Beruflich Dokumente
Kultur Dokumente
CUSTOM CLADDING
2''THK CONCRETE MOULDING
A B C D E F G H I J
TOP OF PARAPET WALL
2.00
TOP OF BEAM
0.50
BOT. OF BEAM
3.00
2.60
8.20
TOP OF BEAM
0.50
BOT. OF BEAM
3.20
2.50
F.F.L.
N.G.L.
0.20
1 FRONT VIEW ELEVATION
SCALE 1:150mtrs.
A 4
1 2 3 4 5 6 7 8 9 10
TOP OF BEAM
0.50
BOT. OF BEAM
3.00
2.60
8.20
TOP OF BEAM
0.50
BOT. OF BEAM
3.20
2.50
F.F.L.
N.G.L.
0.20
PREPARED BY : RECOMMENDING APPROVAL : APPROVED : PROJECT TITLE : CHECKED BY : SHEET CONTENT : SHEET NO. :
4
RIGHT SIDE VIEW ELEVATION
HEALTH AND SCIENCE BUILDING RECEIVED
CADD BY : JAYPEE MANUEL
ELYZAR R. RICO RICHARD P. PABLO SAMUEL O. BENIGNO, Ph. D. LOCATION :
DATE
QUANTITY SURVEYOR OIC-DIRECTOR, PHYSICAL PLANT PRESIDENT
AND SITE DEVELOPMENT QSU - DIFFUN CAMPUS, DIFFUN, QUIRINO SUBMITTED ARCHITECTURAL