Sie sind auf Seite 1von 50

PT.

BRANTAS ABIPRAYA (PERSERO)

CROSS SECTION SURVEYING SHEET


Measurement by waterpass Instrument

No & Type of Instrument :


Name of Canal :
Location :

Point No Backward Sight Forward Sight Distance

Inter
Target

Top Top Cumulateive


Sta Center Center Detile
Bottom Bottom
(mm) (mm) (mm) (mm) (mm) (mm)
Sketh/Description :

Approved by the Enggineer Checked by the Consultant


of the project of the Consultant

(………………………………..) (…………………………….)
TION SURVEYING SHEET
ent by waterpass Instrument

Surveyed :
Date :

Elevation
Point Remarks

(mm)
Checked by The Contractor
PT.Brantas Abipraya

(…………………………..)
PT. BRANTAS ABIPRAYA (PERSERO)

TRAVERSE MEASUREMENT
DIUKUR/MEASURED BY :………………………………………………….. TANGGAL/DATE :……………
PROJECT :………………………………………………….. ALAT/INSTRUMENT :………………

DATA LAPANGAN / FIELD DATA PENGOLA


Sudut Datar / Horizontal Sudut Tegak Jarak miring/Slope
Jarak
TA/H Titik Dituju
Datar
I II Vertical Angle
Meteran
Electronic
Dict
TR/PH Point Object Position deg min sec deg min sec deg min sec Tape band H0r Dist

B/N
LB/UN
B/N
LB/UN

B/N
LB/UN
B/N
LB/UN

B/N
LB/UN
B/N
LB/UN

B/N
LB/UN
B/N
LB/UN
B/N
LB/UN
B/N
LB/UN

Approved by Chief Surveyor Checked by Chief Surveyor Checked


of the project of the Consultant of t

(………………………………..) (…………………………….) (………


ERSERO)

E MEASUREMENT
TANGGAL/DATE :……………………………………………
ALAT/INSTRUMENT :…………………………………………..

PENGOLAHAN / PROCESSING

Beda Tinggi Tinggi Ket

Elevation Ref. Level Remark


Checked by Chief Surveyor
of the Contractor

(…………………………..)
PT.BRANTAS ABIPRAYA ( Persero )
CONSTRUCION OFIRIGATION AIR LAKITAN

DATE : : DATA IS TAKEN BY


LOCATION : SITUATION MEASUREMENT EQUIPMENT NO
AREA : PAGE

STATION TARGET
READING OF HORIZONTAL
ANGEL
READING OF STAFF VERTICAL ANGEL
OPTICAL
DISTANCE
HRZTL
DISTANCE ∆н
deg min sec Centre Top Bottom deg min sec (m) (m) ( +- )
Skets:

Approved by Chief Surveyor Checked by Chief Surveyor Checked


of the project of the Consultant of th

(………………………………..) (…………………………….) (…………


:
:
:

ELEVATION REMARKS
Checked by Chief Surveyor
of the Contractor

(…………………………..)
PT. BRANTAS ABIPRAYA (Persero)
Head Office :jl.D.I.Panjaitan KAV.14,Cawang,East Jakarta(13340)
Telp. 021-8516290,Fax 021-8516095

Lokasi : BENDUNG
Area/Lop : BM.LKT 01 - TP.1.G HITUNGAN POLYGON
Proyek : Air Lakitan II
Sudut Horztl Kor Azimuth D.Sin.az corr D.Cos.az
NO No Point Jarak
deg min sec " deg min sec dx dx dy

LKT.01
338 47 57
1 TP.1 242 50 33
41 38 30 293.977 195.339 219.693
2 a.1 195 03 02
56 41 32 239.935 200.522 131.757
3 a.2 152 32 17
29 13 49 607.593 296.701 530.224
4 a.3 196 21 01
45 34 50 145.592 103.987 101.901
5 BL.1B.1 165 08 36
30 43 26 220.293 112.548 189.372
6 TBM.3N 186 39 42
37 23 08 518.530 314.839 412.007
7 a.4 215 59 45
73 22 53 395.407 378.891 113.086
8 BM.PR.49 164 18 30
57 41 23 185.338 156.642 99.064
TP.1.G

REFERENSI LKT.01
POLYGON I ( MC 100% ) 32 02 02
REFERENSI .TP.1.G

REFERENSI LKT.01
POLYGON II (PENGECEKAN) 32 02 03
REFERENSI .TP.1.G
Close error Analysis : Distance Measurement :
Closing Azimuth-I 32 02 02 Sum of Distance : 2,606.665
Closing Azimuth-II 32 02 03 Close error for Abcis 7,969.215
Number of point 08 Close error for Ordinate -16,888
Close Error 00 00 01 Linier error 18673.7
Tolerance 10Vn 00 00 28 Relative Accuraci 1: -

