PROJECT: THE IMPERIUM AT CAPITOL COMMONS

LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: TOWNHOUSE WOODEN STAIRS
REF. NO.: IMP.SI.CP-10.GTIC.2018.005
DATE : May 03, 2019

UNI MATERIAL OTHER


ITEM DESCRIPTION QTY UNIT RATE
T COST COST
TO TOWN HOUSE UNITS
Supply and Construction of
wooden stair at townhouse
units. (AS PER G&F
SPECIFICATION RELEASE
DATED NOVEMBER 18,
2018)

To Unit A-E 5.00 nos. 205,000.00 95,000.00 300,000.00

Deletion of Structural steel


& Finishing works of
townhouse stairs. (AS PER (1.00) lot ### ###
POST-BID BULLETIN NO.
29 item no. 12)

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

1,500,000.00 New Rate

B2E.2/15;
(1,148,000.00)
item F

352,000.00

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: Deletion of Scope (Floor topping at level 7)
REF. NO.: IMP.SI.CP-10.GTIC.2018.006
DATE : September 14, 2018

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIA
COST RATE
L COST
TO FLOORS; LEVEL 7 (Residential Units)
Topping; Cement & Sand
1:3

To Level 7 (Residential
### m² 450.00 300.00 750.00
Units)

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

BOQ RATE;
B2F.2/2 item
(317,212.50) A

(317,212.50)

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: Charges due to cancelled delivery (August 22, 2018)
REF. NO.: REQUEST FOR SITE INSTRUCTION
DATE : October 21, 2018

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO IMPERIUM (HAULING WORKS)
Cost payroll charges due to
cancelled delivery of OSM
Tiles to be hauled.
(AUGUST 22, 2018)

Site Engr./Cad
3.00 nos 1,300.00 1,300.00
(Supervision)

Safety Officer 2.00 nos 1,145.00 1,145.00

Guard Monitoring 1.00 no. 1,067.00 1,067.00

Foreman 1.00 no. 1,075.00 1,075.00

Warehouseman & Tool


2.00 nos. 1,060.00 1,060.00
Keeper

Electrician (Hauler) 1.00 no. 1,130.00 1,130.00

Painter (Hauler) 1.00 no. 1,067.00 1,067.00

Hauler 5.00 nos. 1,045.00 1,045.00

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Constantino Prevosa / Glenn Mogol


GTIC Quantity Surveyor GTIC Area Manager / Project Manager
TOTAL REMARKS

3,900.00

2,290.00

1,067.00

NEW RATES
1,075.00

2,120.00

1,130.00

1,067.00

5,225.00

17,874.00

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: Charges due to cancelled delivery (September 07, 2018)
REF. NO.: REQUEST FOR SITE INSTRUCTION
DATE : October 21, 2018

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO IMPERIUM (HAULING WORKS)
Cost payroll charges due to
cancelled delivery of OSM
Tiles to be hauled.
(SEPTEMBER 07, 2018)

Site Engr./Cad
2.00 nos 1,300.00 1,300.00
(Supervision)

Safety Officer 1.00 nos 1,145.00 1,145.00

Guard Monitoring 1.00 no. 1,067.00 1,067.00

Foreman 1.00 no. 1,075.00 1,075.00

Warehouseman & Tool


3.00 nos. 1,060.00 1,060.00
Keeper

Electrician (Hauler) 3.00 nos. 1,130.00 1,130.00

Painter (Hauler) 1.00 no. 1,067.00 1,067.00

Hauler 5.00 nos. 1,045.00 1,045.00

Mason 2.00 nos. 1,130.00 1,130.00

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Constantino Prevosa / Glenn Mogol


GTIC Quantity Surveyor GTIC Area Manager / Project Manager
TOTAL REMARKS

2,600.00

1,145.00

1,067.00

1,075.00
NEW RATES

3,180.00

3,390.00

1,067.00

5,225.00

2,260.00

21,009.00

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: Charges due to cancelled delivery (September 17, 2018)
REF. NO.: REQUEST FOR SITE INSTRUCTION
DATE : October 21, 2018

