(PROJECT TITLE)
USACE PROJECT NUMBER:
(Enter Project Number)

ag N
P A
es
d PL
te E
ec PL
S AM
S
el

Prepared By: Prepared for:


Your Company Name
Logo Here

(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee
Insert Company USACE Contract Number: Insert Contract #
Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

TABLE OF CONTENTS
Acronyms and Abbreviations

ag N
Section 1 Signature Sheet

Section 2 Background Information

P A
es
Section 3 Statement of Safety and Health Policy

d PL
Section 4 Project Organization

Section 5 Subcontractors and Suppliers

Section 6 Training
te E
Section 7 Safety and Health Inspections
ec PL

Section 8 Accident Reporting

Section 9 Required Plans


S AM

Section 10 Risk Management Processes


S

Appendix I Personnel Qualifications


el

Appendix I I Material Safety Data Sheets

6/22/2015 TOC, Page i

(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee
Insert Company USACE Contract Number: Insert Contract #
Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan


necessary to promote safety at the job site up to and including stopping work if
necessary. See Section 4 of the APP for additional information on personnel
requirements and expectations concerning safety.

ag N
Pre-Placement Employee Evaluation: Employees' skills and training are
considered prior to hiring or assigning duties. Through this evaluation,

P A
employees are placed in positions to best serve the project in achieving safe and

es
efficient operations.

d PL
Task Training: Employees must fully understand both the safety and production
requirements of their respective tasks before they are assigned to perform work.
If an employee is new to a task they are provided on-the-job-training or formal
training as necessary to fully grasp these requirements. See Section 6 of this
te E
APP for additional information on training.

a. Safety Orientation and Training


ec PL

Ø Site orientation: All employees are required to attend a site orientation


for this project. See Section 6 of this APP for more details regarding
S AM

employee orientations and training.


Ø Owner involved in orientation: It is the goal of Company Name to have
the Project Management participation in each and every orientation.
Ø Safety policies and procedures: Safety Policies and Procedures are
prescribed in this APP. This APP forms the core and substance for the
S

project safety orientation. Additionally, this APP is made available to all


el

project employees for reference.


Ø Project specific orientation: Project specific orientations for this project
are given in concert with the site orientation. Again, Section 6 of this APP
provides additional details concerning orientations.
Ø Formal safety training: Formal Safety training requirements are
presented in Section 6 of this APP.

6/22/15 Section 2, Page 2


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee
Insert Company USACE Contract Number: Insert Contract #
Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan


• Written warning outlining nature of offense and necessary corrective action with
documentation in personnel file;
• Disciplinary suspension with documentation in personnel file or Termination
• Termination

ag N
Management, including superintendents, shall be subject to disciplinary action for the

P A
es
following reasons:

Repeated safety rule violations by their employees;

d PL

• Failure to provide adequate training prior to job assignment;
• Failure to report accidents or provide medical attention to employees injured at
work;
• Failure to control unsafe conditions or work practices;
te E
• Failure to maintain good housekeeping standards or cleanliness at projects.
ec PL

4.6. Management Safety Accountability

Management is ultimately held responsible for construction safety. All accidents can be
avoided. All management including job foremen all the way to the Corporate Safety
S AM

Manager are tasked with staying abreast and accountable for safety on the project.

Superintendents and project managers are evaluated on safety records for their
respective projects. Where safety proves to be outstanding or good, they are justly
S

rewarded and recognized within the company for an outstanding safety record.
el

Where safety appears to be a recurring issue, they are encouraged to take additional
training and their performance is duly noted. Safety infractions will always consider the
management of the task as a contributing cause and paths will be sought to identify any
management shortcomings and improve management procedures.

6/22/15 Section 4, Page 8


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

Preserve the conditions and evidence on the accident site until the Government
investigation team arrives on-site and Government investigation is conducted.

ag N
8.4 EM 385-1-1 Reporting and Recordkeeping Requirements
A mishap is any unplanned, undesired event that occurs during the course of work

P A
es
being performed. The term “mishap” includes accidents, incidents and near misses.
See EM 385-1-1, Appendix Q and reporting thresholds and criteria in Section 01.D.03.

d PL
All mishaps occurring incidentally to an operation, project, or facility shall be
investigated, reported, and analyzed as prescribed by the Contracting Officer.

a) Employees are responsible for reporting all injuries or occupationally


related illnesses as soon as possible to their employer or immediate
te E
supervisor.
ec PL

b) Employers and immediate supervisors are responsible for reporting all


injuries to the Contracting Officer as soon as reasonably possible but no
later than 24 hours after notification from the affected employee.
S AM

c) No supervisor may decline to accept a report of injury from a subordinate.

In addition to the reporting requirements identified above, the employer is required to


report:

A. Property damage (exceeding $5,000 is recordable);


S

B. Days Away Injuries;


el

C. Days Away Illnesses;

D. Restricted/Transfer Injuries.

Boards of Investigation: An incident that has, or appears to have, any of the


consequences listed below shall be immediately reported to the COR. The following

6/22/15 Section 8, Page 3


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

incidents shall be investigated in depth to identify all causes and to recommend hazard
control measures.
a. Fatal injury/illness;

ag N
b. Permanent totally disabling injury/illness;

P A
es
c. Permanent partial disabling injury/illness;

d. Three or more persons hospitalized as inpatients as a result of a single

d PL
occurrence;

e. $200,000 or greater accidental property damage or damage in an amount


specified by USACE in current accident reporting regulations

f. Arc Flash Incident/Accident; or


te E
g. Three or more individuals become ill or have a medical condition, which is
ec PL

suspected to be related to a site condition, or a hazardous or toxic agent on the


site.
Contractors are responsible for notifying OSHA in accordance with 29 CFR 1904.39
within 8-hours when their employee(s) is fatally injured or 3 or more persons are
S AM

hospitalized as inpatients as a result of a single occurrence.

Note: The reporting and associated investigation of these mishaps is considered


a leading indicator. As such, this information is to be used for data collection,
S

data trending and correction of hazards or program deficiencies before they


result in an accident. To encourage reporting of these mishaps, for the
el

betterment of all, this data is NOT to be used for any other reason. See Appendix
Q (in EM 385-1-1) for definitions.

Except for rescue and emergency measures, the mishap scene shall not be disturbed
until it has been released by the investigating official. Company Name is responsible for
obtaining appropriate medical and emergency assistance and for notifying fire, law

6/22/15 Section 8, Page 4


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

ag N
P A
es
d PL
SECTION 9

REQUIRED PLANS, PROGRAMS


te E
AND PROCEDURES
ec PL

(Specification Section 01 35 26 §1.6 & 1.12, 1.14, 1.15, & Part 3;


EM385-1-1, Appendix A, Section i)
S AM

PROJECT NAME

PROJECT LOCATION
S
el

6/22/15 Section 9, Title


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee
Insert Company USACE Contract Number: Insert Contract #
Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

Table of Contents
 
9.0   E.M.  385-­‐1-­‐1  Required  Plans  ............................................................................................................  1  
9.a   Fatigue  Management  Plan  (01.A.20)  ................................................................................................  1  

ag N
9.b   Emergency  Response  Plans  ..............................................................................................................  2  
9.c   Plan  for  Prevention  of  Alcohol  and  Drug  Abuse  (01.C.02)  ..............................................................  14  

P A
es
9.d   Site  Sanitation  Plan  (Section  02.B)  .................................................................................................  16  
9.e   Medical  Support  Plan,  (03.A.01;  03.A.06;  03.D)  .............................................................................  19  

d PL
9.f   Bloodborne  Pathogen  Plan  (03.A.05)  .............................................................................................  24  
9.g   Exposure  Control  Plan  (03.A.05)  .....................................................................................................  34  
9.h   Site  Layout  Plan  (04.A)   ...................................................................................................................  35  
9.i   Access/Haul  road  Plan  (04.B)  .........................................................................................................  36  
9.j   Hearing  Conservation  Program  (05.C)  ............................................................................................  37  
te E
9.k   Respiratory  Protection  Plan  (05.G)  .................................................................................................  40  
ec PL

9.l   Health  Hazard  Control  Program  (06.A)  ...........................................................................................  41  


9.m   Hazard  Communication  Program  (06.B.01)  ....................................................................................  42  
9.n   Process  Safety  Management  Plan  (06.B.04)  ...................................................................................  47  
9.o   Lead  Abatement  Plan  (06.C  &  Specs)  .............................................................................................  48  
S AM

9.p   Asbestos  Abatement  Plan  (06.C  &  Specs)  ......................................................................................  49  


9.q   Radiation  Safety  Program  (06.F)  .....................................................................................................  50  
9.r   Abrasive  Blasting  Plan  (06.I)  ...........................................................................................................  51  
9.s   Heat/Cold  Stress  Monitoring  Plan  (06.J)  ........................................................................................  52  
S

9.t   Indoor  Air  Quality  Management  Plan  (06.L)  ...................................................................................  59  


9.u   Mole  Remediation  Plan  (06.L.04)  ...................................................................................................  60  
el

9.v   Chromium  (VI)  Exposure  Evaluation  (06.M)  ...................................................................................  61  


9.w   Crystalline  Silica  Assessment  (06.N)  ...............................................................................................  62  
9.x   Lighting  Evaluation  (07.A)  ...............................................................................................................  63  
9.y   Lighting  Plan  for  Night  Operations  (07.B.06)  ..................................................................................  67  
9.z   Traffic  Control  Plan  (08.C.05)  .........................................................................................................  68  
9.aa   Fire  Prevention  Plan  (09.A.01)  ........................................................................................................  69  

6/22/15 Section 9, Page i


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

9.bb   Wild  Land  Fire  Management  Plan  (09.L)  ........................................................................................  81  


9.cc   Arc  Flash  Hazard  Analysis  (11.B)  .....................................................................................................  82  
9.dd   Assured  Equipment  Grounding  Control  Program  (AEGCP),  (11.D.05,  App  D)  ................................  84  

ag N
9.ee   Hazardous  Energy  Control  Plan,  (12.A.01)  .....................................................................................  86  
9.ff   Standard  Pre-­‐Lift  Plan  (LHE)  (16.A.03,  16.L.15)  ..............................................................................  95  

P A
es
9.gg   Critical  Lift  Plan  –  LHE  (16.H)  ..........................................................................................................  99  
9.hh   Naval  Architectural  Analysis  (16.L)  ...............................................................................................  107  

d PL
9.ii   Contingency  Plan  for  Severe  Weather  (19.A.03)  ..........................................................................  108  
9.jj   Man  Overboard/Abandon  Ship  (19.A.04)  .....................................................................................  109  
9.kk   Float  Plan  (19.F.04)  .......................................................................................................................  110  
9.ll   Fall  Protection  Program,  (21.D)  ....................................................................................................  111  
te E
9.mm   Demolition/Renovation  Plan  (to  include  engineering  survey),  (23.A.01)  .....................................  116  
9.nn   Rope  Access  Program,  (24.H.02)  ..................................................................................................  117  
ec PL

9.oo   Excavation/Trenching  Plan,  (25.A.01)  ..........................................................................................  118  


9.pp   Underground  construction  fire  prevention  and  protection  Plan,  (26.D.01)  .................................  121  
9.qq   Compressed  Air  Plan,  (26.I.01)  .....................................................................................................  122  
9.rr   Formwork  and  Shoring  Erection  and  Removal  plan,  (27.C)  ..........................................................  123  
S AM

9.ss   PreCast  Concrete  Plan,  (27.D)  ......................................................................................................  124  


9.tt   Lift.  Slab  Plans,  (27.E)  ...................................................................................................................  126  
9.uu   Masonry  Bracing  Plan,  (27.F.01)  ...................................................................................................  127  
9.vv   Steel  Erection  Plan,  (28.B)  ............................................................................................................  128  
S

9.ww   Explosives  Safety  Site  Plan  (ESSP)  (29.A)  ......................................................................................  129  


el

9.xx   Blasting  Plan,  (29.A;  26.J)  .............................................................................................................  130  


9.yy   Underwater  Dive  Operations  Plan,  (30.A.14,  16)  .........................................................................  131  
9.zz   Tree  Felling/Maintenance  Program,  (31.A)  ..................................................................................  132  
9.aaa   Aircraft/Airfield  Construction  Safety  &  Phasing  Plan,  (32.A.02)  ...................................................  133  
9.bbb  Site  Safety  and  Health  Plan  (HTRW),  (33.B)  ..................................................................................  134  
9.ccc   Confined  Space  Entry  Program,  (34.A.06,  07)  ..............................................................................  135  

6/22/15 Section 9, Page ii


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

9.c Plan for Prevention of Alcohol and Drug Abuse (01.C.02)

Company Name (the Company) intends to help provide a safe and drug-free work

ag N
environment for our clients and our employees. With this goal in mind and because
of the serious drug abuse problem in today's workplace, we have established the

P A
es
following policy for existing and future employees of Company Name and all lower
tier contractors that will perform work on project locations.

d PL
The Company explicitly prohibits:

The use, possession, solicitation for, or sale of narcotics or other illegal drugs,
alcohol, or prescription medication without a prescription on Company or
te E
customer premises or while performing an assignment.
Being impaired or under the influence of legal or illegal drugs or alcohol away
ec PL

from the Company or customer premises, if such impairment or influence


adversely affects the employee's work performance, the safety of the
employee or of others, or puts at risk the Company's reputation.
Possession, use, solicitation for, or sale of legal or illegal drugs or alcohol
S AM

away from the Company or customer premises, if such activity or involvement


adversely affects the employee's work performance, the safety of the
employee or of others, or puts at risk the Company's reputation.
The presence of any detectable amount of prohibited substances in the
employee's system while at work, while on the premises of the company or its
S

customers, or while on company business. "Prohibited substances" include


illegal drugs, alcohol, or prescription drugs not taken in accordance with a
el

prescription given to the employee.

The Company will conduct drug and/or alcohol testing under any of the following
circumstances:

AS A CONDITION OF EMPLOYMENT: All new employees will be required to


drug and alcohol tests as a condition of employment.

6/22/15 Section 9, Page 14


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

local weather stations, then Table 9-2, the Approximate WBGT


Temperature Chart, should be used to approximate the WBGT.

ag N
4) If Table 9-2 is used, direct radiant sun exposure, air velocity,
temperature, and humidity and adjustment factors for various work

P A
es
clothing should be taken into consideration.

Table 9-2

d PL
te E
ec PL
S AM

Source: USACE EM 385-1-1 (2014)

I. Employees exposed to solar radiation with the potential for sunburn,


S

should be encouraged to use sunscreen with a sun protection factor (SPF)


el

of 30 or greater, and should wear hats, long sleeve shirts, sunglasses, and
other protective attire.

J. Workers who experience heat stress shall seek medical attention.


Workers who have more than one heat-related episode within a month
shall have a doctor’s written release prior to returning to exposures in a
potential heat stress environment.

6/22/15 Section 9, Page 55


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

9.cc Arc Flash Hazard Analysis (11.B)

Whenever work on or near energized parts greater than 50 volts is necessary, a hazard

ag N
analysis/arc flash hazard analysis will be conducted in accordance with NFPA 70E.
Either Appendices or Tables may be used to conduct the analysis.

P A
es
The flash protection boundary, approach distances, hazard/risk category and personal
protective equipment (PPE) requirements shall all be identified in the applicable AHA

d PL
and clearly identifiable in the field prior to initiating work.

9.cc.1 Arc Flash PPE


Personal Protective Equipment (PPE) that provides appropriate arc flash
protection is required for all personnel working on or near exposed energized
te E
electrical equipment operating at 50 volts or more. Identification of required PPE is
ec PL

based on equipment arc flash labels or NFPA 70E task tables. Selection of PPE
will be in accordance with requirements in EM 385-1-1, Section 05.I.

Personal Protective Equipment garments shall meet and be labeled in accordance


S AM

with ASTM F1506, Standard Specification for Flame Resistant Textile Materials for
Wearing Apparel for use by Electrical Workers Exposed to Momentary Electric Arc
and Related Thermal Hazards.

Arc rated clothing shall be properly worn. Long sleeves must be rolled down and
S

buttoned, shorts are prohibited and trousers shall extend the full length of the leg.
el

Garments with exposed metallic fasteners shall not be worn unless the garments
are properly arc rated.

Garments, to include fall protection harnesses, worn over arc rated protective
clothing, must also be arc rated.

6/22/15 Section 9, Page 82


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

• Receive that training required of entrants;


• Be provided with and trained in the proper use of personal protective
equipment, including rescue equipment;

ag N
• Be trained to perform the assigned rescue functions; and
• Complete a training drill - using mannequins or personnel in a simulation of

P A
es
the confined space - prior to, and at least annually thereafter, issuance of the
entry permit.

d PL
If arrangements have been made for the use of outside rescue team services the
rescue team shall be informed of the hazards they may confront when called on to
perform rescue operations

9.ccc.2 Testing Requirements


te E
Permit Required Confined Spaces must be tested prior to entry.
ec PL

A. If the testing determines the oxygen is below 19.5% or above 23.5%, or the
lower explosive limit (LEL) of 10% is exceeded, or other toxic substances are
measured, then the space should be thoroughly ventilated and appropriate
PPE used for entry as directed by the CPCSSV. Entry is prohibited when the
S AM

LEL is greater than 10% unless it is required for emergency rescue.

B. Air monitoring shall be continuous during entry into the confined space if the
oxygen level is not between 19.5% and 23.5% or ventilation was required to
lower the explosive limit to below 10% of the LEL.
S

C. Air testing for toxic, corrosive, or irritant chemicals shall be made using a
el

calibrated direct reader that provides a reading at a minimum of 50% of the


OEL. If the reading is over the OEL, then the space shall be ventilated until
the value is below the OEL and/or entry shall be made with appropriate PPE.

D. Before hot work is completed in a confined space with toxic, corrosive, or


irritating chemicals, the CPCSSV shall conduct an evaluation to confirm the
hot work will not create a toxic, corrosive, or irritant atmosphere. This

6/22/15 Section 9, Page 136


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

that are performing that activity. AHAs are to be considered living documents and
are intended to be created in the field and updated by the workers as needed.

ag N
E. The AHA shall be reviewed and modified as necessary to address changing site
conditions, operations, or change of CP(s)/QP(s).

P A
es
1. If a new CP/QP (not on the original list) is added, the list shall be updated (an
administrative action not requiring an updated AHA). The new CP/QP shall

d PL
acknowledge in writing that they have reviewed the AHA and is familiar with
current site safety issues.

2. If the initial RAC increases due to a change made to the AHA by the workers, the
te E
AHA shall be resubmitted to COR for acceptance prior to work proceeding.

3. Changes to or updates to an AHA that do not increase the RAC are not required
ec PL

to be resubmitted for acceptance by the Government.

4. Workers/crews shall have in their possession the current AHA that reflects
S AM

current site conditions, personnel, equipment, control measures, etc while the
work is being performed.

F. The AHA shall be used by Company Name and USACE personnel to assure work is
being performed consistent with the AHA. In the event that the work is not being
S

conducted in a safe manner, Company Name and/or the USACE (COR or


el

designated representative) shall immediately stop the unsafe work being conducted
until it is in compliance with this manual, APP and the AHA or the APP/ AHA is
revised and accepted by the Government, if necessary.

G. AHAs for completed work for the same contract or project work shall be readily
available on site (e.g., office, trailer, etc.) and accessible on site by all workers, for a
period of 12 months or, for contract work, the length of the contract;

6/22/2015 Section 10, Page 3


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com
Professional Plan Book Templates www.PreConstructionPlans.com 100% Approval Money-Back Guarantee

Insert Company USACE Contract Number: Insert Contract #


Name/ Logo USACE Project Title
Project Location

Accident Prevention Plan

ag N
P A
es
d PL
te E
ec PL
S AM
S
el

6/22/2015 Section 10, Page 6


(c) 2000-2015 Plan The Job, Inc. All Rights Reserved | www.PlanTheJob.com Questions? Call: (206) 734-4600
Or Email: Jenn@PlanTheJob.com