Approved by Chief Surveyor Checked by Chief Surveyor


of the project of the Consultant

(………………………………..) (…………………………….)
Tanggal : 2/4/2010
Di hitung oleh : Suwito M
Contractor : PT.Brantas Abipraya
corr CORDINATE
No Point
dy X Y

-9,706.006 15,032.252 LKT.01

-9,728.684 15,090.717 TP.1

-9,533.345 15,310.410 a.1

-9,332.823 15,442.167 a.2

-9,036.122 15,972.391 a.3

-8,932.135 16,074.291 BL.1B.1

-8,819.586 16,263.664 TBM.3N

-8,504.747 16,675.671 a.4

-8,125.856 16,788.756 BM.PR.49

-7,969.215 16,887.820 TP.1.G

REFERENSI LKT.01 -9,706.006 15,032.252

REFERENSI .TP.1.G 0.000 0.000

REFERENSI LKT.01 -9,706.006 15,032.252

REFERENSI .TP.1.G -7,969.215 16,887.820


-

Checked by Chief Surveyor


of the Contractor

(…………………………..)
PT.BRANTAS ABIPRAYA ( Persero )
CONSTRUCION OFIRIGATION AIR LAKITAN

DATE : DATA IS TAKEN BY


LOCATION : SITUATION MEASUREMENT EQUIPMENT NO
AREA : PAGE
READING OF HORIZONTAL OPTICAL HORIZONTAL
READING OF STAFF VERTICAL ANGEL
ANGEL DISTANCE DISTANCE
STATION TARGET
deg min sec Centre Top Bottom deg min sec (m) (m)

TP.328

TP.330

1.190 TP.1B 1.400 89 13 37 84.919

TP.330

TP.1B

1.469 TP.2B 1.400 91 5 22 291.433

TP.1B

TP.2B

1.497 1 3.000 89 01 40 62.981

2 3.000 88 35 24 63.273

3 3.000 89 35 24 63.407

4 3.000 88 56 37 63.785

5 3.000 88 37 47 39.112

6 3.000 87 48 18 38.564

7 3.000 87 41 20 37.480

8 3.000 88 14 44 37.233

9 3.000 96 31 08 8.520

10 3.000 76 44 59 8.934

11 3.000 80 23 04 11.948

12 3.000 94 26 11 12.025

13 3.000 95 06 29 10.393

14 3.000 78 24 43 10.221

15 3.000 72 32 00 6.827

16 3.000 98 10 59 6.508

17 3.000 89 42 50 24.528

18 3.000 87 07 30 24.583

19 3.000 86 52 04 25.292

20 3.000 88 11 34 25.766

21 3.000 88 45 26 58.830

22 3.000 88 34 46 58.691

23 3.000 88 41 41 58.698

24 3.000 89 08 19 57.972
25 3.000 89 43 29 48.286

26 3.000 91 00 39 47.780

27 3.000 91 49 10 36.582

28 3.000 92 19 59 32.129

29 3.000 91 25 50 38.691

30 3.000 92 19 59 50.350

Approved by Chief Surveyor Checked by Chief Surveyor


of the project of the Consultant

(………………………………..) (…………………………….)
TAKEN BY :
MENT NO :
:
∆н ELEVATION REMARKS
( +- )

47.746

0.799 48.545

48.545

-5.753 41.993

41.993

-0.544 41.449

-0.012 41.981

-1.116 40.877

-0.430 41.563

-0.648 41.345

-0.055 41.938

-0.023 41.970

-0.434 41.559

-2.480 39.513

0.576 42.570

0.519 42.512

-2.442 39.551

-2.445 39.548

0.573 42.566

0.645 42.638

-2.456 39.537

-1.434 40.559

-0.301 41.692

-0.123 41.870

-0.728 41.265

-0.294 41.700

-0.165 41.805

-0.271 41.722

-0.679 41.290
-1.332 40.661

-2.427 39.543

-2.681 39.312

-2.895 39.617

-2.554 39.439

-3.684 38.309

Checked by Chief Surveyor


of the Contractor

(…………………………..)
BERITA ACARA HASIL PENGUKURAN PENGECEKAN ULANG TITIK-TITIK REFERENS

Pada hari ini jum'at, tanggal 6 Januari 2012 akan di adakan pengecekan BM, TBM dan CP yang akan di gunakan
acuan atau Reverensi pada pekerjan tambahan (Aditional Work).

