Sie sind auf Seite 1von 8

Project No.

Mitra Muda Prima


Document No.
Sangatta
Revision
INSPECTION & TEST PLAN Page
FOR BUILDING CONSTRUCTION Issue Date
M / ( ) = Monitor / Random - = Not
H = Hold Point W = Witness I = Actual Inspection
Inspection Applicable

I = Actual Inspection (with Inspection Report / Record when specified) ( ) = Inspection Frequency – Random
PROJECT
INSPECTION BY
DESCRIPTION OF INSPECTION SPEC / QUALITY RECORD NO. /
NO.
ACTIVITY CODE / REMARKS
CON-QC MMP AI
STANDARD

A. STRUKTUR BETON

1. Pemeriksaan Umum

i.  Alignment benar

ii.  Permukaan sesuai dan


dapat diterima
iii.  Kantung dan sambungan
bersih
iv.  Kusen pintu/jendela
terpasang dengan baik
v.  Bekisting baik
 Ukuran,jenis,penutup,
vi. dan lokasi penguat
lengkap dan sesuai
vii.  Clean Out / Scrabble dan
Joint Preparation sesuai
viii.  Rebar Welding Lap
Length / Type sesuai
ix.  Core Infill sesuai

x.  Bond Beam
dipasang dengan
baik
xi.  Pemeriksaan akhir

B. MASONRY

Pemeriksaan umum, persiapan


1. lokasi, akses,bahan,kualitas dan
keamanan

2. Inspeksi saat konstruksi


berlangsung
i.  Pencampuran fana/ mortal
mixing
ii.  Pemeriksaan vertical
dan alignment
Project No.
Mitra Muda Prima
Document No.
Sangatta
Revision
INSPECTION & TEST PLAN Page
FOR BUILDING CONSTRUCTION Issue Date
M / ( ) = Monitor / Random - = Not
H = Hold Point W = Witness I = Actual Inspection
Inspection Applicable

I = Actual Inspection (with Inspection Report / Record when specified) ( ) = Inspection Frequency – Random
PROJECT
INSPECTION BY
DESCRIPTION OF INSPECTION SPEC / QUALITY RECORD NO. /
NO.
ACTIVITY CODE / REMARKS
CON-QC MMP AI
STANDARD

iii. Pemeriksaan Akhir

C. Pekerjaan kayu dan sambungan

Persiapan lokasi,inspeksi
i. material,verifikasi
tekstur,warna,cacat, dll.
Inspeksi selama konstruksi
ii. berlangsung; pengerjaan,
perlengkapan, sambungan,
pintu,engsel
iii. Pemeriksaan vertical dan
alignment (jika berlaku)

iv. Pemeriksaan Akhir

D. Pengecatan

Persiapan umum, persiapan


i. lokasi, inspeksi bahan, warna,
cacat,dll.

ii. Surface washing, and


distempering

iii. Surface preparation prior coating

iv. Paint application

v. Pemeriksaan Akhir

E. Pekerjaan Lantai

Pemeriksaan umum, lokasi,


i. bahan, kualitas dan keamanan

Bed preparation, sub-base /


ii. layer(s), filling, panel, level, joints
etc.
Project No.
Mitra Muda Prima
Document No.
Sangatta
Revision
INSPECTION & TEST PLAN Page
FOR BUILDING CONSTRUCTION Issue Date
M / ( ) = Monitor / Random - = Not
H = Hold Point W = Witness I = Actual Inspection
Inspection Applicable

I = Actual Inspection (with Inspection Report / Record when specified) ( ) = Inspection Frequency – Random
PROJECT
INSPECTION BY
DESCRIPTION OF INSPECTION SPEC / QUALITY RECORD NO. /
NO.
ACTIVITY CODE / REMARKS
CON-QC MMP AI
STANDARD
iii. Inspection prior flooring I W

iv. Flooring construction / application I W

v. Final inspection I W

F. Saluran

General material inspection,


i. quantity, dimension, size, color,
defects etc

ii. Final Inspection

G. Drainase

i.  Indications of leakage or
erosion

ii.  Sludge present (provide


details below)

iii.
 Pipe penetrations grouted /
sealed

iv.
 Maintenance modifications
records (provide details below
or on a separate sheet if
required)

 Gratings in good condition


v.

vi.  Manhole covers in good


condition

vii.
Project No.
Mitra Muda Prima
Document No.
Sangatta
Revision
INSPECTION & TEST PLAN Page
FOR BUILDING CONSTRUCTION Issue Date
M / ( ) = Monitor / Random - = Not
H = Hold Point W = Witness I = Actual Inspection
Inspection Applicable

I = Actual Inspection (with Inspection Report / Record when specified) ( ) = Inspection Frequency – Random
PROJECT
INSPECTION BY
DESCRIPTION OF INSPECTION SPEC / QUALITY RECORD NO. /
NO.
ACTIVITY CODE / REMARKS
CON-QC MMP AI
STANDARD
H. WALL & CEILING FINISHES

Existing and prepared surfaces in


i. contact with finishes meet
specifications

ii. Material as per specification

Material Storage correct as per


iii. Manufacturer’s recommendation

Suitable tools and equipment


iv. availablefor correct preparation
andapplication of materials.

Masonry surface is prepared in


v. accordancewiththespecifications before
plaster is applied.

Wood stops provided to protect


vi. timber frames

Materials batched in proportions


vii. and method as indicated in the
specifications.

Scratch coat and finish coat plaster


viii. is applied and surface finished to
specification

Walls are plastered full length or to


ix. natural break points, minimizing
number of joints

Curing process is performed after


x. application of each layer as per
specification.