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO IMPERIUM (HAULING WORKS)
Cost payroll charges due to
cancelled delivery of OSM
Tiles to be hauled.
(SEPTEMBER 17, 2018)

Site Engr./Cad
1.00 no. 1,300.00 1,300.00
(Supervision)

Safety Officer 2.00 nos 1,145.00 1,145.00

Guard Monitoring 1.00 no. 1,067.00 1,067.00

Foreman 1.00 no. 1,075.00 1,075.00

Warehouseman & Tool


3.00 nos. 1,060.00 1,060.00
Keeper

Electrician (Hauler) 1.00 nos. 1,130.00 1,130.00

Painter (Hauler) 1.00 no. 1,067.00 1,067.00

Hauler 5.00 nos. 1,045.00 1,045.00

Mason (Hauler) 1.00 no. 1,130.00 1,130.00

Tilesetter (Hauler) 1.00 no. 1,130.00 1,130.00

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Constantino Prevosa / Glenn Mogol


GTIC Quantity Surveyor GTIC Area Manager / Project Manager
TOTAL REMARKS

1,300.00

2,290.00

1,067.00

1,075.00

NEW RATES
3,180.00

1,130.00

1,067.00

5,225.00

1,130.00

1,130.00

18,594.00

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: Charges due to cancelled delivery (October 18, 2018)
REF. NO.: REQUEST FOR SITE INSTRUCTION
DATE : October 21, 2018

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO IMPERIUM (HAULING WORKS)
Cost payroll charges due to
cancelled delivery of OSM
Tiles to be hauled.
(OCTOBER 18, 2018)

Site Engr./Cad
1.00 no. 1,300.00 1,300.00
(Supervision)

Safety Officer 1.00 nos 1,145.00 1,145.00

Guard Monitoring 1.00 no. 1,067.00 1,067.00

Foreman 1.00 no. 1,075.00 1,075.00

Warehouseman & Tool


1.00 nos. 1,060.00 1,060.00
Keeper

Painter (Hauler) 1.00 no. 1,067.00 1,067.00

Hauler 8.00 nos. 1,045.00 1,045.00

Mason (Hauler) 2.00 no. 1,130.00 1,130.00

Helper 1.00 no. 1,060.00 1,060.00

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Constantino Prevosa / Glenn Mogol


GTIC Quantity Surveyor GTIC Area Manager / Project Manager
TOTAL REMARKS

1,300.00

1,145.00

1,067.00

1,075.00
NEW RATES

1,060.00

1,067.00

8,360.00

2,260.00

1,060.00

18,394.00

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: Installation of PVC doors
REF. NO.: IMP.SI.CP-10.GTIC.2018.007
DATE : January 20, 2018

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO MAID'S T&B (TOWER & TOWNHOUSE)

Installtion of 600mm x
2100mm PVC doors at
maid's t&b.

To Residential Units
252.00 nos. osm 1,132.00 1,132.00
(Tower Floors)

To Townhouse Units 25.00 nos. osm 1,132.00 1,132.00

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

NEW RATE
285,264.00

28,300.00

313,564.00

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Elevator Door Jamb Gap Concrete Filler
REF. NO. : IMP.SI.CP-10.GTIC.2018.009
DATE : February 11, 2018

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO ELEVATOR LOBBY (Basement 5 - Level 65)

Supply and Application of


Concrete filler with 10mmØ
rebars/dowels to Elevator
Door jamb gap..

To Passenger
Elevators (100mm
1,200.00 m 750.00 485.00 1,235.00
Gap without
wiremesh)
To Service Elevator
(275mm Gap at left 465.00 m 1,500.00 485.00 1,985.00
side with wiremesh)

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

1,482,000.00 NEW RATE

923,025.00

###

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: Procote Application due to Slab Soffit Deflection
REF. NO.: IMP.SI.CP-10.GTIC.2018.010
DATE : November 12, 2018

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIA
COST RATE
L COST
TO CEILING; LEVEL 5 - 67 (Residential Units)

Supply and Application of


Gypcote Procote due to
ceiling slab deflection.

To Level 6 - 26 (20
7,641.48 m² 540.00 633.00 1,173.00
floors)
To Levels 27,30,51 &
1,601.07 m² 540.00 633.00 1,173.00
54 (4 floors)
To Levels 28, 29, 52 &
1,601.07 m² 540.00 633.00 1,173.00
53 (4 floors)
To Levels 31 - 50 (19
7,259.41 m² 540.00 633.00 1,173.00
floors)
To Levels 55 - 65 (11
4,202.82 m² 540.00 633.00 1,173.00
floors)

Notes: Maximum of 50mm thick only. 51mm thk and above will have additional cost per

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Glenn Mogol / Constantino Prevosa


GTIC Quantity Surveyor GTIC Project Manager / Area Manager
TOTAL REMARKS

8,963,456.04

1,878,055.11

NEW RATE
1,878,055.11

8,515,287.93

4,929,907.86

have additional cost per sqm.

###

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: Floor Mounted ACCU Zocalo
REF. NO.: IMP.SI.CP-10.GTIC.2018.013
DATE : March 04, 2019

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS

Supply and Construction of


ACCU floor mounted
100mm H x 100mm thk
concrete zocalo in 10mmØ
drilled rebars.

To Residential Units
1,770.00 m 1,241.00 3,665.00 4,906.00
(Level 6 - 65)

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

NEW RATE
8,683,620.00

###

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: ACCU CASEMENT (Solid wood Edging)
REF. NO.: REQUEST FOR SITE INSTRUCTION
DATE : March 20, 2019

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS

Deletion of works: Supply &


Install of Solid wood edging
for ACCU casement.

To Residential Units (1,770.00) lm 132.00 60.00 192.00

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

NEW RATE
(339,840.00)

(339,840.00)

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: ADDITIONAL CEILING OF ELEVATOR LOBBY
REF. NO.: IMP.SI.CP-10.GTIC.2019.001
DATE : June 17, 2019

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS & BASEMENTS
Supply and Installation of
Ordinary Gypsum Ceiling
Framing.

Elevator Lobby Ceiling


4,126.73 sqm 1,260.00 615.00 1,875.00
(Basement - Level 66)

Supply and Application of


Ceiling Paint finish.

Elevator Lobby Ceiling


4,126.73 sqm 350.00 300.00 650.00
(Basement - Level 66)

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

B2F.2/6;
item B
7,737,618.75

B2F.2/7;
item N
2,682,374.50

###

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: ADDITIONAL ARCHITECTURAL WORKS FOR ELEVATOR LOBBY
REF. NO.: IMP.SI.CP-10.GTIC.2019.002
DATE : June 18, 2019

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS & BASEMENTS
Supply and Installation of
Ordinary Gypsum Ceiling
Framing.

Elevator Lobby Ceiling


4,126.73 sqm 1,260.00 615.00 1,875.00
(Basement - Level 66)

Supply and Application of


Paint finish for ELEVATOR
LOBBY.
To Ceiling (Basement -
4,126.73 sqm 350.00 300.00 650.00
Level 66)

To Walls (Basement -
8,166.70 sqm 350.00 300.00 650.00
Level 66)

Installation of 800mm X
800mm Homogeneous
floor tiles (Tile Adhesive
should be weber tai fix
only)

Elevator Lobby Ceiling


4,126.73 sqm osm 680.00 680.00
(Basement - Level 66)

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

B2F.2/6;
item B
7,737,618.75

B2F.2/7;
item N
2,682,374.50

5,308,355.00

B2F.2/2;
item D

2,806,176.40

###

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: ADDITIONAL CONCRETE TOPPING FOR ELEVATOR LOBBY OPENING
REF. NO.: IMP.SI.CP-10.GTIC.2019.003
DATE : June 17, 2019

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS, BOH & BASEMENTS

Supply and Construction of


concrete topping for
elevator lobby openings.