Adapun BM,TBM dan CP yang akan di adakan pengecekan ulang dan nantinya akan di pergunakan sebagai acua
Reverensi pada pengukaran selanjutnya adalah sebagai berikut:

Koordinate Elevasi
No No. Point Posisi
(X) (Y) Devinitive
3 LKT.01.a -9817.85719 15116.06801 57.185 Bendung

4 LKT.01.b -9897.23717 15157.80579 57.147 Bendung

3 BL.1B.1 (9,148.385) 16,213.208 51.656 Main Canal

4 TBM.3.N (9,073.205) 16,420.275 53.282 Main Canal

6 BM.03 (8,322.715) 17,575.326 52.767 Main Canal

14 BM.04.P (5,179.349) 22,966.499 48.183 Main Canal

16 BM.BL.1 (3,975.220) 22,591.911 48.128 Main Canal

17 BM.BL.2 (3,664.317) 22,567.101 47.654 Main Canal

Demikian Berita Acara ini dibuat dan ditandatangani untuk dapat di pergunakan sebagai mana mestin

Lubuk Linggau, 5 Januari

Proyek Air Lakitan Konsultan Kontraktor


P P K II PIRIMP PT.Brantas Abipraya (Pers

H. Tagore Ramlan ST. Ir.Guntolo Slamet Haryono.ST.


NIP. 195704011980031002 Sub Project Leader Kepala Proyek
KURAN PENGECEKAN ULANG TITIK-TITIK REFERENSI

012 akan di adakan pengecekan BM, TBM dan CP yang akan di gunakan sebagai

dakan pengecekan ulang dan nantinya akan di pergunakan sebagai acuan atau

keterangan

Didepan Operation House

dikiri bendungan

Village Bridge bl.1B

Village Bridge bl.1D

Out let River side

P.208 / Right side

Off Take BL.1 / Left side

Off Take BL.2 / Left side

ditandatangani untuk dapat di pergunakan sebagai mana mestinya.

Lubuk Linggau, 5 Januari 2012

Kontraktor
PT.Brantas Abipraya (Persero)

Slamet Haryono.ST.
Kepala Proyek
CROSS SECTION SURVEYING SHEET
Measurement by waterpass Instrument

No & Type of Instrument : Sokkia C330


Name of Canal : Main Canal
Location : P.228 s/d BL.1

Point No Backward Sight Forward Sight Distance


Target

Top Top Inter Detile Beda Tinggi


Sta Center Center
Bottom Bottom
(mm) (mm) (mm) (mm) (mm) (mm)
1.757
BM.BL.1 1.560
1.363
1
1.482
P.0 1.327 0.233
1.172

1.098
P.0 1.074
1.050
2
1.278
P.1 1.255 -0.181
1.232

1.264
P.1 1.234
1.204
3
1.224
P.2 1.191 0.043
1.158

1.128
P.2 1.069
1.011
4
1.108
P.3 1.042 0.027
0.976

1.176
P.3 1.121
1.066
5
1.305
P.4 1.235 -0.114
1.165

1.163
P.4 1.133
1.103
6
1.315
P.5 1.278 -0.145
1.241

1.227
P.5 1.202
1.177
7
1.243
P.6 1.216 -0.014
1.189

1.238
P.6 1.170
1.102
8
1.070
P.7 1.012 0.158
0.954

Approved by the Enggineer Checked by the Consultant


of the project of the Consultant

(………………………………..) (…………………………….)
CROSS SECTION SURVEYING SHEET
Measurement by waterpass Instrument
No & Type of Instrument : Sokkia C330
Name of Canal : Main Canal
Location : P.228 s/d BL.1

Point No Backward Sight Forward Sight Distance


Target

Top Top Inter Detile Beda Tinggi


Sta Center Center
Bottom Bottom
(mm) (mm) (mm) (mm) (mm) (mm)
1.282
P.7 1.217
1.152
9
1.165
P.8 1.105 0.112
1.045

1.077
P.8 1.028
0.981
10
1.106
P.9 1.030 -0.002
0.954

1.042
P.9 0.966
0.89
11
1.092
P.10 1.044 -0.078
0.996

1.159
P.10 1.089
1.019
12
1.201
P.11 1.146 -0.057
1.091

1.278
P.11 1.223
1.166
13
1.224
P.12 1.154 0.069
1.084

1.206
P.12 1.148
1.090
14
1.183
P.13 1.116 0.032
1.048

1.096
P.13 1.043
0.990
15
1.248
P.14 1.176 -0.133
1.104

Approved by the Enggineer Checked by the Consultant


of the project of the Consultant
(………………………………..) (…………………………….)
CROSS SECTION SURVEYING SHEET
Measurement by waterpass Instrument
No & Type of Instrument : Sokkia C330
Name of Canal : Main Canal
Location : P.228 s/d BL.1

