Scope of consultancy services for Baisc & Detail Eng

Company
Project title
Location
Area (app)
Facility compliance

S.No Activity
1 Conceptual Study / Basic Engineerin

2 Clean Room
3 Electrical

4 HVAC

5 Utility
6 Fire Fighting,Fire detection and acess co

7 QMS Documents

Note
√ Cosultancy scope for Basic & Detail Engineering
× consultancy scope for Cordination for the complaince
To be considered if existing chiller capacity found inadequate
Scope of consultancy services for Baisc & Detail Engineering

5000 sqft
GMP- schedule M

Discription Scope
Conceptual Study / Basic Engineering

×
Concept facility Drawing finalisation
Evolve basic designs in complaince with input from client √
Develope men and material flow and plant layout √
Prepare furniture layout drawing √
concept of detailing change areas and process change √
Prepare men & material flow diagrams √
Prepare air flow diagram √
Prepare HVAC air classification and zone classification. √
Prepare equipment layout drawing √
Prepare Conceptual design basis on Utilities, HVAC, Electrical etc., (detailing with √
drawings).
Prepare Conceptual design basis on Utilities distribution. √
Electrical lighting & power distribution detailing √
Conceptual design of Fire Hydrant & Smoke detection system. √
Budgetary project costs based on basic engineering package √

Clean Room
GMP facility Drawing with complaince √
Facility layout Plan with wall panel with Raiser panel, doors & view panels √
Ceiling panel drawing √
BOQ raiser panel √
BOQ- Preparation for wall Panel √
BOQ- Preparation for ceiling Panel √
BOQ- Preparation for Doors √
BOQ- Preparation for View panel √
BOQ- Epoxy/PU flooring √
Ceiling panel drawing with coordination of Lights,HVAC duct terminal, Smoke/Heat √
detector

Tender documents preparation, comparision,evaluation & Recommendation
Issue of good for construction drawings √

Electrical
Lighting and Power distribution detailing √
Light fixure location drawing √
Equipment Power point location drawing- Raw power/ UPS power √
Lighting Power point location drawing- Raw power/ UPS power √
Power circuit single line diagram √
Design,selection and BOQ of power distribution panel √
Design,selection and BOQ of UPS √
Design,Selection and BOQ of light fixures √
Design and BOQ of Earth pits and Earthing circuit √
Earthing layout √
Cable tray routing layout √
BOQ for equipment power points √
BOQ for lighting switch √


Tender documents preparation, comparision,evaluation & Recommendation
Issue of good for construction drawings √

HVAC
Design,selection and BOQ of AHU √
Eavaluation of existing chiller load suitability for proposed HVAC √
Design,selection and BOQ of Chiller √
Design,selection and BOQ of cooling tower √
BOQ for chilled water low side √
BOQ for cooling water low side √
Ducting layout plan √
Ducting layout Elevation √
BOQ- Duct and accssories √
BOQ- Supply Terminal with HEPA Filters √
BOQ- Return air terminal √
AHU drain layout √
BOQ- AHU drain line √
BOQ- Clean Room display √
BOQ-BMS integration with existing system √
BOQ-FEMS integration with existing system √


Tender documents preparation, comparision,evaluation & Recommendation
Issue of good for construction drawings √

Utility
Prepare conceptual design for utility distribution √
Layout for air compresor distribution √
Layout CO2 / O2gas distribution system √
BOQ-Air compressor line to autoclave √
BOQ-CO2/ O2 Gas distribution system √


Tender documents preparation, comparision,evaluation & Recommendation
Issue of good for construction drawings √

Fire Fighting,Fire detection and acess control


Prepration of fire fighting and fire detection strategy √
Detailed specification of fire detection and alarm systems √
Design,Selection and BOQ of smoke/Heat detector √
Design, BOQ and Specification √


Tender documents preparation, comparision,evaluation & Recommendation
Issue of good for construction drawings √

QMS Documents
Facility URS preparation √
Room Data sheet √
Civil General Layout √
Equipment Layout √
Personal movement √
Material movement √
Prepare HVAC zoning classification √
AHU differential pressure layout √
Prepare HVAC air classification √
Facility Qualification ×
AHU Qualification ×
Equipments Qualiifcations ×
Operating procedures ×
Cleaning Procedures ×
Maintenance procedures ×
BMS Qualification ×
FEMS Qualification ×

ail Engineering
n for the complaince
r capacity found inadequate
Remarks

Coordination with client


for finalisation
Coordination with client
and Vendor for
finalisation and
Excecution