Sie sind auf Seite 1von 3

Effective Milestones Dates

Date 3-Jul-17 Contractual Data Material Delay Paing Delay Piping Drawings Delay Analysis New Milestones Quantities

Contractual Shop Contractual Contractual Finish Paint Material Drawings related Effective Start Effective Finish Total Field
Shop Quantity Quantity
Sr.# System GROUP Field Start Material Hand Over Material Delay Paint Related Delay Drawings Issuance Applicable Delay Contractual Remarks
Start Milestone Milestone Milestone Availability Delay Milestone Milestone Quantity (60%) (40%)
1 Auxiliay Cooling Water Isometrics GT P1 Simple Cycle 26-Feb-17 29-Mar-17 20-Jun-17 21-Mar-17 23 15-May-17 62 7-Mar-17 16 62 21-Mar-17 21-Aug-17 5,294 3,176 2,118

2 Chilled water Simple Cycle 26-Feb-17 29-Mar-17 30-May-17 21-Mar-17 23 15-May-17 62 25-Apr-17 65 65 25-Apr-17 3-Aug-17 2,965 1,779 1,186 Drawings issuance expected

3 Compressed Air Isometrics P1 Simple Cycle 15-Mar-17 29-Mar-17 15-May-17 21-Mar-17 6 15-May-17 62 7-Mar-17 62 21-Apr-17 16-Jul-17 3,692 3,692 Less than 2", all field routed

4 Cooling system P1 Simple Cycle 26-Feb-17 29-Mar-17 15-May-17 21-Mar-17 23 15-May-17 62 7-Mar-17 16 62 21-Mar-17 16-Jul-17 3,469 2,081 1,388

5 Demineralized Water P1 Simple Cycle 20-Mar-17 29-Mar-17 15-Jun-17 21-Mar-17 1 15-May-17 62 4-Apr-17 22 62 21-Mar-17 16-Aug-17 1,955 1,173 782

9 Desalinated Water Simple Cycle 19-Apr-17 19-May-17 30-Jun-17 21-Mar-17 15-May-17 11 7-Mar-17 11 19-Apr-17 11-Jul-17 2,608 1,565 1,043 SS

6 Filtered Water Simple Cycle 1-Apr-17 1-May-17 30-May-17 21-Mar-17 15-May-17 29 7-Mar-17 29 1-Apr-17 28-Jun-17 112 67 45

7 Fuel Ges P1 Simple Cycle 26-Feb-17 29-Mar-17 30-May-17 21-Mar-17 23 15-May-17 62 7-Mar-17 16 62 21-Mar-17 31-Jul-17 6,733 4,040 2,693

8 Fuel Oil (ASL) P1 Simple Cycle 26-Feb-17 29-Mar-17 25-May-17 21-Mar-17 23 15-May-17 62 7-Mar-17 16 62 21-Mar-17 26-Jul-17 26,052 15,631 10,421

10 GT Interconnections P1 Simple Cycle 15-Mar-17 29-Mar-17 1-Jun-17 21-Mar-17 6 15-May-17 62 10-Apr-17 33 62 10-Apr-17 2-Aug-17 5,956 3,574 2,382

11 Nitrogen Simple Cycle 15-Mar-17 29-Mar-17 10-Jun-17 21-Mar-17 6 15-May-17 62 7-Mar-17 62 21-Mar-17 11-Aug-17 2,014 1,208 806

12 Potable Water Simple Cycle 15-Apr-17 15-May-17 15-Aug-17 21-Mar-17 15-May-17 15 7-Mar-17 15 15-Apr-17 30-Aug-17 3,296 1,978 1,318

13 Raw Water Simple Cycle 15-Mar-17 29-Mar-17 25-May-17 21-Mar-17 6 15-May-17 62 7-Mar-17 62 21-Mar-17 26-Jul-17 9,042 9,042 CPVC piping, field routed

