Index of Forms and Charts

FORMS Description CHARTS Description


Launch Meeting/Planning Forms Cumulative Earned Value Cumulative Planned vs. earned vs. projected earned value
Use these forms to plan a new project Earned Value per Week Planned, earned, and projected value per week
Project Project startup and summary form Cumulative Plan vs. Actual Cumulative planned vs. actual hours per week
Team Team member summary Plan vs. Actual Hours per W Planned vs. actual hours per week
Roles TSPe role assignments Percent Defect Free Percent of components that are defect free by phase
Goals Team goals Cumulative Defects Remove Cumulative defects removed by phase for each component
SUMS Size summary Defects Removed by Phase Defects removed by phase for each component
Task Task plan template Defect Density by Phase Defects per KLOC by phase for each component
Schedule Schedule plan template Review Rates Inspection and review rates for each component
Phase Yield Phase yield for each component
Process Yield Process yield for each component
Quality Profile Five point quality profile for each component
Time in Phase% Percentage of time spent in each phase
Defects Injected% Percentage of defects injected in each phase
Defects Removed% Percentage of defects removed in each phase

Weekly Meeting/Tracking Forms


Use these forms for gathering data and tracking
TimeLog Time recording Log
DefectLog Defect recording log
Weekly meeting status report
Task Task plan template
Schedule Schedule plan template
Quality actuals for system and components
Resource actuals for system and components
Defects injected/removed for system and components

Standards
Phases TSPe process phase standard
DefectTypes Defect type standard

Copyright 1998 James W. Over

Copyright James W. Over 1998 : 455503903.xls Index 01/14/2020 1 of 36


TSPi Support Tool Instructions

Strategy Development and Planning


TSP Process : Step WHO TOOL INSTRUCTIONS FORM
Launch Meeting 2 Launch Coach or Fill out the project information on the Project worksheet (Name, Team name, Project!Name
Planning Manager Project name, Start Date, Instructor, Cycle).
Launch Meeting 2 Launch Coach or Enter the team member names, initials, phone numbers, e-mail addresses, and Team!B2
Planning Manager filenames for the team members workbooks in the Team worksheet.
Launch Meeting 2 Launch Coach or Enter the role assignments on the Roles worksheet. (Optional) Roles!B2
Planning Manager
Launch Meeting 2 Launch Coach or Enter the team goals on the Goals worksheet. (Optional) Goals!A3
Planning Manager

Launch Meeting 3 Launch Coach or Enter all the software assemblies identified during this meeting. Enter the name, SUMS!B8
Planning Manager assembly/part flag, part of, and size measure. Requirements and High-Level
Design documents may also be entered on SUMS.

Launch Meeting 4 Launch Coach or Enter on the SUMS worksheet, the size estimates of all software assemblies. SUMS!B8
Planning Manager
Launch Meeting 4 Launch Coach or Click the Generate Task List button to create an initial task list based on the Task!A8
Planning Manager assemblies on SUMS.
Launch Meeting 4 Launch Coach or Revise the initial task list by adding or deleting tasks as necessary. Then Task!A8
Planning Manager complete the estimate for each task by entering a size estimate, size measure,
rate in units per hour, the estimated hours, and the number of engineers assigned
to the task.

Launch Meeting 4 Launch Coach or Enter hours per week for the team on the Schedule template. Hours per week are Schedule!C8
Planning Manager based on the total hours for the team for each week in the schedule.

Launch Meeting 4 Launch Coach or Click the Update Task and Schedule Plan button on the Task Worksheet to Task!A8
Planning Manager generate the overall plan.

Launch Meeting 5 Team Before creating the quality plan, review the quality guidelines in the TSP Launch
Notebook
Launch Meeting 5 Launch Coach, Enter the planned defect injection rates for each phase on the SUMQ worksheet. SUMQ!D82
Planning Manager, or
Quality Manager
Launch Meeting 5 Launch Coach, Enter estimated phase yields for each phase. SUMQ!D55
Planning Manager, or
Quality Manager

File: 455503903.xls ! TSP Instructions 01/14/2020 2 of 36


Launch Meeting 5 Team Review the calculated defect removal rates and defect densities (Defects/KLOC)
against the Quality Standard. If necessary, adjust planned time (Task worksheet),
defect injection rates (SUMQ), or defect removal yields (SUMQ).

Launch Meeting 6 Launch Coach or Enter the initials of the team member(s) assigned to each task in the resources Task!A8
Planning Manager column on worksheet Task.
Launch Meeting 6 Launch Coach or Enter the initials of the team member that owns each leaf assembly in the owner SUMS!B8
Planning Manager column on worksheet SUMS. Note that plan and actual size are copied from the
owner's workbook to the team workbook during consolidation, so each leaf
assembly MUST have an owner.

Launch Meeting 6 Launch Coach or Make 1 copy of the team workbook for the consolidated team plan. Make 1 copy Team!B2
Planning Manager of the team workbook for each engineer. Use the filename entered on the Team
worksheet (Workbook Filename). Click the Make copies... button to create the
engineer's copies automatically.

Launch Meeting 6 Each engineer Revise the tasks in the Task worksheet to reflect the individual engineers Task!A8
workload (e.g. delete task not assigned to you, and where you share an
assignment with other engineers, set the column Number of Engineers to 1).

