Sie sind auf Seite 1von 6

IG100-TBS AGENT CALCULATION SHEET

Client: MERALCO Approved by: Checked by:


EBM EBM

REVISION NO.:
Protected Room Number

T.V 5
Protected Room Name
INGEST ROOM 1 INGEST ROOM 2 INGEST ROOM 3 INGEST ROOM4 INGEST ROOM 5

1 Area of Floor ( m² ) 24.00 24.00 24.00 24.00 24.00


2 Volume ( m3 ) 76.80 76.80 76.80 76.80 76.80
3 Flooding Factor ( m3 /m3 ) 0.52 0.52 0.52 0.52 0.52
4 N2 Volume ( m3 ) 39.94 39.94 39.94 39.94 39.94
5 Discharge Time (min.) 1 2 3 4 5
6 Minimum Flow Rate (m3/min.) 39.94 19.97 13.31 9.98 7.99
7 Design Flow Rate (m3/min.) 39.94 19.97 13.31 9.98 7.99
8 Number of Cylinders 2 2 2 2 2
9 Main Pipe Size (A)
10 Model
11 Numbers
Nozzle Flow Rate per Nozzle
12 36.48 36.48 36.48 36.48 36.48
( m3/min. )
13 N2 Concentration (%) 40.54 41.06 41.06 41.06 41.06
14 O2 Concentration (%) 12.49 12.38 12.38 12.38 12.38
Allowable Strength of
15 NA NA NA NA NA
Protected Room ( Pa )
16 Length of Duct ( m ) NA NA NA NA NA

1
TBS INDUSTRIAL SERVICES
Area of Pressure Relief
17 NA NA NA NA NA
Opening ( mm2)

The Formula of Pressure Relief Opening A = 134 x (Item 7) x 1.6 x 1/(P-Pd)½


The Formula of the N2 Concentration C (%) = {1 - e (-item 8 x W x 1/item 2 ) x 100} W=20.3m3
The Formula of the O2 Concentration C (%) = {1 - item 13 / 100} x 21

data
l (m) 3 3 3 3 3
w (m) 2.5 2.5 2.5 2.5 2.5
e (m) 3.2 3.2 3.2 3.2 3.2

2
TBS INDUSTRIAL SERVICES
ENT CALCULATION SHEET IG100-TBS AGENT CALCULATION SHEET
Client: MERALCO Calculated by:
AU/PJS

Protected Room Number

T.V 5
Protected Room Name INGEST ROOM INGEST ROOM
6 7
1 Area of Floor ( m² ) 24.00 24.00
2 Volume ( m3 ) 76.80 76.80
3 Flooding Factor ( m3 /m3 ) 0.52 0.52
4 N2 Volume ( m3 ) 39.94 39.94
5 Discharge Time (min.) 6 7
6 Minimum Flow Rate (m3/min.) 6.66 5.71
7 Design Flow Rate (m3/min.) 6.66 5.71
8 Number of Cylinders 2 2
9 Main Pipe Size (A)
10 Model
11 Numbers
Nozzle Flow Rate per Nozzle
12 36.48 36.48
( m3/min. )
13 N2 Concentration (%) 41.06 41.06
14 O2 Concentration (%) 12.38 12.38
Allowable Strength of
15 NA NA
Protected Room ( Pa )
16 Length of Duct ( m ) NA NA

3
TBS INDUSTRIAL SERVICES
Area of Pressure Relief
17 NA NA
Opening ( mm2)

The Formula of Pressure Relief Opening A = 134 x (Item 7) x 1.6 x 1/(P-Pd)½


The Formula of the N2 Concentration C (%) = {1 - e (-item 8 x W x 1/item 2 ) x 100}
300bars W=20.3m3
20.3 m3
The Formula of the O2 Concentration C (%) = {1 - item 13 / 100} x 21

data
l (m) 3 3
w (m) 2.5 2.5
e (m) 3.2 3.2

4
TBS INDUSTRIAL SERVICES
IG100-TBS AGENT CALCULATION SHEET
Client: ADB IG100
Agent Calculation: 300 bars

Protected Room Number

Protected Room Name

1 Area of Floor ( m² )

2 Volume ( m3 )
3 Flooding Factor ( m3 /m3 )
4 N2 Volume ( m3 )
5 Discharge Time (min.)
6 Minimum Flow Rate (m3/min.)
7 Design Flow Rate (m3/min.)
8 Number of Cylinders
9 Main Pipe Size (A)
10 Model
11 Numbers
Nozzle
Flow Rate per Nozzle
12
( m3/min. )
13 N2 Concentration (%)
14 O2 Concentration (%)

Allowable Strength of Protected


15
Room ( Pa )
16 Length of Duct ( m )
Area of Pressure Relief Opening
17
( mm2)

data
l (m)
w (m)
e (m)

The Formula of Pressure Relief Opening

The Formula of the N2 Concentration

The Formula of the O2 Concentration


AGENT CALCULATION SHEET

: 300 bars
REVISION NO.: 0

ADB BMS ROOM

ROOM SPACE AND CEILING VOID

120.70

100.00
0.52
52.00
1
52.00
52.00
2.6
65A
SA/PN
3

22.80

40.54
12.49

NA

NA

NA

14.2
8.5
4.2

A = 134 x (Item 7) x 1.6 x 1/(P-Pd)½


C (%) = {1 - e (-item 8 x W x 1/item 2 ) x 100}
W=20.3m3
C (%) = {1 - item 13 / 100} x 21

Das könnte Ihnen auch gefallen