To Passenger Elevator
110.60 sqm 450.00 300.00 750.00
1,2 & 3.

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

B2F.2/2;
item A
82,950.00

82,950.00

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: SITE SURVEYOR
REF. NO.: IMP.SI.CP-10.GTIC.2019.004
DATE : June 17, 2019

OTHER
ITEM DESCRIPTION QTY UNIT MATERIAL UNIT RATE
COST
COST
TO RESIDENTIAL FLOORS

Deployment of Site
Surveyor. (16months)

Site Surveyor 1.00 lot ### 981,360.00

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

new rate

981,360.00

981,360.00

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: BATH TUB ZOCALLO
REF. NO.: IMP.SI.CP-10.GTIC.2019.006
DATE : May 06, 2019

MATERIAL OTHER
ITEM DESCRIPTION QTY UNIT
COST COST
TO RESIDENTIAL FLOORS

Supply and Construction


of Bath tub zacallo.

To Master's T & B. 232.00 nos. 15,800.00 7,500.00

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
UNIT RATE TOTAL REMARKS

23,300.00 5,405,600.00 New Rate

TOTAL AMOUNT ###

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: BOARD-UP FOR BASEMENT LEVELS
REF. NO.: IMP.SI.CP-10.GTIC.2019.007
DATE : May 02, 2019

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO BASEMENT LEVELS

Supply and Installation of


12mm thk Ordinary
including metal framings
and necessary fixing
accessories.

To Basement 1 - 5
320.00 sqm 1,260.00 615.00 1,875.00
(Board-up)

Supply and Application of


320.00 sqm 350.00 300.00 650.00
Paint finish to board-up.

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

B2F.2/6 item
600,000.00
B.

B2F.2/4 item
208,000.00
A.

808,000.00

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: ADDITIONAL ZOCALLO FOR BALCONY & BREEZE WAY AREAS
REF. NO.: IMP.SI.CP-10.GTIC.2019.008
DATE : April 15, 2019

OTHER UNIT
ITEM DESCRIPTION QTY UNIT MATERIAL
COST RATE
COST
TO RESIDENTIAL FLOORS

Supply and Construction of


concrete zocalo.

To Residential Units
(Balcony Area) - 58
Floors

To ±2000mm x 200mm H 270.00 lm 510.00 6,975.00 7,485.00

To ±920mm x 81mm H 268.00 lm 510.00 6,975.00 7,485.00

To Residential Floors
(Breezeway Area) - 58 155.00 lm 510.00 6,975.00 7,485.00
Floors

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

NEW RATE
2,020,950.00

2,005,980.00

1,160,175.00

###

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT: THE IMPERIUM AT CAPITOL COMMONS
LOCATIO: Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT: RE-CONSTRUCTION OF TEMFACIL
REF. NO.: REQUEST FOR SITE INTRUCTION
DATE : June 06, 2019

MATERIAL OTHER
ITEM DESCRIPTION QTY UNIT UNIT RATE
COST COST
TO BASEMENT 4
Supply and Install of
drywall partition in 2-
6mm thk ficem board.

Temfacil office 90.80 sqm 1,702.60 575.00 2,277.60

Painting Works 90.80 sqm 350.00 300.00 650.00

Supply and Install of


16mm thk ordinary 80.00 sqm 1,488.00 595.00 2,083.00
plywood.