Launch Meeting 6 Each engineer Revise the schedule plan on the Schedule worksheet to reflect your available Schedule!C8
hours per week.
Launch Meeting 6 Each engineer Click the Update Task and Schedule Plan button on the Task Worksheet to
generate your individual plan. Repeat the previous two steps until you are
satisfied with the plan
Launch Meeting 6 Planning Manager Load the engineers' individual worksheets and the consolidated team plan Team!B2
workbook into the same folder. Open the consolidated team plan workbook. Click
the consolidate plan button on the Team worksheet to build a consolidated plan

Launch Meeting 6 All team members If necessary, reassign tasks to balance the workload and repeat the previous 3
steps until a balanced plan is achieved. If planned times for any task change,
review the quality plan and revise it if necessary.

Launch Meeting 7 Launch Coach or Enter the team risks on the IRTL worksheet. (Optional) IRTL!B7
Planning Manager

Weekly Tracking
TSP Process : Step WHO TOOL INSTRUCTIONS FORM
All All team members While working, use the time log to record time spent on each task. Include the LOGT!A7
assembly and phase for each task, the date, start time, interrupt time, stop time,
and comments.

File: 455503903.xls ! TSP Instructions 01/14/2020 3 of 36


All All team members While working, use the defect log to record each defect found. Include the date, LOGD!A7
number, type, assembly, phase injected, phase removed, fix time, fix reference,
and description
All All team members While working, use the issue/risk tracking log (IRTL) to record new issues and IRTL!B7
risks or to change status of existing issues or risks.
All All team members To review status against your plan click the Update Project button on the project Project!B3
worksheet.

Weekly All team members Ensure that the completion data for all completed tasks has been entered, and all
size, time, and defect data for the week have been entered.
Weekly All team members Review the task on worksheet Task and move all organize them into the following Task!A8
order.
1-completed tasks
2-tasks planned for the next two weeks
3-remaining tasks

Weekly All team members Click the Update Project button on the Project worksheet to update individual Project!Name
plans. Print the Task and Schedule worksheets.
Weekly All team members Print the Task worksheet. Task!A8
Weekly All team members Print the Schedule worksheet. Schedule!A8
Weekly All team members Prepare a Week report. The worksheet Week includes the planning summary Week!C2
information required for the week report.
Weekly Planning Manager Prepare a weekly issue/risk report. The worksheet IRWeek contains the IRWeek!C2
information for this reportt.
Weekly All team members Send a copy of your workbook to the planning manager for use in preparing the
team's consolidated weekly report.
Weekly Planning Manager Update consolidated team plan with the current week's data and prepare status
reports for the weekly meeting.
Weekly Planning Manager Load the individual engineers workbooks and the consolidated team workbook Team!A3
into the same folder. Open the consolidated team workbook. Click the
Consolidate Plans button on Team worksheet to update consolidated team plan
with the current week's data.

Weekly Planning Manager Print the Task worksheet. Task!A8


Weekly Planning Manager Print the Schedule worksheet. Schedule!A8
Weekly Planning Manager Prepare a Week report. The worksheet Week includes the planning summary Week!C2
information required for the week report.
Weekly Planning Manager Prepare a weekly issue/risk report. The worksheet IRWeek contains the IRWeek!C2
information for this reportt.
Weekly Planning Manager Select the Project worksheet, select the assembly SYSTEM, then select and print Project!Name
the following charts:
-Earned Value
-Plan vs. Actual Hours

File: 455503903.xls ! TSP Instructions 01/14/2020 4 of 36


Weekly during Planning Manager Select the Project worksheet, select the assembly SYSTEM, then select and print Project!Name
implementation and the following charts:
testing phases -Defect Removal Profile
-Quality Profile
-Percent Defect Free

Project and Phase Postmortem


TSP Process : Step WHO TOOL INSTRUCTIONS FORM
PM All team members Follow the weekly tracking instructions to prepare and print copies of the final See weekly tracking
task, schedule, and week reports. instructions
PM All team members Select the Project worksheet and click the export button to save a copy of your Project!Name
data for the cycle.
PM Planning Manager Follow the weekly tracking instructions to prepare and print copies of the final See weekly tracking
task, schedule, and week reports. instructions
PM Planning Manager Select the SUMP worksheet and print a SUMP form for the SYSTEM and each SUMP!B2
assembly
PM Planning Manager Select the SUMQ worksheet and print a SUMQ form for the SYSTEM and each SUMQ!B2
assembly
PM Planning Manager Select the SUMS worksheet and print a SUMS form SUMS!B8
PM Planning Manager Select the IRTL worksheet and print a copy of all team issues and risk IRTL!B7
PM Planning Manager Select the Project worksheet and click the export button to save a copy of the Project!Name
consolidated team data for the phase or project.

File: 455503903.xls ! TSP Instructions 01/14/2020 5 of 36


TSPi Support Tool Instructions

Strategy Development and Planning


TSPi Process : Step WHO TOOL INSTRUCTIONS FORM
Before STRAT1 Team Leader Fill out the project information on the Project worksheet (Name, Team name, Project!Name
Project name, Start Date, Instructor, Cycle).
Before STRAT1 Team Leader Enter the team member names, initials, phone numbers, e-mail addresses, and Team!B2
filenames for the team members workbooks in the Team worksheet.
Before STRAT1 Team Leader Enter the role assignments on the Roles worksheet. Roles!B2

STRAT1: Produce the Planning Manager Enter on the SUMS worksheet, the names and size estimates of all assemblies SUMS!B8
Size Estimate and parts for this cycle.

