Beruflich Dokumente
Kultur Dokumente
DH-2000
Designation: DH-2000.
Model Name: DH-2000
Frequency: 50~60Hz
Power: 10KW
Index
1. General
2. Safety
4. Operation
5. Maintenance
7. Device components
8. Wire diagram
1. GENERAL INSTRUDCTIONS.
1.2 Warranty
1.3 Maintenance
1.4 Etc.
1. General instructions
improve productivity, the life of device, repair fee and to avoid damage.
- Transportation
- Keep compulsory rules and procedure guidelines for safety and accident
1.2. Warrantys
If the user remodels product, he/she is responsible for all troubles, especially,
1.2. Repair
SECTION 2
2. SAFETY
2.1 Warning, Danger signal
2.6 Maintenance
Attention
Precaution
If the user doesn’t follow rules so he/she get damage, the manufacturing
technique.
It can be dangerous that uneducated user sets the device and uses
improperly.
User should set the device under suitable conditions. It means that
eliminated at once.
on the manual.
on ‘OPERATION’.
appropriately.
guaranteed.
Spare parts
approved parts.
non-genuine parts.
starting work.
This is very important for unskilled workers to prevent the
possibility of accident.
2000.
- Shoes
- Gloves
- Safety cap
falling object.
- Safety key
- Operating panel
- Safety facility
Safety equipment
- Serious injuries
- Extreme danger
2.4. Fire protection
Where is a phone?
safety of the equipment, turn off the power immediately and do not
Note
in “maintenance” part.
2.5.2. Danger of electric radiation
properly.
Don’t bring any equipment that may interfere with the system.
on the equipment.
2.6. Maintenance
Before starting maintenance and repair work, you should take the
Before starting maintenance work and special work, the operating worker
measures
2.6.2. Cleaning the equipment
Note
Do not use steam jet, water injection and compressed air for cleaning.
allowed to
2 Shrink Device electric shock (In particular, you should not open the top
SECTION 3
3.3. Storage
3.4. Cleaning
3.6. Specifications
3.7. Commissioning
3.1. Shipment
Land transportation
by truck or rail.
Before packaging, the parts of equipment are sealed with foil after
NOTE
other cargo.
Please check that the loading capacity is available for the crane.
axi s of
Chains, ropes, rings and the axis of
r ot at i on
rotation should be technically
pl ace
If proper unloading device is not available, place
t he busi ness in
the business in
t he of
the hands of shipping company with loading.
When the consignment goods are lifted by crane, do not stand under there
If you ignore these safety regulations, the risk of accident is increased and the
abroad), the information for the loading (destination, a crane load) should be
The part of equipment should be firmly fixed to designated area for loading
Don’t put the rope in touch with machine parts or around them without any
safety device.
For transport by vehicles, machine parts should not exceed the permitted
vibration.
Only experienced man should tie and fix consignment goods and delegate
connection range.
crane.
3.3. Storage
outside.
3.4. Cleaning
When cleaning, Steam-Jet, Water- Jet and compressed air is not used. On
the other hand, you should take guidance and a confirmation sheet
systems.
If petroleum ether is used for cleaning, you must clean the components
Installation
- Put the basic stand (table) on a horizontal plane, and level off.
fitting. (chapter3.7)
fitting.
3.6. Specification regarding DH-2000
Travel range of head about 330mm. from table to an induction coil (maximum
Power 10Kw
Before connection the wire for power supply, you must check the
switch “OFF”
4. Turn on the switch which is located on the left of the machine and
4. Operation
diameter to be shrunk.
display.
diameter to be shrunk.
display.
When push the button “Start” the machine will start the process of
If you push the button for about 3 seconds, time of a chosen tool
on LCD flickers on and off, and you can modify time at intervals of
0.1 seconds. If you want to reduce time, push the down button. If
you want to increase time, push the up button. If you want to input
modified time, push this button and the modified time will be saved
in the memory.
- If you don’t insert the Tool Holder, you must not start the
button “Start”.
Heat will proceed in the induction coil and IGBT, and the power
fan.
You can only heat the cool shrinking chuck. If you push the button
Caution
You must not install the shrinking device near the machines
described below.
4.3.2. If the Tool Holder is not coincident with boundary surface of shrinking
chuck, you must change the Adapter Flange. In order for this, you put out
pleasure.
Under any circumstances, you must use the Adapter Flange which has to
operate, heated Arbor can do a person harm, and cause device failure.
an induction coil Other Stop Rings are chosen for other axis
as follows.
SR6 Ø3 - 6
If you want to change the Stop Ring, you should handle as follows.
4.4.1. Pull out the slider which is on the upper side of head of the induction coil.
4.5.1. Choose the diameter for work of shrinking on the panel. In order for this work,
you can use the up and down button. ( ) The chosen diameter will be
4.5.2. Insert the Tool Holder to shrink into the Adapter Flange.
4.5.3. Check whether the exact Stop Ring or not. (Chapter 4.5)
4.5.4. Move the head of the induction coil to the shrinking fitting
place.
(The upper part of the Tool Holder must be pressing against the Stop Ring.)
4.5.5. Push the button “Start” : Heat treatment will be started. During the heating
During the heating process, you do not touch the head f induction
head and start with on-load operation, the heating device will be
failure.
position.
machine.
Before using the DH-2000, you must to use the cooled tool holder.
4.8.1 Condition of Induction coil and controller exceeding the safe temperature
- If you put the uninduced tool to induction coil-head and press the
“start” button, induction coil and controller’s IGBT part’s
work.
- When you let the heated tool holder unremoved from device.
5. maintenance
directions.
Please turn off the power and wait for 10 minutes then turn on again.
Please turn off the power and wait for 10 minutes then turn on again.
Please turn off the power and wait for 10 minutes then turn on again.
5.1.4. Fuse
When the fuse blows of shrinking device, that kind of situation can
happen.
If you press the main switch but the LCD screen will have no
response.
When the fuse blow out.
After COAD with connected coil-head detach form shrinking machine body,
30A, 20mm)
SECTION 6
6. Parts
6.1. Adaptor flange
Designation Size
SR6 Ø3 - 6
SECTION 7
7. Components of machine
7.1 DH-2000
Designation Size
고정 레버
Induction Coil
공냉식 (Through)
Induction Coil
공냉식 (Internal)
수분 제거 필터
Main power on
For panel : MS3102A 24-22P
Cable : MS3106A-24-22S
Main Switch
Voltage
Power
converter
IGBT board
Filte
r
condenser
fuse Control
board
SECTION 8
8. wiring diagram
HEAD
Heat sinks
Temperature Sensor
IGBT-1 IGBT-2
Bimetal
LCD MAIN
KEYPA CONTROL
D F F F
BOARD
F
30A U U U 10A U
S S S S
U VE WE E 380/220V
E
SMPS
NOISE
TRANS (+15V/1A)
FILTER
R SPOWER
T
FAN-2
SWITCH
FAN-1
R SAC380V
T
A-R
INPUT
B-S
C-T
D-GND
SECTION 9