13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)

Works Order/ Quotation Summary


13GB - IMPROVEMENT WORKS (Items of Top Priority)
WO no. 12362 Info readiness

RLP Response 2019.11.18 (pink) Estimate Labour Material Target Start Anticipated Status
Trade Location Item no Room Name Works Status RLP Updated Response 2019.11.22 Range (per day) submission RLP JRP JRP's construction dwgs
(puple) status
Date Completion Date (bs)

Electrical CBI IMMD ITEM E052 IMMD 95 Senior Immigration Officer G/F 6x S/O supply change to E+U Completed 1~2 A 9/12/2019 20/12/2019 0 IW/CBI/EE/SK009 Rev 2
IW/CBI/EE/SK012 Rev 1
CBI IMMD ITEM E053 IMMD 96 Duty Office (GV Arr/Dep) G/F Additional 1x S/O (E+U) CANCELLED BS works IW/CBI/EE/SK009 Rev 2
IW/CBI/EE/SK012 Rev 1
CBI IMMD ITEM E055 IMMD 96 Duty Office (GV Arr/Dep) G/F Refer ImmD's Email on 10/12/2018 "Console Desk v3.0.pptx" Completed 1~2 A 5/12/2019 20/12/2019 0 IW/CBI/EE/SK008 Rev 1
IW/CBI/EE/SK009 Rev 1
CBI IMMD ITEM E056 IMMD 96 Duty Office (GV Arr/Dep) G/F 6x S/O supply change to E+U Completed 2~3 A 5/12/2019 20/12/2019 0 IW/CBI/EE/SK009 Rev 2
IW/CBI/EE/SK012 Rev 1
CBI IMMD ITEM E057 IMMD 111 CCTV Control Room 1/F 6x S/O supply change to (E+U) Completed 2~3 A 28/11/2019 20/12/2019 0 IW/CBI/EE/SK010 Rev 2
IW/CBI/EE/SK012 Rev 1
CBI IMMD ITEM E059 IMMD 111 CCTV Control Room 1/F 2x S/O supply change to (E+U) Completed 2~3 A 29/11/2019 20/12/2019 0 IW/CBI/EE/SK010 Rev 2
IW/CBI/EE/SK012 Rev 1
CBI IMMD ITEM E129 Timber Deck (IMMD 113 & IMMD 114) 1/F lighting fittings should change to weatherproof type. (as per 20190604 site 12 Dec for lighting delivery 0~2 A 12/12/2019 16/12/2019 0 IW/CBI/EE/SK002 Rev 1
walk user's comment)

CBI C&ED ITEM A66 C&ED 150 Platform Control Cum Duty Collection Office Addition of 1no. floor boxes and power sockets in this room Completed 1~2 B 9/12/2019 24/12/2019 0 IW/CBI/EE/SK004 Rev 5
CBI C&ED ITEM A68 C&ED 139 ROCARS On-site Control Room Revised BS provisions to suit the additional false ceiling 50%, Completed alternation air duct, 1~2 A 10/12/2019 30/12/2019 1 IW/CBI/AC/SK001 Rev 2
lighting installation in progress

CBI C&ED ITEM A190


C&ED 112 Multi-Purposes cum Staff Common Room
Alternation of lighting layout to suit Altar location NO BS works
CBI C&ED ITEM A216 C&ED 154 Observation Deck Weather proofed luminaire to be provided. 12 Dec for lighting delivery 0~1 A 11/12/2019 12/12/2019 0 IW/CBI/EE/SK002 Rev 5

CBI C&ED ITEM A218 C&ED 109 Conference Room Light circuit for conference room to be reviewed so that light fitting above Completed JRP please reply 0~2 A 11/11/2019 29/11/2019 0 IW/CBI/EE/SK002 Rev 5
projector screen can be switched off when projector screen is used. Pending BW

CBI C&ED ITEM E73 C&ED 109 Conference Room Conduit outlet relocation Completed 0~2 B 11/11/2019 6/12/2019 0 IW/CBI/CB/SK003
Pending BW
CBI C&ED ITEM E75 C&ED 109 Conference Room TV power point relocation (conduit only) Completed 0~2 6/12/2019 6/12/2019 0 IW/CBI/CB/SK001
N IW/CBI/CB/SK003
CBI C&ED ITEM E76 C&ED 109 Conference Room Floor socket blank off 2 rooms, Completed 0~1 11/11/2019 20/11/2019 0 IW/CBI/EE/SK006 Rev 4
CBI C&ED ITEM E77 C&ED 109 Conference Room Surface conduit to Cupboard/Equipment Cabinet 2 rooms, Completed 0~1 A 11/11/2019 6/12/2019 0 IW/CBI/EE/SK002 Rev 5
Pending BW IW/CBI/EE/SK006 Rev 4
CBI C&ED ITEM E78 C&ED 109 Conference Room Missing power point for cupboard/ equipment cabinet Completed 0~1 B 11/11/2019 6/12/2019 0 IW/CBI/EE/SK006 Rev 4
Pending BW IW/CBI/EE/SK014 Rev 0
CBI C&ED ITEM E79 C&ED 111 Standby cum briefing room Light Fitting relocation (all lighting fittings) Completed JRP please reply 0~2 A 21/11/2019 2/12/2019 0 IW/CBI/EE/SK001 Rev 7
Pending BW

DOG C&ED ITEM A78 G/F Additional power supplies for Water Heaters 3 rooms, 80%, await thermostat delivery 1~2 B 16/11/2019 30/12/2019 1 IW/DOG/EE/SK002 Rev 2
(checked by JRP) IW/DOG/EE/SK003a Rev
1
IW/DOG/EE/SK003b Rev
2
FXI C&ED ITEM A157 Scanning Hall C&ED request all high level wall mounted flood light to have colour 20%, additional weatherproof light, very 1~2 A 10/12/2019 30/12/2019 IW/FXI/EE/SK001 Rev 5
temperature 4000K
limit working time of this area
1

CBI ??? corridor Relocation of existing trunking to 2350mm Completed 21/11/2019 2/12/2019 0 ???

Estimated Labourr (Builder's):


Estimated Labour (BS): Date: 20191230 Ph1T Ph2T Ph3T Ph1O Ph2O Ph3O Total
Total BS items 19 26 68 76 70 2 261
Material submission BS works start 3 16 13 16 18 1 67
construction/ installation Await material 0 4 13 17 17 0 51
material/ equipment delivery Await user/information 0 0 30 9 11 0 50
completed activity BS works completed 16 6 12 34 24 1 93
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Items of Top Priority)
WO no. 12365 Info readiness

Material Anticipated Stat


RLP Response 2019.11.18 (pink) Estimate Labour Target Start
Trade Location Item no Room Name Works Status
RLP Updated Response 2019.11.22 (puple) Range (per day)
submission
Date
Completion RLP JRP us
status Date (bs) JRP's construction dwgs

Electrical POB HKP ITEM A6 HKPF 108 ASSS Equipment Room at 1/F (Door 1018) and 1. Additional EM lock at entrance door await ELV system confirmation of setting out Installtion levels have been indicated in drawing. 1~2 16/12/2019 30/12/2019 1 Actual 24 Jun, 27 Sep 2019
HKPF 69 Central Apparatus Room (CAR) at 2/F (Door 2005) 2. Add 1. No. of fused spur unit for each door for power supply to door control panel Actual location pending user confirmation.
3. Modification of existing circuitry, wiring and cable containment (access problem from the key holder) IW/POB/EE/SK105 Rev 2 IW/POB/EE/SK105 Rev 2
4. Make good of finishes after BS modifications IW/POB/EE/SK106 Rev 2 IW/POB/EE/SK106 Rev 2
IW/POB/EE/SK109 Rev 2 IW/POB/EE/SK109 Rev 2
IW/POB/EE/SK110 Rev 1
IW/POB/EE/SK110 Rev 1

POB HKP ITEM A14 1/F Female Shower Room POB 1. Revise lighting arrangement in the shower rooms. 2 rooms, 80%, 23 Dec for lighting delivery Setting-out meeting with user re-schedule from 1~2 B 2/12/2019 30/12/2019 1 Actual 28 May & 24 Jun, 27 Sep
2/F Male Shower Room POB 2. Take down existing non weatherprrof type light fittings, supply and install new 13/11 to 21/11
waterproof type light fitting. 2019
3. Take down existing non weatherprrof type wiring accessories, supply and install new IW/POB/EE/SK102 Rev 4
waterproof type wiring accessories. IW/POB/EE/SK103 Rev 4
4. Modify exsting wiring and circuitry, supply and install new cable wiring and surface
conduit to existing circuitry.
5. Make good of finishes after BS modifications.

POB HKP ITEM A56 HKPF 108 ASSS Equipment Room 1. Add 1 no. of new eathing terminal 50% Installation inside plant room, no user 1~2 B 16/12/2019 30/12/2019 1 Actual 24 Jun, 27 Sep 2019
2. Provide new 3mmx25mm copper tape for connection between the new eathing confirmation issue
terminal to existing clean earth network. IW/POB/EE/SK105 Rev 3
3. Provide wall opening for the new copper tape IW/POB/EE/SK108 Rev 2
4. Make good of finishes after BS modifications

POB HKP ITEM 60 Door 1009 For Electrical Installations: Completed Setting-out meeting with user re-schedule from 0~3 9/12/2019 14/12/2019 0 IW/POB/EE/SK103 Rev 1 - Item
(CHC - electrical 1. Supply and install 1 no. of FSU for LCP of Security 13/11 to 21/11
installation only) 2. Supply and install new wiring and surface conduit to connect to existing circuitry E023 not shown
3. Make good of finishes after BS modifications
4. Coordinate with Security Contractor and provide the builder works associated with the
following security works:
For ELV Installations:
1) Additional of two number of BS4662 base boxes (inside and outside) completed with
conduits to local control panel and to ASSS trunking.
2) Relocation of existing local control panel from door top to Female Night Duty Room and
reconnection to break glass unit, door contact completed with wiring, accessories and
conduits.
3) Concrete chasing, recover and painting.
4) Dismantle and recover of ceiling for installation.
5) Additional FSU in Female Night Duty Room completed with wirings, accessories and
conduits for local control panel.

FS FSD ITEM A6 FSD 36 Exercise Room on 2/F 2. Take down existing recessed type LED down light, supply and install new light fittings. 10%, pending for Ceiling level confirmation by 2~3 C 28/11/2019 30/12/2019 1 Actual 28 Jun, 27 Sep 2019
5. Modification of existing wiring and cable containment to suit the new VRV indoor unit
location. user IW/FSD/AC/SK004 Rev 2
6. Make good of finishes after BS modifications. BS/7272/FSD/IW/A/A06 Rev 1
7. Coordination with FS Contractor for the mark good of FS pipe works after FS
modification works.

FS FSD ITEM A7 All toilets 1. Revise lighting arrangement in the toilets. 5 rooms, 50%, 25 Dec for lighting delivery 1~2 B 2/12/2019 30/12/2019 1 Actual 28 Jun, 27 Sep 2019
2. Change of general light fittings to waterproof type.
3. Change of all general type wiring accessories to weatherproof type. BS/7272/FSD/IW/A/A07a Rev 2
4. Make good of finishes after BS modifications. BS/7272/FSD/IW/A/A07b Rev 2
BS/7272/FSD/IW/A/A07c Rev 4
FS FSD ITEM A8 Main entrance and rear door (G203 & G019 & G302) For G023: Numerical lock (L8) instead of card reader as per end user comment. 4 weeks for submission & keylock approval / 1~2 B 5/1/2020 6/1/2020 2 BS/7272/FSD/IW/A/A07d Rev 4
JRP provided key pad material
For G019 & G302: Password Pad instead of Card Reader to be provided
3. Make good of finishes after security modifications delivery submission (by email on
4. Term Contractor to coordinate with Security Contractor for the installation of digital key 20190603 1935),
pad IW/FSD/SY/SK001 Rev 2

FS FSD ITEM A9 Watch Room (Fire) 1. Additional 1 no. of fused spur unit for wig-wag panel as per EMSD site visit request Completed Setting-out confirmed on 16/11 0~1 5/12/2019 12/6/2019 0 Actual 28 Jun, 27 Sep 2019
2. Make good of finishes after BS modifications.
BS/7272/FSD/IW/A/A09 Rev 1

FS FSD ITEM A10 Barrack (Fire) & Barrack ( AMB) on 2/F 1. Revise lighting arrangement in barrack area. 30%, 13 Dec for lighting delivery CH to check with FSD user on the final setting-out 1~2 B 2/12/2019 30/12/2019 1 BS/7272/FSD/IW/A/A010 Rev 3
2. Change of general light fittings to waterproof type as per user comment on safety as per 16/11 meeting
reasons
3. Make good of finishes after BS modifications

FS FSD ITEM A12 Ventilation provision for FSD 22 Kitchen Store 4. Addition of equipotential bonding wire to new metal parts 27 Dec for ventilation fan and airduct delivery 2~3 B 16/12/2019 30/12/2019 1 Actual 28 Jun, 27 Sep 2019
5. Supply and install new fused spur unit for new fan.
6. Supply and install new wiring and cable containemnt, and modify existing wiring and IW/FSD/AC/SK003 Rev 1
cable containement to connect to existing circuitry. BS/7272/FSD/IW/A/A012 Rev 1
7. Make good of finishes after BS modifications.

FS FSD ITEM A15 FSD 24 Lecture Room / Study Room 1. Add 1 no. of switched fused spur unit at ceiling level for end user projector. Completed Setting-out confirmed on 16/11 0~1 19/11/2019 11/28/2019 0 Actual 28 Jun, 27 Sep 2019
2. Addition of dia. 25mm surface conduit from projector location to wall for user future
cabling. BS/7272/FSD/IW/A/A015 Rev 2
3. Modification of existing circuitry and power supply.
4. Make good of finishes after BS modifications

FS FSD ITEM A20 FSD 13a Female Barrack 1. Removal of one cabinet CA09 to suit as-built bed size relocate the existing FAP 2~3 A 23/12/2019 12/28/2019 1 Actual 28 Jun & 16 Jul, 27 Sep
2. Relocate existing sockets, data outlet and telephone outlet to suit new locations of beds
and cabinets 2019
3. Remove existing FAP, supply and install new FAP at new location as indicated IW/FSD/AC/SK002 Rev 1
4. Relocate existing FAP associated fused spur unit, wiring and cable containment to new BS/7272/FSD/IW/A020a Rev 3
location
5. Modify the glass panel to metal panel for FAP mounting BS/7272/FSD/IW/A020b Rev 2
6. Make good of finishes after BS modifications

FS FSD ITEM A31 Barrack (Fire) on 2/F Provision of lampshade to prevent lamp from being damaged during opening/closing of NO BS works (relocate the cabinet to suit the CH to check with FSD user on the final setting-out Actual 28 Jun, 27 Sep 2019
cabinet door as per 16/11 meeting
lamp) BS/7272/FSD-IW-A-A031 Rev 3
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Items of Top Priority)
FS FSD ITEM A47 Various locations: 1. Revise lighting arrangement for the indicated locations 26 rooms, 40%(TBE Room, Switch Room, Fuel CH to check with FSD user on the final setting-out 2~3 19/11/2019 1/15/2020 1 Actual 28 Jun 27 Sep 2019
Corridor, 2. Dismantle existing light fitting as per BS drawings as per 16/11 meeting
Staircase ST-1, ST-2, ST-4 3. Install new light fitting as per BS drawings Tank Room not yet start), 15 Jan 2020 of BS/7272/FSD-IW-A-A047a Rev 1 BS/7272/FSD-IW-A-A047a Rev 2
FSD 4a1 NCO Office (FIRE), 4. Modify the power supply to the affected lighting circuits and connect to eixsitng lighting frameproof ltg delivery, BS/7272/FSD-IW-A-A047b Rev 3 BS/7272/FSD-IW-A-A047b Rev 3
FSD 4a2 Storage / General /Office F&E (Fire), circuits indicated in the BS drawings BS/7272/FSD-IW-A-A047c Rev 2 BS/7272/FSD-IW-A-A047c Rev 2
FSD 4b2 Storage General Office, 5. Make good of finishes after BS modifications BS/7272/FSD-IW-A-A047d Rev 2
FSD 5 & FSD 6 Watch Room, BS/7272/FSD-IW-A-A047e Rev 3 BS/7272/FSD-IW-A-A047d Rev 2
FSD 19 Rank & Files Refreshment, BS/7272/FSD-IW-A-A047f Rev 3 BS/7272/FSD-IW-A-A047e Rev 3
FSD 20 Officers' Dinning Cum Multi-Purpose Room, BS/7272/FSD-IW-A-A047g Rev 3 BS/7272/FSD-IW-A-A047f Rev 4
FSD 23a, 23b & 23c Bedroom Officer BS/7272/FSD-IW-A-A047h Rev 2
FSD 31 Lan Server and TGMS Equipment Room, BS/7272/FSD-IW-A-A047i Rev 2 (go) BS/7272/FSD-IW-A-A047g Rev 3
FSD 34 Foam Store, BS/7272/FSD-IW-A-A047j (go) BS/7272/FSD-IW-A-A047h Rev 2
FSD 37 Operational Gear Locker Room, BS/7272/FSD-IW-A-A047i Rev 0
Control Valve Rm, TBE Room, Elec Room, Switch Room, Fuel
Tank Room, (go)
BS/7272/FSD-IW-A-A047j (go)

