LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: TOWNHOUSE WOODEN STAIRS
REF. NO.: IMP.SI.CP-10.GTIC.2018.005
DATE : May 03, 2019
TOTAL AMOUNT
B2E.2/15;
(1,148,000.00)
item F
352,000.00
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIA
COST RATE
L COST
TO FLOORS; LEVEL 7 (Residential Units)
Topping; Cement & Sand
1:3
To Level 7 (Residential
### m² 450.00 300.00 750.00
Units)
TOTAL AMOUNT
BOQ RATE;
B2F.2/2 item
(317,212.50) A
(317,212.50)
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO IMPERIUM (HAULING WORKS)
Cost payroll charges due to
cancelled delivery of OSM
Tiles to be hauled.
(AUGUST 22, 2018)
Site Engr./Cad
3.00 nos 1,300.00 1,300.00
(Supervision)
TOTAL AMOUNT
3,900.00
2,290.00
1,067.00
NEW RATES
1,075.00
2,120.00
1,130.00
1,067.00
5,225.00
17,874.00
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO IMPERIUM (HAULING WORKS)
Cost payroll charges due to
cancelled delivery of OSM
Tiles to be hauled.
(SEPTEMBER 07, 2018)
Site Engr./Cad
2.00 nos 1,300.00 1,300.00
(Supervision)
TOTAL AMOUNT
2,600.00
1,145.00
1,067.00
1,075.00
NEW RATES
3,180.00
3,390.00
1,067.00
5,225.00
2,260.00
21,009.00
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO IMPERIUM (HAULING WORKS)
Cost payroll charges due to
cancelled delivery of OSM
Tiles to be hauled.
(SEPTEMBER 17, 2018)
Site Engr./Cad
1.00 no. 1,300.00 1,300.00
(Supervision)
TOTAL AMOUNT
1,300.00
2,290.00
1,067.00
1,075.00
NEW RATES
3,180.00
1,130.00
1,067.00
5,225.00
1,130.00
1,130.00
18,594.00
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO IMPERIUM (HAULING WORKS)
Cost payroll charges due to
cancelled delivery of OSM
Tiles to be hauled.
(OCTOBER 18, 2018)
Site Engr./Cad
1.00 no. 1,300.00 1,300.00
(Supervision)
TOTAL AMOUNT
1,300.00
1,145.00
1,067.00
1,075.00
NEW RATES
1,060.00
1,067.00
8,360.00
2,260.00
1,060.00
18,394.00
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO MAID'S T&B (TOWER & TOWNHOUSE)
Installtion of 600mm x
2100mm PVC doors at
maid's t&b.
To Residential Units
252.00 nos. osm 1,132.00 1,132.00
(Tower Floors)
TOTAL AMOUNT
NEW RATE
285,264.00
28,300.00
313,564.00
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO ELEVATOR LOBBY (Basement 5 - Level 65)
To Passenger
Elevators (100mm
1,200.00 m 750.00 485.00 1,235.00
Gap without
wiremesh)
To Service Elevator
(275mm Gap at left 465.00 m 1,500.00 485.00 1,985.00
side with wiremesh)
TOTAL AMOUNT
923,025.00
###
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIA
COST RATE
L COST
TO CEILING; LEVEL 5 - 67 (Residential Units)
To Level 6 - 26 (20
7,641.48 m² 540.00 633.00 1,173.00
floors)
To Levels 27,30,51 &
1,601.07 m² 540.00 633.00 1,173.00
54 (4 floors)
To Levels 28, 29, 52 &
1,601.07 m² 540.00 633.00 1,173.00
53 (4 floors)
To Levels 31 - 50 (19
7,259.41 m² 540.00 633.00 1,173.00
floors)
To Levels 55 - 65 (11
4,202.82 m² 540.00 633.00 1,173.00
floors)
Notes: Maximum of 50mm thick only. 51mm thk and above will have additional cost per
TOTAL AMOUNT
8,963,456.04
1,878,055.11
NEW RATE
1,878,055.11
8,515,287.93
4,929,907.86
###
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS
To Residential Units
1,770.00 m 1,241.00 3,665.00 4,906.00
(Level 6 - 65)
TOTAL AMOUNT
NEW RATE
8,683,620.00
###
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS
TOTAL AMOUNT
NEW RATE
(339,840.00)
(339,840.00)
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS & BASEMENTS
Supply and Installation of
Ordinary Gypsum Ceiling
Framing.
TOTAL AMOUNT
B2F.2/6;
item B
7,737,618.75
B2F.2/7;
item N
2,682,374.50
###
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS & BASEMENTS
Supply and Installation of
Ordinary Gypsum Ceiling
Framing.
