Sie sind auf Seite 1von 3

8642-GOPC-MWYY Renovation

ACH (A/C) Calculation-GOPC MWYY (Normal Mode)


UG/F
Actual Non-
Design ACH Design ACH Actual Air recirculated ACH Total ACH by A/C
Requirement Requirement Actual Pre-treated Air Flow Rate by Unit (Including Supplied by PAU /
No. Location Area (m2) Height (m) Design Room Condition (Total) (Fresh Air) People Flow Rate (L/s) A/C Unit (L/s) Recirculated Air) OAPU Remark
1 CR-1 13.5 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 3 61 90 6.8 10.0 PAU
2 CR-2 13.5 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 3 60 93 6.7 10.3 PAU
3 CR-3 13.5 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 3 45 88 5.0 9.8 PAU
4 CR-4 13.5 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 3 50 93 5.6 10.3 PAU
5 CR-5 13.5 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 3 42 85 4.7 9.4 PAU
6 CR-6 13.5 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 3 57 93 6.3 10.3 PAU
7 CR-7 11.1 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 3 55 87 7.4 11.8 PAU
8 Optometry 11.6 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 3 38 87 4.9 11.3 PAU
9 Interview Room 7.1 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 3 42 83 8.9 17.5 PAU
10 Dispensary 66.5 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 7 153.0 336 3.5 7.6 PAU 24 Hours A/C provided
11 Treatment Room 59.0 2.4 23±1°C, RH 60±10% 6-8 ACH 6 ACH 15 235.0 448 6.0 11.4 PAU

Sub-Total P.A. (L/s) : 838.0 (Supplied by PAU)_____________(A)

Transferred by CRs, Phar. and


12 Waiting Area 115.0 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 110 838.0 1008 5.7 13.1 PAU Treatment Room
116.0 (Additional PA by PAU)_________(B) PAU

440.0 (Exhaust Air for Waiting Area)___(D)

13 PPE Store Room 10.3 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 2 20.0 81 2.9 11.8 OAPU 24 Hours A/C provided
14 MO Room 16.1 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 4 40.0 90 3.7 8.4 OAPU
Health Education
15 Room 32.9 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 20 190.0 249 8.7 11.4 OAPU
16 Duty Nurse Room 7.1 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 2 20.0 88 4.2 18.6 OAPU
17 Shroff 25.1 2.4 23±1°C, RH 60±10% 6-8 ACH 10 L/s/ppl 5 50.0 174 3.0 10.4 OAPU
18 Waiting Area-2 25.0 2.4 23±1°C, RH 60±10% 6-8 ACH 6 ACH 25 70.0 208 5.9 12.5 OAPU
98.0 (Exhaust Air for Waiting Area-2)__(E)

Sub-Total P.A. (L/s) : 390.0 (Supplied by "OAPU-01")_______(C)

Total P.A.
by PAU (L/s) :
(A)+(B) 954.0

Total P.A.
for UG/F (L/s) :
(A)+(B)+(C ) 1344.0
8642-GOPC-MWYY Renovation
ACH (Exhaust Air) Calculation-GOPC MWYY (Normal Mode)
UG/F

Non-
recirculated Actual Exhaust Air
2
No. Location Ref. No. Area (m ) Height (m) ACH Flow Rate (L/s) Remark
1 Fever Room 7.3 2.4 10.3 50.0
2 Cohort Room 3.5 2.4 29.1 68.0
3 Degown Room EF-02 4.0 2.4 7.5 20.0
4 Unisex Toilet 3.9 2.4 22.7 59.0
5 Unisex Toilet EF-05 3.9 2.4 21.2 55.0
6 Sluice Room 3.0 2.4 17.5 35.0
Public Female
7 Toilet 8.0 2.4 17.4 93.0
8 Public Male Toilet 6.5 2.4 18.0 78.0
9 Disable Toilet EF-06 4.7 2.4 16.6 52.0

Total E.A. (L/s): 510.0


Total P.A. (L/s) : 1344.0
Exhaust air for Waiting Area (L/s) : 538.0
% of Overall Exhaust Air Balancing : 78%
Normal Mode
LEGEND
-ve pressure with Direction of Air Flow
respect to waiting area
-ve pressure with
respect to CR Rooms, 190L/s
Treatement Room
Dispensary, Staff Room
20L/s
+ve pressure with
70L/s -114L/s
respect to Waiting area /
40L/s
Corridor
20L/s
-20L/s
450L/s
-50L/s
-68L/s
-98L/s
70L/s
-440L/s
256L/s
116L/s
110L/s
235 L/s
-258L/s
50L/s
153 L/s

Das könnte Ihnen auch gefallen