PLAN1: Produce the Planning Manager Click the Generate Task List button to create a default task list. Task!A8
Task Plan
PLAN1: Produce the Planning Manager Revise the task list adding or deleting tasks as necessary. Then for each task, Task!A8
Task Plan estimate the size where appropriate, the time, and the time for each engineer
assigned to the task.
PLAN1: Produce the Planning Manager Enter hours per week in the Schedule template. Hours per week are based on the Schedule!C8
Schedule Plan total hours for the team for each week in the schedule.
Planning Manager Click the Update Task and Schedule Plan button on the Task Worksheet to Task!A8
generate a schedule.

PLAN1: Quality Plan Team Before creating the quality plan, review the quality standard in the textbook.

PLAN1: Quality Plan Quality/Process Enter the planned defect injection rates for each phase on the SUMQ worksheet. SUMQ!D82
Manager
PLAN1: Quality Plan Quality/Process Enter estimated phase yields for each phase. SUMQ!D55
Manager
PLAN1: Quality Plan Team Review the calculated defect removal rates and defect densities (Defects/KLOC)
against the Quality Standard. If necessary, adjust planned time (Task worksheet),
defect injection rates (SUMQ), or defect removal yields (SUMQ).

PLAN: Balance Planning Manager Make 1 copy of the team workbook for each engineer. Use the filename entered Team!B2
Workload on the Team worksheet (Workbook Filename). Click the Make copies... button to
create the copies automatically.
PLAN: Balance Each engineer Revise the tasks in the Task worksheet to reflect the individual engineers Task!A8
Workload workload (e.g. delete task not assigned to you, and where you share an
assignment with other engineers, set their planned hours to zero).

File: 455503903.xls ! TSPi Instructions 01/14/2020 6 of 36


PLAN: Balance Each engineer Revise the schedule plan on the Schedule worksheet to reflect your available Schedule!C8
Workload hours per week.
PLAN: Balance Planning Manager Load the engineers' individual worksheets and the consolidated team plan Team!B2
Workload workbook into the same folder. Open the consolidated team plan workbook. Click
the consolidate plan button on the Team worksheet to build a consolidated plan

PLAN: Balance All team members If necessary, reassign tasks to balance the workload and repeat the previous 3
Workload steps until a balanced plan is achieved. If planned times for any task change,
review the quality plan and revise it if necessary.

Weekly Tracking
TSPi Process : Step WHO TOOL INSTRUCTIONS FORM
STRAT, PLAN, REQ, All team members During all TSPi phases, use the time log to record data on each task. Include the LOGT!A7
DES, IMP, TEST, PM assembly and phase for each task, the date, start time, interrupt time, stop time,
and comments.

REQ, DES, IMP, TEST All team members During TSPi phases REQ, DES, IMP, and TEST, use the defect log to record data LOGD!A7
on each defect. Include the date, number, type, assembly, phase injected, phase
removed, fix time, fix reference, and description

Weekly All team members Click the Update Project button on the Project worksheet to update individual Project!Name
plans. Print the Task and Schedule worksheets.
Weekly All team members Print the Task worksheet. Task!A8
Weekly All team members Print the Schedule worksheet. Schedule!C8
Weekly All team members Prepare a Week report. The worksheet Week includes the planning summary Week!C2
information required for the week report.
Weekly All team members Send a copy of your workbook to the planning manager for use in preparing the
team's consolidated weekly report.
Weekly Planning Manager Update consolidated team plan with the current week's data and prepare status
reports for the weekly meeting.
Weekly Planning Manager Load the individual engineers workbooks and the consolidated team workbook Team!A2
into the same folder. Open the consolidated team workbook. Click the
Consolidate Plans button on Team worksheet to update consolidated team plan
with the current week's data.

Weekly Planning Manager Select the Project worksheet and click the update project button before printing Project!Name
status reports for the weekly meeting.
Weekly Planning Manager Print the Task worksheet. Task!A8
Weekly Planning Manager Print the Schedule worksheet. Schedule!C8
Weekly Planning Manager Prepare a Week report. The worksheet Week includes the planning summary Week!C2
information required for the week report.

File: 455503903.xls ! TSPi Instructions 01/14/2020 7 of 36


Weekly Planning Manager Select the Project worksheet, select the assembly SYSTEM, then select and print Project!Name
the following charts:
-Earned Value
-Plan vs. Actual Hours

Weekly during Planning Manager Select the Project worksheet, select the assembly SYSTEM, then select and print Project!Name
implementation and the following charts:
testing phases -Defect Removal Profile
-Quality Profile
-Percent Defect Free

Project and Cycle Postmortem


TSPi Process : Step WHO TOOL INSTRUCTIONS FORM
PM All team members Follow the weekly tracking instructions to prepare and print copies of the final See weekly tracking
task, schedule, and week reports. instructions
PM All team members Select the Project worksheet and click the export button to save a copy of your Project!Name
data for the cycle.
PM Planning Manager Follow the weekly tracking instructions to prepare and print copies of the final See weekly tracking
task, schedule, and week reports. instructions
PM Planning Manager Select the SUMP worksheet and print a SUMP form for the SYSTEM and each SUMP!B2
assembly
PM Planning Manager Select the SUMQ worksheet and print a SUMQ form for the SYSTEM and each SUMQ!B2
assembly
PM Planning Manager Select the SUMS worksheet and print a SUMS form SUMS!B8
PM Planning Manager Select the Project worksheet and click the export button to save a copy of the Project!Name
consolidated team data for the cycle.

