A General requirements
1 Mobilization / demobilization 1.00 ls
2 Safety, Health & Environment
2.1 Provision of full time safety officer accredited by recognized safety organization 1.00 ls
Provision of full time project Engineer on site with minimum 5 years experience in construction
2.2 industry particularly industrial company 1.00 ls
2.3 Scaffolding requirements using H-frame and tubular including accessories (Rent only) 1.00 ls

2.4 Hygiene, (Sanitation of area, cleaning) 1.00 ls

2.5 Nestle policy for project requirements 1.00 ls


3 Bonds & Insurances Fees
3.1 Contractor's All Risk Insurance (CARI) - 1 year validity 1.00 ls
3.2 Contractor PCAB accredited
3.2.1 Irrevocable domestic LC(20% of the total project cost)(Validity: Project duration plus 3 months) 1.00 ls
Irrevocable domestic LC (10% of the total project cost - retention)(Validity: One year after
3.2.2 completion of the project) 1.00 ls
3.3 Contractor DO174 accredited
3.3.1 Irrevocable domestic LC (20% of the total labor cost)(Validity: Project duration plus 3 months) 1.00 ls
3.3.2 Performance Bond (80% Total Labor cost) (Validity: Project duration plus 3 months) 1.00 ls
Irrevocable domestic LC (10% of the total project cost - retention)(Validity: One year after
3.3.3 completion of the project) 1.00 ls
4 Government Permits
4.1 Mechanical permit & permit to use 1.00 ls
4.2 DOLE power piping permit to install & permit to use 1.00 ls
Preparation and submittal of as - built Plan and shop drawings, (signed and sealed) including
5 E-file in CD and 20x30 Blue print - 2 sets each 1.00 ls

Sub total A

B Materials & Installation


1 Recover Condensate from Air Heater at Melting room
Installation of Armstrong Condensate Pump PT-312 (Stock) & Tapping of condensate line
1.1 on the Pump receiver tank 1.00 set
1.1.1 Refurbish of Pump & receiver tank including accessories and with skid 1.00 ls
1.1.2 Installation of housing for condensate pump including concrete flooring 1.00 ls
1.1.3 BI 15mm dia. x 6000mm pipe sch 40 seamless 2.00 lgths
1.1.4 BI 15mm dia. 90 elbow sch 40 8.00 pcs
1.1.5 BI 15mm dia. T-connector sch 40 4.00 pcs
1.1.6 BI 15mm dia. union patente sch 40 4.00 pcs
1.1.7 BI 25mm dia. x 6000mm pipe sch 40 seamless 4.00 lgths
1.1.8 BI 25mm dia. 90 elbow sch 40 8.00 pcs
1.1.9 BI 25mm dia. T-connector sch 40 4.00 pcs
1.1.10 BI 25mm dia. union patente sch 40 4.00 pcs
1.1.11 BI 50mm dia. x 6000mm pipe sch 40 seamless 2.00 lgths
1.1.12 BI 50mm dia. 90 elbow sch 40 6.00 pcs
1.1.13 BI pipe 100mm dia. x 6000mm Sch 40 welded for vent 2.00 lgt
1.1.14 BI 100mm dia. 45° elbow sch 40 4.00 pcs
1.1.15 M10 hilti chemical bolt 10.00 pcs
1.2 Installation of Steam Separator, 25mm dia. with steam trap station 15mm dia. 1.00 ls
1.2.1 BI 15mm dia. x 6000mm pipe sch 40 seamless 1.00 lgth
1.2.2 BI 15mm dia. 90 elbow sch 40 4.00 pcs
1.2.3 BI 15mm dia. T-connector sch 40 4.00 pcs
1.2.4 BI 25mm dia. x 6000mm pipe sch 40 seamless 1.00 lgth
1.3 Installation of drip leg at the end of steam line with complete steam trap station 1.00 ls
1.3.1 BI 100mm dia. x 200mm pipe sch 40 for bucket as a condensate drain 1.00 pc
1.3.2 BI 15mm dia. x 6000mm pipe sch 40 seamless 1.00 lgth
1.3.3 BI 15mm dia. 90 elbow sch 40 4.00 pcs
1.3.4 BI 15mm dia. T-connector sch 40 4.00 pcs
1.4 Replacement & modification of 4 units steam trap stations at Air Heater 1.00 ls
1.4.1 BI 15mm dia. x 6000mm pipe sch 40 seamless 3.00 lgths
1.4.2 BI 15mm dia. 90 elbow sch 40 10.00 pcs
1.4.3 BI 15mm dia. T-connector sch 40 8.00 pcs
1.5 Installation & modification of steam PRV station at Air Heater 1.00 ls
1.4.2 BI 25mm dia. x 6000mm pipe sch 40 seamless 1.00 lgth
1.4.3 BI 25mm dia. 90 elbow sch 40 2.00 pcs
1.4.4 BI 25mm dia. T-connector sch 40 2.00 pcs
Modification of condensate line and installation of Temperature Regulator at additional
1.6 Heat Exchanger 1.00 ls
1.6.1 BI 15mm dia. x 6000mm pipe sch 40 seamless 1.00 lgth
1.6.2 BI 15mm dia. 90 elbow sch 40 2.00 pcs
Insulation of mineral wool & ga 26 SS cladding of pumping trap, steam & condensate
1.7 line including the components 1.00 ls
1.8 Supply & Installation of support 1.00 ls
1.9 Supply of Spiral wound non-asbestos type gasket 1.00 ls
1.10 Restoration of affected areas 1.00 ls
1.11 Testing & Commissioning 1.00 ls

