Title: QUALITY CONTROL

PAINTING OPERATIONS
WALK THROUGH REPORT
Document SD-CIM/PTC-01 Effective Date
No
Revision No Rev-00 Page 1 of 1

Project Name: Contract No: Control No:

Inspection Date/Time: Item Description:

Location: Inspection Date/Time:

PAINTING CHECK LIST Accept Reject Remarks


1 Paint and abrasive material storage
Compressor and air volume tanks drained of water, water and oil
2
traps installed
3 Compressed air is clean and free from oil and moisture
4 Compressed air pressure is above 90 psig
5 Protection of adjacent area and field weld joints
Oil, grease & dirt removed by solvent cleaning followed by HP
6
washing prior to blasting
7 Sharp edges, porosity, weld spatter removed
8 Required tests i.e., salt test, dust test, profile check performed
Paint system check, shelf life, correct components, thinning, mixing
9
and pot life maintained
10 Surface cleanliness, climatic condition verified
11 Calibration of equipment, WFT, DFT, colors
12 Visual appearance, adhesion/holiday test, color coding

COMMENTS:

OBSERVATIONS:
Action Followed
No. Description Remarks
by by
Title: QUALITY CONTROL
PAINTING OPERATIONS
WALK THROUGH REPORT
Document SD-CIM/PTC-01 Effective Date
No
Revision No Rev-00 Page 2 of 1

Performed by: Noted By:

QC Engineer: Lead QC Engineer:


Name/Sign/Date: Name/Sign/Date: