Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato

1. POE

SATISFACTION SECURITY CLEANLINESS TEMPERATURE NOISE LIGHT NETWORK AUDIO/VIDEO


OF THE SPACE CONNECTIVITY
WINTER SUMMER NATURAL ARTIFICIAL

CLASSROOM

STUDYROOM

LYBRARY

AUDITORIUM

GREEN SPACES

BATHROOM

RICREATIVE
SPACES

PROBLEMS DETECTED

1_Accessibility for disable people;


2_Lack of study rooms;
3_Outdated plants (audio/video system);
4_Lack of informatic-lab;
5_Poor green areas;
6_Unused spaces;
7_Lack of places for ricreation;
8_Lack of services;
9_Accessibility to the classrooms;

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato
accessibility problem
no connection
GROUND FLOOR

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato
SECONDARY
ENTRANCE FOR
SPORT AREA
THE STUDENTS

BIKE PARKING
RECREATION
AREA

DINING ROOM

GATHERING SPACE
NEW ENTRANCE

paths
GROUND FLOOR connection
new wall

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato
accessibility problem
no connection
FIRST FLOOR unused space

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato
STUDY ROOM

RECREATION AREA

connection
new wall
FIRST FLOOR

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato
SECOND FLOOR unused space

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato
STUDY ROOM

DINING ROOM

new wall
SECOND FLOOR

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato
THE NEW CAMPUS PROJECT
ACTIONS

1_Improve horizontal connections;


2_Creation of new study rooms;
3_Creation of new informatic-lab;
4_Improvement of the green areas;
5_Sunstitution of old devices;;
6-New places for ricreation;
7_New bike sharing;
8_New sport facilities;
9_Improvement of the network connection;

2.VALUE MANAGEMENT

EXPENSIVE INTERVENTION
CHEAP INTERVENTION

HIGHER VALUE
LOW VALUE

1° IMPROVE HORIZONTAL CONNECTION

2° CREATION OF NEW INFORMATIC-LAB


AND NEW STUDY ROOMS

3° IMPROVE NETWORK CONNECTIVITY AND


SUBSTITUTION OF OLD DEVICES

4° CREATION OF NEW RICREATION SPACES

5° CREATION OF NEW SPORT FACILITIES

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato
3.FACILITIES MANAGEMENT

TIMELINE

Improve horizontal
connection

New informatic Lab


New study room

Creation of new gathering


spaces

Improve network connectivity


and substitution of old devices

Creation of new sport facilities

August

November
March

September

October
February

April

May

June

July

Expensive
Cheap

OPERATIONS OF INTERVENTIONS DURING THE LIFE CIRCLE

_Maintanance of cooling and heating devices;


_Maintanance of the green;
_Maintanance of the safety system;
_Maintanance of the lighting system;
_Maintanance of the electric plant;
_Management of the cleaning of the campus;
_Maintanance of the audio and video system;
_Replacement of forniture;
_Protection of the exterior appearance of the building;
_Maintanance of the existing structure;

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato
5.BIM

SCHEME OF THE OPERATIONS WITH B.I.M.


DURING THE LIFE CYCLE OF THE BUILDING

SCANNING OF THE PERFORMANCE SCANNING OF THE TEMPERATURE


OF THE ELECTRIC PLANT DURING THE YEAR

BIM SCANNING OF THE


PERFORMANCE OF THE HEA-
TING AND COOLING DEVICES

ANALYSIS OF THE STRUCTURES CREATE AN ECONOMIC FRAME


OF THE INTERVENTIONS

Team members: Gaspare Capobianco, Moein Danesh, Dennis Galeazzi, Chiara Minato