Engineered Vessel

Sec VIII – Division 2


2017 Edition
Basics

www.astrongroup.com Sec VIII-Div 2 Basics 1


Sec VIII – Division 2
Code Structure

• Structure & Usage of


The Code Book for
BEGINNERS

• Intention
• Philosophy
• Advantage
• Contents

www.astrongroup.com Sec VIII-Div 2 Basics 2


Definitions:

• Basics:
The simplest and most important facts
• Concept:
Principle or idea
• Philosophy:
use of principles that govern and influence judgment
• Mandatory:
describes something which must be done, or which is
demanded by law
• Beta Analysis
Validation program by rigorous scientific approach

www.astrongroup.com Sec VIII-Div 2 Basics 3


Development

The technology for pressure equipment design continues


to advance each and every day. …100 years

The ASME Boiler and Pressure Vessel Code has been


keeping pace with these advances over the last 105 years.

As far back as the 1960s, it was recognized that the


special requirements for design of pressure vessels
operating at pressures over 2000 psi called for special
rules, and ASME issued Sec. VIII, Division 2 of Alternative
Rules for Pressure Vessels.

www.astrongroup.com Sec VIII-Div 2 Basics 4


The conceptual Change

Since that time…………

has progressed to the stage where a new approach was needed not only in the content of
design codes but in the way they are presented and organized.

International organizations were involved like shell, ABB, BP, Petroleum Association of Japan
etc.

www.astrongroup.com Sec VIII-Div 2 Basics 5


Conceptual Change

www.astrongroup.com Sec VIII-Div 2 Basics 6


Development
• To ensure that the 2007 edition of Section VIII, Division 2 addresses user
requirements, Section VIII, Division 2, Certificate Holders listed below performed
a beta test analysis of the new Section VIII, division 2, by using it to design a
vessel previously designed using the 2004 edition of Section VIII, Division 2. The
testing process was critical in establishing the final quality of the new code.
• Organizations involved for performing this analysis.
– ATB Riva Calzoni, SpA

– CBI Services, Inc.

– Hitachi Zosen Mechanical Corp.- Ariake Works

– Ishikawajima-Harima Heavy Ind Co.,Ltd.- Nuclear Power Divn.

– Kobe Steel, Ltd.

– Sumitomo Heavy Industries, Ltd.-Ehime Works

– The Japan Steel Works, Ltd.- Muroran Plant

– Larsen & Toubro Limited-Heavy Engineering Division

www.astrongroup.com Sec VIII-Div 2 Basics 7


Logic

• LOGIC
Rule V= π r 2 xh

Fill a small quantity

• C Check if
Analysis full
FEM/iteration

Filled

www.astrongroup.com Sec VIII-Div 2 Basics 8


Comparison

Stress Eff Dia "


80.00
20000 1 200
70.00
D2
Pressue PSI basic Div 1 Div2 rdn 60.00 basic

1200 6.00 6.22 6.18 1% 50.00 Div 1

1500 7.50 7.85 7.79 1% Div2


40.00

2000 10.00 10.64 10.52 1% D2 rdn


30.00

3000 15.00 16.48 16.18 2% 20.00

5000 25.00 29.41 28.40 3% 10.00

8000 40.00 52.63 49.18 7% 0.00


0 5000 10000 15000
10000 50.00 71.43 64.87 9%

www.astrongroup.com Sec VIII-Div 2 Basics 9


The allowable stress level
SA 516 Gr 70

70000 PSI

25300 PSI 2.75


20000 PSI 3.5

www.astrongroup.com Sec VIII-Div 2 Basics 10


Factor of Safety

Wide Road (Thicker)

Narrow Road (Thinner)


www.astrongroup.com Sec VIII-Div 2 Basics 11
The Div. 2 Code
Part 1
General
Part 9
Part 2
Over Pr.
Duties
Protection

Total
Part 8 Pr. Pages = Part 3
Testing 867 (2017) Material

Part 7 Part 4
Inspn & Design by
Exam Rules

Part 5
Part 6
Design by
Fabrication
Analysis

www.astrongroup.com Sec VIII-Div 2 Basics 12


UDS & MDR (design)

Design

Mfr Design
User Design Report
Specifications
(Calc)

Registered Registered
Professional Certified Professional Certified
Engineer Individual (CI) Engineer Individual (CI)
(RPE) (RPE)

www.astrongroup.com Sec VIII-Div 2 Basics 13


Vessel Classes (2017)

Div. 2 Vessels

Class 1 Class 2
Design Margin Design Margin
(3.0) (2.4)

UDS by RPE MDR by RPE


UDS by RPE MDR by RPE
Required Required

Only if Fatigue
Only if Fatigue Analysis is
Analysis done or Part 5
is used

www.astrongroup.com Sec VIII-Div 2 Basics 14


LOW TEMPERATURE OPERATION

Ratio Determination:
(trE*) /(tn–c)

Corroded
Condition

t = PR/(SE-0.6P)
tr = t + c
tn = tr + x t+x

www.astrongroup.com Sec VIII-Div 2 Basics 15


Restrictions when Impact test is applicable…..(Main
factors)

www.astrongroup.com Sec VIII-Div 2 Basics 16


Material Requirements

• Permitted Materials
General
• Annex 3-A

• All Ferrous 3.3


Supplemental
• Q&T Steels 3.4

www.astrongroup.com Sec VIII-Div 2 Basics 17


3.3 materials (Supplemental)

3.3.2 Chemistry

3.3.3 UT - Plates

3.3.4 UT – Forgings

3.3.5 MT/PT – Forgings

3.3.6 Overlay clad base metal

3.3.7 Clad Tube sheet

www.astrongroup.com Sec VIII-Div 2 Basics 18


Doubts ….Discussions

www.astrongroup.com Sec VIII-Div 2 Basics 19