Beruflich Dokumente
Kultur Dokumente
Page 1
_______________________________________________________________________________
HVAC CALCULATIONS
TABLE OF CONTENTS
COMPUTER CALCULATIONS
* DESIGN CRITERIA Page 3 – 5
* SCHEDULE OF VRF Page 6 – 7
* SCHEDULE OF AHU & FAHU Page 8
* SCHEDULE OF AIR COOLED CONDENSING UNITS Page 9
* HVAC HAP SPACE INPUT Page 10 - 75
* HVAC HAP OUTPUT FOR VRF SUSTEM Page 76- 267
* HVAC HAP OUTPUT FOR AHU & FAHU SYSTEM Page 268-298
* U VALUES ........................................................................................................Page 299-304
* PUMP ROOM ……………………………………………………………………….. Page 305-326
* GUARD ROOM ……………………………………………………………………... Page 327-335
* SUBSTATION……………………………………………………………………….. Page 336-343
* HEATER BATTERY…………………………………………………………..…….. Page 344
_________________________________________________________________________________
Q.E.A. Page 2
HVAC CALCULATION QATAR ARMED FORCES JOINT WARFARE SIMULATION CENTER BUILDING
___________________________________________________________________________________________________________________________________________________________
1. DESIGN CRITERIA
Notes:
Page 3
HVAC CALCULATION QATAR ARMED FORCES JOINT WARFARE SIMULATION CENTER BUILDING
___________________________________________________________________________________________________________________________________________________________
Page 4
HVAC CALCULATION QATAR ARMED FORCES JOINT WARFARE SIMULATION CENTER BUILDING
___________________________________________________________________________________________________________________________________________________________
First Floor
Page 5
HVAC CALCULATION QATAR ARMED FORCES JOINT WARFARE SIMULATION CENTER BUILDING
___________________________________________________________________________________________________________________________________________________________
1 VRF-GF-01&02 G02 ENTRANCE & FOYER 405 3.3 2.55 2 DUCTED VRF UNIT 0.15
4 VRF-GF-05&06 G11 RESPONSE CELLS HALL DIVISIBLE TO TWO RCS / 1 BY 2 315 3.5 3.1 2 DUCTED VRF UNIT 0.15
VRF-GF-
5 G12 RESPONSE CELLS HALL DIVISIBLE TO TWO RCS / 1 BY 4 347 3.8 3.2 4 DUCTED VRF UNIT 0.15
07,08,09,10
SIDE MEETING ROOM / OFFICE DIVISIBLE TO TWO
6 VRF-GF-11&12 G13 178 2 1.8 2 DUCTED VRF UNIT 0.1
ROOMS (BRIEFING / DEBRIEFING ROOM)
7 VRF-GF-13 G14 CHIEF OF EXCEN 150 1.4 1.4 1 DUCTED VRF UNIT 0.1
8 VRF-GF-14 G15 SITCEN BATTLE MANAGEMENT ROOM 1200 9 7.5 1 DUCTED VRF UNIT 0.25
SIDE MEETING ROOM / OFFICE DIVISIBLE TO TWO
9 VRF-GF-16&17 G17 164 1.5 1.2 2 DUCTED VRF UNIT 0.1
ROOMS
10 VRF-GF-18&19 G18 RESPONSE CELLS DIVISIBLE TO TWO RCS 277 3 2.6 2 DUCTED VRF UNIT 0.15
11 VRF-GF-20 G19 DRIVER ROOM 119 1.2 1.2 1 WALL MOUNTED 0.1
12 VRF-GF-21 G18 ELECTRICAL AND UPS ROOM 426 2.7 2.7 1 DUCTED VRF UNIT 0.15
13 VRF-GF-22&23 G22 HEADQUARTER CELLS DIVISIBLE TO TWO CELLS 277 3 2.6 2 DUCTED VRF UNIT 0.15
SIDE MEETING ROOM / OFFICE DIVISIBLE TO TWO
14 VRF-GF-25&26 G23 164 1.5 1.2 2 DUCTED VRF UNIT 0.1
ROOMS
15 VRF-GF-27 G25 JOC 1200 9 7.5 1 DUCTED VRF UNIT 0.25
16 VRF-GF-28 G26 CHIEF OF JOC 150 1.4 1.4 1 DUCTED VRF UNIT 0.1
SIDE MEETING ROOM / OFFICE DIVISIBLE TO TWO
17 VRF-GF-29&30 G27 178 2 1.8 2 DUCTED VRF UNIT 0.1
ROOMS (BRIEFING / DEBRIEFING ROOM)
VRF-GF-
18 G28 HEAD QUARTER CELLS DIVISIBLE BY 4 337 3.8 3.3 4 DUCTED VRF UNIT 0.15
31,32,33,34
19 VRF-GF-35&36 G29 HEAD QUARTER CELLS DIVISIBLE TO TWO CELLS 304 3.4 2.9 2 DUCTED VRF UNIT 0.15
20 VRF-GF-37 --- LEFT SIDE CORRIDOR/G24 451 3.3 2.9 1 DUCTED VRF UNIT 0.15
21 VRF-GF-38 G32 VIP ROOM 496 4.2 4.2 1 DUCTED VRF UNIT 0.15
22 VRF-GF-39 G01 AIRLOCK 429 5.6 4.7 1 WALL MOUNTED 0.15
23 VRF-GF-40 G07 PANTRY 113 1.6 1.3 1 WALL MOUNTED 0.1
24 VRF-GF-41 G21 MECH ROOM 119 1.2 1.2 1 WALL MOUNTED 0.1
Page 6
HVAC CALCULATION QATAR ARMED FORCES JOINT WARFARE SIMULATION CENTER BUILDING
___________________________________________________________________________________________________________________________________________________________
SELECTED UNIT
AIR SELECTED UNIT
EQUIPMENT ROOM REF. TOTAL ELECTRICAL
S.N. AREA SERVED QTY TOTAL COOLING QTY TYPE
REF. NO. NO SENSIBLELOAD LOAD (kW)
(L/S) LOAD (kW)
(kW)
1 VRF-FF-01 F03 FRONT OFFICE 158 1.2 1.2 1 DUCTED VRF UNIT 0.1
2 VRF-FF-02 --- RIGHT SIDE CORRIDOR 624 4.6 4.6 1 DUCTED VRF UNIT 0.2
VRF-FF-
3 F06 PRODUCTION DIVISION 490 4 3.4 4 DUCTED VRF UNIT 0.15
03,04,05,06
4 VRF-FF-07 F07 CHIEF PRODUCTION 262 2.7 2.7 1 DUCTED VRF UNIT 0.1
5 VRF-FF-08 F10 SME DIVISION 759 6.7 5.1 1 DUCTED VRF UNIT 0.2
6 VRF-FF-09 F09 CHIEF SME 209 2.2 1.9 1 DUCTED VRF UNIT 0.1
7 VRF-FF-10 F08 WORKSHOP 190 2.1 1.9 1 DUCTED VRF UNIT 0.1
8 VRF-FF-11 F11 ANALYST BRANCH 457 3.5 2.9 1 DUCTED VRF UNIT 0.15
9 VRF-FF-12 F12 MOSQUE 460 4.7 3.7 1 DUCTED VRF UNIT 0.15
10 VRF-FF-13 F19 LADIES OFFICE 322 2.8 2.6 1 DUCTED VRF UNIT 0.15
11 VRF-FF-14 F20&F21 REGISTRY & CLASSIFIED DOCUMENT ROOM 321 3 3 1 DUCTED VRF UNIT 0.15
12 VRF-FF-15 F22 C4IS DIVISION 585 5.6 4.7 1 DUCTED VRF UNIT 0.2
13 VRF-FF-16 F23 MEDIA SIM / STUDIO ROOM 562 5.1 4.3 1 DUCTED VRF UNIT 0.2
14 VRF-FF-17 F24 CBT SYSTEM 771 8.8 7.1 1 DUCTED VRF UNIT 0.3
15 VRF-FF-18 F26 CHIEF OF PLANNING 201 1.7 1.7 1 DUCTED VRF UNIT 0.1
16 VRF-FF-19 F27 CHIEF OF C4IS 290 2.8 2.8 1 DUCTED VRF UNIT 0.15
17 VRF-FF-20 F28 CHIEF OF SUPPORT 238 2 2 1 DUCTED VRF UNIT 0.1
18 VRF-FF-21 F29 SUPPORT DIVISION 439 4.7 4.1 1 DUCTED VRF UNIT 0.15
19 VRF-FF-22 F30 PLANNING DIVISION 625 6.7 6.1 1 DUCTED VRF UNIT 0.2
20 VRF-FF-23 F31 DOSS STAFF 400 3.9 3.5 1 DUCTED VRF UNIT 0.15
21 VRF-FF-24 F32 DIRECTOR OF STAFF 355 3.9 3.9 1 DUCTED VRF UNIT 0.15
22 VRF-FF-25 --- LEFT SIDE CORRIDOR 344 2.6 2.6 1 DUCTED VRF UNIT 0.15
23 VRF-FF-26 F13/F14/F15 CENTER CORRIDOR 670 5.7 5.7 1 DUCTED VRF UNIT 0.2
24 VRF-FF-27 F01 CCTV ROOM 235 2.2 2.2 1 DUCTED VRF UNIT 0.1
25 VRF-FF-28 --- TRANSLATOR 109 1.2 1.1 1 DUCTED VRF UNIT 0.1
Page 7
HVAC CALCULATION QATAR ARMED FORCES JOINT WARFARE SIMULATION CENTER BUILDING
___________________________________________________________________________________________________________________________________________________________
SCHEDULE FOR AHU
1 AHU‐01 (AUDITORIUM) 1 4043 720 25.8 19.5 13.3 12.7 93.1 61.1 250 8
AHU‐02 (CANTEEN &
2 1 1890 168 23.8 18.1 9.8 9.4 51.5 31.9 250 4
CAFETERIA
AHU‐03 (COMMNADER
3 1 1251 92 23.2 17.1 13.6 13.1 18.9 14.4 250 3
& MEETING)
SCHEDULE FOR FAHU
1 FAHU‐01 (LEFT SIDE) 1 1252 1252 46 30 12.8 12.1 93.7 50.1 500 3.5
2 FAHU‐02 (RIGHT SIDE) 1 996 996 46 30 12.8 12.1 74.6 39.8 500 3
NOTES:
1. FAN MOTOR TO OPERATE ON 415V,3Ph,50 Hz A.C. SUPPLY
2. CONTRACTOR SHALL BE RESPONSIBLE TO CHECK THE ACTUAL STATIC PRESSURE IN CONJUCTION WITH THE PROPOSED EQUIPMENT AND RELATED SYSTEM
AND SUBMIT THE SAME FOR ENGINEER'S APPROVAL.