Power Plug WRP-022


20.00 pcs 25.00 15.00 40.00
(OMNI)

Electrical Wire 1.00 roll 4,500.00 1,800.00 6,300.00

Flourescent 40W (Philip) 12.00 pcs 100.00 50.00 150.00

900mm x 2100mm
2.00 nos. 8,500.00 3,400.00 11,900.00
Ordinary Door

TOTAL AMOUNT

Prepared by: Noted by:

Kerren Rodas Engr. Constantino Prevosa


GTIC Quantity Surveyor GTIC Area Manager
TOTAL REMARKS

206,806.08 New Rate

B2F.2/4,
59,020.00
item A

166,640.00 New Rate

800.00 New Rate

6,300.00 New Rate

1,800.00 New Rate

23,800.00 New Rate

465,166.08

Approved by:

Ma. Geraldine R. Marte


GTIC President
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Site Instruction/Variation Orders Monitoring

Items Ref. No. Description Amount Remarks

1. IMP.SI.CP-10.GTIC.2018.001 MOCK-UP OF MASTER TOILET CEILING n/a No cost impact


IMP.SI.CP-10.GTIC.2018.002 BATH TUB STEEL PLATE DETAIL n/a No cost impact
IMP.SI.CP-10.GTIC.2018.003 UNIT C MASTER TOILET n/a No cost impact
IMP.SI.CP-10.GTIC.2018.004 FABRICATION & SUPPLY OF WOODEN PALLET verify

SUPPLY & CONSTRUCTION OF STEEL & WOODEN STAIR FOR Subject for
IMP.SI.CP-10.GTIC.2018.005 TOWNHOUSE (revised design) 352,000.00 reconciliation

Subject for
IMP.SI.CP-10.GTIC.2018.006 DELETION OF SCOPE; CONCRETE TOPPING AT LEVEL 7 (317,212.50) reconciliation

Subject for
IMP.SI.CP-10.GTIC.2018.007 INSTALLATION OF PVC DOOR 313,564.00 reconciliation

Included in
IMP.SI.CP-10.GTIC.2018.009 ELEVATOR DOOR JAMB GAP CONCRETE FILLER - Contract

Subject for
IMP.SI.CP-10.GTIC.2018.010 APPLICATION OF SKIMCOAT (PROCOTE) -due to ceiling deflection 26,164,762.05 reconciliation

CHARGES DUE TO CANCELLED DELIVERY OF TILES(osm) - Subject for


REQUEST FOR SITE INSTRUCTION AUGUST 22, 2018 17,874.00 reconciliation

CHARGES DUE TO CANCELLED DELIVERY OF TILES(osm) - Subject for


REQUEST FOR SITE INSTRUCTION SEPTEMBER 07, 2018 21,009.00 reconciliation

CHARGES DUE TO CANCELLED DELIVERY OF TILES(osm) - Subject for


REQUEST FOR SITE INSTRUCTION SEPTEMBER 17, 2018 18,594.00 reconciliation

CHARGES DUE TO CANCELLED DELIVERY OF TILES(osm) - Subject for


REQUEST FOR SITE INSTRUCTION OCTOBER 18, 2018 18,394.00 reconciliation

Verify if same as
IMP.SI.CP-10.GTIC.2018.011 FLOOR MOUNTED ACCU COMPARTMENT DIRECTION - SI NO. 013

Verify if
IMP.SI.CP-10.GTIC.2018.012 TOWN HOUSE BALCONY ADDITIONAL TOPPING (5 UNITS) - SUPERSEDED
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Site Instruction/Variation Orders Monitoring

Items Ref. No. Description Amount Remarks

Subject for
IMP.SI.CP-10.GTIC.2018.013 FLOOR MOUNTED ACCU ZOCALO 8,683,620.00 reconciliation

Verify if
IMP.SI.CP-10.GTIC.2019.001 CEILING FRAMING OF ELEVATOR LOBBY SUPERSEDED

Subject for
IMP.SI.CP-10.GTIC.2019.002 RESIDENTIAL ELEVATOR LOBBY 18,534,524.65 reconciliation

