1. INTRODUCTION
Madhya Pradesh state Govt. has proposed the Redevelopment & Redensification of existing old
Govt. Quarters located at Shajahnabad (Ram Nagar-Pari Bazar-Bara Mahal) in old Bhopal.
Housing & Environment Department has appointed Bhopal Development Authority as executing
Agency for this scheme.
The total plot area of the proposed site is 51700.00 sq mts. The total Built up area is
40,165.00sq.mt. Details are as below:
Name of site - Scheme Area – Total Built-up Area
(In sq.mt.) (FAR +Non FAR)
(In sq.mt.)
Ram Nagar 24310.00 23812.32
Asra-Old Age Home 10,000.00 3007.00
HT Quarters 10000.00 8937.40
Peripheral Road 902.00 -
PWD Stores 5200.00 1789.60
PWD Quarters 2190.00 1342.00
Total 51700.00 38888.32
Say : 38888.00 Sqmt
The development/construction to be done is in accordance with the layout approved by Town
Country Planning, building plan approved by Nagar Nigam and as per Central/State PWD
Specifications and conforming to relevant codes of BSI/ISI with latest amendment.
The Project is designated under Category “B” and falls under Item 8(a) (Building & Construction
Project) of the Environment Impact Assessment (EIA) Notification of September 14, 2006 and
its amendments
Project site is surrounded by settlements such as Idgah Hills, Shahjahnabad, Ram Nagar, Teela
Jamalpura, Judge Colony, Kohefiza, NRI Colony, Sindhi Colony, Peer Gate Area, Medical
College Campus, Hanuman Ganj, Talaiya. Within 5km of the area of project site. Site
surroundings and connectivity detail of the project are given in Table-1
Table-1 Site surroundings and connectivity Details
A Google Map showing the surrounding area within 5.0 km radius is shown in Figure- 2.
A Google Map showing the surrounding area within 10.0 km radius is shown in Figure- 3.
The coordinates of the project boundary of the project site is given below in the Table-2:
Coordinates of HT Quarters
Area in Sq.mt.
S. No. Description
1 PLOT AREA (Area of Site) 23408.00
Permissible Ground Coverage @ 30% of total plot
2 area 7022.4
3 Proposed Ground Coverage @ 25.43 % Of plot area 5953.08
4 Permissible FAR @ 1.25% of Plot area 29260.00
5
Proposed FAR @ 1.01% of Plot area 23812.32
6 Built up area 23812.32
8 Total Open area 2924.46
9 Proposed Green area 12.49 % of plot area 2924.46
10 Maximum Height of Building 13.8 met.
Area in Sq.mt.
S. No. Description
1 PLOT AREA (Area of Site) 10000.00
Permissible Ground Coverage @ 30% of total plot
2 area 3000.00
3 Proposed Ground Coverage @ 30.07% Of plot area 3007.00
4 Permissible FAR @ 1.25 of Plot area 12500
5
Proposed FAR @ 0.3% of Plot area 3007
7 Built up area 3007
8 Total Open area 1068.72
9 Proposed Green area 10.68 % of site area 1068.72
10 Maximum Height of Building 3.40 to 4.50 mtr
HT Quarters
Area in Sq.mt.
S. No. Description
1 PLOT AREA (Area of Site) 10000.00
Permissible Ground Coverage @ 30% of total plot
2 area 3000.00
3 Proposed Ground Coverage @ 22.34% Of plot area 2234.36
4 Permissible FAR @ 1.25% of Plot area 12500.00
5
Proposed FAR @ 0.89 % of Plot area 8937.44
7 Built up area 8937.44
8 Total Open area 1346.41
9 Proposed Green area 13.46% of site area 1346.41
10 Maximum Height of Building 13.8 met.
PWD Store
Area in Sq.mt.
S. No. Description
1 PLOT AREA (Area of Site) 5200.00
Permissible Ground Coverage @ 30% of total plot
2 area 1560
3 Proposed Ground Coverage @ 16.46% Of plot area 856.00
4 Permissible FAR @ 1.25% of Plot area
5
Proposed FAR @ 0.34 % of Plot area 1789.60
7 Built up area 1789.60
8 Total Open area 1184.68
9 Proposed Green area 22.78 % of site area 1184.68
10 Maximum Height of Building 7.2 met.
PWD Quarters
Area in Sq.mt.