FS FSD ITEM A67 2/F Canteen and Kitchen (Additional power provision for 1. Additional Weatherproof Isolator For Water Heater As Shown On The Drawings 3 rooms, 15%, scheduled to be site walk/setting out CH to check with FSD user on the final setting-out 2~3 A 28/11/2019 30/12/2019 1 Actual 28 Jun, 27 Sep 2019
water heater) 2. Provide All Necessary Cable Containment For Cables Feeding To Those Isolator confirmation/installation between 19-23 Dec 2019 as per 16/11 meeting
3. Revise Existing Circuitry Of The Water Heater For Adding Additional Mcb Board And BS/7272/FSD-IW-A-A067a Rev 2 BS/7272/FSD-IW-A-A067a Rev 2
Rewire To Be Fed By New MCB Board BS/7272/FSD-IW-A-A067b Rev 2 BS/7272/FSD-IW-A-A067b Rev 2
4. Additional MCB And MCB Board Units For Water Heater
5. Reinstate And Make Good For Affected Finishing Work

FS FSD ITEM A69 FSD 7 5-BAY APPLIANCE ROOM Additional 4 power socket poles Completed Setting out has been indicated in drawing. 0~1 28/11/2019 12/12/2019 0 Actual 16 Jul, 27 Sep 2019
AB/7272/FSD/IW/A/A069
BS/7272/FSD-IW-A-A069a Rev 1
BS/7272/FSD-IW-A-A069b Rev 1
FS FSD ITEM A71 Watch Room (Fire and Amb) Signal connection between push buttons (for wigwag) and intefacing panels 31 Dec material (signal cable) will be delivery 1~2 C 12/31/2019 1/2/2020 2
BS/7272/FSD-IW-A-A071a Rev 0
BS/7272/FSD-IW-A-A071b Rev 0
CBO C&ED ITEM A69 C&ED 188 ROCARS On-site Control Room Revised BS provisions to suit the additional false ceiling 10%, 26 Dec for lighting delivery 2~3 6/12/2019 30/12/2019 1 IW/CBO/AC/SK001 Rev 1
IW/CBO/EE/SK001 Rev 2
CBO C&ED ITEM A277a Cargo Platform -Fan relocation at column Completed 0~1 21/11/2019 29/11/2019 0 IW/CBO/EE/SK003 Rev 0
- Lighting to be lowered at column
- Yellow Lighting to change to white colour
FXO C&ED ITEM A157 Scanning Hall C&ED request all high level wall mounted flood light to have colour temperature 4000K conduit works first, 13 Dec for lighting delivery, 1~2 16/12/2019 21/1/2020 1
very limit working time of this area IW/FXI/EE/SK001

POB HKP ITEM A19 HKPF74 TBE Room, G/F, POB 1. Stand-by A/C to be provided as HKPF comment Completed Location agreed with user, CH to mark the setting- 2~3 29/11/2019 12/23/2019 0 Actual 24 Jun, 27 Sep 2019
2. Add 1 no. of new A/C unit (indoor unit and out door unit) and all necessary accessories out for end user confirmation, (Cleared)
(clading, insulation material, etc) shall be installed as per BS drawing IW/HKP/AC/SK001 Rev 2
3. Provide wall opening shall be provided for new refrigerant pipe IW/POB/EE/SK104 Rev 2
4. Connect condensate drain pipe to existing pipe works IW/POB/EE/SK111 Rev 2
5. Add new switched fused spur unit and isolator (essential power) for new A/C units
6. Modify existing circuitry, wiring and cable containemnt for new electrical installations
7. Provise drip tray c/w water leakage sensor for new A/C indoor unit
8. Provide control unit for the duty/standby A/C units
9. Provide support for new A/C outdoor unit and associated pipeworks to mount on wall
10. Make good of finishes after BS modifications

AC FS FSD ITEM A1 Officer Bedroom 23A ,B & C 1. Adjust RCP to suit AC unit from wall mount to ceiling mount in order to keep the height 3 rooms, 15%, air duct relocated, scheduled to 2~3 17/12/2019 1/12/2020 1 Actual 28 Jun & 16, 18 Jul, 27
of cabinet
2. For Room 23b & 23c, take down existing VRV indoor unit, and supply and install new be site walk/setting out confirmation between Sep 2019
VRV indoor unit (cooling capacity match with the existing one) at new location. 12-19 Dec 2019 IW/FSD/AC/SK001 Rev 2
3. Modifiy existing refrigerant pipe and condensate drain pipe and associated clading and BS/7272/FSD/IW/A/A01a Rev3
insulation.
4. Relocate existing switched fused spur unit for VRV indoor unit to suit new locations. BS/7272/FSD/IW/A/A01b Rev2
5. Modify existing wiring and cable containment for new switched fused spur unit
locations.
6. Provide wall openings for modified pipeworks.
7. Make good of finishes after BS modifications.

FS FSD ITEM A2 Officer Bedroom 23a 2. For Room 23a, take down existing VRV indoor unit, supply and install new cassette type 5 weeks for VRV indoor unit material delivery , to 2~3 24/12/2019 1/12/2020 1 Actual 28 Jun & 18 Ju, 27 Sep
indoor A/C unit.
3. Modifiy existing refrigerant pipe and condensate drain pipe and associated clading and be confirmed from supply 2019
insulation. IW/FSD/AC/SK001 Rev 1
4. Relocate existing switched fused spur unit for VRV indoor unit to suit new locations. BS/7272/FSD/IW/A/A02 Rev 3
5. Modify existing wiring and cable containment for new switched fused spur unit
locations. IW/FSD/DR/SK001 Rev 1
6. Remove existing branch airduct and lourver. IW/FSD/PL/SK001 Rev 2
7. Modify existing airduct and add new lourver.

FS FSD ITEM A6 FSD 36 Exercise Room on 2/F 3. Take down existing VRV indoor unit, and supply and install new VRV indoor unit (cooling 80% 1~2 30/12/2019 12/31/2019 1 Actual 28 Jun, 27 Sep 2019
capacity match with the existing one) at higher level just below the ceiling vold.
4. Modifiy existing refrigerant pipe and condensate drain pipe, supply and install new IW/FSD/AC/SK004 Rev 0
refrigerant pipe and condensate drain pipe to suit the new VRV indoor unit. BS/7272/FSD/IW/A/A06 Rev 1

FS FSD ITEM A12 Ventilation provision for FSD 22 Kitchen Store 1. Supply and install new ventilation fan at FSD 22 Kitchen Store 80% 1~2 12/31/2019 12/31/2019 2 Actual 28 Jun, 27 Sep 2019
2. Supply and install new airduct and lourver at FSD 22 Kitchen Store
3. Modification of existing airduct at FSD 22 Kitchen Store to suit the new MVAC layout IW/FSD/AC/SK003 Rev 1
BS/7272/FSD/IW/A/A012 Rev 1
FS FSD ITEM A13 FSD 21 Kitchen 1. Modify existing airduct and ventilation fan, shift the mounting level upward to increase 80% CH to check with FSD user on the final setting-out 1~2 12/31/2019 12/31/2019 2 Actual 28 Jun 2019
headroom as per 16/11 meeting
2. Modify existing airduct and lourver and install new air lourvers to minimize short-circuit IW/FSD/AC/SK003 Rev 1
to the exhaust hood.
3. Make good of finishes after BS modifications.

Estimated Labourr (Builder's):


Estimated Labour (BS):

Total BS items 26
Material submission BS works start 16
construction/ installation Await material 4
material/ equipment delivery Await user/information 0
completed activity BS works completed 6
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)

Works Order/ Quotation Summary


13GB - IMPROVEMENT WORKS (Items of Top Priority - Phase 3 & remaining)

Anticipated Status
Trade Location Item no SOA Room Name Room Works Status Target Start Completion
Readiness (CHC's response 2019.11.22) Date
Date (bs) JRP's construction dwgs

Electrical PTB 2/F IMMD ITEM E107 IMMD009 Channel Supervisor 1. Additional 2x S/O (E+U); 1 circuitry change from (E) to (E+U) completed 23/12/2019 29/12/2019
Y 0 IW/PTB/EE/SK003 Rev 1

PTB 2/F By EMSD IMMD052 Observation Room (Arrival) Y 2. Additional 8x S/O(E+U); 2x S/O (N); 1x LAN; 1x Ex. Line NO BS WORKS (BY EMSD) By EMSD
PTB 2/F IMMD ITEM E192 IMMD082 Immigration Traditional Counters (Arrival) N 4) Replace red engagement lights 7 Jan for lighting delivery 2 IW/PTB/EE/SK023 Rev 1
PTB 2/F IMMD ITEM E192 IMMD083 Help-through Counters (Arrival) N 4) Replace red engagement lights 7 Jan for lighting delivery 2 IW/PTB/EE/SK023 Rev 1
PTB 1/F IMMD ITEM E192 IMMD082 N 4) Replace red engagement lights 7 Jan for lighting delivery 2 IW/PTB/EE/SK022 Rev 1
PTB 1/F IMMD ITEM E192 IMMD083 Help-through Counters (Departure) N 4) Replace red engagement lights 7 Jan for lighting delivery 2 IW/PTB/EE/SK022 Rev 1
PTB 2/F IMMD ITEM E183 IMMD025 Immigration Control Room (RR5) 2) LUX level for CR does not fulfill our requirement of 500 LUX. 7 Jan for lighting delivery
N 2 IW/PTB/EE/SK023 Rev 1

PTB 2/F IMMD007 Duty Office (Arrival) Y 12. Departmental logo, name and spotlights outside Duty Office
PTB 2/F IMMD ITEM E101 IMMD007 Duty Office (Arrival)
Y
Additional 8x S/O; Refer ImmD's Email on 10/12/2018 "Console Desk completed 19/12/2019 23/12/2019 0 IW/PTB/EE/SK003 Rev 1
(WO no. 012367) v3.0.pptx"
PTB 2/F IMMD ITEM E102 IMMD007 Duty Office (Arrival)
Y
Change 2x S/O from N to E+U completed 17/12/2019 29/12/2019 0 IW/PTB/EE/SK003 Rev 1
(WO no. 012367)
PTB 2/F IMMD ITEM E104 IMMD007 Duty Office (Arrival)
Y
Additional 1x S/O (E+U) completed 26/12/2019 30/12/2019 0 IW/PTB/EE/SK003 Rev 1
(WO no. 012367)
PTB 2/F IMMD ITEM E105 IMMD007 Duty Office (Arrival)
Y
1x Twin S/O (E) Change to 1x Twin S/O (E+U) No BS works, byJRP IW/PTB/EE/SK003 Rev 1
(WO no. 012367)
PTB 1/F IMMD008 Duty Office (Departure) 12. Departmental logo, name and spotlights outside Duty Office Works Arranging
Y (please refer to bs material schedule)
PTB 1/F IMMD ITEM E072 IMMD008 IMMD 8 Duty Office 1F
Y
Additional 1xS/O supply from nearby S/O completed 19/12/2019 23/12/2019 0 IW/PTB/EE/SK002 Rev 1
(WO no. 012367)

PTB 1/F IMMD ITEM E079 IMMD008 IMMD 8 Duty Office 1F


Y
Addition of 3 nos. of 13A Single S/O supplied by E+U completed 19/12/2019 23/12/2019 0 IW/PTB/EE/SK002 Rev 1
(WO no. 012367)
PTB 1/F IMMD ITEM E081 IMMD008 IMMD 8 Duty Office 1F
Y
Addition of 2nos. of 13A Single S/O supplied from E+U completed 19/12/2019 23/12/2019 0 IW/PTB/EE/SK002 Rev 1
(WO no. 012367) Addition 1 no. of 75x75 adapter box in floor box to CCTV Trunking
PTB 1/F IMMD ITEM E087 IMMD016 IMMD 16 Detention Quarters 1F
N
Addition of 1 no. of 13A Single S/O (E+U) 20% 26/12/2019 5/1/2020 1 IW/PTB/EE/SK002 Rev 1
(WO no. 012367)
PTB 1/F IMMD ITEM E088 IMMD016 IMMD 16 Detention Quarters 1F
N
Change the supply of existing 1 no. of 13A Twin S/O from Normal to 20% 26/12/2019 5/1/2020 1 IW/PTB/EE/SK002 Rev 1
(WO no. 012367) E+U
PTB 2/F IMMD ITEM E106 IMMD052 IMMD 52 Observation Rm 2/F
Y
Additional 8x S/O(E+U); 2x S/O (N); 1x LAN; 1x Ex. Line No BS works, byJRP IW/PTB/EE/SK003 Rev 1
(WO no. 012367)
PTB 2/F IMMD ITEM E107 IMMD009 IMMD 9 Channel Supervisor’s Office 2/F
Y
Additional 2x S/O (E+U); 1 circuitry change from (E) to (E+U) completed 18/12/2019 29/12/2019 0 IW/PTB/EE/SK003 Rev 1
(WO no. 012367)
PTB 1/F IMMD ITEM E183 IMMD027 Immigration Control Room (RR2) 2)LUX level for CR does not fulfill our requirement of 500 LUX. scheduled to be site walk/setting out
N confirmation/installation between 24-31 Dec 3 IW/PTB/EE/SK022 Rev 1
2019
PTB 1/F IMMD ITEM A17 IMMD029 Immigration Control Room (RR3) N 2)LUX level for CR does not fulfill our requirement of 500 LUX. 7 Jan for lighting delivery 2 IW/PTB/EE/SK022 Rev 1
PTB 1/F IMMD ITEM E1191 IMMD043 Briefing Room 1) The LUX level is not enough. scheduled to be site walk/setting out
Y confirmation/installation between 24-31 Dec 3 IW/PTB/EE/SK022 Rev 1
2019
PTB 1/F LCAL provided IMMD080 Channel Supervisor's Podium (Departure) 3. provide & connect bonding/ earth wire NO BS WORKS
N LCAL provided

PTB 2/F LCAL provided IMMD080 Channel Supervisor's Podium (Arrival) 3. provide & connect bonding/ earth wire NO BS WORKS
N LCAL provided

PTB 1/F LCAL provided IMMD081 Channel Supervisor's Podium (Departure) 3. provide & connect bonding/ earth wire NO BS WORKS
N LCAL provided

PTBM/F IMMD ITEM E176 IMMD020 Immigration Control Room (CR) 1)Revise power circuitry for socket 20%, issue BW/BS work schedule was required 10/12/2019 5/1/2020
(WO no. 012367)
2) Number of MCB and ELCB is not enough for the power sockets in
CR. Each power should be connected by independent MCB and ELCB.
N 3)The two CRAC Units shared the same power source, and the power 1 IW/PTB/EE/SK004 Rev 0
is not enough to switch on both CRAC units simultaneously.