3. ALL THE FRESH AIR HANDLING UNIT / AHU'S SHALL BE HORIZONTAL TYPE WITH HORIZONTAL DISCHARGE.
4. CONTRACTOR SHALL BE RESPONSIBLE TO CHECK THE ACTUAL MOTOR RATING IN CONJUNCTION WITH THE PROPOSED EQUPMENT OFFERED.
5. CONTRACTOR SHALL BE RESPONSIBLE TO CALCULATE AND COORDINATE WITH THE ELECTRICAL SECTION THE ACTUAL POWER CONSUMPTION IN
CONJUNCTION WITH THE EQUIPMENT SELECTED.
Page 8
HVAC CALCULATION QATAR ARMED FORCES JOINT WARFARE SIMULATION CENTER BUILDING
___________________________________________________________________________________________________________________________________________________________
SCHEDULE OF AIR COOLED CONDENSING UNITS
COOLING CAPACITY AIR ON CONDENSER ELECTRICAL LOAD
ACCU REF. TYPE QTY REFRIGERANT
KW (ᵒC) (KW)
AIR COOLED
ACCU‐01 1 R134A/R407C 93 46 30
CONDENSER UNIT
AIR COOLED
ACCU‐02 1 R134A/R407C 63.2 46 25
CONDENSER UNIT
AIR COOLED
ACCU‐03 1 R134A/R407C 18.9 46 7
CONDENSER UNIT
AIR COOLED
ACCU‐04 1 R134A/R407C 96.6 46 40
CONDENSER UNIT
AIR COOLED
ACCU‐05 1 R134A/R407C 86.4 46 35
CONDENSER UNIT
NOTE:
1. THE EXTERNAL PRESSURE / RESISTANCE INDICATED IS APPROXIMATE, HOWEVER, CONTRACTOR CHECK PRESSURE HEAD IN CONJUNCTON WITH THE
EQUIPMENT AND RELATED SYSTEM.
2. CONDENSER SECTION SHALL BE SUITABLE TO OPERATE UPTO 50ᵒC AMBIENT TEMPERATURE.
3. POWER SUPPLY 380‐415V,3Ph,50Hz.
Page 9
_______________________________________________________________________________
_________________________________________________________________________________
Q.E.A.
Page 10
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 01 CCTV ROOM
1. General Details:
Floor Area ........................................................... 24.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 25.10 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
SSE 18.0 0 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 24.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 10.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 11
Hourly Analysis Program vv5.01 Page 1 of 71 1
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 02 COMMANDER ROOM
1. General Details:
Floor Area ........................................................... 60.5 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 .............................................. 50.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 3.0 People
Wattage ............................................................ 12.40 W/m² Activity Level ......................................... Heavy Work
Ballast Multiplier ................................................. 1.25 Sensible ........................................................... 153.9 W/person
Schedule ................................................. LIGHTING Latent ............................................................... 271.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
SSE 43.3 1 0 0
ENE 17.0 0 0 0
WSW 9.2 0 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 60.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: Uncondit. Space Max Temp .............................. 43.0 °C
Partition Type ..................................... Wall Partition Ambient at Space Max Temp ............................ 46.0 °C
Area .................................................................... 13.3 m² Uncondit. Space Min Temp ............................... 30.0 °C
U-Value ............................................................ 1.370 W/(m²ꞏK) Ambient at Space Min Temp ............................. 35.3 °C
Page 12
Hourly Analysis Program vv5.01 Page 2 of 71 2
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
Page 13
Hourly Analysis Program vv5.01 Page 3 of 71 3
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 03 FRONT OFFICE
1. General Details:
Floor Area ........................................................... 13.5 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 26.60 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 13.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area ...................................................................... 3.7 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 14
Hourly Analysis Program vv5.01 Page 4 of 71 4
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 05 COMMANDER MEETING
1. General Details:
Floor Area ........................................................... 50.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 .............................................. 42.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 10.0 People
Wattage ............................................................ 10.65 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
SSE 31.5 3 0 0
WSW 20.5 2 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 50.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area ...................................................................... 6.3 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 15
Hourly Analysis Program vv5.01 Page 5 of 71 5
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
Page 16
Hourly Analysis Program vv5.01 Page 6 of 71 6
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 06 PRODUCTION DIVISI
1. General Details:
Floor Area ......................................................... 170.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 36.0 People
Wattage ............................................................ 18.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
WSW 89.5 0 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 170.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 17
Hourly Analysis Program vv5.01 Page 7 of 71 7
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 07 CHIEF PRODUCTION
1. General Details:
Floor Area ........................................................... 21.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 12.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 22.4 3 0 0
ENE 9.6 1 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 21.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 18
Hourly Analysis Program vv5.01 Page 8 of 71 8
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 08 WORK SHOP
1. General Details:
Floor Area ........................................................... 17.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 4.0 People
Wattage ............................................................ 30.30 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 17.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 19
Hourly Analysis Program vv5.01 Page 9 of 71 9
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 09 CHIEF SME
1. General Details:
Floor Area ........................................................... 18.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 4.0 People
Wattage ............................................................ 30.10 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 18.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 20
Hourly Analysis Program vv5.01 Page 10 of 71 10
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 10 SME DIVISION
1. General Details:
Floor Area ........................................................... 72.5 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 15.0 People
Wattage ............................................................ 21.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 72.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 21
Hourly Analysis Program vv5.01 Page 11 of 71 11
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 11 ANALYST BRANCH
1. General Details:
Floor Area ........................................................... 46.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 9.0 People
Wattage ............................................................ 12.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 46.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 22
Hourly Analysis Program vv5.01 Page 12 of 71 12
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 12 MOSQUE
1. General Details:
Floor Area ........................................................... 57.5 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 15.0 People
Wattage ............................................................ 12.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 57.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 23
Hourly Analysis Program vv5.01 Page 13 of 71 13
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 19 LADIES OFFICE
1. General Details:
Floor Area ........................................................... 31.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 4.0 People
Wattage ............................................................ 27.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 31.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 10.4 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 24
Hourly Analysis Program vv5.01 Page 17 of 71 17
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 20 REGISRY
1. General Details:
Floor Area ........................................................... 20.5 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 2.0 People
Wattage ............................................................ 30.20 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 20.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 25
Hourly Analysis Program vv5.01 Page 18 of 71 18
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 21 CLASSIFIED DOCS
1. General Details:
Floor Area ........................................................... 12.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 34.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 12.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area ...................................................................... 6.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 26
Hourly Analysis Program vv5.01 Page 19 of 71 19
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 22 C4IS
1. General Details:
Floor Area ........................................................... 56.5 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 13.0 People
Wattage ............................................................ 20.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 56.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 27
Hourly Analysis Program vv5.01 Page 20 of 71 20
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 23 MEDIA/STUDIO
1. General Details:
Floor Area ........................................................... 56.5 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 3.0 People
Wattage ............................................................ 20.50 W/m² Activity Level ......................................... Heavy Work
Ballast Multiplier ................................................. 1.25 Sensible ........................................................... 153.9 W/person
Schedule ................................................. LIGHTING Latent ............................................................... 271.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 56.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 28
Hourly Analysis Program vv5.01 Page 21 of 71 21
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 24 CBT SYSTEM
1. General Details:
Floor Area ........................................................... 63.2 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 25.0 People
Wattage ............................................................ 18.25 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 38.1 3 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 63.2 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 29
Hourly Analysis Program vv5.01 Page 22 of 71 22
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 26 CHIEF PLANNING
1. General Details:
Floor Area ........................................................... 17.7 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 21.70 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 19.2 1 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 17.7 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 30
Hourly Analysis Program vv5.01 Page 23 of 71 23
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 27 CHIEF OF C4IS
1. General Details:
Floor Area ........................................................... 19.5 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 22.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 26.0 1 0 0
ENE 19.2 2 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 19.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 31
Hourly Analysis Program vv5.01 Page 24 of 71 24
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 28 CHIEF OF SUPPORT
1. General Details:
Floor Area ........................................................... 20.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 31.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
ENE 10.7 1 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 20.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 32
Hourly Analysis Program vv5.01 Page 25 of 71 25
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 29 SUPPORT DIVISION
1. General Details:
Floor Area ........................................................... 47.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 9.0 People
Wattage ............................................................ 24.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
ENE 25.2 0 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 47.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 33
Hourly Analysis Program vv5.01 Page 26 of 71 26
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 30 PLANNING DIVISION
1. General Details:
Floor Area ........................................................... 53.5 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 10.0 People
Wattage ............................................................ 24.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
ENE 24.0 1 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 53.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 34
Hourly Analysis Program vv5.01 Page 27 of 71 27
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 31 DOS STAFF
1. General Details:
Floor Area ........................................................... 34.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 6.0 People
Wattage ............................................................ 26.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
ENE 26.0 0 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 34.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area ...................................................................... 7.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 35
Hourly Analysis Program vv5.01 Page 28 of 71 28
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 32 DIRECTOR OF STAFF
1. General Details:
Floor Area ........................................................... 28.6 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 30.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
ENE 14.8 2 0 0
SSE 19.6 2 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 28.6 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 14.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 36
Hourly Analysis Program vv5.01 Page 29 of 71 29
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
Page 37
Hourly Analysis Program vv5.01 Page 30 of 71 30
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 33 KITCHEN
1. General Details:
Floor Area ........................................................... 30.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 .............................................. 25.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 2.0 People
Wattage ............................................................ 27.20 W/m² Activity Level ......................................... Heavy Work
Ballast Multiplier ................................................. 1.25 Sensible ........................................................... 153.9 W/person
Schedule ................................................. LIGHTING Latent ............................................................... 271.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
SSE 16.0 1 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 30.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 38
Hourly Analysis Program vv5.01 Page 31 of 71 31
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F 34 CAFATERIA
1. General Details:
Floor Area ......................................................... 110.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ............................................ 143.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 44.0 People
Wattage ............................................................ 21.30 W/m² Activity Level ......................................... Heavy Work
Ballast Multiplier ................................................. 1.25 Sensible ........................................................... 153.9 W/person
Schedule ................................................. LIGHTING Latent ............................................................... 271.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
WSW 17.0 0 0 0
ENE 8.2 0 0 0
SSE 40.0 1 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 110.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: Uncondit. Space Max Temp .............................. 43.0 °C
Partition Type ..................................... Wall Partition Ambient at Space Max Temp ............................ 46.0 °C
Area .................................................................... 33.0 m² Uncondit. Space Min Temp ............................... 30.0 °C
U-Value ............................................................ 1.370 W/(m²ꞏK) Ambient at Space Min Temp ............................. 35.3 °C
Page 39
Hourly Analysis Program vv5.01 Page 32 of 71 32
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
Page 40
Hourly Analysis Program vv5.01 Page 33 of 71 33
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F CORRIDOR CENTER
1. General Details:
Floor Area ........................................................... 98.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 2.0 People
Wattage .............................................................. 9.70 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 98.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 64.5 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 41
Hourly Analysis Program vv5.01 Page 34 of 71 34
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F CORRIDOR LEFT
1. General Details:
Floor Area ........................................................... 56.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 2.0 People
Wattage ............................................................ 12.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 56.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 42
Hourly Analysis Program vv5.01 Page 35 of 71 35
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F CORRIDOR RIGHT
1. General Details:
Floor Area ........................................................... 73.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 2.0 People
Wattage ............................................................ 13.10 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 51.0 4 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 73.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 43
Hourly Analysis Program vv5.01 Page 36 of 71 36
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1 F TRANSLATOR
1. General Details:
Floor Area ........................................................... 10.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 2.0 People
Wattage ............................................................ 30.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 10.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 44