S. No. Description
1 PLOT AREA (Area of Site) 2190.00
Permissible Ground Coverage @ 30% of total plot
2 area 657.00
3 Proposed Ground Coverage @ 29.38% Of plot area 643.50
4 Permissible FAR @ 1.25% of Plot area 2737.5
5
Proposed FAR @ 0.61% of Plot area 1342.00
7 Built up area 1342.00
8 Total Open area 402.78
9 Proposed Green area 18.39% of site area 402.78
10 Maximum Height of Building 7.2 met
The Redevelopment project provide the following as per relevant laws, norms, rules and
regulations as per the requirement of the independent site
Design Criteria :
Eco-friendly environment by providing maximum green space, lawns, trees and shrubs.
Using minimum Ground Coverage and height as per Building Bye-laws, better utilization
of Ground Coverage and fire regulations.
Provision of maximum light and ventilation to all spaces.
Septic Tanks connecting with existing Nagar Nigam sewage disposal system.
Underground reservoir – both for domestic use and fire fighting
Over head tank – as per water requirement of the independent site connecting to Nagar
Nigam main supply line.
Parks, lawns, open spaces, pathways, streets, roads, parking, boundary wall of up to 1500
mm high, site entrance gates, landscaping, external electrification including street
lighting, HT/LT as per requirements of M.P.Madhya Kshetra Vidyut Vitran Company,
Rain water harvesting, storm water disposal, garbage collection etc. required for good
quality living on the site
HT Quarter)
Internal Road – Internal roads of 7.5 m width and pathway 3.0 mt width for the drive
way at the periphery and inside the proposed building premises.
PWD Store
Internal Road – Internal roads of 7.5 m width for the proposed building premises for the
drive way at the periphery and inside premises.
PWD Quarters
Internal Road – Internal roads of 7.5 width for the proposed building premises for the
drive way at the periphery and inside premises. The total parking proposed 389 ECS. The
details of parking required and proposed are given below
Parking Details
Table-5: Calculation of Parking Area required @ 1 ECS per 100.00 sq.mt as per BVR
2012.
Parking Parking Proposed Total Parking
Name of Site Required Covered Open Proposed
Area Nos
7. LANDSCAPE DEVELOPMENT
Increasing vegetation in the form of greenbelt is one of the preferred methods to mitigate air
pollution. Plants serve as a sink for pollutants, reduce the flow of dust and reduce noise
pollution. Calculation of green area for proposed project is given in Table – 6.
Table-6 Calculation OF Green Area
Name of Site Site Area Open Landscape Landscape
Area Area provided provided
Area Area
%
Ram Nagar 23408.00 2924.46 2924.46 12.49 % of
plot area
Asra-Old Age 10000.00 1068.72 1068.72 10.68 % of site
Home
area
HT Quarters 10000.00 1346.41 1346.41 13.46% of site
area
PWD Stores 5200.00 1184.68 1184.68 22.78 % of site
area
PWD Quarters 2190.00 402.78 402.78 18.39% of site
area
Table 8(a) Water Requirement during Construction phase (Ram Nagar Govt.Qtrs.)
S.NO. Description No. of Per Capita Fresh Raw Total Water
Persons/AREA consumption Water Water in KLD
in lpcd. in in
KLD KLD
1 Drinking 100 7 0.7
Area/Built-up In
area (sq.mt.) litre/sq.mt.
2 Construction 23812.32 1.57 37.38
Area/Built-up In
area (sq.mt.) litre/sq.mt.
2 Construction 3007.00 1.57 0.47
Area/Built-up In
area (sq.mt.) litre/sq.mt.
2 Construction 8937.44 1.57 14.03
Area/Built-up In
area (sq.mt.) litre/sq.mt.
2 Construction 1789.6 1.57 2.81
Area/Built-up In
area (sq.mt.) litre/sq.mt.
2 Construction 1342.00 1.57 2.10
HT Quarters 81.00
PWD Stores 12.00
PWD Quarters 9.00
Total water Required 319.00 KLD
Details of Break-up of water requirement are given in Table – 9(a), 9(b), 9(c), 9(d), 9(e)
Table 9(a) Water Requirement during Operational phase (Ram Nagar Govt.Qtrs.)
S.NO. Description No. of Per Capita Total water required in
Persons/AREA consumption in (KLD)
lpcd.
