ESSENTIAL REQUIREMENTS
Base Station
©टीईसी, २०१८
©TEC, 2018
2
Table of Contents
Scope ......................................................................................................................... 4
History ........................................................................................................................ 5
Applicability Matrix...................................................................................................... 6
1 EMI/ EMC Requirements ..................................................................................... 7
2 Safety Requirements ......................................................................................... 10
3 Security Requirements ...................................................................................... 11
4 Technical Requirements .................................................................................... 12
4.1 Technical Requirements for GSM ............................................................... 12
4.2 Technical Requirements for WCDMA/HSPA ............................................... 13
4.3 Technical Requirements for LTE/LTE-A...................................................... 14
4.4 Technical Requirements for MSR ............................................................... 15
4.5 Technical Requirements for Active Antenna System .................................. 16
5 Other Requirements .......................................................................................... 17
References ............................................................................................................... 18
Glossary ................................................................................................................... 20
3
Scope
This document lays down the Essential Requirements under the mandatory testing
Framework in accordance with Government of India Gazette Notification No. G.S.R.
1131(E), dated 05th September 2017, for Base Station to be used in Indian Telecom
Network using 2G/3G/4G technology.
The document defines the mandatory testing requirements for certification under the
MT&CTE framework.
4
History
S.
Name of the Product ER Number Remarks
No.
5
Applicability Matrix
Product
Variant\ BSC RNC Um Uu MME SGW eNB eSMLC AAS Management
Interface
BTS (GSM) Yes Yes Through BSC
NodeB
Yes Yes Through RNC
(WCDMA)
eNodeB
Yes Yes Yes Yes Yes Yes
(LTE)
MSR –
Yes Yes Through BSC
GSM
MSR –
Yes Yes Through RNC
WCDMA
MSR – LTE Yes Yes Yes Yes Yes Yes
MSR –
GSM + Yes Yes Yes Yes Yes
WCDMA
MSR
WCDMA + Yes Yes Yes Yes Yes Yes Yes
LTE
MSR GSM
+ WCDMA Yes Yes Yes Yes Yes Yes Yes Yes Yes
+ LTE
MSR GSM
Yes Yes Yes Yes Yes Yes Yes Yes
+ LTE
MSR LTE –
WCDMA
and/ or LTE
with Yes Yes Yes Yes Yes Yes Yes Yes
Active
Antenna
System
Note: The equipment certified for MSR GSM+WCDMA+LTE can also be operated in
any one technology.
6
1 EMI/ EMC Requirements
(These requirements shall be as per TEC Standard No. TEC/SD/DD/EMC-
221/05.OCT-16 as modified/ amended from time to time)
Clause Parameter Standard Limits/ Results
expected
1.1 Conducted and Radiated CISPR 22 (2008) OR Compliance
Emission CISPR 32
Class-A
1.2 Immunity to Electrostatic IEC-61000-4-2 Compliance
discharge: Contact Performance Criteria-B,
discharge level 2 {± 4 kV} Clause 9
1.3 Immunity to Electrostatic IEC-61000-4-2 Compliance
discharge: Air discharge Performance Criteria-B,
level 3 {± 8 kV} Clause 9
1.4 Immunity to radiated RF: IEC 61000-4-3 (2010); Compliance
(a) Radio Frequency: 80 Performance Criteria-A,
MHz to 1 GHz, Clause 9
Electromagnetic field:
3V/m
(b) Radio Frequency: 800
MHz to 960 MHz,
Electromagnetic field:
10V/m
(c) Radio Frequency: 1.4
GHz to 6 GHz,
Electromagnetic field:
10V/m
1.5 Immunity to fast transients IEC 61000- 4- 4 {2012); Compliance
(burst): Test Level 2: Performance Criteria-B,
(a) 1 kV for AC/DC power Clause 9
port
(b) 0. 5 kV for signal /
control / data / telecom
lines.
1.6 Immunity to surges: AC/DC IEC 61000-4-5 (2014) Compliance
ports Performance Criteria-B,
a. 2 kV peak open Clause 9
circuit voltage for line to
ground
b. 1kV peak open
circuit voltage for line to
line
7
1.7 Immunity to surges: IEC 61000-4-5 (2014) Compliance
Telecom ports Performance Criteria-C,
(a) 2 kV peak open Clause 9
circuit voltage for line to
ground coupling.
(b) 2 kV peak open
circuit voltage for line to
line coupling.