PTB M/F IMMD ITEM A66 IMMD 51 Control Flow Operation Room M/F Addition of 2 nos. of 13A S/O (E+U) scheduled to be site walk/setting out 17/12/2019 23/12/2019
(WO no. 012367) N confirmation/installation between 9-13 Dec 2019 2 IW/PTB/EE/SK001 Rev 1
PTB G/F C&ED Item E062 Personal Search Room Y 1. Concealed conduit connect to the CEAS trunking scheduled to be site walk/setting out IW/PTB/EE/SK042, Rev 0
C&ED 58 confirmation/installation between 24-31 Dec 3 IW/PTB/EE/SK042a Rev 0
2019
PTB G/F By EMSD C&ED 81 UPS Room Y 3. Conduit routing from UPS to C&ED 46 NO BS WORKS
4. Conduit routing from UPS to C&ED 79 By EMSD

PTB 2/F 3. C&ED Item E087 C&ED 60 Conference Room 3. Concealed conduit to Cupboard/Equipment Cabinet 20% 26/12/2019 5/1/2020
(cancelled) 4. Red engagement light to be provided 3. IW/PTB/EE/SK044 Rev 0
4. C&ED Item E210 Y 5. floor sockets to be dismantled 1 4. IW/PTB/EE/SK023 Rev 1
5.C&ED Item E226 5. IW/PTB/EE/SK012 Rev 2

PTB 2/F C&ED Item E203 C&ED 30 Profiling Zone (Arrival Hall) N 1. Adding lighting panel to increase the LUX level 80% 16/12/2019 5/1/2020 1 IW/PTB/EE/SK023 Rev 1
PTB 2/F 1. C&ED Item E210 C&ED 31 Personal Search Room x 2 1. Red engagement lamp scheduled to be site walk/setting out 1. IW/PTB/EE/SK023 Rev 1
2. C&ED Item E066 N 2. Concealed Conduit outlet relocation confirmation/installation between 24-31 Dec 3 2. IW/PTB/EE/SK042, IW/PTB/EE/SK042d
2019
PTB 2/F C&ED Item E228 C&ED 32 Operation Area N 1. Relocation of socket with conceal conduit 20% 26/12/2019 5/1/2020 1 IW/PTB/EE/SK012 Rev 2
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)

Works Order/ Quotation Summary


13GB - IMPROVEMENT WORKS (Items of Top Priority - Phase 3 & remaining)
PTB 2/F C&ED Item E233 C&ED 35 Video Interview Room 3. Adaptable box to be relocated to centre of wall scheduled to be site walk/setting out
confirmation/installation between 24-31 Dec
N 2019 3 IW/PTB/EE/SK018 Rev 1

PTB 2/F C&ED Item E071 C&ED 36 Personal Search Room (1) 3. Concealed conduit connect to the CEAS trunking scheduled to be site walk/setting out IW/PTB/EE/SK042 Rev 0, IW/PTB/EE/SK042e Rev
N confirmation/installation between 24-31 Dec 3 0
2019
PTB 2/F C&ED Item E071 C&ED 36 Personal Search Room (2) 3. Concealed conduit connect to the CEAS trunking scheduled to be site walk/setting out IW/PTB/EE/SK042 Rev 0, IW/PTB/EE/SK042e Rev
N confirmation/installation between 24-31 Dec 3 0
2019
PTB 2/F C&ED Item E071 C&ED 36 Personal Search Room 2. Concealed conduit connect to the CEAS trunking scheduled to be site walk/setting out IW/PTB/EE/SK042 Rev 0, IW/PTB/EE/SK042e Rev
N confirmation/installation between 24-31 Dec 3 0
2019
PTB 1/F C&ED Item E233 C&ED 50 Video Interview Room 1. Adaptable box to be relocated to centre of wall scheduled to be site walk/setting out
N confirmation/installation between 24-31 Dec 3 IW/PTB/EE/SK016 Rev 1
2019
PTB 1/F C&ED Item E065 C&ED 51 Personal Search Room (1) 2. Concealed conduit connect to the CEAS trunking scheduled to be site walk/setting out IW/PTB/EE/SK042 Rev 0, IW/PTB/EE/SK042c Rev
Y confirmation/installation between 24-31 Dec 3 0
2019
PTB M/F By EMSD C&ED 79 Main Server Room (AVCSS) 4. Conduit routing from UPS to C&ED 79
N By EMSD, NO BS works By EMSD

PTB M/F C&ED ITEM A70 C&ED 79 C&ED 79 CRAC Room(IT) M/F Additional water leakage detection system scheduled to be site walk/setting out 29/12/2019 31/12/2019 IW/PTB/EE/SK007 Rev 1
(WO no. 012367) N confirmation/installation between 19-23 Dec 2 IW/PTB/AC/SK014
2019
PTB M/F 3. C&ED Item E210 C&ED 63 Training Room 1. Red engagement lamp 7 Jan for lighting delivery 1. IW/PTB/EE/SK021 Rev 1
4. C&ED Item E211 Y 2. Lighting dimming system 2 2. IW/PTB/EE/SK021 Rev 1
PTB 2/F C&ED ITEM A82 C&ED 37 Detention Room incl toilet 4. Revised lighting layout 20%, false ceiling 26/12/2019 5/1/2020 IW/PTB/AC/SK002 Rev 0
(WO no. 012367) Y 1 IW/PTB/EE/SK009 Rev 0
PTB 1/F C&ED Item E203 C&ED 45 Profiling Zone (Departure Hall) N 1. Adding lighting panel to increase the LUX level 3 IW/PTB/EE/SK022 Rev 1
PTB 1/F 1. C&ED Item E066 C&ED 46 Personal Search Room (1) 1. Concealed conduit connect to the CEAS trunking 1. IW/PTB/EE/SK042 Rev 0, IW/PTB/EE/SK042b
2. C&ED Item E210 N 2. Red engagement light to be provided 3 Rev 0
2. IW/PTB/EE/SK022 Rev 1
PTB 1/F C&ED ITEM A81 C&ED 52 Detention Room with toilet 4. Revised lighting layout 20% 26/12/2019 8/1/2020 IW/PTB/AC/SK001 Rev 0
(WO no. 012367) N 1 IW/PTB/EE/SK009 Rev 0
PTB 1/F C&ED ITEM A81 C&ED 52 Toilet 2. Revised lighting layout IW/PTB/AC/SK001 Rev 0
N NO BS WORKS (deplicated) IW/PTB/EE/SK009 Rev 0
PTB C&ED Item E203 Arrival & Departure Hall N Add lighting 80% 17/12/2019 23/12/2019 1 IW/PTB/EE/SK022 Rev 1, IW/PTB/EE/SK023 Rev 1
PTB 2/F By LCAL (AI-EE-175) DH 8 Port Health Control Room Provision of conduit connection between main cable containment
Y and CCTV console By LCAL, NO BS WORKS By LCAL (AI-EE-175)

PTB 2/F HKPF 20 Prisoner Holding Area Y Relocation of roller shutter control, NO BS works , by BW
PTB 2/F HKPF 20 Prisoner Holding Area Y Relocation of roller shutter control, NO BS works , by BW
PTB M/F CEDD ITEM A3 CEDD 6 CEDD 6 Facility Management Office (M/F) Additional Floor box
(WO no. 012367) N 2 IW/PTB/EE/SK010 Rev 0
PTB EMSD ITEM A4 EMSD 1 EMSD 1 M&O Elec. Mainten Div. (Staff Office) Additional floor box
(WO no. 012367) N 2 no item A4? IW/PTB/EE/SK011 Rev 0
PTB G/F GPA Item A1 ATM Provision of the telecom/data point (cable containment only). scheduled to be site walk/setting out
N confirmation/installation between 24-31 Dec 3 IW/PTB/EE/SK037 Rev 0
2019

PTB G/F GPA Item A1 Shop 1 (previously known as convenience store) Provision of the telecom/data point (cable containment only). scheduled to be site walk/setting out
confirmation/installation between 24-31 Dec
N 2019 3 IW/PTB/EE/SK037 Rev 0

PTB G/F GPA Item A1 Shop 2(previously known as convenience store) Provision of the telecom/data point (cable containment only). scheduled to be site walk/setting out
N confirmation/installation between 24-31 Dec 3 IW/PTB/EE/SK037 Rev 0
2019

PTB M/F Direct Contract Public Carpark Associated Builder's and BS enabling Works for CCTV installation
N should be provided by ArchSD. NO BS works

PTB 1/F By LCAL Duty Free Shop Provision of the telecom/data point (cable containment only).
N By LCAL, NO BS WORKS By LCAL

PTB 1/F By LCAL Shop 4 (previously known as supermarket) Provision of the telecom/data point (cable containment only).
N By LCAL, NO BS WORKS By LCAL

PTB 1/F By LCAL Stores for Duty free Provision of the telecom/data point (cable containment only).
N By LCAL, NO BS WORKS By LCAL

PTB 2/F GPA Item A1 Shop 6 (currency exchange) Provision of the telecom/data point (cable containment only). scheduled to be site walk/setting out
confirmation/installation between 24-31 Dec
N 2019 3 IW/PTB/EE/SK037a Rev 0

PTB G/F GPA Item A1 PTI an additional plinth for installation of PT operator's regulator office scheduled to be site walk/setting out
with conduits for electricity, data line and telephone line; confirmation/installation between 24-31 Dec
N 2019 3 IW/PTB/EE/SK037a Rev 0

PTB General BS ITEM E03 Additional metering submitted material 31/1/2019 8/1/2020
(WO no. 012367) IW/CBI/EE/SK020 Rev 0
IW/CBO/EE/SK018 Rev 1
N 2 IW/PTB/EE/SK005 Rev 0
IW/PTB/EE/SK006 Rev 0

DH Kiosks DH ITEM E002 CPK - DH 1.1 Inspection kiosk (1/F)


Y
Additional 12nos of 13A S/O for Mosquito lamp completed 23/12/2019 29/12/2019 0 IW/CPK/EE/SK002 Rev 1
(WO no. 012367)
CBI Hall Uplift BS services Works Arranging TBC TBC
(please refer to bs material schedule)
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)

Works Order/ Quotation Summary


13GB - IMPROVEMENT WORKS (Items of Top Priority - Phase 3 & remaining)
PCBI By EMSD Customs Clearance Cubicle N 1. Conduit outlet relocation By EMSD, NO BS works By EMSD
PCBI By EMSD Customs Clearance Cubicle N 1. Conduit outlet relocation By EMSD, NO BS works By EMSD
PCBI C&ED Item E053 Personal Search Room / CBNI Processing Room 2. Concealed Conduit outlet relocation scheduled to be site walk/setting out
N confirmation/installation between 24-31 Dec 3 IW/PTB/EE/SK042 Rev 0, IW/PCBI/EE/SK002 Rev 1
2019
PCBI C&ED Item E053 Personal Search Room / CBNI Processing Room 2. Concealed Conduit outlet relocation scheduled to be site walk/setting out
N confirmation/installation between 24-31 Dec 3 IW/PTB/EE/SK042 Rev 0, IW/PCBI/EE/SK002 Rev 1
2019
PCBI By EMSD CCTV Control Room Surface conduits connecting to CEAS
N By EMSD, NO BS works By EMSD

PCBI C&ED Item E240 X-ray Examination Area N 1. Change the color of lighting 24 nos. , 3 IW/PCEB/EE/SK001 Rev 1
PCBO By EMSD Customs Clearance Cubicle 1 N 1. Conduit outlet relocation By EMSD, NO BS works By EMSD
PCBO By EMSD Customs Clearance Cubicle 2 N 1. Conduit outlet relocation By EMSD, NO BS works By EMSD
PCBO C&ED Item E047 Personal Search Room 1 1. Conduit outlet relocation scheduled to be site walk/setting out
N confirmation/installation between 24-31 Dec 3 IW/PTB/EE/SK042 Rev 0, IW/PCBI/EE/SK002 Rev 1
2019
PCBO CCTV Control Room Surface conduits connecting to CEAS scheduled to be site walk/setting out
N confirmation/installation between 24-31 Dec 3 By EMSD
2019
PCBO C&ED Item E240 X-ray Examination Area
N 1. Change the color of lighting await updated lighting layout 3 IW/PCEB/EE/SK001 Rev 1
PTB generl item e023 ??? switches, s/0 30%, water heater still waiting for updated summary 25/12/2019 5/1/2020 1 IW/PTB/EE/SK034

AC PTB 1/F C&ED ITEM A81 C&ED 52 1. Revised of the air grilles to security air grilles to suit the revised scheduled to be site walk/setting out 12/12/2019 29/12/2019 IW/PTB/AC/SK001 Rev 0
(WO no. 012367) Toilet N ceiling. confirmation/installation between 9-13 Dec 2019 1 IW/PTB/EE/SK009 Rev 0
PTB 1/F By Direct contractor C&ED 52 Detention Area Additional repeater panel with associated conduit connecting to FS
panel in FCC to suit the FSMP
N NO BS works

PTB 1/F C&ED ITEM A81 C&ED 52 C&ED 52 Detention Cell Toilet (1/F) Revised of the air grilles to security air grilles to suit the revised 25%, 7 Jan for lighting delivery 12/12/2019 29/12/2019 IW/PTB/AC/SK001 Rev 0
(WO no. 012367) ceiling. IW/PTB/EE/SK009 Rev 0
N 1

PTB 2/F C&ED ITEM A82 C&ED 37 C&ED 37 Detention Cell Toilet (2/F) Revised of the air grilles to security air grilles to suit the revised 50%, 7 Jan for lighting delivery 12/12/2019 29/12/2019 IW/PTB/AC/SK002 Rev 0
(WO no. 012367) ceiling. IW/PTB/EE/SK009 Rev 0
N 1

PTB M/F BMO ITEM B4 Canteen at M/F


Y
Additional air ducts completed 12/12/2019 27/12/2019 0
(WO no. 012367) IW/PTB/AC/SK005 Rev 0
IMMD item E066 completed 23/12/2019 29/12/2019 0
C&ED Item B4 completed 23/12/2019 29/12/2019 0
IMMD ITEM E191, 7 Jan for lighting, ATS delivery
IMMD ITEM E116,
2

Material submission
construction/ installation
material/ equipment delivery
completed activity

XXX Top priority

XXX 2nd tier priority

A Approved & Arrived


B Approved & Pending for Delivery
C Pending for Approval
D Pending for Submission
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)

Works Order/ Quotation Summary


13GB - IMPROVEMENT WORKS (Other Items)
WO no. 12362 Info readiness

Material Anticipated Stat


Trade Location Item no Room Name Works Status RLP Response 2019.11.18 Estimate Labour
submission Target Start Date Completion RLP JRP us RLP's
Range (per day) JRP's construction dwgs construction
status Date (bs)
dwgs

Electrical CBI IMMD ITEM A33 IMMD Interview Rooms (G/F - 1/F) Additional red enagement light and lighting 20%, 26 Dec for lighting delivery 1~2 9/12/2019 19/12/2019 1 IW/CBI/EE/SK001 Rev 7 AB/7272/IMMD/
switch B IW/CBI/EE/SK002 Rev 5 IW/A/33
CBI IMMD ITEM E138 G/F & 1/F Revise lighting layout 30%, 23 Dec for lighting delivery 2~3 9/12/2019 20/12/2019 1 IW/CBI/EE/SK001 Rev 7
B IW/CBI/EE/SK002 Rev 5
CBI IMMD ITEM E171 IMMD Area Power provision for panic alarm panel Completed 1~2 B 9/12/2019 20/12/2019 0 IW/CBI/EE/SK005 Rev 2
CBI IMMD ITEM E172 IMMD 112 AVC Control Room 1/F Interconnect trunking NO BS works IW/CBI/EE/SK011 Rev 2
IMMD 100 Computer System Reslience Rm

CBI IMMD ITEM E173 IMMD 100 CSR 1/F Power provision for AC system NO BS works IW/CBI/EE/SK018 Rev 2,
SK001 Rev 7
CBI C&ED ITEM A89 Detention area (G/F) Additional repeater panel with associated Completed 0~2 30/11/2019 2/12/2019 0 IW/CBI/EE/SK015 Rev 1
conduit connecting to FS panel in FCC to suit
the FSMP B

CBI C&ED ITEM A193 C&ED 132 Pantry (G/F) Change one of the socket to waterproof type Completed 0~2 6/12/2019 16/12/2019 0 IW/CBI/EE/SK004 Rev 0 AB/7272/C&ED
B IW/CBI/AC/SK003 Rev 2 /IW/A/193 Rev
IW/CBI/EE/SK007 Rev 2 1
CBI C&ED ITEM A204 C&ED 95 Cargo and Vehicle Processing Unit (2) Illuminance is not sufficient. Luminaire to be 35%, 23 Dec for lighting delivery 1~2
B 9/12/2019 20/12/2019 1 IW/CBI/EE/SK002 Rev 5
added.
CBI C&ED ITEM A208 C&ED 132 Pantry Additional 3 nos. of Socket Outlet to be added Completed 1~2 6/12/2019 26/12/2019 0 IW/CBI/AC/SK003 Rev 2
(One no. of socket outlet on bench level to be
reserved for general use and Two nos. of socket IW/CBI/EE/SK004 Rev 5
outlets on high level to be reserved for wall IW/CBI/EE/SK006 Rev 4
mounted oscillating fan) B IW/CBI/EE/SK007 Rev 2

CBI C&ED ITEM A212 C&ED 103 Common Equipment Room 1 no. of luminaire to be relocated. 2 rooms, 13 Dec for lighting delivery 1~2 C 19/12/2019 23/12/2019 2 IW/CBI/EE/SK002 Rev 5
CBI C&ED ITEM A219 Common Area Change to a different type of speaker phone to NO BS works 1~2 IW/CBI/LE/SK001
avoid knocked off by pedestrian