1 Domestic 1520 120 182.4
Requirement
Visitors 38 15 0.57
Fresh water requirement for the project is 319.00 KLD KLD which will be met by water supply
of Nagar Nigam. Underground reservoir (sump well) for storage of water for domestic use and
fire fighting will be constructed. Existing Over Head Tank will be used, if required additional
Over Head Tank may be constructed. Water will supplied to houses by Gravity. It is expected
that the project would generate approx. 256.00 KLD of wastewater (@80% of the total
consumed water). The details of water consumption and wastewater generation are shown below:
Water Balance
__________________________________________________________________________
Waste Water Waste Water Waste Water Waste Water Waste Water
@ 80% @ 80% @ 80% @ 80% @ 80%
153.00 KLD 21.00 KLD 65.00 KLD 10.00 KLD 7.00 KLD
___________________________________________________________________________
Total Waste
Water
256.00 KLD
STP of Nagar
Nigam
Sewerage System
An external sewage network shall collect the sewage from all locations though chamber, main
hole, in septic tank and from here, it will flow by gravity to the main sewer line of NAGAR
NIGAM Bhopal.
The wastewater generated will be treated in STP. The recycled water from Sewage Treatment
Plant will be around 230 KLD which will be used by NAGAR NIGAM for the horticulture
purposes.
The storm water disposal system for the premises shall be self-sufficient to avoid any
collection/stagnation and flooding of water. Maximum harvesting will be done within the site.
Therefore, it has been decided to provide sufficient rain water harvesting at selected locations,
which are liable to catch the maximum run-off from the area. Following are some measures for
Storm water disposal.
1) Since the existing topography is congenial to surface disposal, a network of storm water
drains is planned adjacent to roads. All building roof water will be brought down through
rain water pipes.
2) Proposed storm water system consists of drain, and ground water recharging pits.
3) The annual rainfall intensity of 40 mm/hr shall be considered for designing the storm
water drainage system.
4) The entire site is provided with extensive planned drainage system with gravity
connections to the Recharge pits. Overflow from Recharge pit shall be connected to water
Drain line. The arrangement provides appropriate protection to the site against flooding.
1) Since the existing topography is congenial to surface disposal, a network of storm water
drains is planned adjacent to roads. All building roof water will be brought down through
rain water pipes.
2) Proposed storm water system consists of pipe drain, catch basins and seepage pits at
regular intervals for rain water harvesting and ground water recharging.
3) The peak hourly rainfall of 25 mm/hr shall be considered for designing the storm water
drainage system.
Rain water harvesting has been catered to and designed as per the guideline of CGWA. Peak
hourly rainfall has been considered as 25 mm/hr. The collection tank is having size 2.4 met.*1.5
met. and 1.8 met. depth. Connecting with filtration tank and a recharge pit with well of 200 mm
diameter is constructed for recharging the available water to the deeper aquifer. Design
specifications of the rain water harvesting plan are as follows:
Total storm water load on the site with per hour retention is 187.12
Taking the size of collecting tank 2.4 met.*1.5 met. and effective
6.48
depth as 1.8 met, volume of a RWH pit . 2.4*1.5*1.8
Hence no. of pits required in approx = Total storm water load 7.098
considering 15 minutes retention time / Volume of a RWH pit Say 7 Nos.
It is proposed to have 7 nos. rain water harvesting pit for the proposed building.
Total storm water load on the site with per hour retention is 74.06
Taking the size of collecting tank 2.4 met.*1.5 met. and effective
6.48
depth as 1.8 met, volume of a RWH pit . 2.4*1.5*1.8
Hence no. of pits required in approx = Total storm water load 2.8
considering 15 minutes retention time / Volume of a RWH pit Say 3.0 No.
It is proposed to have 1 no. rain water harvesting pit for the proposed building.
Total storm water load on the site with per hour retention is 69.79
Taking the size of collecting tank 2.4 met.*1.5 met. and effective
6.48
depth as 1.8 met, volume of a RWH pit . 2.4*1.5*1.8
Hence no. of pits required in approx = Total storm water load 2.64
considering 15 minutes retention time / Volume of a RWH pit Say 3 no.
It is proposed to have 3 no. rain water harvesting pit for the proposed building.
RunOff and Number of Pits Calculation at PWD Stores .