Point No Backward Sight Forward Sight Distance


Target

Top Top Inter Detile Beda Tinggi


Sta Center Center
Bottom Bottom
(mm) (mm) (mm) (mm) (mm) (mm)
1.240
P.14 1.180
1.120
16
1.128
P.15 1.064 0.116
1.000

1.131
P.15 1.070
1.009
17
1.264
P.16 1.198 -0.128
1.132

1.160
P.16 1.106
1.052
18
1.226
P.117 1.154 -0.048
1.082

1.214
P.117 1.163
1.112
19
1.192
P.18 1.138 0.025
1.084

1.195
P.18 1.163
1.131
20
1.258
P.19 1.226 -0.063
1.194

1.224
P.19 1.198
1.172
21
1.224
P.20 1.198 0.000
1.172

Approved by the Enggineer Checked by the Consultant


of the project of the Consultant
(………………………………..) (…………………………….)
CROSS SECTION SURVEYING SHEET
Measurement by waterpass Instrument
No & Type of Instrument : Sokkia C330
Name of Canal : Main Canal
Location : P.228 s/d BL.1

Point No Backward Sight Forward Sight Distance


Target

Top Top Inter Detile Beda Tinggi


Sta Center Center
Bottom Bottom
(mm) (mm) (mm) (mm) (mm) (mm)
1.552
BM.BL.1 1.318
1.084
1
1.517
P.0' 1.367 -0.049
1.217

1.375
P.0' 1.357
1.339
2
1.400
P.1' 1.372 -0.015
1.344

1.272
P.1' 1.243
1.214
3
1.21
P.2' 1.174 0.069
1.138

1.26
P.2' 1.194
1.128
4
1.448
P.3' 1.388 -0.194
1.328

1.38
P.3' 1.32
1.26
5
1.422
P.4' 1.358 -0.038
1.294

1.349
P.4' 1.316
1.282
6
1.222
P.5' 1.189 0.127
1.156

1.184
P.5' 1.156
1.128
7
1.222
P.6' 1.195 -0.039
1.168

1.18
P.6' 1.122
1.064
8
1.345
P.7' 1.277 -0.155
P.7' 1.277 -0.155
1.209

Approved by the Enggineer Checked by the Consultant


of the project of the Consultant

(………………………………..) (…………………………….)
CROSS SECTION SURVEYING SHEET
Measurement by waterpass Instrument
No & Type of Instrument : Sokkia C330
Name of Canal : Main Canal
Location : P.228 s/d BL.1

Point No Backward Sight Forward Sight Distance


Target

Top Top Inter Detile Beda Tinggi


Sta Center Center
Bottom Bottom
(mm) (mm) (mm) (mm) (mm) (mm)
1.405
P.7' 1.352
1.299
9
1.257
P.8' 1.185 0.167
1.113

1.204
P.8' 1.152
1.100
10
1.308
P.9' 1.235 -0.083
1.162

1.386
P.9' 1.340
1.294
11
1.282
P.10' 1.202 0.138
1.122

1.317
P.10' 1.267
1.217
12
1.278
P.11' 1.205 0.062
1.132

1.32
P.11' 1.262
1.204
13
1.363
P.12' 1.290 -0.028
1.217

1.174
P.12' 1.124
1.074
14
1.155
P.13' 1.08 0.044
1.005

1.262
P.13' 1.196
1.130
15
1.236
P.14' 1.178 0.018
1.12

Approved by the Enggineer Checked by the Consultant


of the project of the Consultant
(………………………………..) (…………………………….)
CROSS SECTION SURVEYING SHEET
Measurement by waterpass Instrument
No & Type of Instrument : Sokkia C330
Name of Canal : Main Canal
Location : P.228 s/d BL.1