To Walls (Basement -
8,166.70 sqm 350.00 300.00 650.00
Level 66)
Installation of 800mm X
800mm Homogeneous
floor tiles (Tile Adhesive
should be weber tai fix
only)
TOTAL AMOUNT
B2F.2/6;
item B
7,737,618.75
B2F.2/7;
item N
2,682,374.50
5,308,355.00
B2F.2/2;
item D
2,806,176.40
###
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS, BOH & BASEMENTS
To Passenger Elevator
110.60 sqm 450.00 300.00 750.00
1,2 & 3.
TOTAL AMOUNT
B2F.2/2;
item A
82,950.00
82,950.00
Approved by:
OTHER
ITEM DESCRIPTION QTY UNIT MATERIAL UNIT RATE
COST
COST
TO RESIDENTIAL FLOORS
Deployment of Site
Surveyor. (16months)
TOTAL AMOUNT
new rate
981,360.00
981,360.00
Approved by:
MATERIAL OTHER
ITEM DESCRIPTION QTY UNIT
COST COST
TO RESIDENTIAL FLOORS
TOTAL AMOUNT
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO BASEMENT LEVELS
To Basement 1 - 5
320.00 sqm 1,260.00 615.00 1,875.00
(Board-up)
TOTAL AMOUNT
B2F.2/6 item
600,000.00
B.
B2F.2/4 item
208,000.00
A.
808,000.00
Approved by:
OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS
To Residential Units
(Balcony Area) - 58
Floors
To Residential Floors
(Breezeway Area) - 58 155.00 lm 510.00 6,975.00 7,485.00
Floors
TOTAL AMOUNT
NEW RATE
2,020,950.00
2,005,980.00
1,160,175.00
###
Approved by:
MATERIAL OTHER
ITEM DESCRIPTION QTY UNIT UNIT RATE
COST COST
TO BASEMENT 4
Supply and Install of
drywall partition in 2-
6mm thk ficem board.
900mm x 2100mm
2.00 nos. 8,500.00 3,400.00 11,900.00
Ordinary Door
TOTAL AMOUNT
B2F.2/4,
59,020.00
item A
465,166.08
Approved by:
SUPPLY & CONSTRUCTION OF STEEL & WOODEN STAIR FOR Subject for
IMP.SI.CP-10.GTIC.2018.005 TOWNHOUSE (revised design) 352,000.00 reconciliation
Subject for
IMP.SI.CP-10.GTIC.2018.006 DELETION OF SCOPE; CONCRETE TOPPING AT LEVEL 7 (317,212.50) reconciliation
Subject for
IMP.SI.CP-10.GTIC.2018.007 INSTALLATION OF PVC DOOR 313,564.00 reconciliation
Included in
IMP.SI.CP-10.GTIC.2018.009 ELEVATOR DOOR JAMB GAP CONCRETE FILLER - Contract
Subject for
IMP.SI.CP-10.GTIC.2018.010 APPLICATION OF SKIMCOAT (PROCOTE) -due to ceiling deflection 26,164,762.05 reconciliation
Verify if same as
IMP.SI.CP-10.GTIC.2018.011 FLOOR MOUNTED ACCU COMPARTMENT DIRECTION - SI NO. 013
Verify if
IMP.SI.CP-10.GTIC.2018.012 TOWN HOUSE BALCONY ADDITIONAL TOPPING (5 UNITS) - SUPERSEDED
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Site Instruction/Variation Orders Monitoring
Subject for
IMP.SI.CP-10.GTIC.2018.013 FLOOR MOUNTED ACCU ZOCALO 8,683,620.00 reconciliation
Verify if
IMP.SI.CP-10.GTIC.2019.001 CEILING FRAMING OF ELEVATOR LOBBY SUPERSEDED
Subject for
IMP.SI.CP-10.GTIC.2019.002 RESIDENTIAL ELEVATOR LOBBY 18,534,524.65 reconciliation
Subject for
IMP.SI.CP-10.GTIC.2019.003 TOPPING WORKS FOR ELEVATOR LOBBY OPENING n/a reconciliation
Subject for
IMP.SI.CP-10.GTIC.2019.008 ADDITIONAL ZOCALLO FOR BALCONY AREAS 5,187,105.00 reconciliation
IMP.SI.CP-10.GTIC.2019.007 BOARD-UP FOR BASEMENT LEVELS 808,000.00 TO BE SUBMITTED
Subject for
IMP.SI.CP-10.GTIC.2019.006 BATH TUB ZOCALO 5,405,600.00 reconciliation
Subject for
IMP.SI.CP-10.GTIC.2019.003a SITE SURVEYOR n/a reconciliation
IMP.SI.CP-10.GTIC.2019.004 GROUTING WORKS FOR TOWNHOUSE subject for quantification & costing
Subject for
REQUEST FOR SITE INSTRUCTION RE-CONSTRUCTION OF TEMFACIL 465,166.08 reconciliation
Subject for
RE-ADJUSTMENT OF CEILING HEIGHT 1,196,250.00 reconciliation
Subject for
LABOR ESCALATION (as of NOV. 22, 2018) 5,236,260.30 reconciliation
71,765,670.58
PREPARED BY:
GT-ISTRUKTURA CORP.