Damaged or defective areas


repaired or replaced, surfaces
xi.
are left clean and plaster has an
even tone throughout.
All debris and waste materials are
xii. removed and disposed of safely.
Project No.
Mitra Muda Prima
Document No.
Sangatta
Revision
INSPECTION & TEST PLAN Page
FOR BUILDING CONSTRUCTION Issue Date
M / ( ) = Monitor / Random - = Not
H = Hold Point W = Witness I = Actual Inspection
Inspection Applicable

I = Actual Inspection (with Inspection Report / Record when specified) ( ) = Inspection Frequency – Random
PROJECT
INSPECTION BY
DESCRIPTION OF INSPECTION SPEC / QUALITY RECORD NO. /
NO.
ACTIVITY CODE / REMARKS
CON-QC MMP AI
STANDARD
Substrate is free from loose
xiii. material, dry & dust free prior to
painting

Paint batch number & expiry dates


xiv. are recorded by Contractor

Pencahayaan dan sirkulasi udara


xv. memadai

Masking & sheeting is adequate


xvi.

Application of sealer coat


xvii. acceptable

Patch-up visible hairline cracks, pin


xviii. holes, chips, etc. acceptable

Surface preparation of intermediate


xix. coats acceptable

Application and final appearance


xx. Acceptance

I. FLOOR FINISHES
Existing and prepared surfaces in
i. contact with
finishes meet specifications

ii. Material as per specification

Material Storage correct as


iii. per Manufacturer’s recommendation

Suitable tools and equipment


iv. available for correct preparation
and application of materials.
Concrete moisture content
v. acceptable

vi. Ventilation acceptable


Project No.
Mitra Muda Prima
Document No.
Sangatta
Revision
INSPECTION & TEST PLAN Page
FOR BUILDING CONSTRUCTION Issue Date
M / ( ) = Monitor / Random - = Not
H = Hold Point W = Witness I = Actual Inspection
Inspection Applicable

I = Actual Inspection (with Inspection Report / Record when specified) ( ) = Inspection Frequency – Random
PROJECT
INSPECTION BY
DESCRIPTION OF INSPECTION SPEC / QUALITY RECORD NO. /
NO.
ACTIVITY CODE / REMARKS
CON-QC MMP AI
STANDARD

vii. Humidity acceptable

Adequate masking of surrounding


viii. areas

Mixing of epoxy components as per


ix. specification

Application as per specification


x.

All debris and waste materials are


xi. removed and disposed of
safely.

xii. Final Appearance Acceptable

J. SUSPENDED CEILING

Visual inspection of support


i. steelwork acceptable

Visual inspection of ceiling


ii.
panels acceptable
Visual inspection of cove &
iii.
trim acceptable

iv. Channel clamping to structure

Threaded rod installed


v.
correctly
Support beams installed
vi.
correctly
Apertures cut & taped
vii.
correctly
Panels installed into support
viii.
channel correctly

ix. Coving installation correct

x. Corners mitred correctly

xi. All joints sealed correctly


Project No.
Mitra Muda Prima
Document No.
Sangatta
Revision
INSPECTION & TEST PLAN Page
FOR BUILDING CONSTRUCTION Issue Date
M / ( ) = Monitor / Random - = Not
H = Hold Point W = Witness I = Actual Inspection
Inspection Applicable

I = Actual Inspection (with Inspection Report / Record when specified) ( ) = Inspection Frequency – Random
PROJECT
INSPECTION BY
DESCRIPTION OF INSPECTION SPEC / QUALITY RECORD NO. /
NO.
ACTIVITY CODE / REMARKS
CON-QC MMP AI
STANDARD
All debris and waste materials are
xii. removed and disposed of
safely.

xiii. Final Appearance Acceptable

K. INTERMEDIATE /
COMPLETION / TAKE OVER
Closing of all outstanding
i.
NCR
General Punch-listing in
accordance to Drawings,
ii.
Specifications, Codes, Standards
and Contract
Closing out Punch Listed
iii.
Items Inspection
Review and sign-off of all relevant
Inspection Records / Reports, MDR
iv. and Contract
Checklists, Documentations.
Submission compilation of relevant
Inspection Records / Reports,
Contract Checklists,
v.
Documentation, Completed
and Signed-Off Punch Lists.
Project No.
Mitra Muda Prima
Sangatta Document No.
Revision
INSPECTION & TEST PLAN Page
FOR BUILDING CONSTRUCTION Issue Date
M / ( ) = Monitor / Random - = Not
H = Hold Point W = Witness I = Actual Inspection
Inspection Applicable

I = Actual Inspection (with Inspection Report / Record when specified) ( ) = Inspection Frequency – Random
PROJECT
DESCRIPTION OF INSPECTION INSPECTION BY QUALITY RECORD NO. /
SPEC /
NO. ACTIVITY CODE / REMARKS
CON-QC MMP A
STANDARD I

ATTACHMENT
ABBREVIATION
rd
AI : Authorised Inspector / 3 Party Inspector
Customer : Customer Representative
CON-QC : CONTRACTOR’S QC Inspector
H : Hold Point (Activity Shall Be Hold Until Acceptance Of Respective Party
Approval / Testing)
V : Actual Inspection (with Inspection Report / Record when specified).
W : Witness Point (Activity May Proceed With Approval From Respective Party)
M/() : In-Progress Monitoring, Spot, Random Or Partial Inspection
R : Record Review
- : Not Applicable (N/A)
Engineering Spec : Specifications
Std : Standards Or Codes
Cl : Applicable Clause (s)
For Construction : Drawing For Construction.

Proposed By