  only  preassembly  and 
modular construction address source reduction. 
 
650、 Which  of  the  following  products  would  be  considered  to  contain  postconsumer  recycled  content 
that would contribute to the LEED credit for recycled content? (Choose 3) 
A、    Steel Beams made from used railroad ties 
B、    Glass tiles made from glass broken during the window manufacturing process 
C、    Carpet made from recycled soda bottles 
D、    Plumbing pipe made from recycled plastic components 
E、    A countertop made from newspapers 
The correct answer is:    A. C. E.     
All of the options contain recycled content, but the recycled content in the glass tiles would be considered 
pre‐consumer  and  the  recycled  content  in  the  plumbing  pipe  does  not  contribute  to  the  LEED  recycled 
content credit, because this credit only involves materials in CSI divisions 2‐10. 
 
651、 Which of the following projects is considered to be a “soft cost”? 
A、    The project’s structural steel 
B、    Landscaping costs 
C、    The Architect’s fees 
D、    Money paid to the brick mason for labor 
E、    Carpet 
The correct answer is:    C.     
All of the other options are considered hard costs. 
 
652、 The Regional Priority credits for a project are based on what? 
A、    The project’s city 
B、    The project’s state 
C、    The project’s zip code 
D、    The project’s county 
The correct answer is:    C.   
 
653、 What two specific types of refrigerants does the Montreal Protocol phase out the use of? (choose 
2) 
A、    Natural Refrigerants 
B、    Chlorofluorocarbons (CFCs) 
C、    Hydrochlorofluorocarbons (HCFCs) 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      188 / 206 
D、    Hydrofluorocarbons (HFCs) 
E、    Halons 
The correct answer is:    B. C.   
 
654、 What are the two primary benefits of using regional materials? (choose 2) 
A、    Supporting the local economy 
B、    Minimizing the impacts of transportation 
C、    Assuring quality craftsmanship 
D、    Reducing Cost 
The correct answer is:    A. B.     
While  local  materials  can  be  lower  costs  and  may  be  of  very  high  quality,  these  attributes  are  not 
guaranteed due to them being made locally. 
 
655、 What  is  the  minimum  project  square  footage  required  by  the  Minimum  Program  Requirements 
(MPRs) for projects using LEED BD+R, LEED ID+C and LEED O+M? 
A、    500 square feet 
B、    1,000 square feet 
C、    1,500 square feet 
D、    2,000 square feet 
E、    2,500 square feet 
The correct answer is:    B.     
 
656、 Which  of  the  following  is  not  a  LEED  accepted  strategy  for  decreasing  single  rider,  conventional 
automobile use? 
A、    Providing only the amount of parking required by the zoning code 
B、    Charging fees for parking 
C、    Locating the project near mass transit 
D、    Providing bicycle storage and showers 
E、    Providing preferred parking for fuel‐efficient and low‐emitting vehicles 
The correct answer is:    B.     
While charging fees for parking, may in fact reduce single‐occupant conventional automobile use, it is not 
an accepted LEED strategy 
 
657、 Which of the following are considered to be natural refrigerants? (Choose 3) 
A、    Propane 
B、    Freon 
C、    Ammonia 
D、    Carbon Dioxide 
E、    Puron 
F、    Carbon Monoxide 
The correct answer is:    A. C. D.   
 
658、 What percentage of the solid waste stream each year is attributable to construction and demolition 
waste? 
A、    10% 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      189 / 206 
B、    20% 
C、    30% 
D、    40% 
E、    50% 
The correct answer is:    D.   
 
659、 What is the greatest benefit of an integrative design process as it relates to a LEED project? 
A、    Shortening the project schedule 
B、    Capitalizing on credit synergies 
C、    Reducing project soft costs 
D、    Meeting building codes 
E、    Educating the project owner 
The correct answer is:    B.   
While  all  of  the  other  options  are  possible  benefits  of  an  integrative  design  process,  maximizing 
opportunities for credit synergies is the greatest LEED‐specific benefit. 
 
