OWNER:
LOCATION:
SUBJECT:
29.76 sq.m
ITEM DESCRIPTION QUANTITY UNIT
A. Mobilization / Demobilization 1.00 lot
B. Demolition Works 1.00 lot
C. Site Preparation 1.00 lot
D. Tile Works
d.1 30cm x 30cm Tiles 335.00 Pcs
d.2 Grout 2.00 bags
d.3 Cement 6.00 bags
d.4 Sand 1.00 cu.m
E. Site Clearing 1.00 lot
10.27 sq.m
ITEM DESCRIPTION QUANTITY UNIT
A. Mobilization / Demobilization 1.00 lot
B. Demolition Works 1.00 lot
C. Site Preparation 1.00 lot
D. Tile Works
d.1 30cm x 30cm Tiles 120.00 Pcs
d.2 Grout 2.00 bags
d.3 Cement 3.00 bags
d.4 Sand 0.30 cu.m
E. Site Clearing 1.00 lot
25.08 sq.m
ITEM DESCRIPTION QUANTITY UNIT
A. Mobilization / Demobilization 1.00 lot
B. Demolition Works 1.00 lot
C. Site Preparation 1.00 lot
D. Tile Works
d.1 30cm x 30cm Tiles 280.00 Pcs
d.2 Grout 2.00 bags
d.3 Cement 6.00 bags
d.4 Sand 0.60 cu.m
E. Site Clearing 1.00 lot
29.76 sq.m
MATERIAL COST LABOR COST TOTAL COST AMOUNT
5,000.00 5,000.00 5,000.00
4,000.00 4,000.00 4,000.00
2,500.00 2,500.00 2,500.00
10.27 sq.m
MATERIAL COST LABOR COST TOTAL COST AMOUNT
5,000.00 5,000.00 5,000.00
2,000.00 2,000.00 2,000.00
1,000.00 1,000.00 1,000.00
25.08 sq.m
MATERIAL COST LABOR COST TOTAL COST AMOUNT
5,000.00 5,000.00 5,000.00
2,500.00 2,500.00 2,500.00
1,500.00 1,500.00 1,500.00
153,660.25
30,732.05
15,366.03
199,758.33
29.76 sq.m
QUANTITY UNIT MATERIAL COST LABOR COST
1.00 lot 5,000.00
1.00 lot 3,000.00
1.00 lot 2,000.00
1,080.00 4,320.00
337.50 1,350.00
162.00 648.00
2,500.00 2,500.00
TOTAL AMOUNT 18,818.00