Hourly Analysis Program vv5.01 Page 37 of 71 37
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
AUDITORIUM
1. General Details:
Floor Area ......................................................... 240.5 m²
Avg. Ceiling Height ............................................... 3.8 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ............................................ 702.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ....................................................... 262.0 People
Wattage ............................................................ 20.88 W/m² Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 67.4 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 35.2 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 46.3 0 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 240.5 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ............... Floor Above Unconditioned Space
Floor Area ......................................................... 240.5 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Unconditioned Space Max Temp. ...................... 46.0 °C
Ambient at Space Max Temp. ............................ 46.0 °C
Unconditioned Space Min Temp. ....................... 30.0 °C
Ambient at Space Min Temp. ............................. 35.3 °C
7. Partitions:
(No partition data).
Page 45
Hourly Analysis Program vv5.01 Page 38 of 71 38
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
FAHU AUDITORIUM
1. General Details:
Floor Area ............................................................. 1.0 m²
Avg. Ceiling Height ............................................... 1.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 .......................................... 2596.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 0.0 Person
Wattage .............................................................. 0.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule .......................................................... None Latent ................................................................. 60.1 W/person
Schedule .......................................................... None
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 46
Hourly Analysis Program vv5.01 Page 39 of 71 39
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1. General Details:
Floor Area ............................................................. 1.0 m²
Avg. Ceiling Height ............................................... 1.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 .......................................... 1348.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 0.0 Person
Wattage .............................................................. 0.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule .......................................................... None Latent ................................................................. 60.1 W/person
Schedule .......................................................... None
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 47
Hourly Analysis Program vv5.01 Page 40 of 71 40
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1. General Details:
Floor Area ............................................................. 1.0 m²
Avg. Ceiling Height ............................................... 1.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 .......................................... 1156.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 0.0 Person
Wattage .............................................................. 0.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule .......................................................... None Latent ................................................................. 60.1 W/person
Schedule .......................................................... None
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ................... Floor Above Conditioned Space
(No additional input required for this floor type).
7. Partitions:
(No partition data).
Page 48
Hourly Analysis Program vv5.01 Page 41 of 71 41
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 01 AIRLOCK
1. General Details:
Floor Area ........................................................... 31.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 3.0 People
Wattage .............................................................. 5.00 W/m² Activity Level ......................................... Heavy Work
Ballast Multiplier ................................................. 1.25 Sensible ........................................................... 153.9 W/person
Schedule ................................................. LIGHTING Latent ............................................................... 271.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
SSE 29.0 1 0 2
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 31.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 49
Hourly Analysis Program vv5.01 Page 42 of 71 42
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1. General Details:
Floor Area ......................................................... 155.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 5.0 People
Wattage .............................................................. 5.00 W/m² Activity Level ......................................... Heavy Work
Ballast Multiplier ................................................. 1.25 Sensible ........................................................... 153.9 W/person
Schedule ................................................. LIGHTING Latent ............................................................... 271.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ......................................................... 155.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 49.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 50
Hourly Analysis Program vv5.01 Page 43 of 71 43
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 06 SECURITY
1. General Details:
Floor Area ............................................................. 7.2 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 28.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
SSE 6.4 0 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ............................................................. 7.2 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 51
Hourly Analysis Program vv5.01 Page 47 of 71 47
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 07 PANTRY
1. General Details:
Floor Area ............................................................. 9.0 m²
Avg. Ceiling Height ............................................... 3.0 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 22.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ............................................................. 9.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 52
Hourly Analysis Program vv5.01 Page 48 of 71 48
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 11 RESPONCE CELL
1. General Details:
Floor Area ........................................................... 62.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 12.0 People
Wattage ............................................................ 20.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
SSE 31.3 3 0 0
WSW 20.5 2 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 62.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 22.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 53
Hourly Analysis Program vv5.01 Page 49 of 71 49
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 12 HEADQUATER CELL
1. General Details:
Floor Area ......................................................... 185.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 37.0 People
Wattage ............................................................ 20.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 22.4 1 0 0
WSW 85.0 2 0 0
ENE 6.4 0 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ......................................................... 185.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 54
Hourly Analysis Program vv5.01 Page 50 of 71 50
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1. General Details:
Floor Area ........................................................... 30.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 8.0 People
Wattage ............................................................ 27.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 27.5 2 0 0
ENE 6.4 0 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 30.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 55
Hourly Analysis Program vv5.01 Page 51 of 71 51
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 14 CHIEF OF EXCEN
1. General Details:
Floor Area ............................................................. 9.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 22.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 8.6 1 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ............................................................. 9.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 13.2 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 56
Hourly Analysis Program vv5.01 Page 52 of 71 52
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 15 SITCEN
1. General Details:
Floor Area ......................................................... 122.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 23.0 People
Wattage ............................................................ 20.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ......................................................... 122.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 11.2 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 57
Hourly Analysis Program vv5.01 Page 53 of 71 53
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 16 PRINTING
1. General Details:
Floor Area ............................................................. 9.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 22.00 W/m² Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 67.4 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 35.2 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ............................................................. 9.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 58
Hourly Analysis Program vv5.01 Page 54 of 71 54
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1. General Details:
Floor Area ........................................................... 30.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 6.0 People
Wattage ............................................................ 27.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 30.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area ...................................................................... 8.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 59
Hourly Analysis Program vv5.01 Page 55 of 71 55
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1. General Details:
Floor Area ........................................................... 44.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 22.00 W/m² Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 67.4 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 35.2 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNE 20.3 0 0 1
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 44.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 60
Hourly Analysis Program vv5.01 Page 56 of 71 56
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 18 HEADQUARTER CELL
1. General Details:
Floor Area ........................................................... 58.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 12.0 People
Wattage ............................................................ 21.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 58.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 24.8 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 61
Hourly Analysis Program vv5.01 Page 57 of 71 57
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 19 DRIVER ROOM
1. General Details:
Floor Area ............................................................. 8.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 50.00 W/m² Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 67.4 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 35.2 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ............................................................. 8.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area ...................................................................... 6.4 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 62
Hourly Analysis Program vv5.01 Page 58 of 71 58
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 21 MECH ROOM
1. General Details:
Floor Area ............................................................. 8.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 50.00 W/m² Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 67.4 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 35.2 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ............................................................. 8.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area ...................................................................... 6.4 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 63
Hourly Analysis Program vv5.01 Page 59 of 71 59
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 22 HEADQUARTER CELL
1. General Details:
Floor Area ........................................................... 58.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 12.0 People
Wattage ............................................................ 21.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 58.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 24.8 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 64
Hourly Analysis Program vv5.01 Page 60 of 71 60
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1. General Details:
Floor Area ........................................................... 30.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 6.0 People
Wattage ............................................................ 27.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 30.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area ...................................................................... 8.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 65
Hourly Analysis Program vv5.01 Page 61 of 71 61
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 24 PRINTING
1. General Details:
Floor Area ............................................................. 9.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 22.00 W/m² Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 67.4 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 35.2 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ............................................................. 9.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 66
Hourly Analysis Program vv5.01 Page 62 of 71 62
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 25 JOC
1. General Details:
Floor Area ......................................................... 122.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 23.0 People
Wattage ............................................................ 20.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ......................................................... 122.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 11.2 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 67
Hourly Analysis Program vv5.01 Page 63 of 71 63
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 26 CHIEF OF JOC
1. General Details:
Floor Area ............................................................. 9.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 22.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 8.6 1 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ............................................................. 9.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 13.2 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 68
Hourly Analysis Program vv5.01 Page 64 of 71 64
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
1. General Details:
Floor Area ........................................................... 30.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 8.0 People
Wattage ............................................................ 27.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 27.5 2 0 0
ENE 6.4 0 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 30.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 69
Hourly Analysis Program vv5.01 Page 65 of 71 65
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 28 HEADQUATER CELL
1. General Details:
Floor Area ......................................................... 185.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 37.0 People
Wattage ............................................................ 20.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 22.4 1 0 0
ENE 85.0 2 0 0
WSW 6.4 0 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ......................................................... 185.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 70
Hourly Analysis Program vv5.01 Page 66 of 71 66
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 29 HEADQUATER
1. General Details:
Floor Area ........................................................... 62.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ......................................................... 12.0 People
Wattage ............................................................ 20.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
SSE 31.3 3 0 0
ENE 20.5 2 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 62.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 22.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 71
Hourly Analysis Program vv5.01 Page 67 of 71 67
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G 32 VIP
1. General Details:
Floor Area ........................................................... 52.0 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 5.0 People
Wattage ............................................................ 10.00 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
SSE 26.2 1 0 0
WSW 16.0 0 0 0
ENE 7.7 0 0 0
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 52.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 38.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 72
Hourly Analysis Program vv5.01 Page 68 of 71 68
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
Page 73
Hourly Analysis Program vv5.01 Page 69 of 71 69
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G CORRIDOR LEFT
1. General Details:
Floor Area ........................................................... 60.8 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 6.0 People
Wattage ............................................................ 12.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 6.4 0 0 1
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 60.8 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 74
Hourly Analysis Program vv5.01 Page 70 of 71 70
Space Input Data
QATAR JOINT WARFARE 07-05-2018
qea 08:30AM
G CORRIDOR RIGHT
1. General Details:
Floor Area ........................................................... 60.8 m²
Avg. Ceiling Height ............................................... 3.2 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 6.0 People
Wattage ............................................................ 12.50 W/m² Activity Level ......................................... Office Work
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 71.8 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 60.1 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NNW 6.4 0 0 1
4. Roofs, Skylights:
(No Roof or Skylight data).