660、 Which of the following is not a strategy for reducing stormwater runoff volume? 
A、    Minimizing the building footprint 
B、    Increasing impervious paving 
C、    Using bio‐retention 
D、    Installing a vegetated roof 
E、    Rainwater harvesting 
The correct answer is:    B.   
Increasing pervious area will actually add to stormwater runoff volumes rather than decreasing them 
 
661、 Which of the following people should not have access to LEED Online? 
A、    Architect 
B、    Building Owner 
C、    Building User 
D、    General Contractor 
E、    Landscape Architect 
The correct answer is:    C.   
The  building  owners,  designers  and  builders  need  access  to  LEED  Online  to  document  the  project,  the 
building users do not need access. 
 
662、 If a project has 1 full time (40 hour a week) employee and 6 part time (20 hour a week) 
employees, what is the project’s Full Time Equivalent (FTE) value? 
A、    3 
B、    4 
C、    5 
D、    6 
E、    7 
The correct answer is:    B.     
1 full‐time employees = 1 FTE, 6 part‐time employees (20 hrs/week) = 3 FTE, 1 FTE + 3 
FTE = 4 FTE 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      190 / 206 
 
663、 Which  of  the  following  types  of  vehicle  does  not  qualify  as  an  alternative‐fuel  vehicle  for  the 
purposes of LEED? 
A、    Hydrogen Powered 
B、    Electric Powered 
C、    Hybrid (Gas‐Electric) 
D、    Diesel Powered 
E、    Ethanol Powered 
The correct answer is:    D.   
 
664、 Which of the following strategies does not qualify as providing “preferred parking”? 
A、    Offering a significant discount on parking passes 
B、    Providing a guaranteed space in a lottery system 
C、    Providing a space that is as close to the building as possible 
D、    Providing a designated covered spot 
E、    Providing a randomly assigned parking space 
The correct answer is:    E.   
Providing an assigned space that is closest to the building does qualify as preferred parking, but not just a 
randomly assigned space. 
 
665、 Which type of water is not allowed to be used for irrigation purposes? 
A、    Potable water 
B、    Well water 
C、    Blackwater 
D、    Graywater 
E、    Captured Rainwater 
The correct answer is:    C.     
Blackwater is considered to be contaminated with organic waste and should not be used for any purpose 
without treatment. 
 
666、 If a project team is reusing graywater on a LEED project, what are the two most appropriate uses 
for the graywater? (Choose 2) 
A、    Hand washing 
B、    Toilet flushing 
C、    Clothes Washing 
D、    Drip Irrigation 
E、    Spray Irrigation 
The correct answer is:    B. C.     
Graywater, though not contaminated to the level of blackwater, is still not potable, so it should not come 
into contact with humans. Spray irrigation particularly has the potential to get on people or pets, so it is 
preferable  to  use  drip  irrigation  if  graywater  is  being  used  since  drip  irrigation  water  is  distributed  at 
ground level, not above it. 
 
667、 At a minimum, which of the following materials should a recycling program designed to meet the 
storage and collection of recyclables prerequisite accommodate? (choose 3) 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      191 / 206 
A、    Glass 
B、    Ink Cartridges 
C、    Compact Fluorescent Bulbs 
D、    Plastics 
E、    Cardboard 
The correct answer is:    A. D. E.     
While  LEED  encourages  all  recycling,  projects  are  only  required  to  provide  for  the  recycling  of  glass, 
plastics, metals, paper and cardboard. 
 
668、 The CRI Green Label Plus Certification program certifies what type of building material? 
A、    Paint 
B、    Wood Products 
C、    Carpet 
D、    Furniture 
E、    Adhesives 
The correct answer is:    C.     
 
669、 Which standard that has been adopted by many of the LEED rating systems governs building energy 
use and performance? 
A、    Green Seal Standard 36 
B、    ASHRAE Standard 52.2 ‐ 1999 
C、    ASHRAE Standard 55 – 2004 
D、    ASHRAE Standard 90.1 – 2007 
E、    BIFMA International 
The correct answer is:    D.     
The other listed ASHRAE Standards cover other issues such as ventilation and thermal comfort. BIFMA is 
the Business and Institutional Furniture Manufacturer’s Association and is not included in building codes 
and Green Seal is a third party certification that deals with indoor air quality. 
 
