Sie sind auf Seite 1von 3

CNIC: 33204-0344812-3
asad_121472@yahoo.com
+92-300,6504911,+92-313,48-51214

Objective

I am seeking a position in a company that allows me to apply and enhance my skills in a competitive environment.
In addition, I am eager to contribute my creativity and hard work towards the success of your company and to the
growth of the fast developing field.

Personal Information

• Name MUHAMMAD ASAD ABBAS KHAN


• Father’s Name ALI NAWAZ KHAN
• CNIC 33204-0344812-3
• Date of Birth 25-12-1985
• Address 51/18 U block S.Town Distt Jhang
• Phone +92-3006504911 ,0313-48,5,12,14

Education
 Three-Year Diploma in(Telecom) From TIP in 2006
 Matric (Science) From HSS Hassu Balial(Jhang) in 2002
 Three months course Optical Fiber Transmission System & Cable Jointing From TF(Islamabad)
 Six Month Computer Course

Work History
• Currently working as BSS Engineer in Highrise Pvt Islamabad .(2012 to continue)

• 5 year Experience in Netkom Technologies as BSS Supervisor.(2007 to 2012)


 One Year Experience Jointing & Testing Of OFC in CET Telecom (PVT) LTD(2006 to 2007).

Job Responsibilities/ Work Experience


 Hardware Installation and maintenance All kinds of Huawei BTS,BSC,MW,
Optix Systems, power systems used in pakistan.
 Resume:

 BTS3900&3900A, BTS 3012&3012AE, BTS 3606.


 BSC6000, BSC 6900.
 OSN2500, OSN 3500, OSN 7500 and UMG
 Have good touch on Software TEMS, CNT, LMT,WEBLCTU 2000 and SMT .
 Complete installation of NEC Passolink equipments
 Complete Installation and Configration of RTN (610,620,605).
 Complete Installation and Configration of RTN (910,950.980).
 Making cros conction on site.
 Used all kind of site Analyzer.
 Survey of mobilink sites for swap.
 Site location with GPS.
 Performed sweep test before swap.
 Completely responsible, for integration, installation and commissioning of BTS and DBS.
 Fault rectification and trouble shooting of BTS and DBS.
 Alarm patching, monitoring and clearing of indoor and outdoor sites
 Achieving the targets by completing the up gradation and new sites
 Transmission shifting
 Software commission
 Installation and commissioning complete roll out new creation site swap site.
 Complete site audit orientation tilting and full clearance RF issues.
 Dismantling and Reinstallations and commissioning unit of NEC Passolink and Alcatel.
 Full hand on Transmission shifting activity indoor MW rack to TMC cabinet and minisheltor.
 Provide technical support to the project team
 Installation of PTCL Rollout sites With APM30.
 Optical Fiber Cable Jointing & Testing.
 UTP Testing & Networking Installation of ODF.
 Installation of UTP Patch Panel.
 Operate Fusion Splicer, OTDR, Power Meter and Source Meter.
 Installation of joint Closure in Field.
 Jointing & Repairing of UG Cable.
MAJOR PROJECTS:
 UFONE(new installation,Swap & RF Expansion )
 MOBILINK (new Installation & Swap P1,2,3,4,5 )
 WARID new installation of rollout sites
 ZONG (new installation,Swap & MWSwap)
 AUGERE(in karachi).
 PTCL(new installation)

 Page 2 |
 Resume:

 Page 3 |

Das könnte Ihnen auch gefallen