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 60.8 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 75
Hourly Analysis Program vv5.01 Page 71 of 71 71
_______________________________________________________________________________
_________________________________________________________________________________
Q.E.A.
Page 76
Zone Sizing Summary for G 01 AIRLOCK
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 01 AIRLOCK 1 4.7 Jul 1300 429 0.6 22.0 19.48
Page 77
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 01 AIRLOCK
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 78
Air System Design Load Summary for G 01 AIRLOCK
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 79
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 01 AIRLOCK
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 80
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G CORRIDOR RIGHT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:12PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 16 PRINTING 1 0.5 Jul 2300 76 0.0 9.0 8.41
G CORRIDOR RIGHT 1 2.3 Jul 2100 376 0.0 60.8 6.18
Page 81
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G CORRIDOR RIGHT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:12PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 82
Air System Design Load Summary for G CORRIDOR RIGHT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:12PM
Page 83
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G CORRIDOR RIGHT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:12PM
Page 84
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G CORRIDOR LEFT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G CORRIDOR LEFT 1 2.3 Jul 2100 376 0.0 60.8 6.18
G 24 PRINTING 1 0.5 Jul 2300 76 0.0 9.0 8.41
Page 85
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G CORRIDOR LEFT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 86
Air System Design Load Summary for G CORRIDOR LEFT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
Page 87
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G CORRIDOR LEFT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
Page 88
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 32 VIP
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 32 VIP 1 4.2 Jul 1500 496 0.4 52.0 9.54
Page 89
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 32 VIP
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 90
Air System Design Load Summary for G 32 VIP
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
Page 91
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 32 VIP
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
Page 92
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 29 HEADQUATER
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 29 HEADQUATER 1 5.9 Jul 1400 972 0.4 62.0 15.68
Page 93
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 29 HEADQUATER
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 94
Air System Design Load Summary for G 29 HEADQUATER
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
Page 95
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 29 HEADQUATER
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:11PM
Page 96
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 28 HEADQUATER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 28 HEADQUATER CELL 1 12.4 Jul 1600 1374 0.7 185.0 7.43
Page 97
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 28 HEADQUATER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 98
Air System Design Load Summary for G 28 HEADQUATER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 99
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 28 HEADQUATER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 100
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 27 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 27 SIDE MEETING ROOM 1 3.4 Jul 1600 356 0.2 30.0 11.87
Page 101
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 27 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 102
Air System Design Load Summary for G 27 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 103
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 27 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 104
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 26 CHIEF OF JOC
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 26 CHIEF OF JOC 1 1.4 Jul 1600 150 0.1 9.0 16.68
Page 105
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 26 CHIEF OF JOC
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 106
Air System Design Load Summary for G 26 CHIEF OF JOC
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 107
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 26 CHIEF OF JOC
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 108
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 25 JOC
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 25 JOC 1 7.2 Jul 1500 1200 0.0 122.0 9.84
Page 109
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 25 JOC
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 110
Air System Design Load Summary for G 25 JOC
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 111
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 25 JOC
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 112
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 23 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 23 SIDE MEETING ROOM 1 2.4 Jul 1500 328 0.0 30.0 10.94
Page 113
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 23 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 114
Air System Design Load Summary for G 23 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 115
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 23 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:10PM
Page 116
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 22 HEADQUARTER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 22 HEADQUARTER CELL 1 5.0 Jul 1500 554 0.0 58.0 9.55
Page 117
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 22 HEADQUARTER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 118
Air System Design Load Summary for G 22 HEADQUARTER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Page 119
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 22 HEADQUARTER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Page 120
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 21 MECH ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 21 MECH ROOM 1 1.1 Jul 1500 119 0.0 8.0 14.82
Page 121
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 21 MECH ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 122
Air System Design Load Summary for G 21 MECH ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Page 123
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 21 MECH ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Page 124
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 19 DRIVER ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 19 DRIVER ROOM 1 1.1 Jul 1500 119 0.0 8.0 14.82
Page 125
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 19 DRIVER ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 126
Air System Design Load Summary for G 19 DRIVER ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Page 127
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 19 DRIVER ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Page 128
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 18 ELECTRICAL AND UPS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 18 ELECTRICAL AND UPS 1 2.6 Jul 1900 426 0.1 44.0 9.69
Page 129
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 18 ELECTRICAL AND UPS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 130
Air System Design Load Summary for G 18 ELECTRICAL AND UPS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Page 131
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 18 ELECTRICAL AND UPS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:09PM
Page 132
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 17 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 17 SIDE MEETING ROOM 1 2.4 Jul 1500 328 0.0 30.0 10.94
Page 133
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 17 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 134
Air System Design Load Summary for G 17 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 135
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 17 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 136
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 15 SITCEN
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 15 SITCEN 1 7.2 Jul 1500 1200 0.0 122.0 9.84
Page 137
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 15 SITCEN
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 138
Air System Design Load Summary for G 15 SITCEN
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 139
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 15 SITCEN
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 140
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 14 CHIEF OF EXCEN
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 14 CHIEF OF EXCEN 1 1.4 Jul 1600 150 0.1 9.0 16.68
Page 141
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 14 CHIEF OF EXCEN
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 142
Air System Design Load Summary for G 14 CHIEF OF EXCEN
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 143
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 14 CHIEF OF EXCEN
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 144
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 13 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 13 SIDE MEETING ROOM 1 3.4 Jul 1600 356 0.2 30.0 11.87
Page 145
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 13 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 146
Air System Design Load Summary for G 13 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 147
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 13 SIDE MEETING ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 148
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 12 HEADQUATER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 12 HEADQUATER CELL 1 12.5 Jul 1600 1387 0.7 185.0 7.50
Page 149
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 12 HEADQUATER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 150
Air System Design Load Summary for G 12 HEADQUATER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 151
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 12 HEADQUATER CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:08PM
Page 152
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 11 RESPONCE CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 11 RESPONCE CELL 1 6.1 Jul 1600 629 0.4 62.0 10.15
Page 153
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 11 RESPONCE CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 154
Air System Design Load Summary for G 11 RESPONCE CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 155
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 11 RESPONCE CELL
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 156
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 07 PANTRY
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 07 PANTRY 1 1.2 Jul 2300 113 0.0 9.0 12.61
Page 157
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 07 PANTRY
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 158
Air System Design Load Summary for G 07 PANTRY
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 159
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 07 PANTRY
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 160
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 06 SECURITY
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 06 SECURITY 1 0.7 Jul 2100 62 0.0 7.2 8.59
Page 161
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 06 SECURITY
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 162
Air System Design Load Summary for G 06 SECURITY
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 163
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 06 SECURITY
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 164
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for G 02 Enterance & Foyer
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
G 02 ENTERANCE & FOYER 1 4.9 Jul 1500 810 0.0 136.0 5.95
Page 165
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for G 02 Enterance & Foyer
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 166
Air System Design Load Summary for G 02 Enterance & Foyer
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 167
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for G 02 Enterance & Foyer
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:07PM
Page 168
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 01 CCTV ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:16PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 01 CCTV ROOM 1 2.1 Jul 1800 235 0.2 24.0 9.81
Page 169
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 01 CCTV ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:16PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 170
Air System Design Load Summary for 1 F 01 CCTV ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:16PM
Page 171
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 01 CCTV ROOM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:16PM
Page 172
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F TRANSLATOR
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:25PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F TRANSLATOR 1 1.1 Jul 2200 109 0.0 10.0 10.92