CBI C&ED ITEM A246 C&ER 153 Customs Dog Master Office cum Kennel lighting switches and socket outlets to be 2 rooms, completed 1~2 9/12/2019 26/12/2019 0 IW/CBI/EE/SK001 Rev 1
changed to water proof type B IW/CBI/EE/SK005 Rev 2
CBI C&ED ITEM A252 Corridor Changing lighting type to weather proof type Completed 1~2 9/12/2019 26/12/2019 0 IW/CBI/EE/SK001 Rev 1
B IW/CBI/EE/SK005 Rev 2
CBI C&ED ITEM A190 C&ED27, 111, 141, 175 Additional data outlet NO BS works 1~2 IW/CBI/EE/SK001 Rev 1
IW/CBI/EE/SK005 Rev 2
CBI C&ED ITEM E167 C&ED 118A Archive Cargo Documentation Storage Addition of fan & power point Completed 0~1 5/12/2019 10/12/2019 0 IW/CBI/AC/SK008 Rev 2
Y IW/CBI/EE/SK007 Rev 2

CBI C&ED ITEM E168 C&ED 118B Archive Cargo Documentation Storage Addition of fan & power point 2 rooms, Completed 0~1 5/12/2019 10/12/2019 0 IW/CBI/AC/SK009 Rev 1
Y IW/CBI/EE/SK007 Rev 1
CBI C&ED ITEM E169 C&ED 124 Changing Room Addition of fan & power point Completed 0~2 30/11/2019 2/12/2019 0 IW/CBI/AC/SK010 Rev 2
Y IW/CBI/EE/SK007 Rev 2
CBI C&ED ITEM E170 C&ED 122, 123 & 125 Changing Room Addition of fan & power point Completed 0~2 30/11/2019 2/12/2019 0 IW/CBI/AC/SK011 Rev 1
Y IW/CBI/EE/SK007 Rev 2
CBI C&ED ITEM E171 C&ED 122, 123 & 125 Changing Room Addition of fan & power point Completed 0~2 30/11/2019 2/12/2019 0 IW/CBI/AC/SK011 Rev 2
Y IW/CBI/EE/SK007 Rev 2
CBI C&ED ITEM E172 C&ED 122, 123 & 125 Changing Room Addition of fan & power point Completed 0~1 30/11/2019 2/12/2019 0 IW/CBI/AC/SK011 Rev 1
IW/CBI/EE/SK007 Rev 2
CBI C&ED ITEM E173 C&ED Area Revise lighting Completed 0~1 15/11/2019 9/12/2019 Y 0 IW/CBI/EE/SK001 Rev 7
CBI C&ED ITEM E174 C&ED 152 X-ray examination rm & C&ED 147 waiting area Power provision for sensor Completed 0~1 9/12/2019 10/12/2019 Y 0 IW/CBI/EE/SK004 Rev 5
CBI C&ED ITEM E186 Various Power provision for ELV and AC system NO BS works Y IW/CBI/EE/SK015 Rev 1
CBI DH ITEM A27 Male Staff toilet cum changing room Additional light tube above each cubicle where 25% 1~2 9/12/2019 ?????
Y 1 IW/CBI/EE/SK002 Rev 5
not provided in existing
CBI DH ITEM A46 DH 2 Client Waiting Room, DH 3 Health Screening Room, DH To provide light switch(es) on each interior side 5 rooms, 50% 1~2 23/12/2019 29/12/2019 1
4 Consultation Room, DH all Anterooms, DH 6 Isolation of each door. Y IW/CBI/EE/SK001 Rev 1
Room
CBI DH ITEM A67 DH 5 Anteroom (With cleaning & shower facilities) To provide a twin power socket. 30% 1~2 23/12/2019 29/12/2019 Y 1
CBI DH ITEM A56 Lobby 1 To provide individual light switch for controlling 1~2 27/12/2019 23/12/2019
Y 2 AB/7272/DH-IW-A-A056
the lights inside lobby 1.
CBI DH ITEM E20 Various Revise lighting 1~2 27/12/2019 23/12/2019 2 IW/CBI/EE/SK002 Rev 5
Y IW/CPK/EE/SK003 Rev 2
CBI DH ITEM E21 DH 17 Sluice Relocate water heater location and add power 40% 1~2 9/12/2019 19/12/2019 1 IW/CBI/WS/SK003 Rev 0
point
IW/CBI/EE/SK004 Rev 5
CBI AFCD ITEM A11 AFCD 6 - M Lav. 2 Nos. of Luminaire change to weather proofed 30% 1~2 9/12/2019 12/12/2019
Y 1 IW/CBI/EE/SK001 Rev 7
type
CBI AFCD ITEM A12 AFCD 6 - F Lav. Additional 1 No. of weather proofed type 30% 1~2 9/12/2019 12/12/2019
Y 1 IW/CBI/EE/SK001 Rev 7
luminaire
CBI AFCD ITEM A24 AFCD 8 - Plant, pest exhibit detention room Additional lighting underneath hanging 23 Dec for lighting delivery 2~3 27/12/2019 23/12/2019
Y 2 IW/CBI/EE/SK001 Rev 7
cupboards with additional powerpoint
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)

Works Order/ Quotation Summary


13GB - IMPROVEMENT WORKS (Other Items)
CBI AFCD ITEM A25 Animal Examination Room Additional lighting underneath hanging 30% 1~2 9/12/2019 12/12/2019
Y 1 IW/CBI/EE/SK001 Rev 7
cupboards with additional powerpoint
CBI AFCD ITEM E01 AFCD 3, 5, 6, 10, 13 Revise lighting 4 rooms, 30%, 23 Dec for lighting 1~2 9/12/2019 12/12/2019 1 IW/CBI/EE/SK001 Rev 7
delivery Y
CBI AFCD ITEM E02 AFCD 10 Animal detention cell Power provision for air heater 30% 1~2 9/12/2019 21/12/2019 Y 1 IW/CBI/EE/SK005 Rev 2
CBI AFCD ITEM E03 AFCD 10 Animal detention cell lighting switch to weather proof type 23 Dec for lighting switch delivery 1~2 27/12/2019 23/12/2019 Y 2 IW/CBI/EE/SK001 Rev 7
CBI AFCD ITEM E04 AFCD 5 Power provision for AC system 2~3 27/12/2019 23/12/2019 Y 2 IW/CBI/EE/SK016 Rev 0
CBI CEDD ITEM E01 Accessible Toilet (G/F) Additional ECB NO BS works (added by others) IW/CBI/EE/SK004 Rev 5
CBI General ITEM E01 Various Power provision for ELV and AC system NO BS works of CBI (by JRP ) IW/CBI/EE/SK015 Rev 1
IW/CBI/EE/SK016 Rev 0
Y IW/CBI/EE/SK017 Rev 2
IW/CBI/EE/SK019 Rev 0

CBI General ITEM E02 Pump room Provision of weatherproof lighting in all pump Works Arranging 1~2 27/12/2019 23/12/2019
Y 2
room (please refer to bs material schedule)
CBI General ITEM E03 Additional metering Works Arranging 1~2 23/12/2019 31/12/2019 2 IW/CBI/EE/SK020 Rev 0
(please refer to bs material schedule)
IW/CBO/EE/SK018
Y IW/PTB/EE/SK005
IW/PTB/EE/SK006

FXI C&ED ITEM A159 Check-in Station C&ED request that all F.S.U. for EMSD radiation 3 rooms, Can't access to FXI, will 1~2 27/12/2019 29/12/2019 2 IW/FXI/EE/SK002 Rev 1 No ABWF
Check-out Station sensor equipment shall change to Unswitched
Driver waiting area type rearrange drawing

FXI C&ED ITEM A261 Pre-inspection Area 1.Remove existing electrical swing arms for Doo NO BS works AB/7272/FXI/I
W/A/A261 Rev
FXI C&ED ITEM A288 All EE modification NO BS works
1
IW/FXI/EE/SK001 Rev 5
FXI C&ED ITEM E143 Accessible Toilet Addition ECB NO BS works IW/FXI/EE/SK002 Rev 1
FXI C&ED ITEM E176 C&ED Area Revise lighting 22 rooms, Can't access to FXI, will 1~2 27/12/2019 29/12/2019 2 IW/FXI/EE/SK001 Rev 5
rearrange IW/FXI/EE/SK004 Rev 1

FXI C&ED ITEM E177 C&ED Area Power provision for portal and notice pole NO BS works 1~2 IW/FXI/EE/SK002 Rev 1
FXI C&ED ITEM E188 Various Power provision for ELV and AC system 8 rooms, Can't access to FXI, will 2~3 27/12/2019 29/12/2019 2 IW/FXI/EE/SK003 Rev 0
rearrange
FXI C&ED ITEM A281 Scanning Hall NO BS works
Additional of luminaire to provide white colour IW/FXI/EE/SK001 Rev 5
DOG C&ED ITEM A117 C&ED 299 Veterinarian Office C&ED request to swap the location for bench same as A166 0~1 12/11/2019 9/12/2019 0 cancelled?
socket and soap dispenser
DOG C&ED ITEM A118 C&ED 299 Veterinarian Office Additional surgical light and X-ray light box X-ray light box done, await surgical 0~1 27/12/2019 22/12/2019 3 IW/DOG/EE/SK001 Rev 4 AB/7272/DOG/
E164 (pending info from C&ED)
light location for the additonal FSU IW/A/A118 Rev
1
DOG C&ED ITEM A120 Laundry & Dog Bathing Area, Dog Kennels common area, C&ED request to change existing luminaires to Completed 0~1
B 5/12/2019 9/12/2019 0 IW/DOG/EE/SK001 Rev 4 AB/7272/DOG/
Dog Kennel & Isolated Kennel weatherproof type
IW/A/A120
DOG C&ED ITEM A165 C&ED 305 Laundry & Dog Bathing 1.Change all low level socket to weatherproof Completed 0~1 21/11/2019 29/11/2019 0 IW/DOG/EE/SK002 Rev 2 AB/7272/DOG/
type.
A IW/A/A165 Rev
1
DOG C&ED ITEM A166 C&ED 299 Veterinarian Office Revised level of sockets at sink counter Completed 0~2 B 12/11/2019 9/12/2019 0 IW/DOG/EE/SK002 Rev 2
DOG C&ED ITEM A168 C&ED operational office 1.BS modification completed. Works Arranging 1~2 BS work? AB/7272/DOG/
(please refer to bs material schedule)
IW/A/168a Rev
A 1
AB/7272/DOG/
IW/A/168b Rev
DOG C&ED ITEM E126 C&ED Pantry G/F Pantry - Additional 32A TPN isolator, pilot 1~2 28/11/2019 26/12/2019 1 IW/DOG/EE/SK002 Rev 2 1
C&ED Ele Room G/F switch for water heater B IW/DOG/EE/SK003a Rev 1
Ele Room - Additional new MCB Board for water
heater IW/DOG/EE/SK003b Rev 2
DOG C&ED ITEM E164 DOG G/F Revise lighting in DOG Completed 0~2 28/11/2019 16/12/2019 0 IW/DOG/EE/SK101
B
DOG C&ED ITEM E165 Accessible Toilet (G.l 3/4 B) additional water heater in Accessible toilet 10%, add isolator 1~2 16/12/2019 20/12/2019 1 AB/7272/DOG/I
A
IW/DOG/EE/002 Rev 2 W/A/A165
DOG C&ED ITEM E183 C&ED 298 Standby Briefing cum Room Additional Fuse Connection unit for door bell 3 week for material approval and 1~2 16/12/2019 20/12/2019 1 IW-DOG-EE-SK002 Rev 2
order A IW-DOG-EE-SK003a Rev 1
IW-DOG-EE-SK003b Rev 2
DOG C&ED ITEM E184 Essential Power improvement works Mid of Jan 2020 for material (ATS) 1~2
B 20/1/20120 28/1/20120 2 IW-DOG-EE-SK003b Rev 2
delivery IW-DOG-EE-SK004a Rev 1
DOG C&ED ITEM E187 Various Power provision for ELV and AC system 1~2 15/12/2019 22/12/2019 1 IW/DOG/EE/SK005
IW-DOG-EE-SK004bRev 0 1
Rev
DOG General ITEM E02 Pump room Provision of weatherproof lighting in all pump 2 rooms, 25% 1~2 6/12/2019 18/12/2019 1
room Y
CBI DH ITEM A31 DH 15 Rest Room (Female Staff) Anti-fungal false ceiling to be provided (BS NO BS works IW/CBI/EE/SK002 Rev 5
Provisions on false ceiling)
1~2
AC CBI C&ED ITEM A183 C&ED 133 F. Lav. & C&ED 132 Pantry One no. of addditional fan for each toilet 3 rooms, Completed 0~2 28/11/2019 10/12/2019 0 IW/CBI/EE/SK004 (for
& A208
A183) Rev 5
A IW/CBI/EE/SK006 (for
A183 & A208) Rev 4
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)

Works Order/ Quotation Summary


13GB - IMPROVEMENT WORKS (Other Items)
CBI C&ED ITEM A208 C&ED 132 Pantry Additional 2 nos. of wall mounted oscillating Completed 0~2 28/11/2019 19/12/2019 0 IW/CBI/AC/SK003 Rev 2
fan to be added.
IW/CBI/EE/SK004 Rev 5
A IW/CBI/EE/SK006 Rev 4
IW/CBI/EE/SK007 Rev 2

CBI C&ED ITEM A224 C&ED 113 General Store & C&ED 115 General Equipment 2 Nos. of additional fans to be installed for each Completed 0~1 25/11/2019 10/12/2019 0 IW/CBI/AC/SK004 Rev 1
Store store A IW/CBI/EE/SK004 Rev 5
CBI C&ED ITEM A225, C&ED 114, 117, 141, 143 Stores Additional fans to be installed Completed 0~1 25/11/2019 19/12/2019 0 IW/CBI/AC/SK005 Rev 1
A226 & A228
A IW/CBI/EE/SK005 Rev 5

CBI C&ED ITEM A227 C&ED 147 Waiting Area Exhaust air grille to be modifed to suit the Cancelled BS works IW/CBI/AC/SK006 Rev 1
additional false ceiling.