1.8 Immunity to conducted IEC 61000-4-6 (2013) Compliance
disturbance induced by Performance Criteria-A,
Radio frequency fields: Clause 9
Under the test level 2 {3 V
r.m.s.} in the frequency
range 150 kHz-80 MHz for
AC / DC lines and Signal
/Control/telecom lines.
1.9 Immunity to voltage dips & IEC 61000-4-11 (2004): Compliance
short interruptions a. Performance Criteria B
(applicable to only ac for Reduction of Supply
mains power input ports, if 30% for 500ms or Dip to
any): reduction of 60% for
100ms
Limits: - b. Performance Criteria C
(a) a voltage dip for Reduction of 60% for
corresponding to a 200ms
reduction of the supply c. Performance criteria C for
voltage of 30% for Voltage Interruption>95%
500ms (i.e. 70% supply for 5 s
voltage for 500ms) (Note: In case of Battery
(b) a voltage dip back-up performance
corresponding to a criteria A is applicable).
reduction of the supply d. Performance Criteria B
voltage of 60% for for Voltage Interruption
200ms; (i.e.40% supply >95% duration :10ms
voltage for 200ms) (Note: In case of Battery
(c) a voltage interruption back-up Performance
corresponding to a Criteria A is applicable for
reduction of supply above conditions.)
voltage of > 95% for
5s.
(d) a voltage interruption
corresponding to a
reduction of supply
voltage of >95% for
10ms.
8
1.10 Immunity to voltage dips & IEC 61000-4-29(2000) Compliance
short interruptions a. Applicable Performance
(applicable to only DC Criteria shall be B.
power input ports, if any): b. Applicable Performance
a. Voltage Interruption with Criteria shall be C.
0% of supply for 10ms. c. Applicable Performance
b. Voltage Interruption with Criteria shall be B.
0% of supply for 30ms, d. Applicable Performance
100ms, 300ms and Criteria shall be C.
1000ms. e. Applicable Performance
c. Voltage dip Criteria shall be B.
corresponding to 40% &
70% of supply for 10ms,
30 ms.
d. Voltage dip
corresponding to 40% &
70% of supply for
100ms, 300 ms and
1000 ms.
e. Voltage variations
corresponding to 80%
and 120%of supply for
100 ms to 10s as per
Table 1c of IEC 61000-
4-29.
9
2 Safety Requirements
10
3 Security Requirements
11
4 Technical Requirements
4.1 Technical Requirements for GSM
Clause Parameter Standard Limits/
Results
expected
4.1.1. Operating Frequency Compliance
12
4.2 Technical Requirements for WCDMA/HSPA
Clause Parameter Standard Limits/ Results
expected
4.2.1. Operating Frequency Compliance
13
4.3 Technical Requirements for LTE/LTE-A
Clause Parameter Standard Limits/
Results
expected
4.3.1. Operating Frequency Compliance
14
4.4 Technical Requirements for MSR
Clause Parameter Standard Limits/
Results
expected
4.4.1 Operating Frequency Compliance
15
4.5 Technical Requirements for Active Antenna System
4.5.1. Transmitter
3GPP TS 37.145-1
16
5 Other Requirements
17
References
S.
Document Reference Document Title
No.
1. TEC/SD/DD/EMC- Electromagnetic Compatibility Standard for
221/05/ OCT-16 Telecommunication Equipment
2. CISPR 22 (2008) Limits and methods of measurement of radio disturbance
characteristics of Information Technology equipment
3. CISPR 32 (2015) Electromagnetic compatibility of multimedia equipment -
Emission requirements
18
19. 3GPP TS 37.145-1 Universal Mobile Telecommunications System (UMTS);
LTE; Active Antenna System (AAS) Base Station (BS)
conformance testing; Part 1: conducted conformance
testing
19
Glossary
BSS Base Station Subsystem
CAB Conformance Assessment Body
CISPR Comité International Spécial des Perturbations Radioélectriques
EIR Equipment Identity Register
EMC Electromagnetic Compatibility
ER Essential Requirements
ETSI European Telecommunications Standards Institute
EUT Equipment Under Test
GHz Giga Hertz
GSM Global System for Mobile
GSR General Statutory Rules
HSPA High Speed Packet Access
IEC International Electrotechnical Commission
IPv6 Internet Protocol version 6
MHz Mega Hertz
ms millisecond
LTE Long Term Evolution
MSR Multi Standard Radio
MTCTE Mandatory Testing and Certification of Telecom Equipment
NFAP National Frequency Allocation Plan
TEC Telecommunication Engineering Centre
WCDMA Wideband Code Division Multiple Access
WPC Wireless Planning & Coordination
-----END OF DOCUMENT-----