Page 173
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F TRANSLATOR
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:25PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 174
Air System Design Load Summary for 1 F TRANSLATOR
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:25PM
Page 175
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F TRANSLATOR
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:25PM
Page 176
Hourly Analysis Program v5.01 Page 4 of 4
Ventilation Sizing Summary for 1 F CORRIDOR RIGHT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 177
Air System Design Load Summary for 1 F CORRIDOR RIGHT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 178
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F CORRIDOR RIGHT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 179
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F CORRIDOR LEFT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F CORRIDOR LEFT 1 2.5 Jul 2200 344 0.2 56.0 6.15
Page 180
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F CORRIDOR LEFT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 181
Air System Design Load Summary for 1 F CORRIDOR LEFT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 182
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F CORRIDOR LEFT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 183
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F CORRIDOR CENTER ,F13
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F CORRIDOR CENTER 1 4.5 Jul 1600 533 0.3 72.0 7.41
1 F 13 ELEC ROOM 1 1.2 Jul 1600 137 0.0 6.0 22.82
Page 184
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F CORRIDOR CENTER ,F13
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 185
Air System Design Load Summary for 1 F CORRIDOR CENTER ,F13
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 186
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F CORRIDOR CENTER ,F13
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 187
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 32 DIRECTOR OF STAFF
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 32 DIRECTOR OF STAFF 1 3.9 Jul 1500 355 0.4 28.6 12.42
Page 188
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 32 DIRECTOR OF STAFF
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 189
Air System Design Load Summary for 1 F 32 DIRECTOR OF STAFF
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 190
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 32 DIRECTOR OF STAFF
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 191
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 31 DOS STAFF
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 31 DOS STAFF 1 3.4 Jul 1900 400 0.3 34.0 11.77
Page 192
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 31 DOS STAFF
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 193
Air System Design Load Summary for 1 F 31 DOS STAFF
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 194
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 31 DOS STAFF
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:23PM
Page 195
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 30 PLANNING DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 30 PLANNING DIVISION 1 6.0 Jul 0800 625 0.5 53.5 11.68
Page 196
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 30 PLANNING DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 197
Air System Design Load Summary for 1 F 30 PLANNING DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Page 198
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 30 PLANNING DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Page 199
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 29 SUPPORT DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 29 SUPPORT DIVISION 1 4.0 Jul 2100 439 0.3 47.0 9.33
Page 200
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 29 SUPPORT DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 201
Air System Design Load Summary for 1 F 29 SUPPORT DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Page 202
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 29 SUPPORT DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Page 203
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 28 CHIEF OF SUPPORT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 28 CHIEF OF SUPPORT 1 2.0 Jul 0800 238 0.2 20.0 11.92
Page 204
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 28 CHIEF OF SUPPORT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 205
Air System Design Load Summary for 1 F 28 CHIEF OF SUPPORT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Page 206
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 28 CHIEF OF SUPPORT
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Page 207
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 27 CHIEF OF C4IS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 27 CHIEF OF C4IS 1 2.8 Jul 1600 290 0.4 19.5 14.89
Page 208
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 27 CHIEF OF C4IS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 209
Air System Design Load Summary for 1 F 27 CHIEF OF C4IS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Page 210
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 27 CHIEF OF C4IS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:22PM
Page 211
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 26 CHIEF PLANNING
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 26 CHIEF PLANNING 1 1.7 Jul 1600 201 0.2 17.7 11.36
Page 212
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 26 CHIEF PLANNING
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 213
Air System Design Load Summary for 1 F 26 CHIEF PLANNING
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
Page 214
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 26 CHIEF PLANNING
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
Page 215
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 24 CBT SYSTEM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 24 CBT SYSTEM 1 7.0 Jul 1600 771 0.6 63.2 12.20
Page 216
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 24 CBT SYSTEM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 217
Air System Design Load Summary for 1 F 24 CBT SYSTEM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
Page 218
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 24 CBT SYSTEM
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
Page 219
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 23 MEDIA/STUDIO
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 23 MEDIA/STUDIO 1 4.1 Jul 2200 562 0.2 56.5 9.95
Page 220
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 23 MEDIA/STUDIO
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 221
Air System Design Load Summary for 1 F 23 MEDIA/STUDIO
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
Page 222
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 23 MEDIA/STUDIO
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:21PM
Page 223
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 22 C4IS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:20PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 22 C4IS 1 4.6 Jul 2200 585 0.2 56.5 10.36
Page 224
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 22 C4IS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:20PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 225
Air System Design Load Summary for 1 F 22 C4IS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:20PM
Page 226
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 22 C4IS
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:20PM
Page 227
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 20 & 21 REGISTRY /CLASSI
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 20 REGISRY 1 1.7 Jul 2200 183 0.1 20.5 8.92
1 F 21 CLASSIFIED DOCS 1 1.3 Jul 1700 139 0.1 12.0 11.55
Page 228
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 20 & 21 REGISTRY /CLASSI
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 229
Air System Design Load Summary for 1 F 20 & 21 REGISTRY /CLASSI
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
Page 230
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 20 & 21 REGISTRY /CLASSI
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
Page 231
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 19 LADIES OFFICE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 19 LADIES OFFICE 1 2.5 Jul 1800 322 0.1 31.0 10.40
Page 232
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 19 LADIES OFFICE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 233
Air System Design Load Summary for 1 F 19 LADIES OFFICE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
Page 234
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 19 LADIES OFFICE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
Page 235
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 12 MOSQUE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 12 MOSQUE 1 3.6 Jul 2200 460 0.3 57.5 8.00
Page 236
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 12 MOSQUE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 237
Air System Design Load Summary for 1 F 12 MOSQUE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
Page 238
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 12 MOSQUE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:19PM
Page 239
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 11 ANALYST BRANCH
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 11 ANALYST BRANCH 1 2.8 Jul 2200 457 0.2 46.0 9.94
Page 240
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 11 ANALYST BRANCH
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 241
Air System Design Load Summary for 1 F 11 ANALYST BRANCH
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
Page 242
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 11 ANALYST BRANCH
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
Page 243
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 10 SME DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 10 SME DIVISION 1 5.5 Jul 2200 759 0.3 72.5 10.47
Page 244
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 10 SME DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 245
Air System Design Load Summary for 1 F 10 SME DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
Page 246
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 10 SME DIVISION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
Page 247
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 09 CHIEF SME
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 09 CHIEF SME 1 1.9 Jul 2200 209 0.1 18.0 11.59
Page 248
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 09 CHIEF SME
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 249
Air System Design Load Summary for 1 F 09 CHIEF SME
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
Page 250
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 09 CHIEF SME
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:18PM
Page 251
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 08 WORK SHOP
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 08 WORK SHOP 1 1.8 Jul 2200 190 0.1 17.0 11.19
Page 252
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 08 WORK SHOP
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 253
Air System Design Load Summary for 1 F 08 WORK SHOP
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Page 254
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 08 WORK SHOP
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Page 255
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 07 CHIEF PRODUCTION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 07 CHIEF PRODUCTION 1 2.7 Jul 1600 262 0.4 21.0 12.49
Page 256
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 07 CHIEF PRODUCTION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 257
Air System Design Load Summary for 1 F 07 CHIEF PRODUCTION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Page 258
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 07 CHIEF PRODUCTION
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Page 259
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 06 PRODUCTION DIVISI
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 06 PRODUCTION DIVISI 1 13.0 Jul 2200 1957 1.3 170.0 11.51
Page 260
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 06 PRODUCTION DIVISI
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 261
Air System Design Load Summary for 1 F 06 PRODUCTION DIVISI
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Page 262
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 06 PRODUCTION DIVISI
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Page 263
Hourly Analysis Program v5.01 Page 4 of 4
Zone Sizing Summary for 1 F 03 FRONT OFFICE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 03 FRONT OFFICE 1 1.1 Jul 1800 158 0.1 13.5 11.70
Page 264
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for 1 F 03 FRONT OFFICE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 265
Air System Design Load Summary for 1 F 03 FRONT OFFICE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Page 266
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for 1 F 03 FRONT OFFICE
Project Name: QATAR JOINT WARFARE 09-20-2018
Prepared by: qea 12:17PM
Page 267
Hourly Analysis Program v5.01 Page 4 of 4
_______________________________________________________________________________
_________________________________________________________________________________
Q.E.A.