670、 Which  LEED  recognized  strategy  will  require  Chain‐of‐custody  documentation  as  proof  of  credit 
compliance? 
A、    Certified Wood 
B、    Recycled Materials 
C、    Regional Materials 
D、    Rapidly Renewable Materials 
E、    Materials Reuse 
The correct answer is:    A.     
Forest Stewardship Council (FSC) Certification, the referenced standard for the certified wood credit relies 
on chain‐of‐custody documentation. 
 
671、 What are some other possible LEED Certifications a project may be able to receive if it has already 
received LEED Core and Shell Certification? (choose 2) 
A、    LEED for Commercial Interiors 
B、    LEED for New Construction 
C、    LEED for Schools 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      192 / 206 
D、    LEED for Operations and Maintenance 
E、    LEED for Homes 
The correct answer is:    A. D.     
LEED  for  Core  and  Shell  is  a  new  building  certification  that  deals  specifically  with  speculative  buildings 
where the interior tenant spaces will be built later and/or by a different party. Therefore a core and shell 
building  could  not  be  certified  under  LEED  for  Homes,  New  Construction  or  Schools  because  those  are 
also new building certifications for different product scopes and types. 
 
672、 Which type of refrigerant has an essentially zero ozone depletion potential (ODP) but still has high 
global warming potential (GWP)? 
A、    Natural Refrigerants 
B、    Chlorofluorocarbons (CFCs) 
C、    Hydrofluorocarbons (HFCs) 
D、    Hydrochlorofluorocarbons (HCFCs) 
The correct answer is:    C.     
 
673、 Which rating System has a required recertification process? 
A、    LEED for Operations and Maintenance 
B、    LEED for Building Design and Construction 
C、    LEED for Homes 
D、    LEED for Interior Design and Construction 
E、    LEED for Neighborhood Development 
The correct answer is:    A.   
LEED  O+M  is  currently  the  only  rating  system  that  requires  recertification  at  least  every  five  years;  no 
other certifications expire 
 
674、 Which  of  the  following  is  not  an  acceptable  form  of  renewable  energy  under  the  LEED  rating 
systems? (choose 2) 
A、    Photovoltaic Panels 
B、    Geo‐exchange System 
C、    Wind Turbines 
D、    Low‐impact Hydroelectricity 
E、    Nuclear Power 
The correct answer is:    B. E.     
 
675、 Which of the following groups would be considered “transient occupants”? (choose 2) 
A、    College Students 
B、    Elementary School Students 
C、    Office Workers 
D、    Factory Workers 
E、    Retail Customers 
The correct answer is:    A. E.     
These transient visitors are expected to only spend an hour or so at the building, not the whole day, such 
as an elementary school student or an office worker. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      193 / 206 
676、 What factor should a project team not consider when calculating life cycle costs? 
A、    Operating Costs 
B、    Maintenance Costs 
C、    Initial Costs 
D、    Life Span 
E、    None of the Above 
The correct answer is:    E.     
Life Cycle Costing takes into account all of the listed factors. 
 
677、 Which Rating System requires a project team to establish a Preliminary Rating? 
A、    LEED for Schools 
B、    LEED for Core and Shell 
C、    LEED for Neighborhood Development 
D、    LEED for Operations and Maintenance 
E、    LEED for Homes 
The correct answer is:    E.     
 
678、 What  happens  if  USGBC  finds  out  that  a  project  does  not  meet  the  Minimum  Program 
Requirements (MPRs)? 
A、    Certification can be revoked 
B、    A fine must be paid 
C、    The project’s certification level is lowered by one level 
D、    The project must be resubmitted 
The correct answer is:    A.     
 
679、 What types of plants may reduce irrigation water demand? (Choose 2) 
A、    Invasive Species 
B、    Native Species 
C、    Adapted Species 
D、    Cultivated Species 
The correct answer is:    B. C.   
Native and adapted plant materials are able to grow in your given climate without much human help such 
as  irrigation.  Cultivated  species,  on  the  other  hand,  often  require  lots  of  maintenance  and  watering. 
Invasive  species  may  or  may  not  require  irrigation,  but  they  can  have  other  negative  impacts,  such  as 
choking out biodiversity, so they should be avoided. 
 
680、 What is an appropriate use of the LEED logo? 
A、    On product packaging 
B、    For a link to the website www.usgbC、  org/leed 
C、    To indicate an organization’s USGBC membership 
D、    By a project pursuing LEED certification 
The correct answer is:    B.     
 