CBI C&ED ITEM A249 C&ED 117 Cargo Document Storage 2 Nos. of additional fans to be installed Completed 0~2 28/11/2019 10/12/2019 0 IW/CBI/AC/SK005 Rev 1
A IW/CBI/EE/SK005 Rev 2
CBI C&ED ITEM A189 C&ED 112 Multi-Purposes cum Staff Common Room Alternation for exhaust air outlet layout to suit Completed 0~2 10/12/2019 10/12/2019 0 IW/CBI/AC/SK002 Rev 1
Kwan Tai Statue Location
Y

CBI C&ED ITEM E167 C&ED 118A Archive Cargo Documentation Storage Addition of fan & power point Completed 0~2 9/12/2019 10/12/2019 0 IW/CBI/AC/SK008 Rev 2
Y IW/CBI/EE/SK007 Rev 2

CBI C&ED ITEM E168 C&ED 118B Archive Cargo Documentation Storage Addition of fan & power point Completed 0~2 9/12/2019 10/12/2019 0 IW/CBI/AC/SK009 Rev 1
Y IW/CBI/EE/SK007 Rev 2
CBI C&ED ITEM E169 C&ED 124 Changing Room Addition of fan & power point Completed 0~2 9/12/2019 10/12/2019 0 IW/CBI/AC/SK010 Rev 2
Y IW/CBI/EE/SK007 Rev 2
CBI C&ED ITEM E170 C&ED 122, 123 & 125 Changing Room Addition of fan & power point Completed 2~3 9/12/2019 19/12/2019 0 IW/CBI/AC/SK011 Rev 2
Y IW/CBI/EE/SK007 Rev 2
CBI C&ED ITEM E171 C&ED 122, 123 & 125 Changing Room Addition of fan & power point Completed 0~2 9/12/2019 10/12/2019 0 IW/CBI/AC/SK011 Rev 2
A Y IW/CBI/EE/SK007 Rev 2
CBI C&ED ITEM E172 C&ED 122, 123 & 125 Changing Room Addition of fan & power point Completed 0~2 9/12/2019 10/12/2019 0 IW/CBI/AC/SK011 Rev2
A Y IW/CBI/EE/SK007 Rev 2

CBI C&ED ITEM E185 C&ED 197 Platform Relocation of outdoor rotary fans Completed A 6/11/2019 12/11/2019 Y 0 IW/CBI/AC/SK014 Rev 0
CBI DH ITEM A21 Anteroom 1 The exhaust air grille with ductwork shall be Await to settle of the existing sensors 1~2 28/12/2019 31/12/2019 3 IW/CBI/AC/SK007 Rev 1
blanked off
near the air duct Y IW/CBO/AC/SK002 Rev 1
CBI DH ITEM E024 Modify Exhaust Roof floor Await the detail drawing of frame 1~2 28/12/2019 31/12/2019 3
support for the air duct IW/CBI/AC/SK013 Rev 0
Y IW/CBO/AC/SK008 Rev 2
CBI AFCD ITEM A19 AFCD 13 - FIle and general storage Additional electric fan to be installed Completed 0~2 9/12/2019 10/12/2019 0 IW/CBI/AC/SK012 Rev 1
A Y IW/CBI/EE/SK005 Rev 2
CBI AFCD ITEM A22 Changing room Additional electric fan to be installed Completed 0~2 A 9/12/2019 10/12/2019 Y 0
FXI C&ED ITEM A286 Male/ Female Toilet & Pantry MVAC modification Can't access to FXI, will rearrange, 1~2 B 28/12/2019 31/12/2019 2 IW/FXI/AC/SK001 Rev 1
C&ED ITEM A286 NOT FOUND
FXI C&ED ITEM A287 X-Ray Examination System Operation Room MVAC modification Can't access to FXI, will rearrange, 2~3 B 28/12/2019 31/12/2019 2 IW/FXI/AC/002 Rev 2
C&ED ITEM A287 NOT FOUND
FXI C&ED ITEM E001 Male Toilet 1 No. of additional fans to be installed Can't access to FXI, will rearrange 1~2 B 28/12/2019 31/12/2019 2 IW/FXI/AC/SK001 Rev 1
IW/FXI/EE/SK002 Rev 1
FXI C&ED ITEM E002 Female Toilet 1 No. of additional fans to be installed Can't access to FXI, will rearrange 1~2 B 28/12/2019 31/12/2019 2 IW/FXI/AC/SK001 Rev 1
IW/FXI/EE/SK002 Rev 1
FXI C&ED ITEM E003 Pantry 1 No. of additional fans to be installed Can't access to FXI, will rearrange 1~2 B 28/12/2019 31/12/2019 2 IW/FXI/AC/SK001 Rev 1
IW/FXI/EE/SK002 Rev 1
IW/FXI/AC/SK002 Rev 1
IW/FXI/EE/SK002 Rev 1
Added BS CBI C&ED ITEM E215 C&ED Platform Additional power supply for Fridge (3P,12kW) 3 IW/CBI/EE/SK004 (pending issue)

CBI GENERAL ITEM E027 R/F Cladding Additional timer and photocell for currently 3 IW/CBI/EE/SK026 (pending issue)
maintained L18
CBI DH ITEM E029 DH 17 Sluice Room Additional FCU for water tap sensor 3 IW/CBI/EE/SK004 (pending issue)
DOG GENERAL ITEM E051 C&ED 28 Operational Office Power for signage 3 IW/DOG/EE/SK001 REV.5 (pending
issue)
CBI C&ED ITEM E251 Corrdior (C&ED 116) additional s/o for AVM 3 IW/CBI/EE/SK004 (pending issue)
DOG C&ED ITEM E174 C&ED 299 Veterinarian Office Additional FCU for water tap sensor 3 IW/DOG/EE/SK001 REV.3 (pending
C&ED 305 Laundry & Dog Bathing issue)
C&ED 302

Estimated Labourr (Builder's):


Estimated Labour (BS):

Material submission
construction/installation Total BS items 76
material/ equipment delivery BS works start 16
completed activity Await material 17
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)

Works Order/ Quotation Summary


13GB - IMPROVEMENT WORKS (Other Items)
Await user/information 9
Top priority BS works completed 34
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Other Items)
WO no. 12365 Info readiness

Estimate Labour Target Start Anticipated Status


Trade Location Item no Room Name Works Status RLP Response 2019.11.18 Completion RLP JRP
Range (per day) Date
Date (bs) JRP's construction dwgs RLP's construction dwgs

FS FSD ITEM A27 Lightning arrestor platforn on upper roof 1. Provide intermediate guard-rails or fail arrest await guard-rails completion 1~2 27/12/2019 12/29/2019 2 Actual 28 Jun, 27 Sep 2019 AB/7272/FSD-IW-A-A027
2. Addition of equipotential bonding wire to new metal parts Y BS/7272/FSD-IW-A-A027 Rev 1 AB/7272/FSD-IW-A-A027A
FS FSD ITEM A28 Upper roof Provide proper access to balcony, change part of the fixed fence to openable Completed 0~1 14/11/2019 14/11/2019 Y 0
FS FSD ITEM A37 1/F Planter 1. Provide guard rails await guard-rails completion 1~2 27/12/2019 12/29/2019 2 Actual 28 Jun, 27 Sep 2019 AB/7272/FSD-IW-A-A037
2. Addition of equipotential bonding wire to new metal parts Y BS/7272/FSD-IW-A-A037 Rev 1 AB/7272/FSD-IW-A-A037A
FS FSD ITEM A65 roof balcony outside Fan Room for Kitchen 1. fencing / railing with suitable height is required from EMSD maintenance await guard-rails completion 1~2 27/12/2019 12/29/2019 2 Actual 28 Jun, 27 Sep 2019 AB/7272/FSD-IW-A-A065
2. Addition of equipotential bonding wire to new metal parts
BS/7272/FSD/IW/A-A065 Rev 1 AB/7272/FSD-IW-A-
Y A065A_R1

FXO C&ED ITEM E004 X-Ray Examination System Operation Room Additional drip tray to be provided (No Dwg) Works Arranging Refer BS drawing ref.: IW/FXI/AS/SK002 1~2 27/12/2019 12/29/2019 IW/FXI/AC/SK002 Rev 2
Y 3 IW/FXI/EE/SK002 Rev 1

Electrical POB HKP ITEM A13 Lavatories POB 1. Shift hand dryers upwards Pending for BW works Stated in drawing, issued on 27SEP2019 2~3 11/12/2019 26/12/2019 1 Actual 28 May & 24 Jun, 27 AB/7272/HKP-IW-A-A013
2. Dismantlet and make good of existing fused spur unit (for hand dryer), and install new AB/7272/HKP/IW/A/A013
fused spur unit so to tally with the mid-level of the hand dryer Sep 2019
3. Modification of existing circuitry, wiring and cable containment (Concealed conduit) IW/POB/EE/SK104 Rev 2
4. Provide builder's works for conceal conduit installation IW/POB/EE/SK106 Rev 2
5. Make good of finishes after BS modifications
IW/HKP/EE/SK113 Rev 1

POB HKP ITEM A15 2/F Male Changing Room POB 2. Take down socket and conduit point face plate on mirror, and re-fix the socket and Pending for BW (mirror) works 1~2 11/12/2019 28/12/2019
conduit point face plate after removal of mirror
AB/7272/HKP-IW-A-A015
1 IW/POB/EE/SK105 Rev 3
IW/POB/EE/SK106 Rev 3

POB HKP ITEM A16 G/F to 3/F Toilets 1. Take down and disconnect existing weatherprrof type lighting switch Works Arranging 2~3 27/12/2019 28/12/2019 AB/7272/HKP-IW-A-A016
2. Supply and install new lighting switch (non-weatherproof type) (please refer to bs material schedule)
3. Modify and connect existing circuit and wiring to the new lighting switch (non- IW/POB/EE/SK101 Rev 4
weatherproof type) IW/POB/EE/SK102 Rev 4
4. Make good of finishes after BS modifications. 3 IW/POB/EE/SK103 Rev 4
IW/POB/EE/SK105 Rev 3
IW/POB/EE/SK106 Rev 3
IW/POB/EE/SK109 Rev 2
POB HKP ITEM A20 2/F Female Lav & Accessible Lav. POB 1. Fused spur unit for hand dryer shall be relocated from the bottom of the hand dryer Pending for BW works Setting-out meeting with user re-schedule from 2~3 29/11/2019 26/12/2019 1 Actual 28 May, 24 Jun, 27 Sep
2. Dismantlet and make good of existing fused spur unit (for hand dryer), and install new 13/11 to 21/11
weatherproof type fused spur unit so to tally with the mid-level of the hand dryer 2019
3. Modification of existing circuitry, wiring and cable containment (Concealed conduit) IW/HKP/EE/106 Rev 2
4. Provide builder's works for conceal conduit installation
5. Make good of finishes after BS modifications

POB HKP ITEM A44 General 1. Supply and install new 13A fused spur unit for sensor taps/urinals/WCs completed CH shall refer to the setting-out existing 0~1 28/11/2019 12/12/2019 0 IW/POB/EE/SK104 Rev 2
2. Supply and install new wiring and surface conduit for new 13A fused spur unit installations
3. Modify existing circuitry and connect the new 13A fused spur unit to existing circuit IW/POB/EE/SK105 Rev 3
4. Make good of finishes after BS modifications IW/POB/EE/SK106 Rev 3
POB HKP ITEM A53 G/F Male Toilet Relocate Urinal flushing sensor Work in progress, no bs works Setting-out meeting with user re-schedule from AB/7272/HKP-IW-A-A053
13/11 to 21/11
IW/HK/DR/SK003
POB HKP ITEM A57 Corridor, Lift Lobby, Switch Room, 1. Revise lighting arrangement for the indicated locations await user confirmation of setting out of 2 Setting-out meeting with user re-schedule from 2~3 29/11/2019 28/12/2019 1 Actual 24 Jun, 27 Sep 2019
09 Accessible Lav, 26 OC Office, 30 Armoury, 34 2. Dismantle existing light fitting and lighting switch as per BS drawings locations 13/11 to 21/11
Server Room, 39 Confidential Files Storage Room, 3. Install new light fitting as per BS drawings IW/POB/EE/SK101 Rev 4
40 File and General Storage, 41 CL. Equip Room, 4. Modify the power supply to the affected lighting circuits and connect to eixsitng lighting IW/POB/EE/SK102 Rev 4
42 Pantry, 43 Emergency Equipment Room, 48 circuits indicated in the BS drawings, including re-wiring of affect circuits IW/POB/EE/SK103 Rev 4
M. Night Duty RM., 50 Area (F) Changing, 52 F. 5. Make good of finishes after BS modifications
Night Duty Room, 57 Comm Eq. Rm, 62a to 62e 6. Take down and re-instate ceiling panels for lighting installations
Detention Cell, 69 Central App. Room, 71 Comp
Eq. Room, 72 Comm Eq. Rm, 108 Access
Equipment Room , 109 CCTV. Equipment RM.

POB HKP ITEM A58 All toilets 1. Take down existing general type wiring accessories face plate completed 0~2 29/11/2019 13/12/2019 0 Actual 24 Jun, 27 Sep 2019
2. Supply and install new waterproof type wiring accessoreis.
3. Existing wiring shall be modify and to be connected to new wiring accessories. IW/POB/EE/SK104 Rev 2
4. Make good of finishes after BS modifications IW/POB/EE/SK105 Rev 3
IW/POB/EE/SK106 Rev 3

POB HKP ITEM A68 HKPF 109 (A) & HKPF 109 (B) CCTV. Equipment 1. Supply and install new fused spur unit for local control panel Setting-out meeting with user re-schedule from 1~2 13/12/2019 28/12/2019 1 Actual 24 Jun, 27 Sep 2019
RM. 2. Modify exisitng circuitry, supply and install new wiring and cable containment, and to 13/11 to 21/11
connect to the existing circuitry IW/POB/EE/SK105 Rev 3
3. Make good of finishes after BS modifications IW/POB/EE/SK107 Rev 2

POB HKP ITEM A71 1/F & 2/F Pantry 1. Take down exisitng waterproof type wiring accessories face plate and change to geneal completed One-to-one replacement, no setting-out issue 1~2 29/11/2019 4/12/2019 0 IW/POB/EE/SK105 Rev 3
type (non-waterproof type)
2. Make good of finishes after BS modifications IW/POB/EE/SK106 Rev 3

POB HKP ITEM A72 G/F 61 Female Lav 2. Take down socket and conduit point face plate on mirror, and re-fix the socket and no bs item Setting-out meeting with user re-schedule from
conduit point face plate after removal of mirror 13/11 to 21/11 AB/7272/HKP-IW-A-A072
IW/POB/EE/SK104 Rev 2
POB HKP ITEM A91 Rear entrance gate at G/F The electric socket is converged and has not been changed an accurate one Works Arranging, NO BS item? AB/7272/HKP-IW-A-A091
(please refer to bs material schedule)
POB HKP ITEM A98 Observation tower Addition floor box to connect sockets&data points below raised floor 3 weeks for material approval and =G64:G75Awaiting floor box material submission 1~2 20/12/2019 19/12/2019 2 IW/POB/EE/SK107 Rev 2
from CH
order
POB HKP ITEM E002 Rear entrance gate at G/F New 2/C 4mmsq. XLPE/SWA/PVC cable + CPC to new drop bar gear box location completed No setting-out issue as per existing dropbar island 1~2 9/12/2019 19/12/2019 0 IW/POB/EE/SK115 Rev 0
-New dia 25mm concealed conduit from new drop bar gear box to IR sensor.
-3 nos. of new dia 25mm GI concealed conduit at 600mm below FFL interlink the original
and new drop bar gear box location for power and ELV cable distribution.

POB HKP ITEM E003 ELV RM. 1. Relocation of earthing terminal as figure shown Installation inside plant room, no setting-out issue 1~2 16/12/2019 28/12/2019 1 IW/POB/EE/SK108 Rev 2
2. Reconnection between copper tape and earth terminal
3. Reinstate and make good

POB HKP ITEM E005 Grid 2-3/F-G on 4/F 1. Provide additional bonding for additional railing after the additional railing 1~2 19/12/2019 28/12/2019 2 IW/HKP/EE/112
2. Reinstate and make good
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Other Items)
POB HKP ITEM E007 ELV Rm. 1. Supply and install new 2nos of Fused connection unit for CABD Headend system 20% Setting-out meeting with user re-schedule from 1~2 16/12/2019 28/12/2019 1 IW/POB/EE/SK104 Rev 2
equipment and TRS CCTV switch fed by PFNG1P-18L1 13/11 to 21/11
2. Existing wiring shall be modify and to be connected to new wiring accessories.
3. Make good of finishes after BS modifications

POB HKP ITEM E008 1. Supply and install 4nos of fused connection unit for VDP master, MIMIC Panel, IG master 30% Setting-out meeting with user re-schedule from 1~2 16/12/2019 28/12/2019 1 IW/POB/EE/SK104 Rev 2
and intercom master fed by PFNGP-17L3 with surface conduits 13/11 to 21/11
2. Make good of finishes after BS modifications

POB HKP ITEM E009 ASSS control room at G/F Additional 1no of fused connection unit for AFA panel of AC fed by PFEGL-7L2 with surface 20% Setting-out meeting with user re-schedule from 1~2 16/12/2019 28/12/2019 1 IW/POB/EE/SK104 Rev 2
conduit 13/11 to 21/11

POB HKP ITEM E010 G/F PABX Rm. Additional 1no of fused connection unit for LCP fed by PNGAC-6L2 with surface conduit completed Setting-out meeting with user re-schedule from 1~2 16/12/2019 26/12/2019 0 IW/POB/EE/SK104 Rev 2
13/11 to 21/11

POB HKP ITEM E011 Armory at G/F 1. Additional fused connection unit for indoor unit fed by PFNGAC-3L1 with surface completed Setting-out meeting with user re-schedule from 1~2 29/11/2019 26/12/2019 0 IW/POB/EE/SK104 Rev 2
conduits connected to the trunking. 13/11 to 21/11
2. Make good of finishes after BS modifications IW/POB/EE/SK111 Rev 2
3. Supply and install 1 no. of new 20A DP weatherproof isolator for outdoor unit fed from
PFSGAC-4L3
4. Supply and install new wiring and to existing MCB board
5. Supply and install new surface conduit to existing trunking.
6. Make good of finishes after BS modifications

POB HKP ITEM E012 Armory at G/F 1. Additional fused connection unit for VDP fed by PFSGP-21L2 with surface conduits completed Setting-out meeting with user re-schedule from 1~2 29/11/2019 26/12/2019 0 IW/POB/EE/SK104 Rev 2
connected to the trunking. 13/11 to 21/11
2. Make good of finishes after BS modifications IW/POB/EE/SK116 Rev 0