Page 268
Air System Sizing Summary for 1 F KITCHEN & CAFETARIA
Project Name: QATAR JOINT WARFARE 09-25-2018
Prepared by: qea 02:39PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Total coil load ..................................................... 63.3 kW Load occurs at .................................................. Jul 1500
Sensible coil load ............................................... 37.4 kW OA DB / WB ................................................... 46.0 / 30.0 °C
Coil L/s at Jul 1500 ............................................ 1833 L/s Entering DB / WB ........................................... 26.5 / 19.9 °C
Max block L/s at Jul 1700 .................................. 1833 L/s Leaving DB / WB ............................................... 9.6 / 9.2 °C
Sum of peak zone L/s ....................................... 1889 L/s Coil ADP .................................................................... 7.8 °C
Sensible heat ratio ............................................ 0.590 Bypass Factor ........................................................ 0.100
m²/kW ................................................................... 2.2 Resulting RH ............................................................... 50 %
W/m² ................................................................. 452.2 Design supply temp. ................................................ 12.5 °C
Water flow @ 5.6 K rise ..................................... N/A Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ............................... 0.1 K
Max coil load ........................................................ 9.1 kW Load occurs at .................................................. Jul 0500
Coil L/s at Jul 0500 ............................................ 1833 L/s W/m² ........................................................................ 65.1
Max coil L/s ....................................................... 1833 L/s Ent. DB / Lvg DB .............................................. 9.4 / 13.6 °C
Water flow @ 11.1 K drop .................................. N/A
Actual max L/s at Jul 1700 ................................ 1833 L/s Fan motor BHP ........................................................ 0.43 BHP
Standard L/s ...................................................... 1831 L/s Fan motor kW .......................................................... 0.34 kW
Actual max L/(sꞏm²) .......................................... 13.09 L/(sꞏm²) Fan static .................................................................. 100 Pa
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 33 KITCHEN 1 3.7 Jul 2000 364 0.2 30.0 12.13
1 F 34 CAFATERIA 1 15.1 Jul 1700 1470 0.9 110.0 13.36
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate ................................................................ 370 L/s
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Total coil load ..................................................... 51.5 kW Load occurs at .................................................. Jul 1500
Sensible coil load ............................................... 31.9 kW OA DB / WB ................................................... 46.0 / 30.0 °C
Coil L/s at Jul 1500 ............................................ 1890 L/s Entering DB / WB ........................................... 23.8 / 18.1 °C
Max block L/s .................................................... 1890 L/s Leaving DB / WB ............................................... 9.8 / 9.4 °C
Sum of peak zone L/s ....................................... 1890 L/s Coil ADP .................................................................... 8.3 °C
Sensible heat ratio ............................................ 0.619 Bypass Factor ........................................................ 0.100
m²/kW ................................................................... 2.7 Resulting RH ............................................................... 50 %
W/m² ................................................................. 367.9 Design supply temp. ................................................ 12.5 °C
Water flow @ 5.6 K rise ..................................... N/A Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ............................... 0.1 K
Max coil load ........................................................ 8.8 kW Load occurs at .................................................. Jul 0500
Coil L/s at Jul 0500 ............................................ 1890 L/s W/m² ........................................................................ 62.6
Max coil L/s ....................................................... 1890 L/s Ent. DB / Lvg DB .............................................. 9.7 / 13.6 °C
Water flow @ 11.1 K drop .................................. N/A
Actual max L/s ................................................... 1890 L/s Fan motor BHP ........................................................ 0.44 BHP
Standard L/s ...................................................... 1888 L/s Fan motor kW .......................................................... 0.35 kW
Actual max L/(sꞏm²) .......................................... 13.50 L/(sꞏm²) Fan static .................................................................. 100 Pa
Page 269
Hourly Analysis Program v5.01 Page 1 of 5
Air System Sizing Summary for 1 F02 COMMANDER/ MEETING
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:08AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Total coil load ..................................................... 18.9 kW Load occurs at .................................................. Jul 1500
Sensible coil load ............................................... 14.4 kW OA DB / WB ................................................... 46.0 / 30.0 °C
Coil L/s at Jul 1500 ............................................ 1251 L/s Entering DB / WB ........................................... 23.2 / 17.7 °C
Max block L/s .................................................... 1251 L/s Leaving DB / WB ........................................... 13.6 / 13.1 °C
Sum of peak zone L/s ....................................... 1251 L/s Coil ADP .................................................................. 12.6 °C
Sensible heat ratio ............................................ 0.763 Bypass Factor ........................................................ 0.100
m²/kW ................................................................... 5.9 Resulting RH ............................................................... 50 %
W/m² ................................................................. 170.7 Design supply temp. ................................................ 14.0 °C
Water flow @ 5.6 K rise ..................................... N/A Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ............................... 0.0 K
Max coil load ........................................................ 2.8 kW Load occurs at .................................................. Jul 0700
Coil L/s at Jul 0700 ............................................ 1251 L/s W/m² ........................................................................ 25.5
Max coil L/s ....................................................... 1251 L/s Ent. DB / Lvg DB ............................................ 13.8 / 15.6 °C
Water flow @ 11.1 K drop .................................. N/A
Actual max L/s ................................................... 1251 L/s Fan motor BHP ........................................................ 0.29 BHP
Standard L/s ...................................................... 1250 L/s Fan motor kW .......................................................... 0.23 kW
Actual max L/(sꞏm²) .......................................... 11.32 L/(sꞏm²) Fan static .................................................................. 100 Pa
Page 274
Hourly Analysis Program v5.01 Page 1 of 5
Zone Sizing Summary for 1 F02 COMMANDER/ MEETING
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:08AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
1 F 02 COMMANDER ROOM 1 5.0 Jul 1600 591 0.7 60.5 9.77
1 F 05 COMMANDER MEETING 1 5.3 Jul 1600 623 0.6 50.0 12.46
Page 275
Hourly Analysis Program v5.01 Page 2 of 5
Ventilation Sizing Summary for 1 F02 COMMANDER/ MEETING
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:08AM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................. 92 L/s
Page 276
Air System Design Load Summary for 1 F02 COMMANDER/ MEETING
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:08AM
Page 277
Hourly Analysis Program v5.01 Page 4 of 5
Zone Design Load Summary for 1 F02 COMMANDER/ MEETING
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:08AM
Page 278
Hourly Analysis Program v5.01 Page 5 of 5
Air System Sizing Summary for AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:09AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Total coil load ..................................................... 93.1 kW Load occurs at .................................................. Jul 1400
Sensible coil load ............................................... 61.1 kW OA DB / WB ................................................... 45.7 / 29.9 °C
Coil L/s at Jul 1400 ............................................ 4043 L/s Entering DB / WB ........................................... 25.8 / 19.5 °C
Max block L/s .................................................... 4043 L/s Leaving DB / WB ........................................... 13.3 / 12.7 °C
Sum of peak zone L/s ....................................... 4043 L/s Coil ADP .................................................................. 11.9 °C
Sensible heat ratio ............................................ 0.657 Bypass Factor ........................................................ 0.100
m²/kW ................................................................... 2.6 Resulting RH ............................................................... 50 %
W/m² ................................................................. 386.9 Design supply temp. ................................................ 12.5 °C
Water flow @ 5.6 K rise ..................................... N/A Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ............................... 0.0 K
Actual max L/s ................................................... 4043 L/s Fan motor BHP ........................................................ 0.94 BHP
Standard L/s ...................................................... 4038 L/s Fan motor kW .......................................................... 0.75 kW
Actual max L/(sꞏm²) .......................................... 16.81 L/(sꞏm²) Fan static .................................................................. 100 Pa
Page 279
Hourly Analysis Program v5.01 Page 1 of 5
Zone Sizing Summary for AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:09AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
AUDITORIUM 1 40.2 Jul 1600 3921 1.3 240.5 16.30
Page 280
Hourly Analysis Program v5.01 Page 2 of 5
Ventilation Sizing Summary for AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:09AM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate ................................................................ 702 L/s
Page 281
Air System Design Load Summary for AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:09AM
Page 282
Hourly Analysis Program v5.01 Page 4 of 5
Zone Design Load Summary for AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:09AM
Page 283
Hourly Analysis Program v5.01 Page 5 of 5
Air System Sizing Summary for FAHU AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:12AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing ..................... Coincident space loads
Total coil load ................................................... 194.3 kW Load occurs at .................................................. Jul 1500
Sensible coil load ............................................. 103.8 kW OA DB / WB ................................................... 46.0 / 30.0 °C
Coil L/s at Jul 1500 ............................................ 2596 L/s Entering DB / WB ........................................... 46.0 / 30.0 °C
Max block L/s at Des Htg .................................. 2596 L/s Leaving DB / WB ........................................... 12.8 / 12.1 °C
Sum of peak zone L/s ....................................... 2676 L/s Coil ADP .................................................................... 9.1 °C
Sensible heat ratio ............................................ 0.534 Bypass Factor ........................................................ 0.100
m²/kW ................................................................... 0.0 Resulting RH ............................................................... 50 %
W/m² ........................................................... 194343.9 Design supply temp. ................................................ 13.0 °C
Water flow @ 5.6 K rise ..................................... N/A Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ............................... 0.0 K
Max coil load ...................................................... 27.8 kW Load occurs at .................................................. Jul 0500
Coil L/s at Jul 0500 ............................................ 2596 L/s W/m² .................................................................. 27753.7
Max coil L/s ....................................................... 2596 L/s Ent. DB / Lvg DB ............................................ 11.7 / 20.6 °C
Water flow @ 11.1 K drop .................................. N/A
Actual max L/s at Des Htg ................................. 2596 L/s Fan motor BHP ........................................................ 1.52 BHP
Standard L/s ...................................................... 2593 L/s Fan motor kW .......................................................... 1.20 kW
Actual max L/(sꞏm²) ...................................... 2596.00 L/(sꞏm²) Fan static .................................................................. 250 Pa
Page 284
Hourly Analysis Program v5.01 Page 1 of 5
Zone Sizing Summary for FAHU AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:12AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing ..................... Coincident space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
FAHU AUDITORIUM 1 0.0 Des Htg 2596 0.0 1.0 2596.00
Page 285
Hourly Analysis Program v5.01 Page 2 of 5
Ventilation Sizing Summary for FAHU AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:12AM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .............................................................. 2596 L/s
Page 286
Air System Design Load Summary for FAHU AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:12AM
Page 287
Hourly Analysis Program v5.01 Page 4 of 5
Zone Design Load Summary for FAHU AUDITORIUM
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:12AM
Page 288
Hourly Analysis Program v5.01 Page 5 of 5
Air System Sizing Summary for FAHU LEFT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:22AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing ..................... Coincident space loads
Total coil load ..................................................... 93.7 kW Load occurs at .................................................. Jul 1500
Sensible coil load ............................................... 50.1 kW OA DB / WB ................................................... 46.0 / 30.0 °C
Coil L/s at Jul 1500 ............................................ 1252 L/s Entering DB / WB ........................................... 46.0 / 30.0 °C
Max block L/s at Des Htg .................................. 1252 L/s Leaving DB / WB ........................................... 12.8 / 12.1 °C
Sum of peak zone L/s ....................................... 1291 L/s Coil ADP .................................................................... 9.1 °C
Sensible heat ratio ............................................ 0.534 Bypass Factor ........................................................ 0.100
m²/kW ................................................................... 0.0 Resulting RH ............................................................... 50 %