File: 455503903.xls ! TSPi Instructions 01/14/2020 8 of 36


Cha
Ti
TSPi - Project Summary
Use Time Log Use Defect Log
Name Jonathan Cepeda Date 14-Jan-20
Project Virtual Shop - TSP Start Date 28-Oct-19
Team Politecnico Grancolombiano Team1 Instructor Isabel Mahecha Weeks 4 Draw
Assembly Cycle 1
Cumulative Earned Value Print
TSPi.20041202. ©2004 Addison Today's Date
Version:
Wesley . Override

Cumulative Earned Value

100

90
Earned Value

80

70

60

Cumulative Planned Value


50
Cumulative EV
40 Cumulative Predicted Earned
Value
30 Baseline Cumulative Plan Value

20

10

0
10/28/2019
10/29/2019
10/30/2019
10/31/2019

11/3/2019

11/6/2019

11/8/2019
11/9/2019

11/14/2019

11/16/2019
11/17/2019
11/1/2019
11/2/2019

11/4/2019
11/5/2019

11/7/2019

11/10/2019
11/11/2019
11/12/2019
11/13/2019

11/15/2019

11/18/2019

Weeks

File: 455503903.xls ! Project 01/14/2020 9 of 36


Planned Planned
Planned Task Schedule
ID Name Initials Phone e-mail Workbook Filename Tasks Hours Weeks
01 Ruben Lopez RL 3186936805 rubenvillo04@gmail.com Ruben Lopez.xls
02 Jonathan Cepeda JC 3107336156 jocepeda3@poligran.edu.co Jonathan Cepeda.xls
03 Walter Gomez WG 3104020463 walterb2978@gmail.com Walter Gomez.xls
04 Hernan Zambrano HZ 3133093192 hezambrano3@poligran.edu.co Hernan Zambrano.xls
05 Jose Barreto JB 3012687470 Baserjose@gmail.com Jose .xls
06
0 0 0

✘ Consolidation Mode

File: 455503903.xls ! Team 01/14/2020 10 of 36


Measures Tracking
Stakeholders Goal Goal Actual Who When

File: 455503903.xls ! Goals 01/14/2020 11 of 36


Team Member Roles
Team Leader RL

Development Manager WG

Planning Manager JC

Quality/Process Manager HZ

Support Manager JB

File: 455503903.xls ! Roles 01/14/2020 12 of 36


TSPi Plan Summary - Form SUMP
Name Jonathan Cepeda Date 1/14/2020
Team Politecnico Grancolombiano Team1 Instructor Isabel Mahecha
Assembly Cycle 1

Program Size Plan Actual


Total Requirements Pages (SRS) 0 0
Total HLD Pages (SDS)
Total Detailed Design Lines
Base LOC (B) 0 0
Deleted LOC (D) 0 0
Modified LOC (M) 0 0
Added LOC (A) 0 0
Reused LOC (R) 0 0
New and Changed LOC (N) 0 0
Total LOC (T) 0 0
Total New Reuse LOC 0 0
Estimated Object LOC (E)
Upper Prediction Interval (70%)
Lower Prediction Interval (70%)

Time in Phase (hours) Plan Actual Actual%


Management and Miscellaneous 20.0 15.0 7.2%
Launch and Strategy 12.0 9.0 4.3%
Planning 28.0 28.0 13.5%
Requirements 15.0 13.0 6.3%
System Test Plan 14.0 12.0 5.8%
REQ Inspection 16.0 16.0 7.7%
High-Level Design 14.0 13.0 6.3%
Integration Test Plan 15.0 15.0 7.2%
HLD Inspection 16.0 12.0 5.8%
Detailed Design 0.0 0.0 0.0%
DLD Review 0.0 0.0 0.0%
Test Development 0.0 0.0 0.0%
DLD Inspection 0.0 0.0 0.0%
Code 0.0 0.0 0.0%
Code Review 0.0 0.0 0.0%
Compile 0.0 0.0 0.0%
Code Inspection 0.0 0.0 0.0%
Unit Test 0.0 0.0 0.0%
Build and Integration Test 16.0 14.0 6.8%
System Test 20.0 20.0 9.7%
Documentation 20.0 20.0 9.7%
Postmortem 20.0 20.0 9.7%
Total 226.0 207.0 100.0%
Total Time UPI (70%)
Total Time LPI (70%)

File: 455503903.xls ! SUMP 01/14/2020 13 of 36


TSPi Plan Summary - Form SUMP
Name Jonathan Cepeda Date 1/14/2020
Team Politecnico Grancolombiano Team1 Instructor Isabel Mahecha
Assembly Cycle 1

