Sie sind auf Seite 1von 4

URBAN PLANNING AND DEVELOPMENT DEPARTMENT

CONSTRUCTION OF BLACK TOP ROADS,PAVERS PAVEMENT AND SEWERAGE


SYSTEM AT SHALDARA,H.GHEBI ROAD,MALIK NAZAR CHOWK AND LINK
STREETS DURANI BAGH QUETTA.
ABSTRACT OF COST
PSDP NO. 2355(2019-20)
BASED ON COMPOSITE SCHEDULE OF RATES 2018
AMOUNT
S.NO DESCRIPTION
(PAK RS)

1 BLACK TOP ROADS

2 CONCRETE PAVER PAVEMENT

3 SEWERAGE SYSTEM

TOTAL
G-TOTAL RS
MILLION
URBAN PLANNING AND DEVELOPMENT DEPARTMENT
CONSTRUCTION OF BLACK TOP ROADS AT SHALDARA,H.GHEBI ROAD,MALIK NAZAR
CHOWK AND LINK STREETS DURANI BAGH QUETTA.
BILL OF QUANTITIES
BASED ON COMPOSITE SCHEDULE OF RATES 2018

S/No. Descrition Quantity Unit Rate Amount


(Pak Rs) (Pak Rs)
Excavation or cutting to a required grade, camber and
1 side slopes including dressing top and sides and
disposal of excavated material within a lift of 5ft
(1.5m) and lead upto 100 ft. (30m)
c Gravelly soil
(S.I.No 21-1 (c) )
EXCAVATION

66752.69 Cft
Preparation of sub-grade over bottom of excavation
with required dressing to required grade, camber and
side slopes including cutting to required depth and
breaking clods, watering and consolidation with
2 suitable mechanical means to attain maximum density
of 95% modified AASHTO for top 6" (150mm) layer
including disposal of surplus earth within a lead of
90m.
(S.I.No 21-12 -1) )
PREPARATION OF SUB-GRADE
100991.00 Sft
Providing and laying graded aggregate base course
of crushed stone of approved quality, including
placing, mixing, spreading, watering and compacting
base course to required depth, camber and grade to
3 achieve 100% max. modified AASHTO dry density
conforming to AASHTO specifications T -180, with
mechanical means and with all lead and lift.
(Carriage of crushed stone is included in the rate,
within 5km of Project premises).
(S.I.No 21-17 -1) )
P/L OF AGGREGATE BASE COURSE
50495.50 Cft

Providing and laying hot-mix bituminous concrete in


road pavement laid with mechanical paver and mixed
4 in central mixing plant in required thickness and
density, rolled hot with different types of rollers
complete as per specifications and job-mix formula
and design in single layer
c 2" (50 mm) thick
(S.I.No 21-32 c) )
BITUMINOUS CONCTERE
ROAD PAVEMENT

100991.00 Sft
TOTAL
Premium ----------------% Above or Below
G.Total

Page 2 of 4
URBAN PLANNING AND DEVELOPMENT DEPARTMENT
CONSTRUCTION OF CONCRETE PAVERS PAVEMENT AT SHALDARA,H.GHEBI
ROAD,MALIK NAZAR CHOWK AND LINK STREETS DURANI BAGH QUETTA.
BILL OF QUANTITIES
BASED ON COMPOSITE SCHEDULE OF RATES 2018

S/No. Descrition Quantity Unit Rate Amount


(Pak Rs) (Pak Rs)

1 Manual Levelling and dressing the ground


by cutting and filling earth upto 6 inches
(150mm) in depth including consolidating and
watering. To be used for area less than 100
sq.m, for areas more than 100 sq.m item No. 3-
46 to be utilized.
(S.I.No 3-55 -1)
EARTH WORK
For Concrete Pavers Pavement

47710.98 Sft

2 Rehandling of earthwork
TRANSPORTATION OF EARTH
(S.I.No 1 - 1 )

143.13 k.m

3 Filling, watering and compacting earth under


floors in layers not exceeding 8 inchs in
thickness.
With new earth excavated from outside, lead
upto 10 k.meter and lift upto 5 ft. (1.5m)
including royality of Clay
TRANSPORTATION OF EARTH
(S.I.No 3-16b + 1 - 1 )
143.13 k.m

4 Supply and Fixing of Concrete pavers on 3"


thick sand cushion of different designs having
thickness of 80 mm, mechnically compressed,
minimium strenght of 7000 psi after laboratory
testing at factory and random testiing at site as
and when desired by the Engineer inchange
comple in all respects. (No PCC work is
premitted underneath this item of work)
(S.I.No 21-91 -1)
CONCRETE PAVERS WITH SAND
CUSHION
45725.28 Sft
TOTAL
Premium ----------------% Above or Below
G.TOTAL

Page 3 of 4
URBAN PLANNING AND DEVELOPMENT DEPARTMENT
CONSTRUCTION OF SEWERAGE SYSTEM AT SHALDARA,H.GHEBI ROAD,MALIK
BILL OF QUANTITIES
BASED ON COMPOSITE SCHEDULE OF RATES 2018

S/No. Descrition Quantity Unit Rate Amount


Excavation in open cutting for sewers and manholes (Pak Rs) (Pak Rs)
1 as shown in drawings, dressing to correct sections
and dimensions according to templates and levels
and removing surface water in all types of soil except
rock
(i) The rate includes back filling after laying of sewer,
which is payable separately.
(ii) The rate for close/open shuttering & timbering will
be as per item No. 3-43 & 3-44 where actually used at
c Gravelly soil
(S.I.No 3-42 (A)iv )
EXCAVATION FOR SEWER

86124.64 Cft

2 Providing and laying 4" (100 mm) thick sand cushion


under R.C.C pipe
(S.I.No 14-3 -b )
SAND CUSHION UNDER R.C.C PIPE

23115.43 Sft

3 Providing and laying cement concrete pipes moulded


with cement concrete 1:1.5:3 with spigot socket or
collar joint as specified in trenches to correct
alignment and grade, jointing with jointing materials
including cutting pipes where necessary, finishing
R.C.C pipe with bell & spigot or tongued & grooved
joint conforming to ASTM C-76 class II wall B or BS
3911 Part I class M including cost of reinforcement.
18"(450 mm) inner dia
(S.I.No 25-1 -b iv)
P/L OF R.C.C PIPE

7705.14 Rft
TOTAL
Premium ----------------% Above or Below
G.TOTAL

Page 4 of 4