Sie sind auf Seite 1von 1

AP-ADE ROAD SEGREGATION

GHERZI CONSULTING ENGINEERS PVT. LTD.


ROAD SEGREGATION 02-01-20
LENGTH
PHASE 1 WIDTH FINISH DEFINITION OF ROAD COST (MLRC)
(MLRC)
FULL FROM ENTRANCE
36M
1 COMPOSITION ALONG MU1 UPTO I20

36M UPTO WMM SOUTH OF I20 TO I43


1
FULL FRONT ROAD ALONG
25M
1 COMPOSITION MU0,MU1

FULL EAST OF A1 UPTO


25M
COMPOSITION RD5
1
FULL
EAST OF I14 TO I19
COMPOSITION
1 18M
FULL
1 18M COMPOSITION SOUTH OF I43 TO I44
FULL
ALONG MU0 ,MU1
COMPOSITION
1 15M (South and east side)

1 7.5(15)M UPTO WMM FROM MU2 TO I44

1 10.5 (15)M UPTO WMM FROM R1 TO I22

LENGTH
PHASE 2 WIDTH FINISH DEFINITION OF ROAD COST (MLRC)
(MLRC)
FULL
SOUTH OF I23 TO I25
2 36M COMPOSITION
FULL
NORTH OF I34 TO I33
2 36M COMPOSITION
FULL
2 18M EAST OF I25 TO I33
COMPOSITION

LENGTH
PHASE 3 WIDTH FINISH DEFINITION OF ROAD COST (MLRC)
(MLRC)
FULL
EAST OF I43 TO I41
3 36M COMPOSITION
FULL
EAST OF I45 TO I48
3 18M COMPOSITION
3 7.5(15)M UPTO WMM WEST OF I45 TO I38

Page 1

Das könnte Ihnen auch gefallen