Sie sind auf Seite 1von 3

Italian-Thai development Public Company Limited Dhaka Mass Rapid Transit Development Project Contract No.

CP-03 CP-04

REQUEST FOR INSPECTION


RFI No.
Issue Date : 22 December,19
Expire Date: 21 January, Rev. 0
20 CP03-04/RIW/191222/CVW/S08/13660
The Employer: DMTCL The Engineer: NKDM Associates Contractor: Italian-Thai Development PCL

ITP Ref. No.ITD/CP03-04/PR/ST 0012 Rev.02 Method Statement No. ITD/CP03-04/PR/ST 0012 Rev.02

Drawing Ref. No. ITD/CP-03&04/NKDM/DWG0291 Sub-Con. Name: McDonald Steel Building Product LTD. (MSBPL)

Labour and Plant to be Used : (if applicable)


Construction
QC person Inspection Date /
Type / Description of Inspection person BOQ-Bill No: Location
Resonsibility Time
Resonsibility

Inspection Fabrication with final paint of Top Coat of


Station-08 From
steel structure roof at MSBPL Factory

Shewrapara
Nate Zaren Bill-10 23 December,19
Station

S08C10a-C1, S08C11-C1, S08C11a-C2, S08C12-


Column
C1, S08C13-C2
Item-6.1 Zone-C To

Item Inspection: 26 December,19

1. Visual

2. Dimension

3. Welding

4. NDT test

5. Paint

Site Engineer

Nate -01847464544

QC Engineer
Md.Zaren Mahmud- 01983715800

Request By : Italian-Thai Development PCL (ITD) Received For : The Engineer NKDM Associates

Name Mr.Prapan Y Name

Signature Signature
Note : The contractor shall submit Request For Inspection to The Engineer 24 Hrs. in advance. This RFI shall expire and can't be used for inspection beyond the inspection
date specified above.

Note :If the part which mentioned below is not associated with the work for anyone then please write down (Not Applicable) in comment

Document No. Revision Page No.


ITD/CP 03-04/PRO 006/1 No. 03 Date : April 05, 2018 1 of 3
Italian-Thai development Public Company Limited Dhaka Mass Rapid Transit Development Project Contract No. CP-03 CP-04

RFI No. CP03-04/RIW/191222/CVW/S08/13660 Rev. 0

Comment:

Note :If the part which mentioned below is not associated with the work for anyone then please write down (Not Applicable) in comment

Contractor (ITD) Checking & Pre Inspection by ITD - Site Civil Engineer.

Name : Signature : Date : Comment

:
Contractor (ITD) Checking & Pre Inspection by ITD - Site Mechanical Engineer.

Name :___________________________________ Signature :____________________________ Date :___________________________


Drawing Ref.
Method Statement No.
No.

Comment :

Contractor (ITD) Checking & Pre Inspection by ITD - Site Electrical Engineer.

Name :___________________________________ Signature :____________________________ Date :___________________________


Drawing Ref.
Method Statement No.
No.

Comment :

Primary Inspection by ITD Site QC Engineer


Contractor (ITD) Checking & Pre Inspection by ITD - Engineer.

Name : Signature : Date :


Comment:

Document No. Revision Page No.

ITD/CP 03-04/PRO 006/1 No. 03 Date : April 05, 2018 2 of 3


Italian-Thai development Public Company Limited Dhaka Mass Rapid Transit Development Project Contract No. CP-03 CP-04

RFI No. CP03-04/RIW/191222/CVW/S08/13660 Rev. 0

Pre Inspection by NKDM

Name :__________________________________ Signature :____________________________ Date :___________________________

Comments:

The Engineer's Response for inspection to above Request for Inspection as Follows; ( √ the box below)

1 Approved
2 Approve with Comment (all comments must be addressed)
3.Rejected with Comment

Comments :

The Engineer : NKDM Associates


Inspection By Inspector Inspection By Site Engineer

Name : Signature : Name :

Date / Time : Signature :

/ Date / Time : /

Verbal or written permission by the Engineer or his staff shall in no way relieve the Contractor of his responsibilities under the Contract.

Document No. Revision Page No.


ITD/CP 03-04/PRO 006/1 No. 03 Date : April 05, 2018 3 of 3