POB HKP ITEM E013 71 Computer Equipment Room (CER) on 1/F 1. Supply and install new 13A fused spur unit for LCP completed Setting-out meeting with user re-schedule from 2~3 16/12/2019 26/12/2019 0 IW/POB/EE/SK104 Rev 2
2. Supply and install new wiring and surface conduit for new 13A fused spur unit 13/11 to 21/11
3. Modify existing circuitry and connect the new 13A fused spur unit to existing circuit
4. Make good of finishes after BS modifications

POB HKP ITEM E014 Lactation Cum Multi Purpose Room 55A on 1/F 1. Supply and install new 13A fused spur unit for Handryer completed Setting-out meeting with user re-schedule from 1~2 25/12/2019 26/12/2019 0 IW/POB/EE/SK104 Rev 2
2. Supply and install new wiring and surface conduit for new 13A fused spur unit 13/11 to 21/11
3. Modify existing circuitry and connect the new 13A fused spur unit to existing circuit
4. Make good of finishes after BS modifications

POB HKP ITEM E019 G/F, 1/F & 2/F Corridor Change of exit sign from general type to weatherproof type 6 weeks for material approval and 0~2 27/12/2019 29/12/2019 2 IW/POB/EE/SK101 Rev 4
order IW/POB/EE/SK102 Rev 4
IW/POB/EE/SK103 Rev 4
POB HKP ITEM E020 Potable / Flushing Water Pump Room & FS Pump Change of light fitting from general type to weatherproof type 40% 0~2 16/12/2019 6/12/2019 1 IW/POB/EE/SK103 Rev 2
Room
FS FSD ITEM A14 FSD 9 Station General Store, FSD 33 Hose Store, 1. Revise lighting arrangement in storage area. 3 rooms, 25%, 2 week for material 0~2 22/11/2019 12/16/2019 1 Actual 28 Jun, 27 Sep 2019
FSD 8 Emergency Equip. Store 2. Change of general light fittings to waterproof type as per user comment (impact
resistant light fitting) approval and order BS/7272/FSD/IW/A/A014 Rev
3. Make good of finishes after BS modifications 2

FS FSD ITEM A59 Drill Tower 1. Take down exisitng general type light fitting and install new waterproof light fittings 12 Dec for waterproof light fittings 13 Dec for lighting delivery 0~2 12/20/2019 1 Actual 28 Jun, 27 Sep 2019
2. Modify exisitng circuitry, wiring can cable containment
3. Make good of finishes after BS modifications delivery BS/7272/FSD-IW-A-A059a Rev
12/10/2019 1
BS/7272/FSD-IW-A-A059b Rev
FS FSD ITEM E04 Potable / Flushing Water Pump Room & FS Pump Change of light fitting from general type to weatherproof type 2 weeks for Weatherproof lighting 1~2 26/12/2019 2 1
Room 12/20/2019 BS/7272/FSD-IW-A-A059c
BS/7272/FSD-IW-E-E04 RevRev
0
delivery
1
FS FSD ITEM E05 Drill Tower Change of operation alarm bell to waterproof type 3 weeks for Weatherproof alarm bell 1~2 26/12/2019 12/29/2019 2 BS/7272/FSD-IW-A-A059d Rev
delivery 1 BS/7272/FSD/IW/E-E05a Rev 0
BS/7272/FSD/IW/E-E05b Rev 0
BS/7272/FSD/IW/E-E05c Rev 0
BS/7272/FSD/IW/E-E05d Rev 0
BS/7272/FSD/IW/E-E05e Rev 0

FS FSD ITEM E06 2/F Drying Room 1. Change of 3 nos. of 3-ph waterproof socket to 3 nos. of 1-ph waterproof socket completed Setting-out agreed on 16/11 as per existing 0~1 28/11/2019 12/14/2019 0
2. Modify existing wiring, circuitry and cable containment equipment arrangement BS-7272-FSD-IW-E-E06a
3. Modify existing water supply pipework
4. Supply and install new water point BS-7272-FSD-IW-E-E06b
5. Make good of finishes after BS modifications IW/FSD/PL/SK001 Rev 2

CBO IMMD ITEM E035 IMMD 97 Kiosk Supervisor Office and Waiting Change 4 nos. of 13A Twin S/O to from E to E+U completed 1~2 25/12/2019 0 IW/CBO/EE/SK007 Rev 0
Area G/F 12/10/2019
IW/CBO/EE/SK008 Rev 0
CBO IMMD ITEM E040 IMMD 97 Kiosk Supervisor Office and Waiting Addition of 2nos. of 13A Twin S/O supplied by E+U completed 1~2 11/12/2019 26/12/2019 0 IW/CBO/EE/SK007 Rev 0
Area G/F
IW/CBO/EE/SK008 Rev 0
CBO IMMD ITEM E042 IMMD 97 Kiosk Supervisor Office and Waiting Change the supply of 2 nos. of 13A S/O from E to E+U completed 1~2 9/12/2019 25/12/2019 0 IW/CBO/EE/SK007 Rev 0
Area G/F Addition of 1 no. of 13A Twin S/O supplied from E+U IW/CBO/EE/SK008 Rev 0
CBO IMMD ITEM E048 IMMD 97 Kiosk Supervisor Office and Waiting Addition of 3 nos. of 13A Twin S/O supplied from E+U completed 1~2 11/12/2019 25/12/2019 0 IW/CBO/EE/SK007 Rev 0
Area G/F
IW/CBO/EE/SK008 Rev 0
CBO IMMD ITEM E049 IMMD 97 Kiosk Supervisor Office and Waiting Addition of 1 nos. of 13A Twin S/O supplied from E+U completed 1~2 11/12/2019 25/12/2019 0 IW/CBO/EE/SK007 Rev0
Area G/F
IW/CBO/EE/SK008 Rev 0
CBO IMMD ITEM E138 G/F & 1/F Revise lighting layout 3 weeks for material approval and 1~2 25/12/2019 27/12/2019 2 IW/CBO/EE/SK001 Rev 2
CBO IMMD ITEM E174 IMMD 97 Waiting Area Power provision for ELV system order
await user confirmation of setting out 1~2 25/12/2019 29/12/2019 3 IW/CBO/EE/SK004 Rev 1
CBO C&ED ITEM A244 C&ED 199 Customs Dog Master Office cum lighting switches and socket outlets to be changed to water proof type completed 1~2 25/12/2019 27/12/2019 0 IW/CBO/EE/SK001 Rev 2
Kennel
IW/CBO/EE/SK004 Rev 1
CBO C&ED ITEM A250a Cargo Platform Additional Cover for light tube (BS item) NO bs work? 1~2 AB/7272/C&ED/IW/A/A250a
CBO C&ED ITEM A252 Corridor Changing lighting type to weather proof type +DB68 1~2 25/12/2019 29/12/2019 2 IW/CBO/EE/SK001 Rev 2
IW/CBO/EE/SK002 Rev 2
CBO C&ED ITEM E173 C&ED Area Revise lighting await user confirmation of setting out 1~2 25/12/2019 29/12/2019 3 IW/CBO/EE/SK001 Rev 2
IW/CBO/EE/SK002 Rev 2
CBO General ITEM E02 Pump Rooms Power provision modification Works Arranging 1~2 25/12/2019 29/12/2019 2
(please refer to bs material schedule)
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Other Items)
FXO C&ED ITEM A159 Check-in Station C&ED request that all F.S.U. for EMSD radiation Works Arranging 1~2 25/12/2019 29/12/2019 2
Check-out Station sensor equipment shall change to Unswitched type (please refer to bs material schedule) IW/FXI/EE/SK002 Rev 1
Driver waiting area
FXO C&ED ITEM E143
Accessible Toilet Addition ECB await user confirmation of setting out 1~2 25/12/2019 29/12/2019 3 IW/FXI/EE/SK002 Rev 1
FXO C&ED ITEM E176 C&ED Area Revise lighting await user confirmation of setting out 1~2 24/12/2019 29/12/2019 3 IW/FXI/EE/SK001 Rev 5
BS/7272/AFD/FXI/EE/401

AC FS FSD ITEM E03 1/F LV Switch Room Addition of air conditioner deflector to prevent air diffusing to switchboard directly 3 weeks for air conditioner deflector Installation inside plant room, no setting-out issue 2~3 12/23/2019 2
12/22/2019 IW/FSD/AC/SK005 Rev 0

FS FSD ITEM E09 G/F LAN Server and TGMS Equipment Power Provision for stand-by AC await user confirmation of setting out CH to check with FSD user on the final setting-out 2~3 24/12/2019 12/25/2019 3 BS/7272/FSD/IW/E-E09a Rev 0
Addition of stand-by AC as per 16/11 meeting BS/7272/FSD/IW/E-E09b Rev 0
IW/FSD/AC/SK006 - Item E09 not
CBO C&ED ITEM E190 C&ED 184 Panrty Addition of fan & power point completed 1~2 13/12/2019 23/12/2019 0 shown
IW/CBO/AC/SK003 Rev 0
IW/CBO/AC/SK005 Rev 0
IW/CBO/EE/SK004 Rev 1
IW/CBO/EE/SK005 Rev 0
CBO C&ED ITEM E191 C&ED 177 General Equipment Stire Addition of fan & power point completed 1~2 13/12/2019 23/12/2019 0 IW/CBO/AC/SK003 Rev 0
IW/CBO/EE/SK004 Rev 1
CBO C&ED ITEM E192 M. LAV & F. LAV Addition of fan & power point completed 1~2 13/12/2019 23/12/2019 0 IW/CBO/AC/SK004 Rev 0
IW/CBO/AC/SK005 Rev 0
IW/CBO/EE/SK004 Rev 1
IW/CBO/EE/SK005 Rev 0
CBO C&ED ITEM E193 C&ED 176 General Store Addition of fan & power point completed 1~2 13/12/2019 23/12/2019 0 IW/CBO/AC/SK006 Rev 0
IW/CBO/EE/SK005 Rev 0
CBO C&ED ITEM E194 C&ED 179 Cargo Document Storage Room Addition of fan & power point completed 1~2 13/12/2019 23/12/2019 0 IW/CBO/AC/SK006 Rev 0
IW/CBO/EE/SK005 Rev 0
CBO C&ED ITEM E195 C&ED180 Archive Document Storage Room Addition of fan & power point completed 1~2 13/12/2019 23/12/2019 0 IW/CBO/AC/SK006 Rev 0
IW/CBO/EE/SK005 Rev 0
CBO C&ED ITEM E196 C&ED 197 Platform Relocation of outdoor rotary fans Completed 23/11/2019 29/11/2019 0 IW/CBO/AC/SK007 Rev 0
CBO C&ED ITEM E197 Various Power provision for AC, ELV, WS system 30% 2~3 24/12/2019 31/12/2019 1 IW/CBO/EE/SK004 Rev 1
IW/CBO/EE/SK006 Rev 0
CBO DH ITEM A26 Various Power provision for AC, ELV, WS system await user confirmation of setting out, 2~3 27/12/2019 30/12/2019 3 IW/CBO/EE/SK004 Rev 1
DH ITEM A26 not found IW/CBO/EE/SK009 Rev 0
CBO DH ITEM E026 Various Power provision for AC, ELV, WS system Works Arranging 2~3 27/12/2019 30/12/2019 2 IW/CBO/EE/SK004 Rev 1
(please refer to bs material schedule)
IW/CBO/EE/SK009 Rev 0
CBO General ITEM E01 Various Power provision for ELV and AC system 15% 2~3 9/12/2019 24/12/2019 1
IW/CBO/EE/SK009 Rev 0
Y IW/CBO/EE/SK010 Rev 0
IW/CBO/EE/SK011 Rev 0
FXO C&ED ITEM E001 20% 1~2 26/12/2019 29/12/2019 1 IW/FXI/AC/SK001 Rev 1
Male Toilet 1 No. of additional fans to be installed
IW/FXI/EE/SK002 Rev 1
FXO C&ED ITEM E002 20% 1~2 26/12/2019 29/12/2019 1 IW/FXI/AC/SK001 Rev 1
Female Toilet 1 No. of additional fans to be installed
IW/FXI/EE/SK002 Rev 1
FXO C&ED ITEM E003 20% 1~2 26/12/2019 29/12/2019 1 IW/FXI/AC/SK001 Rev 1
Pantry 1 No. of additional fans to be installed
IW/FXI/EE/SK002 Rev 1
FXO C&ED ITEM E188 Various
Power provision for ELV and AC system 30% 2~3 23/12/2019 31/12/2019 1 IW/FXI/EE/SK003 Rev 0
Added BS POB 55A 1/F Lactation Cum Multi Purpose Room Provision of hot water pipe and connected to existing water heater
POB HKPF 26 HKPF 26 OC's office 1. Addition of red engagement lighting 3 IW/POB/EE/SK101
HKPF 27 HKPF 27 SUS's office 2. Change existing one gang lighting to 2 gang for additional red engagement light IW/POB/EE/SK102
HKPF 28 HKPF 28 Conference Room
HKPF 29 HKPF 29 Briefing Room
HKPF 30 HKPF 30 Armory
HKPF 31 HKPF 31 Interview Room x 2

POB HKPF ITEM E027 Potable / Flushing Water Pump Room & FS Pump 1) Change the socket outlet in pump room to weatherproof type 3 IW/POB/EE/106
Room
CBO GENERAL ITEM Addition of timer and photocell for maintanied L18 3 IW/CBO/EE/SK003
E027

Estimated Labourr (Builder's):


Estimated Labour (BS):

Material submission
construction/installation Total BS items 70
material/ equipment delivery BS works start 18
completed activity Await material 17
Await user/information 11
Top priority BS works completed 24
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Items of Top Priority - Phase 3 & remaining)

Info readiness
Statu
s (bs)

Material Anticipated JRP's construction dwgs


Room Estimate Labour Target Start
Trade Location Item no SOA Room Name Readiness Works Status RLP Response 2019.11.18 Range (per day) submission Date Completion RLP JRP
status Date

Electrical PTB M/F IMMD002 Syndicate Room Y 1. Red engagement lamp no bs drawing IW/PTB/EE/SK021
PTB M/F IMMD017 Conference Room 1. Red engagement lamp IW/PTB/EE/SK021
Y 2. Lighting dimming system no bs drawing

PTB M/F IMMD018 Workshop / Training Room 1. Red engagement lamp IW/PTB/EE/SK021
Y 2. Lighting dimming system no bs drawing

PTB M/F IMMD051 Contra Flow Operation Room (Departure) Y Addition of 2 nos. of 13A S/O (E+U) IW/PTB/EE/SK001
PTB M/F IMMD062 Female Changing Room (Rank & File) Y 1) Lighting misaligned LCAL Defect
PTB M/F IMMD063 Barrack (Male) Y 1) Missing power sockets no bs drawing IW/PTB/EE/SK033
PTB M/F IMMD064 Barrack (Female) Y 1) Check LUX level, add lighting if required IW/PTB/EE/SK021
PTB 2/F IMMD074 Medical Examination Room 1) There should be two sockets at the TV side. 1) EMSD
Y 2) There are 5 missing UPS socket opposite of the TV side no bs drawing 2) No change agreed by IMMD's Mr Poon

PTB 1/F IMMD073 Enrolment Office 1) The TV output and one of the socket should be relocated to the correct wall. 1) IW/PTB/CB/SK001
2) One of the telephone line should be relocated to another wall near the reception 2) EE (No change agreed by IMMD's Mr
Y counter. no bs drawing Poon)

PTB G/F C&ED 58 Personal Search Room 1) There should be two sockets at the TV side. Should be IMMD074
Y 2) There are 5 missing UPS socket opposite of the TV side 1) EMSD
2) No change agreed by IMMD's Mr Poon
PTB G/F C&ED 85 Personal Search Room N Additional lighting to be provided IW/PTB/EE/SK020
PTB M/F C&ED 67 Male Changing Room with shower (Inspectorate) 1. Waterproof light to be provided IW/PTB/EE/SK021
Y
PTB M/F C&ED 69 Male Changing Room (COG)) Y Waterproof lighitng to be provided IW/PTB/EE/SK021
PTB M/F C&ED 79 Main Server Room (AVCSS + IT) 1. Additional water leakage detection system 1. Addition of water leakage detection
2. PTB SR M/F - No thermal insulation measures on the floor (Requested in point 8.3.11 system in CRAC room (IW/PTB/EE/SK007)
of RDS) -Water leakage signal from AVCSS part
3. Additional working platform for CRAC units repairing required to be repeat to C&ED FRMS
(IW/PTB/EE/SK046)
(AVCSS) -Water leakage signal and air conditioning
N 1. Additional normal power supply for AVCSS equipment signal for UPS required to be repeat to
2. Addition of MCB Board and 6 nos. of 32A sockets C&ED FRMS (IW/PTB/EE/SK046)
1. 13A x6 power socket with normal or essential power -All signals to be repeated to junction box
2. 32A x6 isolator power sockets with essential power inside server room (IW/PTB/EE/SK046)