Total storm water load on the site with per hour retention is 27.58
Taking the size of collecting tank 2.4 met.*1.5 met. and effective
6.48
depth as 1.8 met, volume of a RWH pit . 2.4*1.5*1.8
Hence no. of pits required in approx = Total storm water load 1.063
considering 15 minutes retention time / Volume of a RWH pit Say 1.0 no.
It is proposed to have 1.0 no. rain water harvesting pit for the proposed building.
Total storm water load on the site with per hour retention is 20.62
Taking the size of collecting tank 2.4 met.*1.5 met. and effective
6.48
depth as 1.8 met, volume of a RWH pit . 2.4*1.5*1.8
Hence no. of pits required in approx = Total storm water load 0.79
considering 15 minutes retention time / Volume of a RWH pit Say 1.0 no
It is proposed to have 1 no. rain water harvesting pit for the proposed building.
Solid waste would be generated both during the construction as well as during the operation
phase. The solid waste expected to be generated during the construction phase will comprise of
excavated materials, used bags, bricks, concrete, MS rods, tiles, wood etc. The following steps
are to be followed for the management solid waste:
Construction yards for storage of construction materials.
The excavated material such as topsoil and stones will be stacked for reuse during later
stages of construction
Excavated top soil will be stored in temporary constructed soil bank and will be reused
for landscaping of the township project.
Remaining soil shall be utilized for refilling / road work / rising of site level at locations/
selling to outside agency for construction of roads etc.
Management System:
Twin bin waste collection will be used within the premise green bins for biodegradable
wastes and blue bins for non biodegradable wastes will be provided.
The waste will be collected by trolly /Cycle Rikshaw and transfer to temporary storage
point.
Nagar Nigam vendor will collect waste from temporary storage point and transfer to
Dumping Site/Recycler.
Personnel engaged in the collection, segregation and composting will be trained and
demonstrated to make them proactive and efficient in the solid waste management
practices.
Grass clippings from the mowing of the lawns shall be collected separately and converted
into manure.
The waste shall be handled according to Municipal Solid Waste (Management and
Handling) Rules 2000.
E-waste shall be collected stored and disposed in accordance with E-waste Management
Guidelines.
Horticulture waste which will be collected at the secured location such that it will not
hinder daily activity schedule or washed away by the surface run off causing choking of
drains, etc. and will be separately disposed off along with biodegradable waste
Copy of letter applied for permission for disposal of solid waste by Nagar Nigam Bhopal
vide letter no1736 dated. 22/7/16 is attached as Annexure IX.
Power Requirement
Construction phase
Electricity requirement has been worked out for lighting, HVAC, IT infrastructure and kitchen
equipments in site offices, store, quality laboratory and construction equipments, batching plants
and external lighting for site. There will be total load demand of 200 KW, for which temporary
power will be arranged from MPEB. Backup power will be provided using DG - 10 KVA for
site office, DG-50 KVA for batching plant and a mobile DG-10 KVA for construction works in
case of power failures. All DGs will be with low noise machines within norms. Separate 10 KVA
DGs each will be provided at Pwd Store and Pwd Quarter
Operation phase
3ngRT,
rrTT qTft-6 ftqq
+nqrd I
d-d-rT &b Rrro gefi of Rarftr d-eirsa-e 51q fr qqIri .r$ t oen gen o1
e-wfr qd w"ft tr 3ilR aff fr-{r.T qA r{d.q t r
em, eqtu t fu
q)-"TqT ela c rzr
Edf of 6T-a qri tg q-q.fud offt.fRrd
o-{i qq vm gei ot s-iT{ tg nn firTq d frqfpd g-o
r} qTp.oiq o} erqqn o-sri
fl. cF-q 6| |
M
2 gqil of
/A
2. n''s ft"ftq frG-q'q ft0, wrz nro 5 rilftq q*rriTur Ri- tc S cliqi qqT \c-C),
" lt"s. dqld C q-,n wR'-fi ftrq'rnqTd t r{Tqq 6qi gq s-+*
'nldlr
rrd frerfRd ge. qqT o-{i im qtnl
tg I
rfrL
2r*qrd
*.; Ant-,g/tr-VI
*;
.'.;
Office af the hlunicilral C*rprraticnn llhopal, IU.p.
.f .F.{ "N, U.tt. il1. (Wa ter l}istr i bu tic n project)
lilirshu,ardlrln Slri:ptrrirrg Cr:m1riex, plr$e * l.