681、 What is not a possible source of graywater? 
A、    Showers 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      194 / 206 
B、    Toilets 
C、    Washing Machine 
D、    Bathroom Sink 
E、    Drinking Fountain 
The correct answer is:    B.     
The wastewater from toilets is considered blackwater, not graywater. 
 
682、 Which of the following materials may not contribute to construction waste management strategies? 
(Choose 2) 
A、    Land clearing debris 
B、    Scrap Wood 
C、    Asbestos Floor Tiles 
D、    Concrete 
E、    Product Packaging 
The correct answer is:      A. C.   
Land‐clearing  debris  and  hazardous  materials  such  as  asbestos  should  be  excluded  from  construction 
waste management calculations. 
 
683、 Which  specific  refrigerant  has  the  highest  global  warming  potential  (GWP)  of  all  the  common 
refrigerants? 
A、    CFC‐502 
B、    HCFC‐123 
C、    HFC‐404A 
D、    CFC‐11 
E、    HFC‐23 
The correct answer is:    E.     
 
684、 Which  of  the  following  strategies  would  not  be  appropriate  for  mitigating  the  heat  island  effect 
potential of the parking lot of a large office building? 
A、    Use mature trees to shade 50% of the parking lot 
B、    Use paving with an SRI of 35 
C、    Place half the parking underground 
D、    Plant seedling conifers to shade the parking 
E、    Use open‐grid paving 
The correct answer is:    D.     
While these trees may eventually provide a substantial amount of shade for the parking lot it will be many 
years before these tiny trees provide any significant shade, and LEED specifies that you can only count the 
shade provided by trees within 5 years of project completion. 
 
685、 What project features are included in the “development footprint”? (choose 3) 
A、    The building itself 
B、    A natural pond 
C、    A wooded area 
D、    Landscaping 
E、    A parking lot 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      195 / 206 
F、    Sidewalks 
The correct answer is:    A. E. F.     
 
686、 Which of the following is not an approved strategy for minimizing the non‐roof heat island effect? 
A、    Using open grid paving 
B、    Shading hardscape with photovoltaic panels 
C、    Placing parking underground 
D、    Using asphalt for parking areas 
E、    Using paving materials with an SRI of 29 or higher 
The correct answer is:    D.     
Typical asphalt is a very dark surface that contributes to the heat island effect rather than minimizing it. 
 
687、 A  project  team  is  using  cotton  insulation  that  is  grown  and  manufactured  200  miles  from  the 
project site. What credit(s) will the use of this material count toward? 
A、    Recycled Content 
B、    Rapidly Renewable Materials 
C、    Regional Materials 
D、    Recycled Content and Regional Materials 
E、    Rapidly Renewable Materials and Regional Materials 
The correct answer is:    E.   
Cotton is an agricultural product with a sustainable growth and harvest period of less than 10 years and, 
therefore,  qualifies  as  a  rapidly  renewable  material.  Since  the  product  is  also  grown  and  manufactured 
within 500 miles of the project, it also qualifies as a regional material. 
 
688、   “Green Tags” is a common term for: 
A、    Any form of renewable energy 
B、    Sustainable products certifications 
C、    Renewable Energy Certificates (RECs) 
D、    Incentives for purchasing fuel‐efficient vehicles 
The correct answer is:    C.     
 
689、 What are the two primary strategies for reducing the heat island effect in regards to roofs? (Choose 
2) 
A、    Do not locate mechanical equipment on the roof 
B、    Use materials with a high solar reflectance index 
C、    Use a metal roof instead of shingles 
D、    Avoid sloped roofs 
E、    Use vegetated roofs 
The correct answer is:    B. E.     
 
690、 Which of the following is not a duty of the LEED Project Administrator? 
A、    Invite project team members to LEED Online 
B、    Manage the LEED Online system 
C、    Document all project credits 
D、    Submit CIRs 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      196 / 206 
E、    Register the project 
The correct answer is:    C.     
While  the  LEED  Project  Administrator  will  likely  document  some  project  credits,  the  person  who  has 
firsthand  knowledge  of  the  credit  requirements  and  how  the  project  has  satisfied  them  should  be 
documenting  each  credit.  This  means  that  many  team  members  will  share  the  documentation 
requirements. 
 