(AVCSS)
By EMSD refer to C&ED Item 5 -
Improvement works Drawings for C_ED 79
PTB M/F C&ED 81 UPS Room Y 2. Alarm buzzer of panic alarm system AVCSS (R2)
PTB 2/F C&ED 8 Equipment Area for Passenger Processing Units additional socket outlets and lan ports to be installed IW/PTB/EE/SK027
(Inspectorate) Y IW/PTB/EE/SK028
PTB 2/F C&ED 60 Conference Room Y 4. Red engagement light to be provided IW/PTB/EE/SK023
PTB 2/F C&ED 31 Personal Search Room x 2 Y 1. Red engagement lamp IW/PTB/EE/SK023
PTB 2/F C&ED 34 Interview Room (1) Y 1. Red engagement lamp IW/PTB/EE/SK023
PTB 2/F C&ED 34 Interview Room (2) Y 1. Red engagement lamp IW/PTB/EE/SK023
PTB 2/F C&ED 36 Personal Search Room (1) N 1. Red engagement lamp IW/PTB/EE/SK023
PTB 2/F C&ED 36 Personal Search Room (2) N 1. Red engagement lamp IW/PTB/EE/SK023
PTB 2/F C&ED 56 Personal Search Room Y 1. Red engagement lamp IW/PTB/EE/SK023
PTB 1/F C&ED 51 Personal Search Room (1) Y 1. Red engagement lamp IW/PTB/EE/SK022
PTB 1/F C&ED 51 Personal Search Room (2) Y 1. Red engagement lamp IW/PTB/EE/SK022
PTB 2/F IMMD030 Profiling Zone (Arrival Hall) N 1. Adding lighting panel to increase the LUX level IW/PTB/EE/SK023
PTB 2/F C&ED 31 Customs Duty Collection Office 3. Surface conduit (public side and staff side) connect to the CEAS trunking
N
PTB 2/F C&ED 37 Toilet for Detainees 3. Revised of the air grilles to security air grilles to suit the revised ceiling. 3. IW/PTB/AC/SK001
4. Revised lighting layout 4. IW/PTB/EE/SK022
N

PTB 2/F C&ED 39 Personal Search Room Y Emergency call bell missing IW/PTB/EE/SK026
PTB 2/F C&ED 59 Customs Dog Master Office cum Kennel N 1. Waterproof lighting and socket outlet IW/PTB/EE/SK023 1~2 A 17/12/2019 20/12/2019 1
PTB 1/F C&ED 44 Observation Room 1 Y 1. Diming lighting and benching lighting to be provided IW/PTB/EE/SK022 (Dimming only)
Bench lighting to be coordinated with RLP
PTB M/F C&ED 20 Detention Room with toilet 1. Provide 1 no. 13A twin socket outlet Should be DH 20 Server Room
and users
2. Relocate the fluorescent tube, so that it would be out of the air-conditioner inside 1. AI-EE-175 (by LCAL)
Y the server room. 2. IW/PTB/EE/SK021
3. provide uniform lighting inside the room. 3. IW/PTB/EE/SK021

PTB G/F ATM N Provision of energy meter for chilled water supply IW/PTB/AC/SK009 (Direct Contract)
IW/PTB/EE/SK014a
PTB G/F Shop 1 (previously known as convenience store) Upgrade of power supply from 63A to 100A 3p (subject to technical assessment by JRP) IW/PTB/EE/SK014a (to be issued)
Provision of energy meter for chilled water supply IW/PTB/EE/SK014b (to be issued)
N

PTB G/F Shop 2 (previously known as general retail shop) Provision of energy meter for chilled water supply IW/PTB/AC/SK009 (Direct Contract)
N IW/PTB/EE/SK014a
PTB 1/F Duty Free Shop N Provision of energy meter for chilled water supply IW/PTB/AC/SK008 (Direct Contract)
IW/PTB/EE/SK016
PTB 1/F Shop 4 (previously known as supermarket) Provision of energy meter for chilled water supply IW/PTB/AC/SK008 (Direct Contract)
N IW/PTB/EE/SK017
PTB 2/F Stores for Duty free N Provision of energy meter for chilled water supply IW/PTB/AC/SK007 (Direct Contract)
IW/PTB/EE/SK018
PTB 2/F Shop 6 (currency exchange) N Provision of energy meter for chilled water supply IW/PTB/AC/SK007 (Direct Contract)
Power by LCAL (AI-EE-238)
PCBI Customs Office N 1. C&ED Intercom trunking connect to CEAS trunking By EMSD
PCBI Customs Clearance Cubicle x2 N 2. Power point for mic box By EMSD
PCBI Personal Search Room / CBNI Processing Room x2 2. Power point for mic box IW/PCBI/EE/SK002
N
PCBO Customs Clearance Cubicle 1 N 2. Power point for mic box By EMSD
PCBO Customs Clearance Cubicle 2 N 2. Power point for mic box By EMSD
PCBO Personal Search Room 1 N 2. Power point for mic box IW/PCBO/EE/SK002
PCBO Personal Search Room 2 N 2. Power point for mic box IW/PCBO/EE/SK002
GV Kisok Inspection Kiosk (inbound) x 9 Y 2. Waterproof lighting at external area IW/GVK/EE/SK001
GV Kisok Inspection Kiosk (outbound) x 9 Y 2. Waterproof lighting at external area IW/GVK/EE/SK001

AC PTB 2/F C&ED 76 Lavatory for Staff 2. additional fans to be installed no this room in RDS and layout plan
N only CEDD 4.3 Male and female staff
common toilet 11 can be found
PTB 1/F C&ED 41 Briefing Room N Original AC layout to be rearranged IW/PTB/AC/SK018 1~2 A 17/12/2019 24/12/2019 0
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Items of Top Priority - Phase 3 & remaining)
PTB 2/F AF003 Changing Room Y Electical Fan should be installed
TCOI Inbound Traffic Control Office/ toilet N 1. Location of outdoor AC unit to be reviewed pending RLP reply for the BW, refer to
email dated 20/11/2019 and 4/12/2019

PD PTB 2/F DH 16 Sluice Room N To provide a slop sink


PTB 2/F AFCD Kennels relocation of water point
Y adding hair trap
PTB 2/F FEHD (QDDU) 7 Quarantine Detector Dog Kennel N 1. Hair trap inside floor drain should be installed. (surface channel)

PTB 1/F IMMD 16 Examination Room Remove digital keypad and E&M lock to all detention cells
PTB 1/F, 2/F IMMD Hall Provision for deparmental sign IW/PTB/EE/SK002
IW/PTB/EE/SK018

PTB 2/F IMMD 40 Traffic Cone Storage Room (Arrival) Remove IT Trunking IW/PTB/EE/SK029
GVK/CPK EL Room Kiosk revised power supply to essential power (for IMMD) IW/GVK/EE/SK004
IW/CPK/EE/SK002

PTB M/F C&ED 81 UPS Room Revised power supply for UPS for C&ED 79 Server Room only IW/PTB/EE/SK038
PTB M/F C&ED 79 CRAC Room Revise power supply for crac unit IW/PTB/EE/SK041,043a,043b
PCEBI C&ED 243 Pantry Addition of socket outlet for fridge and addition of socket outlet at cabinet IW/PCBI/EE/SK001
side as per 6/12/2019 Verbal Comment during Handover Inspection
PCEBI C&ED 234 Baggage Examination Cubicle Blank off floor mounted socket outlet as per 6/12/2019 Verbal Comment IW/PCBI/EE/SK001
during Handover Inspection
PCEBO C&ED 252 Baggage Examination Cubicle Blank off floor mounted socket outlet as per 6/12/2019 Verbal Comment IW/PCBO/EE/SK001
during Handover Inspection
PTB C&ED Hall Provision for deparmental sign IW/PTB/EE/SK016
IW/PTB/EE/SK018
PTB C&ED 79 Server Room -Water leakage signal from AVCSS part required to be repeat to C&ED FRMS IW/PTB/EE/SK046a
CBI -Water leakage signal and air conditioning signal for UPS required to be IW/PTB/EE/SK046b
repeat to C&ED FRMS
-All signals to be repeated to junction box inside server room

PTB 2/F C&ED 25 Firearms Loading / Unloading Room C&ED request 1 no. of telephone point to be installed as per room data sheet IW/PTB/EE/SK028
requested.

PTB 1/F, 2/F C&ED Case Processing Area Corrdior C&ED request that this door without any elect lock will increase the risk for IW/PTB/SY/SK015 (pending return of
escape. Noted that any change for this door may affect FSMP. direct contract quatation)
IW/PTB/SY/SK024 (pending return of
direct contract quatation)
IW/PTB/EE/SK016
IW/PTB/EE/SK018

PTB 2/F C&ED 34 Video Interview Room C&ED requested 3 nos of telephone port / data port on floor to be blanked IW/PTB/EE/SK030
off
PTB 2/F C&ED 75 Pantry 3 Addition of fan & power point IW/PTB/AC/SK015
IW/PTB/EE/SK012
HKPF 1/F Police Report Centre Shift upward by 400mm for concealed conduit box IW/PTB/EE/SK047
PTB 1/F 2/F HKPF 10 Operation Control Room Addition of red engagement light IW/PTB/EE/SK022
HKPF 2 Interview Room x 3 IW/PTB/EE/SK023
HKPF 4 Search Room x 2 IW/PTB/EE/SK024
HKPF 8 OC Office
HKPF 9 SUS's office
HKPF 22 Observation Posts (OPs) x 5
Added BS HKPF 17 SSGT Office

PTB R/F HKPF 22 Observation Post 1 & 4 (R/F) 1. Relocate drain pump away from the MCB board. IW/PTB/AC/SK022
2. Modify the CDP to suit the drain pump.
PTB R/F Additional trunking for HKPF antenna post IW/PTB/EE/SK035
PTB R/F CABD Additional trunking for CABD Room IW/PTB/EE/SK036
PTB 1/F, 2/F DH 16 2/F, DH4 2/F Sluice Rm, Consultation Rm Additional FSU for water tap sensor IW/PTB/EE/SK018
IW/PTB/EE/SK027
PTB 2/F AFCD 2 Interview Room 2 Addition of red engagement light IW/PTB/EE/SK023
PTB 2/F FEHD 2 FIES Interview Room Addition of red engagement light IW/PTB/EE/SK023
FEHD 5 FIES (inspection)
FEHD 4 FIES (Staff Toilet)
FEHD 3 FIES locker changing room x 2

PTB M/F CEDD 14 CEDD Server Room By Term Contractor IW/PTB/AC/SK026


1. Supply and install 2 nos. of ceiling-mounted type indoor units and 1 no. of IW/PTB/AC/SK027
outdoor with associated ac controller, refrigerant pipes, condensate drain IW/PTB/EE/SK045a
pipes and associated cladding for cedd server room.(ac unit cooling: 11kw IW/PTB/EE/SK045b
(total 22kw); refrigerant: r410a)
2. provide necessay control units and coordinate with direct contractor for
the additional ac unit acts as standby unit in case of the duty unit is failed.
(please refer to IW/PTB/AC/SK027)
4. modify the existing condensate drain pipe to connect the new ac unit.
5. coordinate with direct contractor to provide necessary structure, ceiling,
wall opening for modification work.

PTB 2/F CEDD 3.1 2/F VIP TOILET Addition of Emergency call bell IW/PTB/EE/SK018
PTB G/F, 2/F Addition mobile tray for telephone phone / data point connection IW/PTB/EE/SK037
IW/PTB/EE/SK037a

PTB G/F TD Addition 63A TPN power supply for regulator office and Bus metering IW/PTB/EE/SK031
PTB Payphone/AVM Additional power for Payphone/AVM IW/PTB/EE/SK012
GVK DH 1 Inspection Kiosk Additional 18nos of 13A S/O for Mosquito lamp IW/GVK/EE/SK002
EUVSS Additional Check meter for EUVSS IW/EUVSS/EE/SK002
EUVSS HKPF 103 Update lighting provision for EVA IW/EUVSS/EE/SK004
EUVSS HKPF 104 EUVSS Monitoring Room Addition GI conduits IW/EUVSS/EE/SK003
PUT Power of signage IW/PUT/EE/SK002
MLP Rotating lighting pole for L32E in MLP IW/MLP/EE/SK001
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Items of Top Priority - Phase 3 & remaining)
MLP Additional of photocell and timer for external lighting IW/MLP/EE/SK001

Material submission
construction/ installation
material/ equipment delivery
completed activity

A Approved & Arrived


B Approved & Pending for Delivery
C Pending for Approval
D Pending for Submission

Total BS items 2
BS works start 1
Await material 0
Await user/information 0
BS works completed 1
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Other Items)

Estimate Labour Target Start Anticipated


Trade Location Item no Room Name Works Status Range (per day) Date Completion RLP JRP
Date

ELV (SY,BRI,AE) POB HKP ITEM A59 ASSS Room, CAR 1. Coordinate with Security Contractor and provide the builder works associated with the Await quotation return 2/12/2019 18/12/2019
following security works:
1) Additional of breakglass unit completed with wirings, accessories and conduits to local
control panel.
2) Additional of door contact completed with wirings, accessories and conduits to local
control panel.
3) Additional of local control panel completed with wirings, accessories and conduits to
EM lock.
4) Additional of two number of BS4662 base boxes (inside and outside) completed with
conduits to local control panel and to ASSS trunking.
5) Additional of EM lock. Y
6) Opening on Door frame
7) Concrete chasing, recover and painting.
8) Dismantle and recover of ceiling for installation.
9) Additional of fused spur unit completed with wirings, accessories and conduits for local
control panel.

POB HKP ITEM 60 Door 1009 For Electrical Installations: Await quotation return 2/12/2019 18/12/2019
1. Supply and install 1 no. of FSU for LCP of Security
2. Supply and install new wiring and surface conduit to connect to existing circuitry
3. Make good of finishes after BS modifications
4. Coordinate with Security Contractor and provide the builder works associated with the
following security works:

For ELV Installations:


1) Additional of two number of BS4662 base boxes (inside and outside) completed with
conduits to local control panel and to ASSS trunking.
2) Relocation of existing local control panel from door top to Female Night Duty Room and
reconnection to break glass unit, door contact completed with wiring, accessories and
conduits. Y
3) Concrete chasing, recover and painting.
4) Dismantle and recover of ceiling for installation.
5) Additional FSU in Female Night Duty Room completed with wirings, accessories and
conduits for local control panel.

POB HKP ITEM A61 Door 1022 1. Coordinate with Security Contractor and provide the builder works associated with the Await quotation return 2/12/2019 18/12/2019
following security works:
1) Additional of two number of BS4662 base boxes (inside and outside) completed with
conduits to local control panel and to ASSS trunking.
Y

POB HKP ITEM A62 Door 6001, 6003 1. Coordinate with Security Contractor and provide the builder works associated with the Await quotation return 2/12/2019 18/12/2019
following security works:
1) Additional of two number of BS4662 base boxes (inside and outside) completed with Y
conduits to local control panel and to ASSS trunking.

POB HKP ITEM A63 Door G204 1. Coordinate with Security Contractor and provide the builder works associated with the Await quotation return 2/12/2019 18/12/2019
following security works:
1) Supply and install 25mm dia. G.I. conduit completed with adaptable box and accessories
from existing adaptable box to existing local control panel of door G204 to door lock Y
trunking.