Point No Backward Sight Forward Sight Distance


Target

Top Top Inter Detile Beda Tinggi


Sta Center Center
Bottom Bottom
(mm) (mm) (mm) (mm) (mm) (mm)
1.103
P.14' 1.038

16
1.186
P.15' 1.136 -0.098
1.086

1.384
P.15' 1.318
1.252
17
1.142
P.16' 1.082 0.236
1.022

1.190
P.16' 1.130
1.07
18
1.182
P.117' 1.116 0.014
1.05

1.18
P.117' 1.133
1.086
19
1.051
P.18' 0.995 0.138
0.939

1.098
P.18' 1.062
1.022
20
1.089
P.19' 1.064 -0.002
1.038

1.172
P.19' 1.148
1.124
21
1.238
P.20' 1.21 -0.062
1.182

Approved by the Enggineer Checked by the Consultant


of the project of the Consultant
(………………………………..) (…………………………….)
CTION SURVEYING SHEET
ement by waterpass Instrument

Surveyed : Suwito Makatita


Date : 10/01/2012

Elevation Point
Remarks

(mm)
48.128 BM.BL.1

48.361 P.0

48.361 P.0

48.180 P.1

48.180 P.1

48.223 P.2

48.223 P.2

48.250 P.3

48.250 P.3

48.136 P.4

48.136 P.4

47.991 P.5

47.991 P.5

47.977 P.6

47.977 P.6
48.135 P.7

Checked by The Contractor


PT.Brantas Abipraya

(…………………………..)
CTION SURVEYING SHEET
ement by waterpass Instrument
Surveyed : Suwito Makatita
Date : 10/01/2012

Elevation Point
Remarks

(mm)
48.135 P.7

48.247 P.8

48.247 P.8

48.245 P.9

48.245 P.9

48.167 P.10

48.167 P.10

48.110 P.11

48.110 P.11

48.179 P.12

48.179 P.12

48.211 P.13

48.211 P.13

48.078 P.14

Checked by The Contractor


PT.Brantas Abipraya
(…………………………..)
CTION SURVEYING SHEET
ement by waterpass Instrument
Surveyed : Suwito Makatita
Date : 10/01/2012

Elevation Point
Remarks

(mm)
48.078 P.14

48.194 P.15

48.194 P.15

48.066 P.16

48.066 P.16

48.018 P.117

48.018 P.117

48.043 P.18

48.043 P.18

47.980 P.19

47.980 P.19

47.980 P.20

Checked by The Contractor


PT.Brantas Abipraya
(…………………………..)
CTION SURVEYING SHEET
ement by waterpass Instrument
Surveyed : Suwito Makatita
Date : 10/01/2012

Elevation Point
Remarks

(mm)
48.128 BM.BL.1

48.079 P.0'

48.079 P.0'

48.064 P.1'

48.064 P.1'

48.133 P.2'

48.133 P.2'

47.939 P.3'

47.939 P.3'

47.901 P.4'

47.901 P.4'

48.028 P.5'

48.028 P.5'

47.989 P.6'

47.989 P.6'

47.834 P.7'
47.834 P.7'

Checked by The Contractor


PT.Brantas Abipraya

(…………………………..)
CTION SURVEYING SHEET
ement by waterpass Instrument
Surveyed : Suwito Makatita
Date : 10/01/2012

Elevation Point
Remarks

(mm)
47.834 P.7'

48.001 P.8'

48.001 P.8'

47.918 P.9'

47.918 P.9'

48.056 P.10'

48.056 P.10'

48.118 P.11'

48.118 P.11'

48.090 P.12'

48.090 P.12'

48.134 P.13'

48.134 P.13'

48.152 P.14'

Checked by The Contractor


PT.Brantas Abipraya
(…………………………..)
CTION SURVEYING SHEET
ement by waterpass Instrument
Surveyed : Suwito Makatita
Date : 10/01/2012

Elevation Point
Remarks

(mm)
48.152 P.14'

48.054 P.15'

48.054 P.15'

48.290 P.16'

48.290 P.16'

48.304 P.117'

48.304 P.117'

48.442 P.18'

48.442 P.18'

48.440 P.19'

48.440 P.19'

48.378 P.20'

Checked by The Contractor


PT.Brantas Abipraya
(…………………………..)
CROSS SECTION SURVEYING SHEET
Measurement by waterpass Instrument

No & Type of Instrument :


Name of Canal :
Location :

Point No Backward Sight Forward Sight Distance


Target

Top Top Inter Detile Cumulateive


Sta Center Center
Bottom Bottom
(mm) (mm) (mm) (mm) (mm) (mm)
Sketh/Description :

Approved by the Enggineer Checked by the Consultant


of the project of the Consultant

(………………………………..) (…………………………….)
ON SURVEYING SHEET
nt by waterpass Instrument

Surveyed :
Date :

Elevation Point
Remarks

(mm)
Checked by The Contractor
PT.Brantas Abipraya

(…………………………..)