W/m² ............................................................. 93728.2 Design supply temp. ................................................ 13.0 °C
Water flow @ 5.6 K rise ..................................... N/A Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ............................... 0.0 K
Max coil load ...................................................... 13.4 kW Load occurs at .................................................. Jul 0500
Coil L/s at Jul 0500 ............................................ 1252 L/s W/m² .................................................................. 13385.1
Max coil L/s ....................................................... 1252 L/s Ent. DB / Lvg DB ............................................ 11.7 / 20.6 °C
Water flow @ 11.1 K drop .................................. N/A
Actual max L/s at Des Htg ................................. 1252 L/s Fan motor BHP ........................................................ 0.73 BHP
Standard L/s ...................................................... 1251 L/s Fan motor kW .......................................................... 0.58 kW
Actual max L/(sꞏm²) ...................................... 1252.00 L/(sꞏm²) Fan static .................................................................. 250 Pa
Page 289
Hourly Analysis Program v5.01 Page 1 of 5
Zone Sizing Summary for FAHU LEFT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:22AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing ..................... Coincident space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
FAHU LEFT SIDE 1 0.0 Des Htg 1252 0.0 1.0 1252.00
Page 290
Hourly Analysis Program v5.01 Page 2 of 5
Ventilation Sizing Summary for FAHU LEFT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:22AM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .............................................................. 1252 L/s
Page 291
Air System Design Load Summary for FAHU LEFT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:22AM
Page 292
Hourly Analysis Program v5.01 Page 4 of 5
Zone Design Load Summary for FAHU LEFT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:22AM
Page 293
Hourly Analysis Program v5.01 Page 5 of 5
Air System Sizing Summary for FAHU RIGHT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:23AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing ..................... Coincident space loads
Total coil load ..................................................... 74.6 kW Load occurs at .................................................. Jul 1500
Sensible coil load ............................................... 39.8 kW OA DB / WB ................................................... 46.0 / 30.0 °C
Coil L/s at Jul 1500 .............................................. 996 L/s Entering DB / WB ........................................... 46.0 / 30.0 °C
Max block L/s at Des Htg .................................... 996 L/s Leaving DB / WB ........................................... 12.8 / 12.1 °C
Sum of peak zone L/s ....................................... 1027 L/s Coil ADP .................................................................... 9.1 °C
Sensible heat ratio ............................................ 0.534 Bypass Factor ........................................................ 0.100
m²/kW ................................................................... 0.0 Resulting RH ............................................................... 50 %
W/m² ............................................................. 74563.4 Design supply temp. ................................................ 13.0 °C
Water flow @ 5.6 K rise ..................................... N/A Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ............................... 0.0 K
Max coil load ...................................................... 10.6 kW Load occurs at .................................................. Jul 0500
Coil L/s at Jul 0500 .............................................. 996 L/s W/m² .................................................................. 10648.2
Max coil L/s ......................................................... 996 L/s Ent. DB / Lvg DB ............................................ 11.7 / 20.6 °C
Water flow @ 11.1 K drop .................................. N/A
Actual max L/s at Des Htg ................................... 996 L/s Fan motor BHP ........................................................ 0.58 BHP
Standard L/s ........................................................ 995 L/s Fan motor kW .......................................................... 0.46 kW
Actual max L/(sꞏm²) ........................................ 996.00 L/(sꞏm²) Fan static .................................................................. 250 Pa
Page 294
Hourly Analysis Program v5.01 Page 1 of 5
Zone Sizing Summary for FAHU RIGHT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:23AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing ..................... Coincident space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
FAHU RIGHT SIDE 1 0.0 Des Htg 996 0.0 1.0 996.00
Page 295
Hourly Analysis Program v5.01 Page 2 of 5
Ventilation Sizing Summary for FAHU RIGHT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:23AM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate ................................................................ 996 L/s
Page 296
Air System Design Load Summary for FAHU RIGHT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:23AM
Page 297
Hourly Analysis Program v5.01 Page 4 of 5
Zone Design Load Summary for FAHU RIGHT SIDE
Project Name: QATAR JOINT WARFARE 09-22-2018
Prepared by: qea 09:23AM
Page 298
Hourly Analysis Program v5.01 Page 5 of 5
_______________________________________________________________________________
U VALUES
_________________________________________________________________________________
Q.E.A.
Page 299
Section 12: Thermal Insulation of Building
All Air conditioned new buildings and addition to existing building shall be
provided with insulation as mentioned in the section 12.2 and 12.3.
12.1 Definitions :
U Value (Overall Heat Transfer Coefficient): Heat transmission in unit time
through unit area of material of construction and the boundary of air films,
induced by unit temperature difference between the environments on each side.
Units of U are W/m2 ºC ( Btu/h.ft2 ºF ).
Shading Coefficient (SC) : The ratio of solar heat gain at normal incidence
through glazing to that occurring through 1/8 in thick clear double strength glass.
Window Wall Ratio (WWR) : The window wall ratio is the ratio of vertical
fenestration area to gross exterior wall area. The fenestration area is the rough
opening ie it includes the frame, sash and other nonglazed window components.
The gross exterior wall area is measured vertically from top of the floor to bottom
of the roof.
Visible Transmittance (VT) : It is the fraction of visible light transmitted through
the glazing material .
Thermal insulation material used in the building external wall/roof must not
exceed the following U Value.
The total glass area in the building shall be reasonable to minimize the heat
transmission and solar gain through the glazing. For different Window Wall ratio,
overall U Value and Shading Coefficient of the glass assembly does not exceed
the following values.
Page 300
For the showroom building, double galzing shall be used with maximum U value
2.10 ( 0.36 ) W/m2 ºC ( Btu/ft2h F ), maximum SC 0.6 and with minimum Visible
Transmittance 0.3.
12.4 Compliance:
Consultant should submit U value calculation for the walls, roof and Windows for
KAHRAMAA approval. Sample building envelope compliance forms are provided
in the Appendix 04.
The material used for the thermal insulation shall be approved by Qatar General
Electricity & Water Corporation “KAHRAMAA” before being installed, and as per
the approval on the building permit application form.
Page 301
Page 302
Page 303
Page 304
________________________________________________________________________________
PUMP ROOM
________________________________________________________________________________
Q.E.A.
Page 305
Space Input Data
IMAR INSTANBUL PUMP ROOM 09-23-2018
qea 04:50PM
1. General Details:
Floor Area ........................................................... 47.8 m²
Avg. Ceiling Height ............................................... 3.4 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 2.0 People
Wattage ............................................................ 900.0 Watts Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.00 Sensible ............................................................. 67.4 W/person
Schedule ............................................. LIGHTING(1) Latent ................................................................. 35.2 W/person
Schedule ................................................ PEOPLE(1)
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
WSW 17.4 0 0 0
SSE 30.6 0 0 1
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 47.8 0 0
5. Infiltration:
Design Cooling ................................................... 1.00 ACH
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs at all hours.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 47.8 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 306
Hourly Analysis Program vv5.01 Page 1 of 2
Space Input Data
IMAR INSTANBUL PUMP ROOM 09-23-2018
qea 04:50PM
1. General Details:
Floor Area ........................................................... 15.0 m²
Avg. Ceiling Height ............................................... 3.4 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 900.0 Watts Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.00 Sensible ............................................................. 67.4 W/person
Schedule ............................................. LIGHTING(1) Latent ................................................................. 35.2 W/person
Schedule ................................................ PEOPLE(1)
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
ENE 17.0 1 0 0
SSE 10.2 0 0 1
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 15.0 0 0
5. Infiltration:
Design Cooling ................................................... 1.00 ACH
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs at all hours.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 15.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 307
Hourly Analysis Program vv5.01 Page 2 of 2
________________________________________________________________________________
________________________________________________________________________________
Q.E.A.
Page 308
Air System Sizing Summary for FIRE PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Total coil load ....................................................... 4.9 kW Load occurs at .................................................. Jul 1700
Sensible coil load ................................................. 3.7 kW OA DB / WB ................................................... 44.9 / 29.8 °C
Coil L/s at Jul 1700 .............................................. 186 L/s Entering DB / WB ........................................... 31.9 / 21.8 °C
Max block L/s at Jul 1700 .................................... 186 L/s Leaving DB / WB ............................................ 15.6 / 14.7 °C
Sum of peak zone L/s ......................................... 186 L/s Coil ADP .................................................................. 13.8 °C
Sensible heat ratio ............................................ 0.753 Bypass Factor ........................................................ 0.100
m²/kW ................................................................... 9.8 Resulting RH ............................................................... 42 %
W/m² ................................................................. 101.6 Design supply temp. ................................................ 13.0 °C
Water flow @ 5.6 K rise ..................................... N/A Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ................................ 0.0 K
Actual max L/s at Jul 1700 .................................. 186 L/s Fan motor BHP ........................................................ 0.04 BHP
Standard L/s ........................................................ 186 L/s Fan motor kW .......................................................... 0.03 kW
Actual max L/(sꞏm²) ............................................ 3.89 L/(sꞏm²) Fan static .................................................................... 75 Pa
Page 309
Hourly Analysis Program v5.01 Page 1 of 10
Zone Sizing Summary for FIRE PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
FIRE PUMP ROOM 1 3.8 Jul 1700 186 0.5 47.8 3.89
Page 310
Hourly Analysis Program v5.01 Page 2 of 10
Ventilation Sizing Summary for FIRE PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 311
Hourly Analysis Program v5.01 Page 3 of 10
Air System Design Load Summary for FIRE PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
Page 312
Hourly Analysis Program v5.01 Page 4 of 10
Zone Design Load Summary for FIRE PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
Page 313
Hourly Analysis Program v5.01 Page 5 of 10
Air System Sizing Summary for WATER PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Total coil load ....................................................... 2.8 kW Load occurs at .................................................. Jul 1400
Sensible coil load ................................................. 2.4 kW OA DB / WB ................................................... 45.7 / 29.9 °C
Coil L/s at Jul 1400 .............................................. 118 L/s Entering DB / WB ........................................... 31.9 / 21.0 °C
Max block L/s at Jul 1500 .................................... 118 L/s Leaving DB / WB ............................................ 15.4 / 14.4 °C
Sum of peak zone L/s ......................................... 118 L/s Coil ADP .................................................................. 13.5 °C
Sensible heat ratio ............................................ 0.842 Bypass Factor ........................................................ 0.100
m²/kW ................................................................... 5.3 Resulting RH ............................................................... 38 %
W/m² ................................................................. 187.2 Design supply temp. ................................................ 13.0 °C
Water flow @ 5.6 K rise ..................................... N/A Zone T-stat Check ................................................. 1 of 1 OK
Max zone temperature deviation ................................ 0.0 K
Actual max L/s at Jul 1500 .................................. 118 L/s Fan motor BHP ........................................................ 0.03 BHP
Standard L/s ........................................................ 118 L/s Fan motor kW .......................................................... 0.02 kW
Actual max L/(sꞏm²) ............................................ 7.90 L/(sꞏm²) Fan static .................................................................... 75 Pa
Page 314
Hourly Analysis Program v5.01 Page 6 of 10
Zone Sizing Summary for WATER PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
Calculation Months .................................... Jul to Jul Zone L/s Sizing ...................... Peak zone sensible load
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
WATER PUMP ROOM 1 2.4 Jul 1500 118 0.3 15.0 7.90
Page 315
Hourly Analysis Program v5.01 Page 7 of 10
Ventilation Sizing Summary for WATER PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 316
Hourly Analysis Program v5.01 Page 8 of 10
Air System Design Load Summary for WATER PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
Page 317
Hourly Analysis Program v5.01 Page 9 of 10
Zone Design Load Summary for WATER PUMP ROOM
Project Name: IMAR INSTANBUL PUMP ROOM 09-23-2018
Prepared by: qea 04:57PM
Page 318
Hourly Analysis Program v5.01 Page 10 of 10
________________________________________________________________________________
*****************************************************
________________________________________________________________________________
Q.E.A.
