GOAL REPORT

(Project Semester June-December 2019)

Four laning of exiting two lanes from Talwandi Bhai to Ferozpur NH-05 in state of
Punjab

Submitted By
Shivam Garg
101782016

Under the Guidance of


Mr. Devender Sharma Mr. Davinder Singh
(Project Manager)

DEPARTMENT OF CIVIL ENGINEERING


Thapar Institute of Engineering and Technology, Patiala
(Deemed-to-be-University u/s 3 of the UGC Act, 1956)
December 2019
About the Company

CEIGALL INDIA LIMITED


Ceigall India Limited is a Non-govt company, incorporated on 08 Jul, 2002. It's a private
unlisted company and is classified as 'company limited by shares'.

Company's authorized capital stands at Rs 100.0 lakhs and has 62.03% paid-up capital which
is Rs 62.03 lakhs. Ceigall India Limited last annual general meet (AGM) happened on 30 Sep,
2017. The company last updated its financials on 31 Mar, 2017 as per Ministry of Corporate
Affairs (MCA).

Ceigall India Limited is majorly in Construction business from last 17 years and currently,
company operations are active. Current board members & directors are Ramneek Sehgal,
Paramjeet Kaur Sehgal and Mohinder Pal Singh. Company is registered in Chandigarh
(Punjab) Registrar Office. Ceigall India Limited registered address is A-898 TAGORE NAGAR
LUDHIANA PB 141001 IN.

Directors
The company has three directors and no reported key management personnel.
The longest serving directors currently on board are Ramneek Sehgal and Paramjeet Kaur Sehgal
who were appointed on 8 July, 2002. They have been on the board for more than 17 years. The
most recent appointed director is Mohinder Pal Singh, who was appointed on 01 January,2003.
Mohinder Pal Singh has the largest number of other directorships with a seat at a total of 1
company. In total, the company is connected to no other companies through the directors.
Ceigall India Limited Details
CIN U45201PB2002PTC025257
Date of Incorporation 08 Jul, 2002
Status Active
Company Category Company limited by Shares
Company Sub-category Non-govt company
Company Class Private
Business Activity Construction
Authorized Capital 100.0 lakhs
Paid-up Capital 62.03 lakhs
Paid-up Capital % 62.03
Registrar Office City Chandigarh
Registered State Punjab
Registration Number 25257
Registration Date 08 Jul, 2002
Listing Status Unlisted
AGM last held on 30 Sep, 2017
Balance Sheet last updated on 31 Mar, 2017

Services provided by the company:


• Highway road construction services
• Bridge construction services
• Residential Building Construction Services
• Commercial Building Services
About the project
Four laning of existing two lane from Talwandi Bhai to Ferozpur NH- 05(Old NH- 95) from
km.170.38 to km.194.040 in the state of Punjab. This project also includes minor bridges and
culverts.

Client: NHAI

Salient Features of Minor Bridge-

• Span of Minor bridge: 35 m


• carriage way width: 13 m on each side (RHS and LHS)
• Foundation: 1 m diameter RCC cast in situ pile foundation.
• Super Structure: Pre-stressed longitudinal beams, cross beams, bearings, diaphragm
and deck slab.
Some of the tests performed in lab are:

• Cement tests like consistency test, initial and final setting time test, soundness test
etc.
• Soil tests like maximum dry density test, field dry density test, moisture content test,
gradation test etc.
• Some bitumen tests like penetration tests, softening point test, flash and fire point
test etc.
Salient features of road:

• Type of pavement: Flexible pavement.


• Purpose served: National highway connecting Talwandi Bhai to Ferozpur.
• Width of carriage way: 13 metres on each side.

Some ongoing Projects

• Kartarpur Corridor
• Nh-24 (Delhi to Meerut)
• Nh-95 (Kharar to Ludhiana)
Project Goals
• Understanding reinforcement drawings
• Comparing work done on site are according to drawings
• Pile foundation casting
• Pile cap casting
• Abutment casting
• Tests to be performed on soil and bitumen
• Road crust designing

Date of joining: 14 June,2019

List Of Work Completed Before Joining:

• Testing of pile foundation.


• 10 pile foundation were casted but there was problem in their alignment. So those
have to be re casted.

Project Progress at Joining

• Fixing of points for pile foundation.


• Casting of test pile.

Casting of Piles
Casting of piles require following steps:
• Boring, linear insertion and rock cutting
• Applying bentonite slurry to walls of bore hole
• Temporary cage insertion
• Permanent reinforcement cage insertion
• Concreting
• Removal of temporary cage
Problems faced and solutions to these problems

• 10 pile were casted with wrong alignment. These will be casted again with proper
fixation of points.
• Breakdown of machine causing delay in work. 2 machines were hired later on for
speeding up the work.
• Some thieves stole some reinforcement bars from cages. As a result, cages had to
be recasted.

METHOLOGY

• Interacting with site engineers, Supervisors and Contractors.


• Learning proper steps in completion of structural elements.
• Supervision of work at Site.
• Using basic knowledge of subjects studied in college.

Das könnte Ihnen auch gefallen