Defects Injected Plan Actual Actual%


Planning 0.0 0 0.0%
Requirements 0.0 0 0.0%
System Test Plan 0.0 0 0.0%
REQ Inspection 0.0 0 0.0%
High-Level Design 0.0 0 0.0%
Integration Test Plan 0.0 0 0.0%
HLD Inspection 0.0 0 0.0%
Detailed Design 0.0 0 0.0%
DLD Review 0.0 0 0.0%
Test Development 0.0 0 0.0%
DLD Inspection 0.0 0 0.0%
Code 0.0 0 0.0%
Code Review 0.0 0 0.0%
Compile 0.0 0 0.0%
Code Inspection 0.0 0 0.0%
Unit Test 0.0 0 0.0%
Build and Integration Test 0.0 0 0.0%
System Test 0.0 0 0.0%
Total Development Defects Injected 0.0 0 0.0%

Defects Removed Plan Actual Actual%


Planning 0.0 0 0.0%
Requirements 0.0 0 0.0%
System Test Plan 0.0 0 0.0%
REQ Inspection 0.0 0 0.0%
High-Level Design 0.0 0 0.0%
Integration Test Plan 0.0 0 0.0%
HLD Inspection 0.0 0 0.0%
Detailed Design 0.0 0 0.0%
DLD Review 0.0 0 0.0%
Test Development 0.0 0 0.0%
DLD Inspection 0.0 0 0.0%
Code 0.0 0 0.0%
Code Review 0.0 0 0.0%
Compile 0.0 0 0.0%
Code Inspection 0.0 0 0.0%
Unit Test 0.0 0 0.0%
Build and Integration Test 0.0 0 0.0%
System Test 0.0 0 0.0%
Total Development Defects Removed 0.0 0
Acceptance Test 0.0 0
Product Life 0.0 0

Summary Plan Actual


LOC/Hour 0.0 0.0
CPI (Cost-Performance Index) 1.1
% Reuse
% New Reuse

File: 455503903.xls ! SUMP 01/14/2020 14 of 36


TSPi Quality Plan - Form SUMQ
Name Jonathan Cepeda Date 1/14/2020
Team Politecnico Grancolombiano Team1 Instructor Isabel Mahecha
Assembly Cycle 1

SYSTEM Percent Defect Free Actual


In Compile 100.0%
In Unit Test 100.0%
In Build and Integration Test 100.0%
In System Test 100.0%
In Acceptance Test 100.0%
In Product Life 100.0%

Defects/Page Plan Actual


REQ Inspection 0.00 0.00
HLD Inspection 0.00 0.00

Defects/KLOC Plan Actual


DLD Review 0.00 0.00
DLD Inspection 0.00 0.00
Code Review 0.00 0.00
Compile 0.00 0.00
Code Inspection 0.00 0.00
Unit Test 0.00 0.00
Build and Integration Test 0.00 0.00
System Test 0.00 0.00
Total Development 0.00 0.00
Acceptance Test 0.00 0.00
Product Life 0.00 0.00
Total 0.00 0.00

Defect Ratios Plan Actual


DLD Review/Unit Test 0.00 0.00
Code Review/Compile 0.00 0.00

Development Time Ratios Plan Actual


REQ Inspection/Requirements 1.07 1.23
HLD Inspection/High-Level Design 1.14 0.92
Detailed Design/Code 0.00 0.00
DLD Review/Detailed Design 0.00 0.00
Code Review/Code 0.00 0.00

Inspection/Review Rates Plan Actual


REQ Inspection 0.00 0.00
HLD Inspection 0.00 0.00
DLD Review 0.00 0.00
DLD Inspection 0.00 0.00
Code Review 0.00 0.00
Code Inspection 0.00 0.00

A/FR 0.00 0.00

File: 455503903.xls ! SUMQ 01/14/2020 15 of 36


TSPi Quality Plan - Form SUMQ
Name Jonathan Cepeda Date 1/14/2020
Team Politecnico Grancolombiano Team1 Instructor Isabel Mahecha
Assembly Cycle 1

Phase Yields Plan Actual


Planning 0%
Requirements 0%
System Test Plan 0%
REQ Inspection 0%
High-Level Design 0%
Integration Test Plan 0%
HLD Inspection 0%
Detailed Design 0%
DLD Review 0%
Test Development 0%
DLD Inspection 0%
Code 0%
Code Review 0%
Compile 0%
Code Inspection 0%
Unit Test 0%
Build and Integration Test 0%
System Test 0%
Acceptance Test 0%
Process Yields Plan Actual
% Before Compile 0% 0%
% Before Unit Test 0% 0%
% Before Build and Integration Test 0% 0%
% Before System Test 0% 0%
% Before Acceptance Test 0% 0%

Defect Injection Rates (Defects Injected Per Hour) Plan Actual


Planning 0.00
Requirements 0.00
System Test Plan 0.00
REQ Inspection 0.00
High-Level Design 0.00
Integration Test Plan 0.00
HLD Inspection 0.00
Detailed Design 0.00
DLD Review 0.00
Test Development 0.00
DLD Inspection 0.00
Code 0.00
Code Review 0.00
Compile 0.00
Code Inspection 0.00
Unit Test 0.00
Build and Integration Test 0.00
System Test 0.00

File: 455503903.xls ! SUMQ 01/14/2020 16 of 36


TSPi Quality Plan - Form SUMQ
Name Jonathan Cepeda Date 1/14/2020
Team Politecnico Grancolombiano Team1 Instructor Isabel Mahecha
Assembly Cycle 1

