S. No Work Activities Parameter / Ok /Not Ok 1 Double Phase Voltage Check 2 Ambient Temp. Check 3 Cooling Tower Condition Check And Clean Dry & Wet 4 Condenser Fan Out let Temp. Check 5 Electrical panel Off & Dry Clean 6 All Electrical Connection Check & tight 7 All Machine Body Clean
AMC Work Activities For Pump-1
S. No. Work Activities Parameter / Ok /Not Ok 1 Pump Parameter Check Check 2 Double Phase Voltage Check 3 Current of Pump Check 4 In let Water Pressure Kg Check 5 Out let water Pressure Kg Check 6 Aliment Check 8 vibration check Check 9 Sound Check Check 10 Pump Greasing Check & Refiling 11 All Electrical Connection Check & tight 12 Starter Panel & Pump Clean Office: 179, Udyog 13 Insulation Vihar Phase Resistance Test – I, Gurgaon Check Phone: +91-8130690835 Email: sales@comfonomics.com www.comfonomics.com [TYPE TEXT] [TYPE TEXT] 14 Motor Rpm Check
AMC Work Activities For Pump-2
S. No. Work Activities Parameter / Ok /Not Ok 1 Pump Parameter Check Check 2 Double Phase Voltage Check 3 Current of Pump Check 4 In let Water Pressure Kg Check 5 Out let water Pressure Kg Check 6 Aliment Check 8 vibration check Check 9 Sound Check Check 10 Pump Greasing Check & Refiling 11 All Electrical Connection Check & tight 12 Starter Panel & Pump Clean 13 Insulation Resistance Test Check 14 Motor Rpm Check Engineer Remarks:-