691、 How can a project purchase “green power”? (Choose 2) 
A、    Through a program provided by the local utility company 
B、    By purchasing Green‐e certified RECs 
C、    By purchasing and installing solar panels 
D、    By buying energy directly from a nearby wind farm 
The correct answer is:    A. B.     
“Green Power” is off‐site, grid‐source power generated from renewable sources. On‐site PV installations 
would qualify as “On‐Site Renewable Energy” not “Green Power.” The energy from the local wind farm is 
not grid‐source and may also not be green‐e certified which is another requirement of this credit. 
 
692、 What type of plant material is most appropriate for use on a green roof? 
A、    Annuals 
B、    Cultivated Plant Species 
C、    Native Plants 
D、    Trees and shrubs 
The correct answer is:    C.     
Because  green  roofs  may  be  difficult  to  access,  they  should  be  planted  with  materials  that  are  low 
maintenance,  which  many  native  species  are,  requiring  little  to  no  irrigation  and  fertilization  like  most 
annuals and cultivated species. Trees and shrubs likely have roots that grow very deep and could puncture 
a roof membrane or weigh too much to be supported by the roof. 
 
693、 The SMACNA guidelines address what sustainable design issue? 
A、    Air quality 
B、    VOC content 
C、    Refrigerant use 
D、    Construction waste management 
E、    Stormwater management 
The correct answer is:    A.     
The  SMACNA  guidelines  are  aimed  at  protecting  the  indoor  air  quality  of  buildings  that  are  under 
construction through measures such as housekeeping, scheduling, source control and HVAC protection. 
 
694、 Which of the following is not required of an Innovation and Design strategy? 
A、    It must be comprehensive 
B、    It must be cost effective 
C、    It must be repeatable by other projects 
D、    It must be quantifiable 
E、    It must be a strategy not already covered in the LEED Rating System 
The correct answer is:    B.     
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      197 / 206 
Just by virtue of being “innovative” many strategies that qualify for innovation and design credit can be 
very costly. 
 
695、 What is the average savings in a commercial building when implementing water efficiency goals? 
A、    10% 
B、    40% 
C、    30% 
D、    20% 
The correct answer is:    C 
According  to  USGBC,  the  average  commercial  building  can  achieve  a  30%  water  savings.  Normally,  this 
doesn't come at any added cost. 
         
696、 How can automobile use be reduced?    
A、    Creating a ride share board 
B、    Replacing the parking lot with underground parking 
C、    Creating parking further from the building entrance 
D、    Providing incentives for purchasing fuel efficient vehicles. 
The correct answer is:    A 
 
697、 If a LEED project that is providing preferred parking for fuel‐efficient and low‐emitting vehicles has 
multiple parking lots, where should the preferred parking spaces be located? 
A、    Preferred parking spaces only need to be provided in one lot 
B、    Preferred parking spaces only need to be located in the lot designated for visitors 
C、    Preferred parking spaces only need to be provided in the lot designated for staff 
D、    Preferred parking spaces must be distributed among all lots 
The correct answer is:    D.     
 
698、 What environmental problem is associated with CFC and HCFC use? 
A、    Water pollution 
B、    Air pollution 
C、    Soil erosion 
D、    Ozone depletion 
E、    The heat island effect 
The correct answer is:    D.     
 
699、 What is a requirement of open space? 
A、    It is vegetated 
B、    It is accessible to the general public 
C、    It is lit at night 
D、    It is directly adjacent to the building’s entry 
E、    It provides habitat for endangered species 
The correct answer is:    A.     
“Open space” must be vegetated, but it does not have to be vegetated with native or adapted species‐ 
any vegetation is acceptable. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      198 / 206 
700、 Which type of refrigerant, in general, is the most efficient? 
A、    CFCs 
B、    HFCs 
C、    HCFCs 
D、    Natural Refrigerants 
The correct answer is:    A.     
CFCs  were  the  preferred  refrigerant  for  many  years  because  they  are,  in  general,  the  most  efficient 
category  of  refrigerants.  They  have  been  phased‐out,  however,  due  to  their  negative  environmental 
impacts. 
 