Reconciled
CN NO. PO NO.
Amount
non-yet
- - non-yet
- - non-yet
- - non-yet
- non-yet
- - non-yet
- - non-yet
- - non-yet
- - non-yet
- - non-yet
- - non-yet
Reconciled
CN NO. PO NO.
Amount
- - non-yet
non-yet
- - non-yet
non-yet
- - non-yet
Reconciled
CN NO. PO NO.
Amount
- - non-yet
- - non-yet
- - non-yet
non-yet
tification & costing non-yet
- - non-yet
RECONCILED AMOUNT -
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Site Instruction/Variation Orders Monitoring
SUPPLY & CONSTRUCTION OF STEEL & WOODEN STAIR FOR Subject for
IMP.SI.CP-10.GTIC.2018.005 TOWNHOUSE (revised design) 352,000.00 reconciliation
Subject for
IMP.SI.CP-10.GTIC.2018.006 DELETION OF SCOPE; CONCRETE TOPPING AT LEVEL 7 (317,212.50) reconciliation
Subject for
IMP.SI.CP-10.GTIC.2018.007 INSTALLATION OF PVC DOOR 313,564.00 reconciliation
Included in
IMP.SI.CP-10.GTIC.2018.009 ELEVATOR DOOR JAMB GAP CONCRETE FILLER - Contract
Subject for
IMP.SI.CP-10.GTIC.2018.010 APPLICATION OF SKIMCOAT (PROCOTE) -due to ceiling deflection 26,164,762.05 reconciliation
Verify if same as
IMP.SI.CP-10.GTIC.2018.011 FLOOR MOUNTED ACCU COMPARTMENT DIRECTION - SI NO. 013
Verify if
IMP.SI.CP-10.GTIC.2018.012 TOWN HOUSE BALCONY ADDITIONAL TOPPING (5 UNITS) - SUPERSEDED
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Site Instruction/Variation Orders Monitoring
Subject for
IMP.SI.CP-10.GTIC.2018.013 FLOOR MOUNTED ACCU ZOCALO 8,683,620.00 reconciliation
included in
IMP.SI.CP-10.GTIC.2019.001 CEILING FRAMING OF ELEVATOR LOBBY SI.2019.002
Subject for
IMP.SI.CP-10.GTIC.2019.002 RESIDENTIAL ELEVATOR LOBBY 18,534,524.65 reconciliation
Verify if
IMP.SI.CP-10.GTIC.2019.003 TOPPING WORKS FOR ELEVATOR LOBBY OPENING 82,950.00 SUPERSEDED
Subject for
REQUEST FOR SITE INSTRUCTION ADDITIONAL ZOCALLO FOR BALCONY AREAS 5,187,105.00 reconciliation
REQUEST FOR SITE INSTRUCTION BOARD-UP FOR BASEMENT LEVELS 808,000.00 TO BE SUBMITTED
Subject for
REQUEST FOR SITE INSTRUCTION BATH TUB ZOCALO 5,405,600.00 reconciliation
Verify if
IMP.SI.CP-10.GTIC.2019.004 SITE SURVEYOR 981,360.00 SUPERSEDED
IMP.SI.CP-10.GTIC.2019.005 GROUTING WORKS FOR TOWNHOUSE subject for quantification & costing
Subject for
REQUEST FOR SITE INSTRUCTION RE-CONSTRUCTION OF TEMFACIL 465,166.08 reconciliation
58,737,344.20
GT-ISTRUKTURA CORP.
Reconciled
Date Submitted
Amount
n/a
n/a
n/a
11-Jun-19
22-Oct-18 -
23-Jan-19 -
19-Nov-18 -
22-Oct-18 -
22-Oct-18 -
22-Oct-18 -
22-Oct-18 -
-
Reconciled
Date Submitted
Amount
05-Apr-19 -
20-Jun-19 -
20-Jun-19
-
Reconciled
Date Submitted
Amount
15-May-19 -
-
15-May-19 -
20-Jun-19
tification & costing
06-Jun-19 -