OPERABILITY STUDY
Vessel – Chlorine vaporizer
Intention – untuk meningkatkan konsentrasi chlorine yang akan masuk ke vapour reactor
Guide word Deviation Cause Consequences and
action
Line No. 1
Intention – transfers chlorine feed from pump
Less of Flow Pump failure Possible dangerous
increase in temperature
of evaporator and high
pressure cause of
excessive steam in
evaporator: measure
and log pressure
differential
Level Valve failure (LC) detect that feed is
less than normal
threshold, so the steam
is closed due to less
flow level in evaporator
More of Flow Pump failure and flow Possible dangerous
control broken increase in volume of
chlorine feed in
evaporator impact to
excessive volume of
feed and low
temperature and
pressure on evaporator
Level Valve failure (LA) alarms, reaction
ceases:
Considered high flow
alarm, closed the vessel
or shut down the pump.
Possible damage to
evaporator and impact
to low temperature and
pressure
Line No. 2
Intention – transfers steam to evaporator
No/None Level Failure of steam flow Possible dangerous –
chlorine feed could
fulfill the evaporator
that makes evaporator
to explode
Failure of chlorine
feed valve
Failure of flow
control indicator
OR
Failure of level
control
Failure of steam
valve
Failure of pressure
control
Flooding of
Failure of steam
AND vaporizer liquid
chlorine to reactor
trap
Failure of high-
level S / D system
The probability of failure of the total system by this route can be calculated.
Probability of failure x 103
Chlorine feed valve 1
Flow control valve 0.1
Pump of chlorine feed 0.5
Level control 0.7
Steam valve 0.75
Pressure control 0.6
Steam trap 1.2
High level shut-down, sub-system 0.02
Probabilities are added for OR gates, and multiplied for AND gates; so the probability of flooding the
vaporizer is given by:
(1+0.1+0.5+0.7+0.75+0.6+1.2)x10-3 x 0.02 x 10-3 = 9.7 x 10-8