701、 What  is  one  potential  disadvantage  of  using  comingled  recycling  as  part  of  a  construction  waste 
management plan? 
A、    It takes up more site are than site‐separated recycling 
B、    It may require a greater time investment from the project team 
C、    It may be more expensive than site‐separated recycling 
D、    It is more difficult to document than site‐separated recycling 
The correct answer is:    C.     
Many waste management companies charge more for processing co‐mingled recycling than recycling that 
has been separated on site, because it is more work for them to separate it at their facility. 
 
702、 What may prevent pedestrian access to a community resource? (Chose 3) 
A、    Distance 
B、    A public park 
C、    A freeway interchange 
D、    A wall 
E、    A parking lot 
The correct answer is:    A. C. D.   
You can often simply walk through or past a parking lot or park, but a wall or freeway interchange may 
create an impenetrable barrier. Distance can also hinder pedestrian access because people are willing to 
walk a limited distance. 
 
703、 Which  federal  act  has  been  adopted  by  many  local  jurisdictions  and  contains  requirements  for 
building accessibility? 
A、    ASHRAE 
B、    EPAct 
C、    Civil Rights Act 
D、    ADA 
E、    ANSI 
The correct answer is:    D.     
The Civil Rights Act is also a federal act, but it has nothing to do with building codes and EPAct (the Energy 
Policy Act) is a federal act that is related to building codes, but it deals with energy and water use, not 
building accessibility. ASHRAE is an energy code which is not a federal act and ANSI is a national institute 
that sets standards. 
 
704、 What is the best use for potable water? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      199 / 206 
A、    Cooling towers 
B、    Irrigation 
C、    Swimming Pools 
D、    Drinking 
E、    Toilet Flushing 
The correct answer is:    D.     
 
705、 Which strategy is not effective in reducing potable water use for irrigation? 
A、    Spray irrigation 
B、    Drip Irrigation 
C、    Mulching 
D、    Using Native or Adapted Plants 
E、    Rainwater Harvesting 
The correct answer is:    A.     
Spray irrigation uses much more water than alternative methods such as drip irrigation. 
 
706、 What  strategy  is  considered  by  the  EPA  to  have  the  greatest  impact  on  reducing  the  solid  waste 
stream? 
A、    Material recycling 
B、    Source reduction 
C、    Material reuse 
D、    Material incineration 
E、    Using recycled content materials 
The correct answer is:    B.     
 
707、 Ideally, when should the integrated design process begin? 
A、    In the project pre‐planning phase 
B、    Once project construction begins 
C、    One the project has been registered with GBCI 
D、    Halfway through the project’s design phase 
The correct answer is:    A.     
The integrative design process should begin as early in the process as possible. 
 
708、 Which  of  the  following  projects  would  definitely  not  meet  the  Minimum  Program  Requirements 
(MPRs) for a LEED project? 
A、    A casino built on a riverboat 
B、    The renovation of and addition to a large office building 
C、    A brand new elementary school 
D、    A temporary sports practice facility 
E、    A 5,000 square foot fire station 
The correct answer is:    A. D.   
The LEED Minimum Program Requirements state that the building must be built on existing land and the 
building must be permanent. These two requirements prohibit the above projects from being eligible for 
LEED certification. 
 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      200 / 206 
709、 Which type of system or equipment would not be a consumer of process water? 
A、    Domestic hot water heater 
B、    Dishwasher 
C、    Clothes Washer 
D、    Cooling Tower 
E、    Food Steame 
The correct answer is:    A.     
 
710、 Which  of  the  following  plumbing  fixtures  measure  water  usage  in  gallons  per  minute  (GPM)? 
(Chose 3) 
A、    Toilet 
B、    Kitchen Sink 
C、    Shower Head 
D、    Bathroom Sink 
E、    Urinal 
The correct answer is:    B. C. D.     
Toilet and urinal water usage is measured in gallons per flush (GPF) not gallons per minute (GPM) 
 
711、 Which LEED category has the most available LEED points? 
A、    Sustainable Sites 
B、    Water Efficiency 
C、    Energy and Atmosphere 
D、    Materials and Resources 
E、    Indoor Environmental Quality 
The correct answer is:    C.     
 