Subject for
IMP.SI.CP-10.GTIC.2019.003 TOPPING WORKS FOR ELEVATOR LOBBY OPENING n/a reconciliation

DELETION OF SCOPE; WOOD EDGING AT ACCU COMPARTMENT Subject for


REQUEST FOR SITE INSTRUCTION (DEDUCTIVE) (339,840.00) reconciliation
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Site Instruction/Variation Orders Monitoring

Items Ref. No. Description Amount Remarks

Subject for
IMP.SI.CP-10.GTIC.2019.008 ADDITIONAL ZOCALLO FOR BALCONY AREAS 5,187,105.00 reconciliation
IMP.SI.CP-10.GTIC.2019.007 BOARD-UP FOR BASEMENT LEVELS 808,000.00 TO BE SUBMITTED

Subject for
IMP.SI.CP-10.GTIC.2019.006 BATH TUB ZOCALO 5,405,600.00 reconciliation

Subject for
IMP.SI.CP-10.GTIC.2019.003a SITE SURVEYOR n/a reconciliation
IMP.SI.CP-10.GTIC.2019.004 GROUTING WORKS FOR TOWNHOUSE subject for quantification & costing

Subject for
REQUEST FOR SITE INSTRUCTION RE-CONSTRUCTION OF TEMFACIL 465,166.08 reconciliation

Subject for
RE-ADJUSTMENT OF CEILING HEIGHT 1,196,250.00 reconciliation
Subject for
LABOR ESCALATION (as of NOV. 22, 2018) 5,236,260.30 reconciliation

71,765,670.58

TOTAL RECONCILED AMOUNT

PREPARED BY:

GT-ISTRUKTURA CORP.
Reconciled
CN NO. PO NO.
Amount

n/a n/a n/a


n/a n/a n/a
n/a n/a n/a

non-yet

- - non-yet

- - non-yet

- - non-yet

- non-yet

- - non-yet

- - non-yet

- - non-yet

- - non-yet

- - non-yet

- - non-yet
Reconciled
CN NO. PO NO.
Amount

- - non-yet

non-yet

- - non-yet

non-yet

- - non-yet
Reconciled
CN NO. PO NO.
Amount

- - non-yet
- - non-yet

- - non-yet

non-yet
tification & costing non-yet

- - non-yet

RECONCILED AMOUNT -
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Site Instruction/Variation Orders Monitoring

Items Ref. No. Description Amount Remarks

IMP.SI.CP-10.GTIC.2018.001 MOCK-UP OF MASTER TOILET CEILING n/a No cost impact


IMP.SI.CP-10.GTIC.2018.002 BATH TUB STEEL PLATE DETAIL n/a No cost impact
IMP.SI.CP-10.GTIC.2018.003 UNIT C MASTER TOILET n/a No cost impact
IMP.SI.CP-10.GTIC.2018.004 FABRICATION & SUPPLY OF WOODEN PALLET verify

SUPPLY & CONSTRUCTION OF STEEL & WOODEN STAIR FOR Subject for
IMP.SI.CP-10.GTIC.2018.005 TOWNHOUSE (revised design) 352,000.00 reconciliation

Subject for
IMP.SI.CP-10.GTIC.2018.006 DELETION OF SCOPE; CONCRETE TOPPING AT LEVEL 7 (317,212.50) reconciliation

Subject for
IMP.SI.CP-10.GTIC.2018.007 INSTALLATION OF PVC DOOR 313,564.00 reconciliation

Included in
IMP.SI.CP-10.GTIC.2018.009 ELEVATOR DOOR JAMB GAP CONCRETE FILLER - Contract

Subject for
IMP.SI.CP-10.GTIC.2018.010 APPLICATION OF SKIMCOAT (PROCOTE) -due to ceiling deflection 26,164,762.05 reconciliation

CHARGES DUE TO CANCELLED DELIVERY OF TILES(osm) - Subject for


REQUEST FOR SITE INSTRUCTION AUGUST 22, 2018 17,874.00 reconciliation

CHARGES DUE TO CANCELLED DELIVERY OF TILES(osm) - Subject for


REQUEST FOR SITE INSTRUCTION SEPTEMBER 07, 2018 21,009.00 reconciliation

CHARGES DUE TO CANCELLED DELIVERY OF TILES(osm) - Subject for


REQUEST FOR SITE INSTRUCTION SEPTEMBER 17, 2018 18,594.00 reconciliation

CHARGES DUE TO CANCELLED DELIVERY OF TILES(osm) - Subject for


REQUEST FOR SITE INSTRUCTION OCTOBER 18, 2018 18,394.00 reconciliation

Verify if same as
IMP.SI.CP-10.GTIC.2018.011 FLOOR MOUNTED ACCU COMPARTMENT DIRECTION - SI NO. 013

Verify if
IMP.SI.CP-10.GTIC.2018.012 TOWN HOUSE BALCONY ADDITIONAL TOPPING (5 UNITS) - SUPERSEDED
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Site Instruction/Variation Orders Monitoring

Items Ref. No. Description Amount Remarks

Subject for
IMP.SI.CP-10.GTIC.2018.013 FLOOR MOUNTED ACCU ZOCALO 8,683,620.00 reconciliation

included in
IMP.SI.CP-10.GTIC.2019.001 CEILING FRAMING OF ELEVATOR LOBBY SI.2019.002

Subject for
IMP.SI.CP-10.GTIC.2019.002 RESIDENTIAL ELEVATOR LOBBY 18,534,524.65 reconciliation

Verify if
IMP.SI.CP-10.GTIC.2019.003 TOPPING WORKS FOR ELEVATOR LOBBY OPENING 82,950.00 SUPERSEDED

DELETION OF SCOPE; WOOD EDGING AT ACCU COMPARTMENT Subject for


REQUEST FOR SITE INSTRUCTION (DEDUCTIVE) (339,840.00) reconciliation
PROJECT : THE IMPERIUM AT CAPITOL COMMONS
LOCATION : Camino Verde Road, Capitol Commons, Brgy. Orambo, Pasig City
SUBJECT : Site Instruction/Variation Orders Monitoring

Items Ref. No. Description Amount Remarks

Subject for
REQUEST FOR SITE INSTRUCTION ADDITIONAL ZOCALLO FOR BALCONY AREAS 5,187,105.00 reconciliation
REQUEST FOR SITE INSTRUCTION BOARD-UP FOR BASEMENT LEVELS 808,000.00 TO BE SUBMITTED

Subject for
REQUEST FOR SITE INSTRUCTION BATH TUB ZOCALO 5,405,600.00 reconciliation

Verify if
IMP.SI.CP-10.GTIC.2019.004 SITE SURVEYOR 981,360.00 SUPERSEDED
IMP.SI.CP-10.GTIC.2019.005 GROUTING WORKS FOR TOWNHOUSE subject for quantification & costing

Subject for
REQUEST FOR SITE INSTRUCTION RE-CONSTRUCTION OF TEMFACIL 465,166.08 reconciliation

58,737,344.20

PREPARED BY: TOTAL RECONCILED AMOUNT

GT-ISTRUKTURA CORP.
Reconciled
Date Submitted
Amount

n/a
n/a
n/a

11-Jun-19

22-Oct-18 -

23-Jan-19 -

19-Nov-18 -

22-Oct-18 -

22-Oct-18 -

22-Oct-18 -

22-Oct-18 -

-
Reconciled
Date Submitted
Amount

05-Apr-19 -

20-Jun-19 -

20-Jun-19

-
Reconciled
Date Submitted
Amount

15-May-19 -
-

15-May-19 -

20-Jun-19
tification & costing