Power Flow Case Title :
Base MVA : 100.0 MVA

CONVERGENCE SUMMARY
ITER DELP DELQ

0.0 0.468920
0.5 1.375936
1.0 0.452880
1.5 0.108061
2.0 0.011201
2.5 0.001997
3.0 0.000633
3.5 0.000161

**************************** POWER FLOW REPORT ***************************

BUS VOLTAGE ANGLE GENERATION LOAD


NO. (PU) (DEG) (MW) (MVAR) (MW) (MVAR)

30 0.9546 -15.47 0.00000 0.00000 10.60000 1.90000


TO-BUS 29 -10.60225 MW -1.90093 MVAR

29 0.9869 -14.01 0.00000 0.00000 2.40000 0.90000


TO-BUS 27 -13.30391 MW -3.14235 MVAR
TO-BUS 30 10.90771 MW 2.24427 MVAR

27 1.0309 -11.28 0.00000 0.00000 0.00000 0.00000


TO-BUS 25 8.56104 MW 2.99729 MVAR
TO-BUS 29 13.72562 MW 3.93914 MVAR
TO-BUS 28 -22.28828 MW -6.94716 MVAR

28 1.0271 -6.66 0.00000 0.00000 0.00000 0.00000


TO-BUS 6 -13.67915 MW -2.89162 MVAR
TO-BUS 8 -8.60997 MW -6.08539 MVAR
TO-BUS 27 22.28828 MW 8.97794 MVAR

26 0.9982 -12.50 0.00000 0.00000 3.50000 2.30000


TO-BUS 25 -3.49850 MW -2.29806 MVAR

24 1.0053 -12.94 0.00000 0.00000 8.70000 6.70000


TO-BUS 25 -4.88889 MW -0.39466 MVAR
TO-BUS 23 7.10748 MW -6.60079 MVAR
TO-BUS 22 -10.91859 MW 0.29586 MVAR

25 1.0159 -12.08 0.00000 0.00000 0.00000 0.00000


TO-BUS 26 3.54324 MW 2.36488 MVAR
Page 1
pfoutput.dat
TO-BUS 27 -8.47643 MW -2.83572 MVAR
TO-BUS 24 4.93376 MW 0.47302 MVAR

23 1.0141 -14.51 0.00000 0.00000 13.20000 1.60000


TO-BUS 24 -6.98459 MW 6.85215 MVAR
TO-BUS 15 -6.21653 MW -8.45417 MVAR

14 1.0294 -14.50 0.00000 0.00000 16.20000 1.60000


TO-BUS 15 -2.87989 MW -0.77711 MVAR
TO-BUS 12 -13.31944 MW -0.82106 MVAR

15 1.0371 -14.29 0.00000 0.00000 8.20000 2.50000


TO-BUS 18 3.72837 MW 7.07336 MVAR
TO-BUS 12 -21.14810 MW 2.47666 MVAR
TO-BUS 23 6.32362 MW 8.67048 MVAR
TO-BUS 14 2.89845 MW 0.79388 MVAR

18 1.0183 -14.32 0.00000 0.00000 3.20000 0.90000


TO-BUS 19 0.46419 MW 6.04273 MVAR
TO-BUS 15 -3.66458 MW -6.94347 MVAR

12 1.0478 -12.75 0.00000 0.00000 11.20000 7.50000


TO-BUS 16 -0.66069 MW 7.64580 MVAR
TO-BUS 13 9.99996 MW 2.17716 MVAR
TO-BUS 4 -55.49350 MW -16.66320 MVAR
TO-BUS 14 13.52633 MW 1.25114 MVAR
TO-BUS 15 21.42717 MW -1.92696 MVAR