Page 319
________________________________________________________________________________
DESIGN CRITERIA
AIR CONDITIONING
e. Software used
Software used for heat load A.C. calculations is CARRIER - Hourly Analysis Program
5.01
________________________________________________________________________________
Q.E.A.
Page 320
________________________________________________________________________________
Tentative
Sl. Occupancy Equipment Lighting Load (watts)
Room
No. (persons) Load (watts) including Ballast Factor
Notes:
________________________________________________________________________________
Q.E.A.
Page 321
________________________________________________________________________________
Infiltration 45
Note:
1. For normal operation of A.C. system, fresh air is assumed through infiltration.
Since engines are not to be used for continuous duty and only for stationary emergency
standby fire pump services, in the event of fire, fire fighting deluge system is designed for
20 minutes as per Kahra-maa specifications.
By substitution:
Q = 12.7 .
1.2 (327.4 – 319)
= 1.259 m³/s or 1259 l/s
Fresh air intake connection will be sized for 1259 l/s.
Exhaust air fan at full load shall be in capacity of 1259 l/s for removal of heat dissipation
in the Pump room.
________________________________________________________________________________
Q.E.A.
Page 322
________________________________________________________________________________
Note
1. Split units, fresh air motorized damper and exhaust fans shall be interlocked, so that at
a time only one item shall operate.
2. Fresh air intake is provided with motorized damper and all other accessories as per
specification.
________________________________________________________________________________
Q.E.A.
Page 323
________________________________________________________________________________
Computer Calculations
________________________________________________________________________________
Q.E.A.
Page 324
5.0 SCHEDULE OF EQUIPMENT
COOLING SENSIBLE
UNIT REF. AREA SERVED DESCRIPTION OF A.C. UNIT ELECTRICAL SUPPLY CAPACITY CAPACITY QTY.
kW kW
IU-01/OU-1 & Pump room Air cooled Split ceiling / wall mounted 220 - 240 V / 1 Ph / 50 Hz 3.36 2.88 2
IU-02/OU-2 unit with remote outdoor unit (1 working +
1 standby)
Notes:
1. The above mentioned cooling / heating capacities are based on 46°C.DB, 30°C. WB ambient condition.
2. Fan motor and compressor of the outdoor and package unit shall be suitable to operate upto 50°C. ambient temperature without tripping.
___________________________________________________________________________________________________________________________
Q.E.A.
Page 325
5.3 SCHEDULE OF FRESH AIR FANS
UNIT REF. AREA SERVED EXHAUST AIR FLOW (l/s) TYPE EXT. STATIC PRESSURE (Pa) QTY.
Notes:
1. Guard room fan Electrical Supply: 240 V, 1 Ph., 50 Hz. AC supply.
2. Pump room fan Electrical Supply: 415 V, 3 Ph., 50 Hz., and motor and complete fan assembly shall be suitable upto 400°C. temperature.
___________________________________________________________________________________________________________________________
Q.E.A.
Page 326
________________________________________________________________________________
GUARD ROOM
________________________________________________________________________________
Q.E.A.
Page 327
________________________________________________________________________________
________________________________________________________________________________
Q.E.A.
Page 328
Space Input Data
QATAR JOINT WARFARE 09-24-2018
qea 09:01AM
guard room
1. General Details:
Floor Area ............................................................. 8.0 m²
Avg. Ceiling Height ............................................... 2.4 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 2.0 People
Wattage ............................................................ 12.00 W/m² Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 67.4 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 35.2 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
N 8.7 0 0 1
S 8.7 1 0 0
E 7.0 1 0 0
W 7.0 1 0 0
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 8.0 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
Page 329
Hourly Analysis Program vv5.01 Page 1 of 2
Space Input Data
QATAR JOINT WARFARE 09-24-2018
qea 09:01AM
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ............................................................. 8.0 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
(No partition data).
Page 330
Hourly Analysis Program vv5.01 Page 2 of 2
________________________________________________________________________________
________________________________________________________________________________
Q.E.A.
Page 331
Zone Sizing Summary for guard room
Project Name: QATAR JOINT WARFARE 09-24-2018
Prepared by: qea 09:02AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
guard room 1 1.8 Jul 1600 170 0.3 8.0 21.22
Page 332
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for guard room
Project Name: QATAR JOINT WARFARE 09-24-2018
Prepared by: qea 09:02AM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 333
Hourly Analysis Program v5.01 Page 2 of 4
Air System Design Load Summary for guard room
Project Name: QATAR JOINT WARFARE 09-24-2018
Prepared by: qea 09:02AM
Page 334
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for guard room
Project Name: QATAR JOINT WARFARE 09-24-2018
Prepared by: qea 09:02AM
Page 335
Hourly Analysis Program v5.01 Page 4 of 4
________________________________________________________________________________
SUBSTATION
________________________________________________________________________________
Q.E.A.
Page 336
________________________________________________________________________________
________________________________________________________________________________
Q.E.A.
Page 337
Space Input Data
QATAR JOINT WARFARE 09-24-2018
qea 09:20AM
substation lv switchroom
1. General Details:
Floor Area ........................................................... 37.8 m²
Avg. Ceiling Height ............................................... 3.7 m
Building Weight ................................................ 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ...................................... User-Defined
OA Requirement 1 ................................................ 0.0 L/s
OA Requirement 2 .............................................. 0.00 L/(sꞏm²)
Space Usage Defaults ASHRAE Standard 62.1-2007
2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ......................... Recessed (Unvented) Occupancy ........................................................... 1.0 Person
Wattage ............................................................ 12.00 W/m² Activity Level .................................... Seated at Rest
Ballast Multiplier ................................................. 1.25 Sensible ............................................................. 67.4 W/person
Schedule ................................................. LIGHTING Latent ................................................................. 35.2 W/person
Schedule ..................................................... PEOPLE
Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NW 22.2 0 0 1
4. Roofs, Skylights:
Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 37.8 0 0
5. Infiltration:
Design Cooling ................................................... 0.00 L/s
Design Heating ................................................... 0.00 L/s
Energy Analysis .................................................. 0.00 L/s
Infiltration occurs only when the fan is off.
6. Floors:
Type ....................................... Slab Floor On Grade
Floor Area ........................................................... 37.8 m²
Total Floor U-Value .......................................... 1.440 W/(m²ꞏK)
Exposed Perimeter ............................................... 0.0 m
Edge Insulation R-Value .................................... 0.00 (m²ꞏK)/W
7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ..................................... Wall Partition (No partition data).
Area .................................................................... 69.0 m²
U-Value ............................................................ 1.370 W/(m²ꞏK)
Uncondit. Space Max Temp ............................... 43.0 °C
Ambient at Space Max Temp ............................. 46.0 °C
Uncondit. Space Min Temp ................................ 30.0 °C
Ambient at Space Min Temp .............................. 35.3 °C
Page 338
Hourly Analysis Program vv5.01 Page 1 of 1
________________________________________________________________________________
________________________________________________________________________________
Q.E.A.
Page 339
Zone Sizing Summary for substation lv switchroom
Project Name: QATAR JOINT WARFARE 09-24-2018
Prepared by: qea 09:20AM
Calculation Months .................................... Jul to Jul Zone L/s Sizing .................. Sum of space airflow rates
Sizing Data ............................................. Calculated Space L/s Sizing .............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(sꞏm²)
Zone 1
substation lv switchroom 1 5.0 Jul 1600 465 0.3 37.8 12.30
Page 340
Hourly Analysis Program v5.01 Page 1 of 4
Ventilation Sizing Summary for substation lv switchroom
Project Name: QATAR JOINT WARFARE 09-24-2018
Prepared by: qea 09:20AM
1. Summary
Ventilation Sizing Method ................................. Sum of Space OA Airflows
Design Ventilation Airflow Rate .................................................................... 0 L/s
Page 341
Hourly Analysis Program v5.01 Page 2 of 4
Air System Design Load Summary for substation lv switchroom
Project Name: QATAR JOINT WARFARE 09-24-2018
Prepared by: qea 09:20AM
Page 342
Hourly Analysis Program v5.01 Page 3 of 4
Zone Design Load Summary for substation lv switchroom
Project Name: QATAR JOINT WARFARE 09-24-2018
Prepared by: qea 09:20AM
Page 343
Hourly Analysis Program v5.01 Page 4 of 4
1.0 HEATER CALCUALTION TO MAINTAIN REALTIVE HUMIDITY IN WINTER CONDITION
50±5% Relative Humidity has to maintained in the room heating is required to maintain relative
humidity. Header is provided to raise the air temperature by 2.50C
Page 344