POB HKP ITEM A77 HKPF 62a, 62b, 62c & 62d 1) Dismantle existing wall mount type intercom unit. Await quotation return 9/12/2019 18/12/2019
2) Supply and install flush mount type intercom unit completed with conduit and all Y
necessary accessories.
POB HKP ITEM A96 HKPF 62a, 62b, 62c & 62d 3) Addition
1) Reconnect existing
video phonewiring
call cables
systemto the intercom
inside unit.
armory (standard same Await quotation return 9/12/2019 18/12/2019
4) Concrete
as chasing,
ASSS control room)recover and painting. Y
2) Coordination with all relevant parties for the works.
POB HKP ITEM E025 2/F corridor 1) Additional of two numbers of door release buttons (door 2014 and door 2021) Await quotation return 9/12/2019 18/12/2019
completed with all wiring, conduits and all necessary accessories to local control panel.
2) Coordination with all relevant parties for the works.
Y

POB HKP ITEM E026 G/F ASSS Room 1) Supply and install visual and audial alarm panel for breakglass unit completed with Await quotation return 9/12/2019 18/12/2019 Y
wiring, conduit and all necessary accessories.
2) Panel detail refer to detail AA. The detail is indicative only. This contractor shall design
the panel design based on the breakgass unit shown on layout drawings and provide
drawing submission for approval.
3) Coordination with all relevant parties for the works.
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Other Items)
CBI C&ED ITEM E178 G/F C&ED 90 Control Point Investigation Unit & Additional 2x TV outlet Await quotation return 2/12/2019 6/12/2019
G/F C&ED 93 Post-clearance Audit Unit
Y

CBI C&ED ITEM E75 G/F C&ED 109 Conference Room TV power point relocation Await quotation return 25/11/2019 29/11/2019 Y
CBI C&ED ITEM A86 G/F C&ED 139 ROCARS On-site Control Room Blank off access control provisions Await quotation return 2/12/2019 6/12/2019

CBI C&ED ITEM E181 G/F C&ED 150 Platform Conrol cum Duty Collection Office Relocation of the intercom panel to suit the TV wall installation Await quotation return 25/11/2019 29/11/2019

CBI C&ED ITEM A184 / G/F C&ED 116 Specialized Equipment Store Swap location of card reader access and door release button at door G162 due to security Await quotation return 9/12/2019 23/12/2019
E146 G/F C&ED152 X-ray Examination Room level Y
CBI C&ED ITEM E179 G/F C&ED 147 Search Room Relocation of Panic Alarm Button and Intercom Await quotation return 9/12/2019 23/12/2019
Y
CBI C&ED ITEM A213 G/F C&ED 87 Duty Office (Cargo Processing) Intercom unit to be raised up to eye level as per user request. Await quotation return 9/12/2019 23/12/2019
Y
CBI C&ED ITEM A214 G/F C&ED 110 Reception/ Waiting Area Intercom unit to be relocated outside the room. Await quotation return 9/12/2019 23/12/2019
Y
CBI C&ED ITEM G/F Corrdidor Modification of speakers to suit 2350 headroom issue. Await quotation return 2/12/2019 6/12/2019
Y
CBI IMMD ITEM A30 G/F IMMD 96 Duty Office Modification of panic alarm panel to collect panic alarm button at GVKI, GVKO & CBI Await quotation return 2/12/2019 6/12/2019
Y
CBI DH ITEM A17 / A20 G/F DH 2 Client Waiting Room & DH 8 Port Health Control Change position of card reader to be mounted on different side of wall. Await quotation return 2/12/2019 6/12/2019
Room Relocation of Card Reader to nearby Junction Box. Y
CBI DH ITEM E23 G/F DH 3 Health Screening Room & Anteroom 1, Relocation of break glass units Await quotation return 2/12/2019 6/12/2019 Y
G/F
G/F DH 4 Consultation Room & DH 5 Anteroom,
CBI AFCD ITEM A5 AFCD 11 Storage Room
G/F DH 6 Isolation Room & Anteroom 2
Additional 1 no. TV outlet to existing BRI system Await quotation return 9/12/2019 23/12/2019 Y
FXI C&ED ITEM E114 G/F C&ED 212 Check-out Station Installation of door release button for Driver Exit Door Await quotation return 9/12/2019 23/12/2019 Y
FXI C&ED ITEM E125 G/F FXI Drop Bars near Shielding Doors Additional Intra-red sensors at drop bars Await quotation return 9/12/2019 23/12/2019 Y
CBO C&ED ITEM A31 MMD 97 Kiosk Supervisor Office (G/F) 1) Modification of panic alarm panel at Kiosk Supervisor Office. Await quotation return 9/12/2019 18/12/2019 Y
CBO C&ED ITEM E201 C&ED 193 Personal Search Room (exact
1) locationofcoordinate
Relocation panic alarm onbutton
site) and intercom as per typical Await quotation return 9/12/2019 18/12/2019 Y
2) Connect existing panic alarm button at GVKO and CBO to panic
arrangement.
CBO C&ED ITEM G/F Corrdidor Modification
alarm of speakerswith
panel completed
2) Re-wiring from the nearest
to suit 2350 headroom
allELV
wiring,
roomaccessories
issue.
and
to new location.
Await quotation return 2/12/2019 6/12/2019 Y
FXO C&ED ITEM E118 C&ED 223 Check-out Station conduits.
1) Door release button change to card reader Await quotation return 9/12/2019 18/12/2019 Y
FXO C&ED ITEM E200 Drop bar location 2)
AddSupply and install
IR sensors onebar
for Drop number of LCP and Card Reader control Await quotation return 9/12/2019 18/12/2019 Y
panel completed with wirings
FS POB HKP ITEM A51 Entrance at G/F and Corridor 1 1)
andModify the sprinkler
all necssary level to suit the new ceiling height
accessories. Await quotation return 9/12/2019 9/12/2019 Y
POB HKP ITEM A64 G/F Detention area 2)
1) Coordination with allpanel
Additional repeater relevant
withparties for the
associated worksconnecting to FS panel in FCC to
conduit Await quotation return 2/12/2019 18/12/2019 Y
POB HKP ITEM A67 3/F Water tanks Room (G.L.: B1/2) suit the FSMP.
1) Modification of sprinkler heads away from Cat. ladder of water tank. Await quotation return 9/12/2019 9/12/2019 Y
2)
2) Coordination
Coordination with all relevant parties for the works.
POB HKP ITEM E004 Detention Cell, POB Reconnect FWP with
from all
H/Lrelevant
to L/L parties for the works. Await quotation return 9/12/2019 18/12/2019 Y
POB HKP ITEM B7 G/F to 1/F in ST-2; a) The headroom under the pipes and the fire rated enclosure at half-landing Await quotation return 9/12/2019 18/12/2019 Y
POB HKP ITEM C4 5/F to 6/F incentre
37 resource ST-1 at 2/F between G/F and
1) Modification of1/F in ST-2 was
of sprinkler headlessand
than 2m to avoid obstruction to movable
alarm Await quotation return 9/12/2019 18/12/2019 Y
(b) For ST-1 from 5/F to 6/F, the headroom was measured less than 2000mm due to
partion.
FS FSD ITEM A48 G/F Door G019 Security works
emergency
2)
for item
services
Coordination with
A08: and the exit route less than 1050mm.
intalled,
all relevant parties for the works.
Await quotation return 2/12/2019 11/12/2019 Y
FS FSD ITEM A49 G/F Door G023 1)
1) Dismantle
Security
Modification
worksoffor
card reader
of sprinkler
item completed
A08:pipe routingwith wirings
to wall and accessories
mounted to maintaintothelocal control
clear headpanel. Await quotation return 2/12/2019 11/12/2019 Y
2)
1) Additional
Dismantle
room of
lessof keypad
card
not sprinkler
than completed
reader
2000mm. completedwithwith
wirings and and
wirings accessories to local
accessories control
to local panel.
control panel.
FS FSD ITEM A50 Officer Bedroom 23A ,B & C 1)
3) Revise
Dismantle items heads
kept layout
as spare to suit for
parts theUser.
revised false ceiling in accordance with the item Await quotation return 13/12/2019 23/12/2019
2) Supply
A1 of and installation
Coordination
improvement withworks of keypad
all relevant completed
parties for the with wirings and accessories to local
works.
4) Dismantle
control
2) Make panel.
Coordination
and recover of ceiling for installation.
with all relevant partiesmodifications
for the work
Y
5) good of finishes after security
3) Dismantle items kept as spare parts for User.
FS FSD ITEM A51 Officer Bedroom 23a 4) Revise
1) Make good of finishes
sprinkler heads after
layoutsecurity
to suit modifications
the revised false ceiling in accordance with the item Await quotation return 13/12/2019 23/12/2019
A2 of improvement works Y
2) Coordination with all relevant parties for the works

FS FSD ITEM A52 Officer Bedroom 23c 1) Revise sprinkler heads layout to suit the revised false ceiling in accordance with the item Await quotation return 13/12/2019 23/12/2019
A3 of improvement works
2) Relocate alarm bell Y
3) Coordination with all relevant parties for the works

FS FSD ITEM A53 FSD 36 Exercise Room 1) Revise sprinkler heads layout to suit the revised false ceiling in accordance with the item Await quotation return 13/12/2019 23/12/2019
A6 of improvement works
2) Dismantle of sprinkler to suit revised false ceiling arrangement
3) Modify exixting exposed type sprinkler heads at false ceiling to concealed type sprinkler Y
heads
4) Coordination with all relevant parties for the works
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Other Items)
FS FSD ITEM A55 Barrack (Fire) & Barrack (AMB) 1) Revise sprinkler heads layout to suit the revised false ceiling in accordance with the item Await quotation return 13/12/2019 23/12/2019
A10 of improvement works Y
2) Coordination with all relevant parties for the works
FS FSD ITEM A57 FSD 21 Kitchen 1) Revise sprinkler heads layout to suit the revised false ceiling in accordance with the Await quotation return 13/12/2019 23/12/2019
item A13 of improvement works
2) Supply and install new sprinkler head to suit revised airduct arrangement
3) Coordination with all relevant parties for the works Y

FS FSD ITEM A58 FSD 13a Female Barrack 1) Revise sprinkler heads layout to suit the revised false ceiling in accordance with the Await quotation return 13/12/2019 23/12/2019
item A20 of improvement works
2) Coordination with all relevant parties for the works Y

FS FSD ITEM E02 G/F LPG Store 5kg dry powder fire extinguisher to replace 4.5kg CO2 fire extinguisher Await quotation return 9/12/2019 18/12/2019 Y
FS FSD ITEM E12 2/F Barrack (Fire) 1) Relocate sprinkler heads away from cabinet door swing area Await quotation return 9/12/2019 18/12/2019
2) Add sprinkler guards Y
3) Coordination with all relevant parties for the works

CBI C&ED ITEM A68 / G/F C&ED 139 ROCARS On-site Control Room Modification of sprinkler heads to suit the revised false ceiling. Await quotation return 2/12/2019 6/12/2019
A83 Modification of sprinkler heads to suit the revised AC layout. Y
CBI C&ED ITEM A89 G/F C&ED 144 Case Processing Room & Detention Areas Additional repeater panel with associated conduit connecting to FS panel in FCC to suit the Await quotation return 9/12/2019 23/12/2019
FSMP Y
CBI C&ED ITEM A205 1/F C&ED 97 INSP Officers for Cargo and Vehicle Processing Fire alarm bell to relocated due to the obstruction to future TV monitors. Await quotation return 25/11/2019 29/11/2019
Unit Y
CBI C&ED ITEM G/F Corridor Modification of sprinkler heads to suit 2350 headroom issue. Await quotation return 9/12/2019 23/12/2019 Y
CBI DH ITEM A31 1/F DH 15 Rest Room (Female Staff) Modification of sprinkler heads to suit the revised false ceiling. Await quotation return 2/12/2019 6/12/2019 Y
FXI C&ED ITEM E162 G/F X-Ray Control Cum Training Room Relocate sprinkler head to suit the cabinet design change (low cabinet to replace the high Await quotation return 9/12/2019 23/12/2019
cabinet) Y
FXI C&ED ITEM E163 1/F Sprinkler / FS Pump Room Reroute the pipe routing inside the pump room such that the maintenance space for a/c Await quotation return 9/12/2019 23/12/2019
duct fire dampers are free of obstruction. Y
DOG C&ED ITEM A88 G/F C&ED 296 Training Aids Store Modification of sprinkler heads away from AC provision Await quotation return 9/12/2019 23/12/2019 Y
CBO C&ED ITEM A69 C&ED 188 ROCARS On-site Control Room Relocate the sprinkler heads under obstruction as necessary to suit the additional Await quotation return 13/12/2019 23/12/2019
false ceiling. Y
CBO C&ED ITEM A90 Detention area (G/F) 1. Supply and install repeater panel at case processing room and all associated Await quotation return 13/12/2019 23/12/2019
Fire Control Centre (G/F) conduits and
wirings to receive alarm signal from the fire alarm panel.
2. Modify the fire alarm panel to provide alarm signals to the new repeater panel.
3. Provide 1 nos. CO2 fire extinguisher and 2 nos sand buckets in detection cell
corridor. Y
4. Supply and install sufficient low level direction signs along the evacuation route in
detection
area.

CBO C&ED ITEM E208 Corridor Relocate the sprinkler head in corridor area to maintain 2350mm headroom in the Await quotation return 13/12/2019 23/12/2019
area Y
FXO C&ED ITEM E163 FXRVIS (Outbound) Sprinkler/ FS Pump Room Reroute the pipe routing inside the pump room such that the maintenance space for a/c Await quotation return 13/12/2019 23/12/2019
duct fire dampers are free of obstruction. Y
General E06 Subway Provide an interfacing dry contact control relay for repeating the common fire Await quotation return 25/10/2019 25/10/2019
alarm
signal of ptb under zone 1 fire to the subway fire alarm panel.
Y

AC (CCMS) FS FSD ITEM E09 G/F LAN Server and TGMS Equipment 1) Supply and install drip tray complete with water leakage sensor under the new ac Await quotation return 13/12/2019 31/12/2019
indoor unit and drain pump.
2) Supply and install the local control panel, connected to the existing ddc panel at G/F ELV
CAB., and two-stage room temperature sensor (adjustable temperature setting) with
assoicated cable for high temperature alarm and water leakage alarm. the high
temperature alarm and water leakage alarm signal shall be repeated to the central control
and monitoring systems (CCMS) (INCLUDED SOFTWARE MODIFICATION FOR CCMS POINTS
AND GRAPHICS).
3) Coordinate with term contractor and provide the necessary control units with
associated wiring and cable containment for the duty/standby ac units. the additional ac
unit acts as standby unit in case of the duty unit is failed. (please refer to Y
IW/FSD/AC/SK007)
4) Coordination with all relevant parties for the works

POB HKP ITEM A19 HKPF30 Armoury and HKPF74 TBE Room, G/F 1) Supply and install drip tray complete with water leakage sensor under the ac Await quotation return 13/12/2019 31/12/2019 Y
indoor unit in TBE room.
13GB - Liantang/ Heung Yuen Wai Boundary Control Point (updated on 10 Oct 2019)
Works Order/ Quotation Summary
13GB - IMPROVEMENT WORKS (Other Items)
CBI C&ED ITEM A2 CCMS system (R/F) 1. SUPPLY AND INSTALL DDC FOR LIFT PANEL INTERFACING (LOW LEVEL) C/W Await quotation return 13/12/2019 31/12/2019
WEATHERPROOF CABINET. (THE MOUNTING LOCATION SHALL BE COORDINATED ON
SITE)
2. PROVIDE ESSENTIAL POWER FOR THE DDC.
3. SUPPLY AND INSTALL Ø25 G.I. CONDUIT AND 1 NO. OF MULTI-PAIR CABLE TO CONNECT
THE EXISTING DDC FOR CCMS (INCLUDED SOFTWARE MODIFICATION FOR CCMS POINTS
AND GRAPHICS). (HEADROOM SHALL NOT LESS THAN 2350MM)
4. COORDINATE WITH TERM CONTRACTOR FOR NECESSARY STRUCTURE, CEILING, WALL Y
OPENING FOR MODIFICATION WORK.

CBO C&ED ITEM A2 CCMS system (R/F) 1. SUPPLY AND INSTALL DDC FOR LIFT PANEL INTERFACING (LOW LEVEL) C/W Await quotation return 13/12/2019 31/12/2019
WEATHERPROOF CABINET. (THE MOUNTING LOCATION SHALL BE COORDINATED ON
SITE)
2. PROVIDE ESSENTIAL POWER FOR THE DDC.
3. SUPPLY AND INSTALL Ø25 G.I. CONDUIT AND 1 NO. OF MULTI-PAIR CABLE TO CONNECT
THE EXISTING DDC FOR CCMS (INCLUDED SOFTWARE MODIFICATION FOR CCMS POINTS
AND GRAPHICS). (HEADROOM SHALL NOT LESS THAN 2350MM)
4. COORDINATE WITH TERM CONTRACTOR FOR NECESSARY STRUCTURE, CEILING, WALL
OPENING FOR MODIFICATION WORK.

FXI/O C&ED ITEM E04 X-Ray Examination System Operation Room (Inbound 1. Supply and install the drip tray completed with water leakage sensor under Await quotation return 13/12/2019 31/12/2019
& Outbound) the a/c indoor units and drain pumps. Y
PD POB HKP ITEM E016 3/F Water Tank Room
2. Supply and install the local control panel with contact points for CCMS and
1) Revise routing of water pipe. Await quotation return 13/12/2019 31/12/2019
2) Coordination with all relevant parties for the works.
Y

Estimated Labourr (Builder's):


Estimated Labour (BS):

Material submission
construction/installation
material/ equipment delivery
completed activity

Top priority