2 Replacement of Condensate Pump at RTD Batching 2


2.1 Installation of Armstrong Condensate Pump, Model: PT-312 (New) 1.00 set
2.1.1 M10 hilti chemical bolt 10.00 pcs
2.1.2 SS 15mm dia. pipe sche 40 seamless 304 2.00 lgths
2.1.3 SS 15mm dia. 90 deg. elbow sche 40 304 8.00 pcs
2.1.4 SS 15mm dia. T-connector sche 40 304 6.00 pcs
2.1.5 SS union patente 15mm dia. 304 6.00 pcs
2.1.6 SS 25mm dia. pipe sche 40 seamless 304 1.00 lgth
2.1.7 SS 25mm dia. 90 deg. elbow sche 40 304 4.00 pcs
2.1.8 SS union patente 25mm dia. 304 4.00 pcs
2.1.9 SS 40mm dia. pipe sche 40 seamless 304 1.00 lgth
2.1.10 SS 40mm dia. 90 deg. elbow sche 40 304 4.00 pcs
2.1.11 SS SMS 50mm dia. 304 4.00 pcs
2.1.12 SS 50mm dia. pipe sche 40 seamless 304 1.00 lgth
2.1.13 SS 50mm dia. 90 deg. elbow sche 40 304 4.00 pcs
2.1.14 SS SMS 65mm dia. 304 6.00 pcs
Replacement stream trap station, 15mm dia. complete with ball valves, steam trap &
2.2 check valve 2.00 sets
2.2.1 SS 15mm dia. pipe sche 40 seamless 304 2.00 lgths
2.2.2 SS 15mm dia. 90 deg. elbow sche 40 304 6.00 pcs
2.3 Tapping of Condensate lines to new Armstrong Condensate pump 1.00 ls
2.4 Tapping of overflow to drainage 1.00 ls
2.4.1 SS pipe 50mm dia. sch. 40 welded 304 3.00 lgths
2.4.2 SS 90 deg. elbow 50mm dia. sch. 40 304 10.00 pcs
2.4.3 SS SMS 65mm dia. 304 6.00 pcs
Insulation of 50mm thk. mineral wool & ga 26 SS cladding of pumping trap, steam &
2.5 condensate line 1.00 ls
2.6 Supply & Installation of support 1.00 ls
2.7 Supply of Spiral wound non-asbestos type gasket 1.00 ls
2.8 Restoration of affected areas 1.00 ls
2.9 Testing & Commissioning 1.00 ls