Defect Removal Rates Plan Actual


Planning 0.00 0.00
Requirements 0.00 0.00
System Test Plan 0.00 0.00
REQ Inspection 0.00 0.00
High-Level Design 0.00 0.00
Integration Test Plan 0.00 0.00
HLD Inspection 0.00 0.00
Detailed Design 0.00 0.00
DLD Review 0.00 0.00
Test Development 0.00 0.00
DLD Inspection 0.00 0.00
Code 0.00 0.00
Code Review 0.00 0.00
Compile 0.00 0.00
Code Inspection 0.00 0.00
Unit Test 0.00 0.00
Build and Integration Test 0.00 0.00
System Test 0.00 0.00

File: 455503903.xls ! SUMQ 01/14/2020 17 of 36


TSPi Size Summary - Form SUMS
Name Jonathan Cepeda
Team Politecnico Grancolombiano Team1
Date 1/14/2020
Instructor Isabel Mahecha
Cycle 1 Planned Size Actual Size

(A)ssembly or (P)art

New and Changed

New and Changed


Total New Reuse

Total New Reuse


Size Measure

Modified

Modified
Deleted

Reused

Deleted

Reused
Owner

Added

Added
Base

Base
Assembly, Sub-Assembly, or

Total

Total
Part Name Parent Assembly Name
ID

1 Development Register Module A SYSTEM LOC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

File: 455503903.xls ! SUMS 01/14/2020 18 of 36


TSPi Size Summary - Form SUMS
Name Jonathan Cepeda
Team Politecnico Grancolombiano Team1
Date 1/14/2020
Instructor Isabel Mahecha
Cycle 1 Planned Defects Injected

Build and Integration


Integration Test Plan
(A)ssembly or (P)art

High-Level Design

Test Development
System Test Plan

Acceptance Test
Code Inspection
Detailed Design
REQ Inspection

HLD Inspection

DLD Inspection
Requirements
Size Measure

Code Review
DLD Review

System Test

Product Life
Planning

Unit Test
Compile
Owner

Code
Assembly, Sub-Assembly, or

Test
Part Name Parent Assembly Name
ID

1 Development Register Module A SYSTEM LOC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

File: 455503903.xls ! SUMS 01/14/2020 19 of 36


TSPi Size Summary - Form SUMS
Name Jonathan Cepeda
Team Politecnico Grancolombiano Team1
Date 1/14/2020
Instructor Isabel Mahecha
Cycle 1 Actual Defects Injected

Build and Integration


Integration Test Plan
(A)ssembly or (P)art

High-Level Design

Test Development
System Test Plan

Acceptance Test
Code Inspection
Detailed Design
REQ Inspection

HLD Inspection

DLD Inspection
Requirements
Size Measure

Code Review
DLD Review

System Test

Product Life
Planning

Unit Test
Compile
Owner

Code
Assembly, Sub-Assembly, or

Test
Part Name Parent Assembly Name
ID

1 Development Register Module A SYSTEM LOC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

File: 455503903.xls ! SUMS 01/14/2020 20 of 36


TSPi Size Summary - Form SUMS
Name Jonathan Cepeda
Team Politecnico Grancolombiano Team1
Date 1/14/2020
Instructor Isabel Mahecha
Cycle 1 Planned Defects Removed

Build and Integration


Integration Test Plan
(A)ssembly or (P)art

High-Level Design

Test Development
System Test Plan

Acceptance Test
Code Inspection
Detailed Design
REQ Inspection

HLD Inspection

DLD Inspection
Requirements
Size Measure

Code Review
DLD Review

System Test

Product Life
Planning

Unit Test
Compile
Owner

Code
Assembly, Sub-Assembly, or

Test
Part Name Parent Assembly Name
ID

1 Development Register Module A SYSTEM LOC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

File: 455503903.xls ! SUMS 01/14/2020 21 of 36


TSPi Size Summary - Form SUMS
Name Jonathan Cepeda
Team Politecnico Grancolombiano Team1
Date 1/14/2020
Instructor Isabel Mahecha
Cycle 1 Actual Defects Removed

Build and Integration


Integration Test Plan
(A)ssembly or (P)art

High-Level Design

Test Development
System Test Plan

Acceptance Test
Code Inspection
Detailed Design
REQ Inspection

HLD Inspection

DLD Inspection
Requirements
Size Measure

Code Review
DLD Review

System Test

Product Life
Planning

Unit Test
Compile
Owner

Code
Assembly, Sub-Assembly, or

Test
Part Name Parent Assembly Name
ID

1 Development Register Module A SYSTEM LOC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

File: 455503903.xls ! SUMS 01/14/2020 22 of 36


ID

Part Name
Assembly, Sub-Assembly, or

1 Development Register Module


Team
Name

Instructor
Cycle
Date

File: 455503903.xls ! SUMS


1

A
(A)ssembly or (P)art
1/14/2020

SYSTEM
Isabel Mahecha
Jonathan Cepeda
TSPi Size Summary - Form SUMS

Parent Assembly Name


Politecnico Grancolombiano Team1

Owner
LOC

Size Measure

Management and
Miscellaneous
0

Launch and
Strategy
Planned Time

Planning
0

Requirements
0

System Test Plan


0

REQ Inspection
0

High-Level Design
0

Integration Test Plan


0

HLD Inspection
0

Detailed Design
0

DLD Review
0

Test Development
0

DLD Inspection
0

Code
0

Code Review
0

Compile
0

Code Inspection
0

Unit Test
0

Build and Integration


Test
0

System Test
0

Documentation
0

Postmortem
0

01/14/2020 23 of 36
ID

Part Name
Assembly, Sub-Assembly, or

1 Development Register Module


Team
Name

Instructor
Cycle
Date

File: 455503903.xls ! SUMS


1

A
(A)ssembly or (P)art
1/14/2020

SYSTEM
Isabel Mahecha
Jonathan Cepeda
TSPi Size Summary - Form SUMS

Parent Assembly Name


Politecnico Grancolombiano Team1

Owner
LOC

Size Measure

Management and
Miscellaneous
0

Launch and
Actual Time

Strategy
0

Planning
0

Requirements
0

System Test Plan


0

REQ Inspection
0

High-Level Design
0

Integration Test Plan


0

HLD Inspection
0

Detailed Design
0

DLD Review
0

Test Development
0

DLD Inspection
0

Code
0

Code Review
0

Compile
0

Code Inspection
0

Unit Test
0

Build and Integration


Test
0

System Test
0

Documentation
0

Postmortem
0

01/14/2020 24 of 36
TSPi Size Summary - Form SUMS
Name Jonathan Cepeda
Team Politecnico Grancolombiano Team1
Date 1/14/2020
Instructor Isabel Mahecha
Cycle 1

(A)ssembly or (P)art

Baseline Plan Hours


Baseline Plan Date
Size Measure
Owner
Assembly, Sub-Assembly, or
Part Name Parent Assembly Name
ID

1 Development Register Module A SYSTEM LOC

File: 455503903.xls ! SUMS 01/14/2020 25 of 36


Task

TSPi Task Planning Template - Form TASK Total Plan Hours Total Actual Hours
Name Jonathan Cepeda 226.0 207.0
Team Politecnico Grancolombiano Team1 Reminder:
Date 1/14/2020 If Size and Rate are present, estimated hours is calculated as Size / Rate
Instructor Isabel Mahecha whenever the plan is updated. To prevent calculation, size or rate must be blank.
Cycle 1 Plan Hours by Role

Support Manager

Time in Phase %

Cumulative Plan

Cumulative Plan
Quality/Process

Total Resource

Estimated Size

Predicted Date
Size Measure

Rate (per Hr.)

Earned Value
Development
Team Leader

Actual Hours

Actual Week
Actual Date
Plan Hours

Plan Week

Plan Value
Plan Date
Manager

Manager

Manager
Planning

Hours

Hours
Engrs

Value
Assembly Phase Task
SYSTEM MGMT SYSTEM Management and Miscellaneous 4 4 4 4 4 20 1.0 20.0 15.0 11/19/2019
SYSTEM STRAT SYSTEM Launch and Strategy 2 4 2 2 2 12 1.0 12.0 9.0 11/21/2019
SYSTEM PLAN SYSTEM Planning 2 6 8 6 6 28 1.0 28.0 28.0 11/21/2019
SYSTEM REQ SYSTEM Requirements 1 3 3 3 5 15 1.0 15.0 13.0 11/21/2019
SYSTEM STP SYSTEM System Test Plan 4 2 4 2 2 14 1.0 14.0 12.0 11/22/2019
SYSTEM REQINSP SYSTEM REQ Inspection 2 6 2 4 2 16 1.0 16.0 16.0 11/22/2019
SYSTEM HLD SYSTEM High-Level Design 4 2 2 3 3 14 1.0 14.0 13.0 11/23/2019
SYSTEM ITP SYSTEM Integration Test Plan 4 2 2 4 3 15 1.0 15.0 15.0 11/23/2019
SYSTEM HLDINSP SYSTEM HLD Inspection 4 2 2 4 4 16 1.0 16.0 12.0 11/23/2019
SYSTEM IT SYSTEM Build and Integration Test 4 2 2 4 4 16 1.0 16.0 14.0 11/23/2019
SYSTEM ST SYSTEM System Test 4 4 4 4 4 20 1.0 20.0 20.0 11/24/2019
SYSTEM DOC SYSTEM Documentation 2 2 8 6 2 20 1.0 20.0 20.0 11/24/2019
SYSTEM PM SYSTEM Postmortem 4 4 4 4 4 20 1.0 20.0 20.0 11/26/2019

File: 455503903.xls ! Task 01/14/2020 26 of 36


Plan Date +
Current Slip

Committed Date

Baseline Date

File: 455503903.xls ! Task


Baseline Plan
Hours
Task

01/14/2020 27 of 36
TSPi Schedule Planning Template - Form SCHEDULE
Name Jonathan Cepeda
Team Politecnico Grancolombiano Team1 Total Task Plan Hours 226.0
Date 1/14/2020 Total Schedule Plan Hours 185.0 Warning: add schedule hours
Instructor Isabel Mahecha Difference 41.0
Cycle 1

Baseline Plan

Baseline Plan
Earned Value

Earned Value

Earned Value
Actual Hours

Actual Hours

Cumulative

Cumulative

Cumulative

Cumulative
Cumulative

Cumulative

Cumulative

Cumulative
Plan Hours

Plan Value
Predicted

Predicted

Predicted

Predicted

Baseline

Baseline
Planned

Planned

Planned

Planned
Hours

Hours

Hours

Hours

Hours
Value

Value

Value
EV
Date Week
10/28/2019 1 45.0 45.0
11/4/2019 2 40.0 40.0
11/11/2019 3 50.0 50.0
11/18/2019 4 50.0 50.0

File: 455503903.xls ! Schedule 01/14/2020 28 of 36


Notes

File: 455503903.xls ! Schedule 01/14/2020 29 of 36


Risk Impact Likelihood Priority Assigned Date

Copyright James W. Over 1998 : 455503903.xls Risk 01/14/2020 30 of 36


TSPi Defect Recording Log - Form LOGD
Name Jonathan Cepeda Date 1/14/2020
Team Politecnico Grancolombia Instructor Isabel Mahecha
Cycle 1

Fix
Date Num Type Assembly Injected Removed Time Fix Ref. Description

File: 455503903.xls ! LOGD 01/14/2020 31 of 36


TSPi Week Summary - Form WEEK
Name Jonathan Cepeda Date 1/14/20
Team Politecnico Grancolombiano Team1 Instructor Isabel Mahecha
Status for Week 4 Selected Assembly Cycle 1
Week Date 11/18/19 SYSTEM
Plan / Plan -
Task Hours %Change Weekly Data Plan Actual Actual Actual Project End Date
Baseline 0.0 Schedule hours for this week 50.0 50.0 1.00 0.0 Baseline 12/30/99
Current 226.0 Schedule hours this cycle to date 0.0 185.0 0.00 -185.0 Plan 12/30/99
%Change Earned value for this week 0.0 0.0 0.0 Predicted
Earned value this cycle to date 0.0 0.0 0.0
To-date hours for tasks completed 0.0 0.0
To-date average hours per week 0.0 46.3 0.00
EV per completed task hour to date
Plan Actual Plan Earned
Consolidated Team Member Schedule Data Hours Hours Value Value
Team Leader
Development Manager
Planning Manager
Quality/Process Manager
Support Manager

Totals 0.0 0.0 0.0 0.0

Actual Date
Task Actual

Baseline or
Actual Hrs.

Committed
Plan Value
Earned or

Plan Date
Task Plan

Predicted
Slip Date
Plan vs.
Development Tasks

Date

Date
Hrs.

Hrs.
Completed Phase Task Resource

TASKS DUE THROUGH WEEK 6


SYSTEM MGMT SYSTEM Management and Miscellaneous 20.0 15.0 1.33 12/30/99 11/19/19
SYSTEM STRAT SYSTEM Launch and Strategy 12.0 9.0 1.33 12/30/99 11/21/19
SYSTEM PLAN SYSTEM Planning 28.0 28.0 1.00 12/30/99 11/21/19
SYSTEM REQ SYSTEM Requirements 15.0 13.0 1.15 12/30/99 11/21/19
SYSTEM STP SYSTEM System Test Plan 14.0 12.0 1.17 12/30/99 11/22/19
SYSTEM REQINSP SYSTEM REQ Inspection 16.0 16.0 1.00 12/30/99 11/22/19
SYSTEM HLD SYSTEM High-Level Design 14.0 13.0 1.08 12/30/99 11/23/19
SYSTEM ITP SYSTEM Integration Test Plan 15.0 15.0 1.00 12/30/99 11/23/19
SYSTEM HLDINSP SYSTEM HLD Inspection 16.0 12.0 1.33 12/30/99 11/23/19
SYSTEM IT SYSTEM Build and Integration Test 16.0 14.0 1.14 12/30/99 11/23/19
SYSTEM ST SYSTEM System Test 20.0 20.0 1.00 12/30/99 11/24/19
SYSTEM DOC SYSTEM Documentation 20.0 20.0 1.00 12/30/99 11/24/19
SYSTEM PM SYSTEM Postmortem 20.0 20.0 1.00 12/30/99 11/26/19

File: 455503903.xls ! Week 01/14/2020 32 of 36


TSPi Issue/Risk Tracking Log - Form IRTL
Name Jonathan Cepeda Date 1/14/2020
Team Politecnico Grancolombiano Team1 tructor Isabel Mahecha
Cycle 1

P=Personal

Likelihood
T=Team
R=Risk
I=Issue

(H,M,L)

(H,M,L)
Issue or

Impact
Risk Date Follow-up Date Status
Number Created Owner Date Description Current Status Changed

File: 455503903.xls ! IRTL 01/14/2020 33 of 36


TSPi Issue Risk Week Summary - Form IRWEEK
Name Jonathan Cepeda Date 1/14/2020
Team Politecnico Granco Team Isabel Mahecha
Week 4 Cycle 1
P=Personal
T=Team

I=Issue
R=Risk

Issue/Risk
Number Description Status

File: 455503903.xls ! IRWeek 01/14/2020 34 of 36


Type Description
10 Documentation
20 Syntax
30 Build, Package
40 Assignment
50 Interface
60 Checking
70 Data
80 Function
90 System
100 Environment

File: 455503903.xls ! DefectTypes 01/14/2020 35 of 36


Parameter Value Description
Design/Code Time 100% Design time as % of coding time
Code Review Time 50% Code review time as % of code time
Compile Defects/KLOC 10 Compile defects/KLOC
Unit Test Ddefects/KLOC 5 Unit test defects/KLOC
Design Review Time 50% Design review time as % of design time