,; l\.tata t\landir. Illr*prl - 462003
Plronc Nri. 2701{166,Iiax Nu.0?55 _- 27A1223
qg*
fin:ai I *prr:jrrbnrc Crrr gr nai I.corrr
*; t'ro.-$!q1...../pTwJNNURMA#$1201? --
f,i
itt€
To,,"i'
'r'j \r/executive Fngineer
ry*
* Division no. g,
Bhopal Developrnent Authority, Bhopal
K :fffitis'
K iii' ii
; !1r,rLil I I i I i i
K ltlirlRii{{ltti
R.'pawar)
8lje fAl
K
xi
s.
proj{d M.inager, - :
E;
JNNqRM (Water Distribution proiecl)
tr.@.
Bhopal Municipal Corporalion, Bhopai
w
T t1o........./FM/Jf{N
E U HMAAr$/z0r Bhopal,
@
Copy to:- "t Bate
1' Assistanr €ngineer, Zone no.2, Bhopar Municipar corpo;ation,
Bhopal
2' Team l-eader, M/s HaskoningDHV consulting pvt.
Lld., Bhopal wilh reference Letter
No' HDCB/ wr/ MP/SQC-W$DNPI2016-2017/xtt
dt..j5-0a^20.; - for informarion.
iI
{A.n.pawar)
project Manager,
jl.NN U RM (Waier Distribution project),
Bhopal Municipal Corporation, Bnopai'
,,t#
,
igdp Arrtrc-x -F
,q
#9 rFTCd"q +nqid ft_dpTq
t,v^,!? U-D-m-i"l ,nqrm
'n
.."*8$
ytcl,
Hf-\
r-\
.-1
I
.r-l>Jt ,.,
rq
.d{&c ,/
,./ fiq dl-fl,
,.&s
Fftaq sr-ril)
;rrq qTfrqrr'i?.FT,
,,tia,
$qr$ |
,.*
ftqq:- qr6q6rqrdTq Rero
nq' =rrq, rrfuTiTTq, qriT*im grdrrdf*rxT
qd 460 $Rrftlq 3{rilw g-q r enffT qrsi,i E) einkl
fi} $rqhfl frfiEq rtfrqT sq"r-r .FqTi -*
* ah # '
wq-fttq enqT*}
qEnf:* r qTEFin
qtqrr l "*C
# Itft fu6 Ar* fe_** t',/ r,t ,rQ
q.ft1h qff t"&6 frr*r",
a,qTTffi"qfly
ftr#j;i",l, t.ro,,
q<firr itrry,.-1-i- ar* r- t); :r.,.*, .
Eq-qT
tr)q"ie frqtfiT niQzrq.'l |,.., ...::r.-,,:.;:;;..,
i..:_;. ...:
.--.{ E.r{f z160 tirc.r.i,:izl irrnrrr i-,rii ,,,,,;-"r*:i:',::.1..-
ffi*,T*fyfilqT
r,T ;r- **'* eri irrn
.,i"',,.J,]'rij #i.;'';, ,,,.... .""
.,.,
?]-ET ?16' ..'t ad-s-flq
t fu *1 wfl qgq1, w gi E qr\T+,iiq sTrqrs ffin
sq rnft oTrflrl) t {fi?r.hfr R{-{e.r +1 gfrur ;"i
fr*'qrra av d} qi crr rdi ii I ,lETn. ..,
t6Qfr tft+t d itni :,,n q-,,q .+q,-.
m-%,Y*T oi'#,no fn.3-,,1 1;fi
{hq-iT 3r'il'fd d sqE}qa eDin d{
o} qhinT .1-* n-ffi- qff \iri
r oTi\r-\T qqrT qmdq iil'rfui * Eqfro uol-u* q, -i-,j mr,-i ii
qrcr,1 +oc;
ltr
j
\iti} ;i"h1
tG'qd l l- !.,.,,
\"'i-\
u'
cfu
'' l
,, An n€)t _
"'^'
,)
,r
t-,()t @_@EmHlfBo-qut,
-1;,r
qluq
Wqrffi (...'l'-#,,9' genroi / ffi ,q. / q j
q,17qw
;--*
t .7 ^.\--*
r-iltil\.1.
(?il:t{::l iilTl;rt
alrv qftmil i?rp1
1i-,J1.-'T i
:i.? r
'JtAt ).t
ttrl
-,r r L
I
V.-'
..
.t.,..
4
4r.
.)o .'