3 Supply of Armstrong Condensate Pump at RTD UHT 1


3.1 Installation of Armstrong Condensate Pump, Model: PT-312 (New) 1.00 set
3.1.1 SS pipe 15mm dia. x 6000mm sch 40 seamless 304 3.00 lgts
3.1.2 SS 15 mm dia. 90° elbow sch 40 304 8.00 pcs
3.1.3 SS 15 mm dia. T-connector sch 40 304 5.00 pcs
3.1.4 SS union patente 15mm dia. 304 10.00 pcs
3.1.5 SS pipe 20mm dia. x 6000mm seamless 304 2.00 lgts
3.1.6 SS 20 mm dia. 90° elbow sch 40 304 10.00 pcs
3.1.7 SS union patente 20mm dia. 304 10.00 pcs
3.1.8 SS pipe 25mm dia. x 6000mm seamless 304 4.00 lgts
3.1.9 SS 25 mm dia. 90° elbow sch 40 304 10.00 pcs
3.1.10 SS 25 mm dia. T-connector sch 40 304 10.00 pcs
3.1.11 SS 25mm dia. union patente 304 10.00 pcs
3.1.12 SS pipe 100mm dia. x 6000mm sch 40 welded 304 5.00 lgts
3.1.13 SS 100 mm dia. 45° elbow sch 40 304 8.00 pcs
3.1.14 SS SMS 100mm dia. 304 6.00 pcs
3.1.15 M10 hilti chemical bolt 10.00 pcs
3.2 Replacement of steam trap station, 20mm dia. of PRV station & steam header 2.00 units
Tapping of condensate line from UHT-1, PRV station & steam Header on the Pump
3.3
receiver tank including the 3 condensate drain line 1.00 ls
3.4 Dismantling of existing condensate line 1.00 ls
3.5 Installation of SS 100mm dia. sch 40. vent outside the roof & water proofing 1.00 ls
Insulation of 50mm thk. mineral wool & ga 26 SS cladding of pumping trap, steam &
3.6
condensate line 1.00 ls
3.7 Supply & Installation of support 1.00 ls
3.8 Supply of Spiral wound non-asbestos type gasket 1.00 ls
3.9 Restoration of affected areas 1.00 ls
3.10 Testing & Commissioning 1.00 ls

4 Recover Condensate from Scanima A & B


4.1 Installation of assembly Armstrong condensate Pump, Model: PT-312 1.00 unit
4.1.1 SS pipe 40mm dia. x 6000mm Sch 40 seamless 304 3.00 lgts
4.1.2 SS 40mm dia. 90° elbow sch 40 seamless 304 10.00 pcs
4.1.3 SS SMS 50mm dia. 304 10.00 pcs
4.1.4 M10 hilti chemical bolt 10.00 pcs
4.2 Installation of Steam Seperator, 50mm dia. complete with stream trap station, 15mm 4.00 sets
4.2.1 SS pipe 15mm dia. x 6000mm sch 40 seamless 304 6.00 lgts
4.2.2 SS 15 mm dia. 90° elbow sch 40 304 16.00 pcs
4.2.3 SS 15 mm dia. T-connector sch 40 304 16.00 pcs
4.2.4 SS 15 mm dia. union patente sch 40 304 16.00 pcs
4.3 Installation of Steam Trap Station, 15mm dia. at Steam Culinary Filter. 2.00 sets
4.4 Installation of Vacuum breaker, 15mm dia. in between control valve & PHE 2.00 units
4.5 Tapping of condensate line from Discharge of double Duty Condensate Pump to new Ar 2.00 units
4.6 Tapping of Condensate lines from Steam Trap Stations to new Armstrong Condensate Pu 6.00 units
4.7 Installation of Vent line, 100mm dia. going to CIP area. 1.00 ls
4.7.1 SS pipe 100mm dia. x 6000mm Sch 40 welded 304 7.00 lgts
4.7.2 SS 100mm dia. 45° elbow sch 40 welded 304 6.00 pcs
4.7.3 SS 100mm dia. 90° elbow sch 40 welded 304 10.00 pcs
4.7.4 SS SMS union 100mm dia. 304 10.00 pcs
4.8 Installation of 2" dia. new condensate line going to receiver tank at the hallway 1.00 ls
4.8.1 SS pipe 50mm dia.x 6000mm sch 40 welded 304 10.00 lgts
4.8.2 SS 50mm dia. 90° elbow sch 40 304 14.00 pcs
4.8.3 SS SMS union 50mm dia. 304 14.00 pcs
Insulation of 50mm thk. mineral wool & ga 26 SS cladding of pumping trap, steam &
4.9 condensate line 1.00 ls
4.10 Supply & Installation of support 1.00 ls
4.11 Supply of Spiral wound non-asbestos type gasket 1.00 ls
4.12 Relocation & Restoration of affected areas 1.00 ls
4.13 Testing & Commissioning 1.00 ls

Sub total B

Total Project Cost (A & B) VAT Exclusive


Total Project Cost (A & B) VAT Inclusive
Summary
Material cost
Labor cost
Mark-up/profit
Total Project Cost (A & B) VAT Exclusive
Total Project Cost (A & B) VAT Inclusive
Project duration :90 calendar days