712、 Why should a project team aim to significantly exceed the established threshold of a LEED credit? 
A、    To earn Exemplary Performance 
B、    To save the World 
C、    As a precaution against a credit being audited 
D、    To be an overachiever 
The correct answer is:    A.     
Exemplary performance can be achieved on some credit by exceeding the established threshold for credit 
achievement. 
 
713、 What is the Energy Policy Act used for in the LEED Rating Systems? 
A、    To set product VOC limits 
B、    To establish baseline building energy performance 
C、    To establish baseline building plumbing fixture performance 
D、    To set indoor air quality requirements 
The correct answer is:    C.     
While the Energy Policy Act also deals with energy use, LEED uses it to establish baseline water use rates 
for plumbing fixtures. 
 
714、 What costing model should be used to demonstrate the true cost of sustainability strategies? 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      201 / 206 
A、    Simple Payback 
B、    Return on Investment 
C、    Life Cycle Costing 
D、    Benefit Analysis 
The correct answer is:    C.     
Life Cycle Costing takes into account not only product and system first costs, but also costs for ongoing 
maintenance,  energy  use,  life‐span  etc.  Sustainable  design  strategies  often  have  higher  first  costs  than 
comparable materials but can be shown to be less expensive in the long run due to decrease energy or 
maintenance costs. 
 
715、 Which of the following is the best type of site to develop on? 
A、    Greenfield 
B、    Prime Farmland 
C、    Flood Plain 
D、    Previously Developed Site 
E、    Wetland 
The correct answer is:    D.     
LEED encourages you not to build on the other listed types of sites. 
 
716、 Which two standards are used to establish what vehicles qualify as low‐emitting and fuelefficient 
vehicles? (Choose 2) 
A、    California Air Resources Board ZEV 
B、    American Council for an Energy‐Efficient Economy Green Book 
C、    The Greenguard Certification Program 
D、    Green Seal Standard 
E、    Green‐e Product Certification 
The correct answer is:    A. B.   
 
717、 How many points would a project team receive for having 10 LEED APs on a LEED Project? 
A、    1 
B、    5 
C、    10 
D、    20 
The correct answer is:    A.     
A project can only earn one Innovation and Design point for LEED AP participation no matter how many 
LEED Aps are working on the project. 
 
718、 What  is  the  minimum  amount  of  pervious  area  a  paving  system  must  have  to  be 
considered ”open‐grid”? 
A、    20% 
B、    30% 
C、    40% 
D、    50% 
E、    60% 
The correct answer is:    D.     
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      202 / 206 
 
719、 What  is  required  as  documentation  for  each  and  every  prerequisite  and  credit  in  the  LEED  for 
Building Design and Construction Rating Systems? 
A、    A project narrative 
B、    A project drawings 
C、    Photos 
D、    A letter template 
E、    A required signatory 
The correct answer is:    D.   
Some  credits  and  prerequisites  may  also  require  additional  supporting  documentation,  but  all  LEED 
credits and prerequisites require a LEED letter template. 
 
720、 LEED Certification fees are based on: 
A、    Project square footage 
B、    Project Complexity 
C、    Project Cost 
D、    The number of review submissions 
The correct answer is:    A.     
 
721、 Within  what  distance  from  a  project  site  must  a  product  be  harvested  or  extracted  and 
manufactured to qualify as a regional material? 
A、    100 miles 
B、    150 miles 
C、    250 miles 
D、    500 miles 
E、    1000 miles 
The correct answer is:    D.     
 
722、 Which of the following are mandatory for any LEED project? (Choose 2) 
A、    Credits 
B、    Minimum Program Requirements 
C、    A LEED Accredited Professional on the project team 
D、    Prerequisites 
E、    An Integrated Project Team 
The correct answer is:    B. D.     
Credits, in general are optional‐ you get to pick and choose which to pursue. LEED AP involvement and 
integrated design are highly recommended, but not mandatory. 
 
723、 Which  of  the  following  transportation  methods  does  not  count  as  public  transportation  for  LEED 
purposes? 
A、    Bus 
B、    Subway System 
C、    Elevated Rail System 
D、    Taxi 
E、    Campus Shuttle or School Bus System 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      203 / 206 
The correct answer is:    D.     
To  meet  the  requirements  for  LEED  “mass  transit”  must  carry  ten  or  more  people  and  operate  on  a 
regular schedule. 
 