14 Service Water Simple Cycle 26-Feb-17 29-Mar-17 15-Aug-17 21-Mar-17 23 15-May-17 62 7-Mar-17 16 62 21-Mar-17 16-Oct-17 4,167 2,500 1,667
ABENER

Fabrication & Erection Piping Plan for Simple Cycle(Priority First Fire)
W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-10 W-11 W-12 W-13 W-14 W-15 W-16 W-17 W-18 W-19 W-20 W-21

Sr. No. System Description Shop Achieved Balance 15-July to 20- 22-July to 27- 29-July to 03- 05-Aug. to 10- 12-Aug. to 17- 19-Aug. to 24- 26-Aug. to 31- 02-Sep. to 07- 09-Sep. to 14- 16-Sep. to 21- 23-Sep. to 28- 30-Sep. to 05 07-Oct. to 12- 14-Oct. to 19- 21-Oct. to 26- 28-Oct. to 02- 04-Nov. to 09- 11-Nov. to 16- 18-Nov. to 23-
Status 1-July to 06-July 8-July to 13-July
July July Aug. Aug. Aug. Aug. Aug. Sep. Sep. Sep. Sep. -Oct. Oct. Oct. Oct. Nov. Nov. Nov. Nov.

1 Auxiliay Cooling Water Isometrics GT P 3,176 3,117 59 Planned 59 (0) 59

1 Auxiliay Cooling Water Isometrics GT P 3,176 3,102 Actual -

2 Chilled water 1,779 1,554 225 Planned 225 - 225

2 Chilled water 1,779 1,779 Actual -

3 Cooling system P1 2,081 1,514 567 Planned 567 (0) 120 120 120 120 87

3 Cooling system P1 2,081 24 2,057 Actual -

4 Demineralized Water P1 1,173 1,023 150 Planned 150 - 60 60 30

4 Demineralized Water P1 1,173 1,173 Actual -

5 Desalinated Water 1,565 312 1,253 Planned 1,253 0 300 355 455 143

5 Desalinated Water 1,565 1,565 Actual -

6 Filtered Water 67 36 31 Planned 31 (0) 31

6 Filtered Water 67 67 Actual -

7 Fuel Ges P1 4,040 3,809 231 Planned 231 0 120 111

7 Fuel Ges P1 4,040 4,040 Actual -

8 Fuel Oil (ASL) P1 10,432 8,477 1,955 Planned 1,955 - 345 345 345 345 345 230

8 Fuel Oil (ASL) P1 10,432 10,432 Actual -

9 GT Interconnections P1 2,925 1,880 1,045 Planned 1,045 - 255 255 255 255 25

9 GT Interconnections P1 2,925 2,925 Actual -

10 Potable Water 1,978 162 1,816 Planned 1,816 0 330 330 330 330 330 166

10 Potable Water 1,978 1,978 Actual -

11 Service Water 2,500 128 2,372 Planned 2,372 (0) 330 330 500 335 335 335 207

11 Service Water 2,500 2,500 Actual -

Total Planned 31,716 22,012 9,704 1650 1776 1880 1740 1577 874 207 0 0 0

Comm. Planned 1650 3426 5306 7046 8623 9497 9704 9704 9704 9704

/Day Target 275 296 313 290 263 146 35 - - - - -

W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-10 W-11 W-12 W-13 W-14 W-15 W-16 W-17 W-18 W-19 W-20 W-21
Sr. No. System Description Shop Achieved Balance 15-July to 20- 22-July to 27- 29-July to 03- 05-Aug. to 10- 12-Aug. to 17- 19-Aug. to 24- 26-Aug. to 31- 02-Sep. to 07- 09-Sep. to 14- 16-Sep. to 21- 23-Sep. to 28- 30-Sep. to 05 07-Oct. to 12- 14-Oct. to 19- 21-Oct. to 26- 28-Oct. to 02- 04-Nov. to 09- 11-Nov. to 16- 18-Nov. to 23-
Status 1-July to 06-July 8-July to 13-July July July Aug. Aug. Aug. Aug. Aug. Sep. Sep. Sep. Sep. -Oct. Oct. Oct. Oct. Nov. Nov. Nov. Nov.

