JRTPIC-FP-004 Rev.

1
CHECKLIST NUMBER DATE APPROVED QR NUMBER
CONTRACTOR INSPECTION CHECKLIST
Fireproofing Surface Preparation Inspection JRTPIC-FP-004 CIVIL
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Jazan Refinery & Terminal Project EPC-12 10-01055/0012 JGC-DEC


EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

CONTRACTOR ITP NUMBER CONTRACTOR ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Surface Preparation Inspection

Steel surfaces that are to be fireproofed with cementitious materials or


other proprietary fireproofing such as lightweight concrete, shall be
SAES-B-006,
A1 coated in accordance with SAES-H-101, APCS-1B.
Para. 8.4
The surface preparation and coating system specified shall be
referenced on all applicable construction drawings.

The Surface preparation and coating requirements shall be specified on


SAES-B-006,
A2 the applicable construction drawings and shall comply with SASD
Para. 8.4
Drawings AC-036915 and AD-036711.

The substrate must be clean, dry and free from visible moisture
Manufacturer's
A3 (including condensation), concrete laittance, formwork release oils, loose
Technical Data
millscale, loose rust and any other condition preventing good adhesion.

Manufacturer
Any repairs to the coating should be carried out and any loose surface
A4 Application
particles removed before application of a surface coating.
Manual

Minimum cleanliness level per SAES-H-101 (APCS 1B), Initial: Sa 2-1/2 SAES-B-006,
A5
(SP10), Touch-up: Sa 2-1/2 (SP10) St 3 (SP3) for areas less than 0.1m². Para. 8.4

Required profile per SAES-H-101 (APCS 1B): 40-65 micrometers,


SAES-B-006,
A6 minimum-maximum. Abrasive: 1000161068 (08-220-865), 1000161203
Para. 8.4
(08-220-895) or 1000160374 (08-202-900).

Wire mesh shall be provided in all fireproofing concrete. The wire mesh
A7 shall be either 4" x 4" - 10 GA. X 10 GA (SAMSS 12-743-625) or 2" x 2" - AD-036711
14GA x 14 GA (SAMSS 12-743-620).

Cover other work subject to damage from fallout or overspray of Manufacturer


A8
fireproofing materials during application.. Specifications

In all cases where a stud welded pin is to be attached to the steel


substrate, a good weld can only be achieved by good metal/metal Manufacturer
A9 contact. It therefore follows that any applied corrosion protection system Application
must therefore be removed locally back to bright metal prior to pin fixing Manual
at approximately 400mm centres on a diamond or staggered pitch.

Application shall be made in strict accordance with the manufacturer's


SAES-B-006,
A10 guidelines regarding ambient temperature, storage temperature,
Para. 8.2.3
materials, proportioning, and mixing.

Page 1 of 2
JRTPIC-FP-004 Rev.1
CHECKLIST NUMBER DATE APPROVED QR NUMBER
CONTRACTOR INSPECTION CHECKLIST
Fireproofing Surface Preparation Inspection JRTPIC-FP-004 CIVIL
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Jazan Refinery & Terminal Project EPC-12 10-01055/0012 JGC-DEC

The material may be be applied when the substrate and air temperature
is at least 2ºC and rising, but should not be applied if the substrate or air
Manufacturer's
A11 temperature are less than 4ºC and falling. Maxumum substrate and air
Technical Data
temperature is 50ºC. Substrate temperature should be at least 2ºC
above dew point temperature.

Manufacturer
In some cases it may be necessary to mask off surrounding areas to
A12 Application
protect from overspray.
Manual

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-B-006 - Fireproofing for Plants
2- SASD AD-036711 and SASD AC-036915
3- Manufacturer's Technical Data

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED