Sie sind auf Seite 1von 3

TECHNICAL FEASIBILITY

A. Location
The store location shall be located at one of the stalls in the University Of Mindanao-Matina
Campus Food Court beside Toppings Food Stall. The said area will be rented for an amount of
Php**. Below is the proposed location of the business.

Picture of food court and exact area

Facility Lay-out
The facility layout is designed to support the smooth operation of the business. The countertop
will serve as a display and claiming area of all the finished outputs. There are designated places for
every services that the business is catering. There would also be owner’s area, which some business
related transactions would be catered.

B. Supplies, Machinery and Equipment needed


The printing and other services will be conducted through the following supplies,
machinery and equipment.

Ballpen Fire Extinguisher Printer


Bond Paper (A4) Foldable Long Table Record Book
Bond Paper (Long) Folder Rug
Bond Paper (Short) Garbage Bags Scissor
Broom Ink (Cyan, Magenta, Yellow, Black) Sofa Chair
Cabinets Pencil Stapler
Calculator Photocopier Toner Trash Can
Computer Set Photocopy Machine Wall fan
Dust pan Plastic Chair Binder Machine
Emergency Light PLDT Wi-Fi with Telephone
C. Breakdown of Cost and List of Suppliers

MACHINERIES AND STORE EQUIPMENT


Quantity Price Supplier Total Amount
Computer Set 4 20,000 Computer World Superstore PHP 80,000.00
Photocopy Machine 1 40,000 GCV Copier Supplies and Services PHP 40,000.00
Calculator 1 200 Paper Tree PHP 200.00
Printer 3 7,000 EMCOR PHP 21,000.00
Binder Machine 1 2,200 GCV Copier Supplies and Services PHP 2,200.00
Wall fan 2 800 EMCOR PHP 1,600.00
TOTAL PHP 145,000.00
STORE FURNITURES AND FIXTURES
Quantity Price Supplier Total Amount
Sofa Chair 1 2,400 LYR Marketing PHP 2,400.00
Foldable Long Table 1 3,500 LYR Marketing PHP 3,500.00
Plastic Chair 2 280 SM Dept. Store PHP 560.00
Cabinets 1 5,000 LYR Marketing PHP 5,000.00
TOTAL PHP 11,460.00
STORE SUPPLIES
Quantity Price Supplier Total Amount
Record Book 2 150 Paper Tree PHP 300.00
Scissor 2 15 Paper Tree PHP 30.00
Stapler (Book binding) 1 596 Paper Tree PHP 596.00
Stapler (Small) 4 80 Paper Tree PHP 320.00
Folder 5 5 Paper Tree PHP 25.00
Pencil 3 5 Paper Tree PHP 15.00
Ballpen 3 6.5 Paper Tree PHP 19.50
TOTAL PHP 1,305.50
INVENTORIABLE SUPPLIES
Quantity Price Supplier Total Amount
Bond Paper (A4) 4 box 815 Paper Tree PHP 3,260.00
Bond Paper (Long) 2 box 815 Paper Tree PHP 1,630.00
Bond Paper (Short) 2 box 800 Paper Tree PHP 1,600.00
Ink (Cyan, Magenta, Yellow, Black) 1L/ color 1900 InkTech Davao PHP 7,600.00
PVC Cover 100 320/ 100 pcs Paper Tree PHP 320.00
Plastic Binder Ring 100 6 Paper Tree PHP 600.00
Adhesive Cloth Duct Tape 5 89 Paper Tree PHP 445.00
Padding Glue 2 325 Paper Tree PHP 650.00
Photo Paper 1 pack 250 Paper Tree PHP 250.00
Photocopier Toner 2 750 GCV Copier Supplies and Services PHP 1,500.00
TOTAL PHP 17,855.00
CLEANING SUPPLIES
Quantity Price Supplier Total Amount
Broom 2 50 Department Store PHP 100.00
Dust pan 1 60 Department Store PHP 60.00
Garbage Bags 1 roll 90 Department Store PHP 90.00
Rug 3 3 for 100 Department Store PHP 100.00
Trash Can 2 150 Department Store PHP 300.00
TOTAL PHP 650.00
EMERGENCY AND SAFETY EQUIPMENT
Quantity Price Supplier Total Amount
Emergency Light 1 350 Department Store PHP 350.00
Fire Extinguisher 1 1,300 Department Store PHP 1,300.00
TOTAL PHP 1,650.00
INTERNET CONNECTION
Quantity Price Supplier Total Amount
PLDT Wifi with Telephone 1 2,799 PLDT PHP 2,799.00
TOTAL PHP 180,719.50
D. Conclusion
Feasibility Study has verified the technical aspect of the proposed project and this includes the
location, facility layout, supplies, machineries, and equipment needed, suppliers and breakdown of
costs. The location and facility lay-out of the business is clearly viable because it is convenient for
students, it is located in the center of the university, and students visit it often. Machineries,
equipment, and supplies needed are also viable due to its availability in the market. Concerning
our chosen suppliers, it is also viable because all of them can supply the machineries, equipment,
and supplies needed.

Das könnte Ihnen auch gefallen