June 2019 –
Field Lead HSE Engineer, Saipem S.p.A. Serbia Branch
Borislav
Gazprom’s contractor on TurkStream gas pipeline project-Transmission Gas Pipeline Serbia
(Interconnector) border of Bulgaria – border of Hungary (1,2billion+$;13.88 billion m3; 403km)
• 1000+ employees on site, leading HSE officers (16 FTE)
Vulić
August 2018 – May 2019
HSE Manager, Elita-Cop Ltd.
CB&I’s civil works contractor on DCU Plant project in NIS Gazprom Neft Pancevo Oil Refinery
(500 million+ $; 2 million Man Hours without Lost Time Injuries), Pančevo, Serbia
• excavations, piling, trenches, foundations, demolition, roads, paving, manholes, concrete
Grad IOSH structures, fireproofing…
• 500+ employees on site, leading HSE staff (13 FTE)
31 years old
March - August 2018
EHS Site Lead, CJR Renewables Ltd.
Belgrade, Serbia • General Electric's (GE Renewable Energies) subcontractor on Masdar CIBUK 1 wind farm
project (158,4MW-57WTG’s; 300 million+ $), Cibuk 1 wind farm, Dolovo, Serbia
❖ BoP works (platforms, foundations, roads, medium-voltage cable grid instalation)
Republic of Serbia
• Enlight Renewable Energies contractor on Blacksmith wind farm project (104,5MW-
38WTG’s; 200 million+ $), Blacksmith wind farm, Kovačica, Serbia
+381 (0)65 89 07 041 ❖ Installation of 19 WTG’s & BoP works (platforms, foundations, 40km access and
roads,45km of Cable trenches, 2 OHL 220 kV, Substation 220/33/10 kV)
EMPLOYMENT
June 2019 –
Field Lead HSE Engineer, Saipem S.p.A. Serbia Branch
Gazprom’s contractor on TurkStream gas pipeline project-Transmission Gas Pipeline Serbia
Borislav (Interconnector) border of Bulgaria – border of Hungary (1,2billion+$;13.88 billion m3; 403km)
1000+ employees on site, leading HSE officers (11 FTE)
Vulić
HSE Manager, Elita-Cop Ltd.
CB&I’s civil works contractor on DCU Plant project in NIS Gazprom Neft Pancevo Oil Refinery
(500 million+ $; 2 million Man Hours without Lost Time Injuries), Pančevo, Serbia
excavations, piling, trenches, foundations, demolition, roads, paving, manholes, concrete
Grad IOSH structures, fireproofing…
500+ employees on site, leading HSE staff (13 FTE)
30 years old
March - August 2018
EHS Site Lead, CJR Renewables Ltd.
Belgrade, Serbia General Electric's (GE Renewable Energies) subcontractor on Masdar CIBUK 1 wind farm
project (158,4MW-57WTG’s; 300 million+ $), Cibuk 1 wind farm, Dolovo, Serbia
BoP works (platforms, foundations, roads, medium-voltage cable grid instalation)
Republic of Serbia
Enlight Renewable Energies contractor on Blacksmith wind farm project (104,5MW-
38WTG’s; 200 million+ $), Blacksmith wind farm, Kovačica, Serbia
+381 (0)65 89 07 041 Installation of 19 WTG’s & BoP works (platforms, foundations, 40km access and
roads,45km of Cable trenches, 2 OHL 220 kV, Substation 220/33/10 kV)