REPORT Page 1 of 1
SAIPEM
DESCRIPTION OF SITUATION:
For the high vibration on the first section of drilling, the canrig top drive has some
problems.
REPORT Page 1 of 1
• Cover for auxiliary J-BOX on the top drive has been fallen.
• Ethernet module in J-BOX top drive has been broken in special the fiber optic
connection.
• When the top drive is subject to high vibration, we need to do the inspections
recommended by CANRIG to reduce or prevent the problems on TOP DRIVE.
(attached the document)
1. Bulletin # 21
2. Bulletin # 28
3. Bulletin # 41
4. Inspection # 1
REPORT Page 1 of 1
SAIPEM
Electrical Supervisor Top Drive Team
Full Name: Herney Perdomo Badge Number: SAS 26039
Date: 18-08-2016 Location: DAMMAM BASE
Description: Additional communication system on Canrig Top Drive
• Electrical top drive team has a proposal for the follow point:
Ethernet module in J-BOX top drive has been broken in special the fiber optic connection.
• When the top drive is drilling in hard condition (high vibration) a thing that has
problem is Ethernet module because it broken the fiber optic connection or the
Ethernet plug.
Ethernet connection
• Normally the top drive working with fiber optic communication until the J-BOX TD after, it
use a short Ethernet cable directly to plc, according to following drawing:
Ethernet
cables to Fiber optic connection
plc
Ethernet module
Ethernet plug
REPORT Page 1 of 1
SAIPEM
Electrical Supervisor Top Drive Team
Full Name: Herney Perdomo Badge Number: SAS 26039
Date: 18-08-2016 Location: DAMMAM BASE
Description: Additional communication system on Canrig Top Drive
The idea is put an additional communication system but it just use Ethernet cables from
the upper J-BOX to directly PLC, in conclusion, changed the fiber optic to Ethernet cable
in this case we will need.
Upper J-BOX
Additional Ethernet module and
Ethernet cables in service loop
Ethernet
Fiber optic
Fiber optic
Lower J-BOX
Ethernet cables
Note: attached you can find the Drawing for the additional communication system.
• Fiber Optic
• Additional communication Ethernet cables.
REPORT Page 1 of 1
SAIPEM
Electrical Supervisor Top Drive Team
Full Name: Herney Perdomo Badge Number: SAS 26039
Date: 18-08-2016 Location: DAMMAM BASE
Description: Additional communication system on Canrig Top Drive
The purpose is, install the additional system in a Canrig top drive and start to test about
the additional system, after we will install in all Canrig top drive.
• We will need the top drive in Dammam base for make a modification.
Remarks
• Very important when the top drive is drilling on high vibration condition, you need to do a
Canrig recommendation inspection(mandatory)
• When the additional communication system has been installed, the proposal is reduce the
Down time from lost communication on the top drive, in case you could connect the
Ethernet communication and continue working.