1 Auxiliay Cooling Water Isometrics GT P 2,118 2,118 Planned 2,118 0 590 650 503 375

1 Auxiliay Cooling Water Isometrics GT P 2,118 2,118 Actual -

2 Chilled water 1,186 1,186 Planned 1,186 - 208 329 319 267 63

2 Chilled water 1,186 1,186 Actual -

3 Compressed Air Isometrics P1 3,692 94 3,598 Planned 3,598 - 615 716 716 726 490 335

3 Compressed Air Isometrics P1 3,692 3,692 Actual -

4 Cooling system P1 1,388 1,388 Planned 1,388 0 95 309 468 468 48

4 Cooling system P1 1,388 1,388 Actual -

5 Demineralized Water P1 782 60 722 Planned 722 - 70 166 343 143

5 Demineralized Water P1 782 782 Actual -

6 Desalinated Water 1,043 1,043 Planned 1,044 1 30 165 317 462 70

6 Desalinated Water 1,043 1,043 Actual -

7 Filtered Water 45 45 Planned 45 0 45

7 Filtered Water 45 45 Actual -

8 Fuel Ges P1 2,693 2,693 Planned 2,693 (0) 56 284 517 517 316 316 371 316
8 Fuel Ges P1 2,693 2,693 Actual -
9 Fuel Oil (ASL) P1 10,421 265 10,156 Planned 10,156 0 239 455 455 455 1255 1455 1455 1301 1289 1289 508

9 Fuel Oil (ASL) P1 10,421 10,421 Actual -

10 GT Interconnections P1 2,382 2,382 Planned 2,382 (0) 988 809 194 391

10 GT Interconnections P1 2,382 2,382 Actual -

11 Nitrogen 806 806 Planned 806 0 21 372 139 274

11 Nitrogen 806 806 Actual -

2of3
W-1 W-2 W-3 W-4 W-5 W-6 W-7 W-8 W-9 W-10 W-11 W-12 W-13 W-14 W-15 W-16 W-17 W-18 W-19 W-20 W-21

Sr. No. System Description Shop Achieved Balance 15-July to 20- 22-July to 27- 29-July to 03- 05-Aug. to 10- 12-Aug. to 17- 19-Aug. to 24- 26-Aug. to 31- 02-Sep. to 07- 09-Sep. to 14- 16-Sep. to 21- 23-Sep. to 28- 30-Sep. to 05 07-Oct. to 12- 14-Oct. to 19- 21-Oct. to 26- 28-Oct. to 02- 04-Nov. to 09- 11-Nov. to 16- 18-Nov. to 23-
Status 1-July to 06-July 8-July to 13-July July July Aug. Aug. Aug. Aug. Aug. Sep. Sep. Sep. Sep. -Oct. Oct. Oct. Oct. Nov. Nov. Nov. Nov.

12 Potable Water 1,318 171 1,147 Planned 1,147 (0) 53 161 434 434 65

12 Potable Water 1,318 1,318 Actual -

13 Raw Water 9,042 9,042 Planned 9,042 - 600 730 742 742 742 742 742 742 742 742 822 954

13 Raw Water 9,042 9,042 Actual -

14 Service Water 1,667 1,667 Planned 1,667 0 90 141 311 311 311 311 192

14 Service Water 1,667 1,667 Actual -

Total Planned 38,582 590 37,992 982 2,102 2,658 2,753 3,408 3,466 3,248 3,393 3,751 3,830 3,713 2,919 1,080 691 - - - - - - -

Comm. Planned 982 2,102 4,760 7,513 10,921 14,387 17,635 21,028 24,779 28,609 32,322 35,241 36,321 37,012 37,012

/Day Target 164 350 443 459 568 578 541 566 625 638 619 487 180 115 - - - - -

3of3

Das könnte Ihnen auch gefallen