19 1.0103 -14.14 0.00000 0.00000 15.50000 3.40000


TO-BUS 20 -15.05890 MW 2.59621 MVAR
TO-BUS 18 -0.44156 MW -5.99696 MVAR

20 1.0137 -13.51 0.00000 0.00000 5.20000 0.70000


TO-BUS 10 -20.33605 MW 1.74171 MVAR
TO-BUS 19 15.13668 MW -2.44066 MVAR

22 1.0175 -11.83 0.00000 0.00000 0.00000 0.00000


TO-BUS 21 -0.49309 MW 3.30353 MVAR
TO-BUS 10 -10.56052 MW -3.21757 MVAR
TO-BUS 24 11.05435 MW -0.08455 MVAR

21 1.0168 -11.80 0.00000 0.00000 20.50000 11.20000


TO-BUS 10 -20.99330 MW -7.89645 MVAR
TO-BUS 22 0.49434 MW -3.30098 MVAR

10 1.0298 -11.09 0.00000 0.00000 5.80000 2.00000


TO-BUS 9 -54.92540 MW -7.49977 MVAR
TO-BUS 17 13.29033 MW 0.29283 MVAR
Page 2
pfoutput.dat
TO-BUS 21 21.16264 MW 8.26094 MVAR
TO-BUS 22 10.64611 MW 3.39405 MVAR
TO-BUS 6 -16.68828 MW -5.55650 MVAR
TO-BUS 20 20.71549 MW -0.89446 MVAR

17 1.0255 -11.70 0.00000 0.00000 9.00000 5.80000


TO-BUS 10 -13.23634 MW -0.15203 MVAR
TO-BUS 16 4.23572 MW -5.64876 MVAR

16 1.0340 -12.30 0.00000 0.00000 3.50000 1.80000


TO-BUS 17 -4.21088 MW 5.73992 MVAR
TO-BUS 12 0.71139 MW -7.53922 MVAR

4 1.0224 -5.65 0.00000 0.00000 7.60000 1.60000


TO-BUS 12 55.49350 MW 24.49100 MVAR
TO-BUS 6 18.56872 MW -26.24064 MVAR
TO-BUS 2 -34.30335 MW -6.06000 MVAR
TO-BUS 3 -47.36224 MW 6.20492 MVAR

13 1.0450 -13.48 30.00000 -2.04360 40.00000 0.00000


TO-BUS 12 -9.99996 MW -2.04360 MVAR

1 1.0400 0.00 123.50252 -48.57297 0.00000 0.00000


TO-BUS 2 72.40075 MW -43.17588 MVAR
TO-BUS 3 51.15003 MW -5.39710 MVAR

2 1.0500 -2.59 60.00000 1.21883 21.70000 12.70000


TO-BUS 4 34.95441 MW 4.09222 MVAR
TO-BUS 5 35.58111 MW 6.15581 MVAR
TO-BUS 6 38.94869 MW -2.15251 MVAR
TO-BUS 1 -71.18164 MW 41.06081 MVAR

9 1.0395 -7.86 0.00000 0.00000 0.00000 0.00000


TO-BUS 11 -39.99992 MW -3.72084 MVAR
TO-BUS 10 54.92540 MW 10.68711 MVAR
TO-BUS 6 -14.92422 MW -6.96815 MVAR

6 1.0307 -6.23 0.00000 0.00000 0.00000 0.00000


TO-BUS 9 14.92422 MW 7.49036 MVAR
TO-BUS 10 16.68828 MW 7.17840 MVAR
TO-BUS 8 -21.25521 MW -17.22106 MVAR
TO-BUS 7 32.53473 MW 17.19890 MVAR
TO-BUS 2 -38.14926 MW 0.53016 MVAR
TO-BUS 28 13.70991 MW 1.62440 MVAR
TO-BUS 4 -18.45385 MW 25.69188 MVAR

11 1.0500 -3.48 40.00000 6.82736 0.00000 0.00000


TO-BUS 9 39.99992 MW 6.82736 MVAR
Page 3
pfoutput.dat

7 1.0081 -7.44 0.00000 0.00000 52.80000 20.90000


TO-BUS 5 -20.61370 MW -3.00437 MVAR
TO-BUS 6 -32.18632 MW -17.89563 MVAR

5 1.0200 -6.15 80.00000 12.16746 94.20000 19.00000


TO-BUS 7 20.80780 MW 1.39610 MVAR
TO-BUS 2 -35.00846 MW -8.22863 MVAR

8 1.0400 -5.86 60.00000 48.22721 30.00000 30.00000


TO-BUS 28 8.66349 MW 1.68145 MVAR
TO-BUS 6 21.33792 MW 16.54576 MVAR

3 1.0262 -4.62 0.00000 0.00000 2.40000 1.20000


TO-BUS 4 47.65111 MW -6.25677 MVAR
TO-BUS 1 -50.05241 MW 5.05410 MVAR

*********************** AREA INTERCHANGE REPORT ***************************

FROM AREA

TO AREA MW FLOW MVAR FLOW

Page 4