724、 A new high rise residential building should use what LEED Rating System for Certification? 
A、    LEED for Homes 
B、    LEED for Core and Shell 
C、    LEED for New Construction 
D、    LEED for Operations and Maintenance 
E、    LEED for Interior Design and Construction 
The correct answer is:    C.   
High rise residential projects (4 stories or more) must use LEED for New Construction not LEED for Homes. 
Watch for a “LEED for Mid‐Rise Residential Rating System” to be introduced soon! 
 
725、 What does the construction activity pollution prevention plan aim to prevent? (Choose 3) 
A、    Erosion 
B、    Solid Waste Generation 
C、    Construction Worker Accidents 
D、    Carbon Emissions 
E、    Sedimentation 
F、    Airborne Dust Pollution 
The correct answer is:    A. E. F.   
 
726、 Wastewater from a restroom sink is considered which type of water? 
A、    Graywater 
B、    Blackwater 
C、    Potable Water 
D、    Rain Water 
The correct answer is:    A.   
Since bathroom sink water is unlikely to contain organic waste, it is considered graywater, not blackwater 
 
727、 Use  of  a  dry  urinal  would  decrease  the  fixture’s  water  use  from  the  Energy  Policy  Act  baseline 
urinal water usage by how much? 
A、    1.6 GPF 
B、    1.0 GPF 
C、    0.5 GPF 
D、    2.5 GPM 
The correct answer is:    B.     
Since  a  dry  urinal  uses  no  water,  it  would  decrease  water  use  from  the  baseline  by  the  full  established 
baseline amount, which is 1.0 GPF. 
 
728、 Which LEED rating system should a 100‐unit, 5 story apartment building located in a downtown 
area utilize when undergoing a complete renovation? 
A、LEED for New Construction 
B、LEED for Commercial Interiors 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      204 / 206 
C、LEED for Homes 
D、LEED for Existing Buildings 
The correct answer is A、     
LEED Homes only applies to low‐rise residential projects (3 stories and below, single of multi‐family). For 
all  other  residential  projects  (mid‐rise  and  high‐rise),  LEED  New  Construction  and  major  renovations  is 
currently the only rating system availablE、   
 
729、 A 25,000 sqft one‐story office building in a suburban location is undergoing minor renovations that 
affect 15% of gross floor area and wants to improve its ongoing  sustainable building operations. Which 
rating system should the project utilize? 
A、LEED Existing Buildings 
B、LEED Homes 
C、LEED New Construction 
D、LEED Commercial Interiors 
The correct answer is A、     
LEED  Existing  Buildings  Operations  &  Maintenance  provides  a  benchmark  for  building  owners  and 
operators to measure operations, improvements and maintenance. Under this rating system, projects may 
make sustainable alterations and even add additions. Such alterations may affect up to 50% of a building’s 
total  floor  area  and  additions  that  increase  total  building  floor  area  up  to  50%  may  still  pursue  LEED 
Existing Buildings certification. 
 
730、 How many of the 110 available points in most of the rating systems are considered “bonus” points? 
A、    5 
B、    10 
C、    15 
D、    20 
The correct answer is:    B.   
These  ten  points  represent  the  points  available  from  the  Innovation  and  Design  and  Regional  Priority 
categories. 
 
731、 Which of the following is not considered an environmental factor of thermal comfort? 
A、    Air Temperature 
B、    Radiant Temperature 
C、    Air Speed 
D、    Humidity 
E、    Space Volume 
The correct answer is:    E.     
 
732、 Which  of  the  following  is  not  a  category  in  the  LEED  for  Operations  and  Maintenance  Rating 
System? 
A、    Water Efficiency 
B、    Materials and Resources 
C、    Indoor Air Quality 
D、    Innovation in Operations 
E、    Regional Priority 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      205 / 206 
The correct answer is:    C.     
While  Indoor  Air  Quality  is  an  important  aspect  of  the  category,  the  name  of  the  category  is  Indoor 
Environmental Quality. 
 

 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。      206 / 206 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。     
207 / 206 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。     
208 / 206 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。     
209 / 206 
 
郑重声明:本资料整理总结自网络中网友分享资料,取之于网络,分享于网友。严禁用于一切商业用途。     
210 / 206 

Das könnte Ihnen auch gefallen